"The most toxic and dangerous type of radioactive waste created by the nuclear industry"
This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.
It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.
Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.
Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.
The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.
Holtec proposal:
New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
Shallow sub-surface burial system
New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.
These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.
New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.
New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.
Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.
History
For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.
Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.
Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.
Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:
Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
Placement of individual canisters that makes detection difficult from outside the site boundary.
Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes
HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.
Nuclear Power Has No Place in a Green Energy Future
Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes
from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.
Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian
The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs
A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation
There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times
More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature
Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal
LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:
LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11
Late Friday February 23 the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] “Weapons Activities”, 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office’s High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990.
Under Trump’s budget, funding for nuclear warhead dismantlements stay flat at $56 million, (point).5% of NNSA’s total nuclear weapons budget, despite the fact that dismantlements save taxpayers by eliminating constant security costs.[1] NNSA’s Nonproliferation Programs are budgeted at $1.86 billion, only 16% the size of the nuclear weapons budget. Funding for DOE cleanup of Cold War legacy wastes remains flat, in a number of cases insufficient to meet legal milestones. Meanwhile, the Department of Energy cuts sustainable transportation, renewable energy and energy efficiency by 33%.
Some selected NNSA FY 2019 nuclear weapons budget highlights are:
Funding is tripled from $218.76 million to $654.77 million for the W80-4 Life Extension Program for a Long Range Standoff nuclear warhead,[2] (slated for $804 million in FY 2022). This is for a new dual-use air launched cruise missile (ALCM), which is particularly destabilizing because ALCMs can evade radar by hugging topography. In addition, the targeted adversary has no way of knowing until it is hit whether the payload is conventional or nuclear. The LRSO nuclear weapon is arguably redundant to the new B61-12 nuclear bomb, to be delivered by the new super-stealthy new B21 Raider heavy bomber (whose astronomical costs are kept classified by the Air Force).
Funding for the world’s first nuclear smart bomb, the B61-12, is increased from $611.9 million to $794 million, with a First Production Unit scheduled for March 2020. As part of the escalating Cold War II arms race, its main mission is to be forward deployed in NATO countries against Russia.
The Obama Administration had delayed the Interoperable Warhead (IW) for five years. The IW-1 is very much back as a $53 million FY 2019 budget line item, up from $0 in FY 2018. The NNSA and the nuclear weapons labs are proposing three different types of interoperable warheads, which all together could cost more than $40 billion.
The IW-1 is supposed to be interoperable between the Air Force’s W78 intercontinental ballistic missile warhead and the Navy’s W88 sub-launched warhead. However, a 2012 memo leaked to Nuclear Watch and Tri-Valley CAREs shows that the Navy never supported it.[3] In addition, NNSA is beginning a $3 billion “alteration” to the W88 that will refresh its high explosives and give it a new fuze, making the Navy even less inclined to support the IW. The Interoperable Warhead is a huge make work project for the labs, particularly the Lawrence Livermore National Laboratory.
Nevertheless, the IW is the programmatic drive for expanded production of plutonium pits at the Los Alamos National Laboratory (LANL), which will incur many more billions in costs.
Trump’s recently released Nuclear Posture Review proposed quick development of a low-yield sub-launched Trident missile warhead. While not yet a separate budget line item, NNSA’s FY 2019 hints at dedicated funding next year:
The 2018 Nuclear Posture Review states that the United States will modify a small quantity of existing SLBM [submarine launched ballistic missiles] warheads to provide a low-yield option in the near-term. As the Nuclear Weapons Council translates policy into military requirements, the Administration will work with Congress for appropriate authorizations and appropriations to develop options that support the modification. (P. 80)
“Plutonium Sustainment” is nearly doubled from $184 million to $361 million. NNSA’s FY 2019 budget says this will:
[S]upport fabrication of four to five development (DEV) W87 pits… and the selection of a single preferred alternative for plutonium pit production beyond 30 war reserve pits per year… (P. 57)
The increase represents the following:
Supports additional personnel, equipment, and certification activities needed to ramp pit production to meet mandated pit production requirements.
Supports additional infrastructure investments to meet requirements by the Nuclear Weapons Council to produce no fewer than 80 war reserve pits per year. (P. 117)
This is significant for a number of reasons. First, as mentioned above, “plutonium pit production beyond 30 war reserve pits per year” is driven by the Interoperable Warhead, which the Navy doesn’t want and is a radically different design that could prompt a return to full-scale nuclear weapons testing. The existing stockpile does not need pit production. Future production is all about future new nuclear weapons designs.
The W87 pits mentioned above are for the Interoperable Warhead. Inside sources indicate that they will not be exact replicas, but instead may have additional built-in “surety” mechanisms to prevent unauthorized use. A serious concern is that any changes to the pit design could perturb the symmetrical implosion process of the plutonium pit, thereby potentially degrading confidence in weapons reliability.
Finally, there are serious doubts that the Los Alamos National Laboratory, the current site of plutonium pit production, is capable of more producing more than 30 pits per year.[4] This may lead to the relocation of the plutonium pit production mission to the Savannah River Site in South Carolina, or more likely in Nuclear Watch’s view production at both places.[5]
Despite the uncertainty of where future expanded plutonium pit production is going to be located, the Chemistry and Metallurgy Research Replacement Project at LANL is slated to be increased from $181 million in FY 2018 to $235 million in FY 2019. Increasing the plutonium limit 10-fold to 400 grams in the CMRR “Rad Lab” is the main priority, for which NNSA has just issued notice of an environmental assessment.[6] The purpose of the increase is to dramatically expand the Rad Lab’s capabilities for materials characterization[7] and analytical chemistry,[8] all in direct support of expanded plutonium pit production.[9]
The Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, TN, is increased to $703 million from $663 million, and is projected to go to $750 million in FY 2021, with construction to start soon. The UPF will produce future thermonuclear components that put the “H” in H-bomb. It was halted after a half-billion design mistake for which no one was held responsible, and a Defense Department estimate that it would cost $19 billion.
NNSA’s FY 2019 budget repeats the original claim that the UPF will cost only $6.5 billion. However, after downscoping the original UPF because of costs, NNSA now omits the costs of continued operations at two dangerous old facilities previously slated for decontamination and decommissioning.[10] Moreover, after a team of Lockheed Martin and Bechtel won the Y-12 management contract, it awarded UPF construction to Bechtel without competition. Bechtel is responsible for some of the biggest cost overruns in the DOE complex, for example the Waste Treatment Facility at Hanford (originally $3.5 billion, now $13.5 billion and may never work).
Jay Coghlan, Nuclear Watch Director, commented, “This rapid arms race build up is not going to make us safer. We don’t need thousands of nuclear weapons to deter North Korea. A new arms race with Russia is a giant step backwards. Further enriching the usual nuclear weapons contractors is the wrong priority when instead taxpayers’ money should be making our schools safe and rebuilding our country.”
# # #
NNSA’s FY 2019 detailed Congressional Budget Request is available at https://www.energy.gov/sites/default/files/2018/03/f49/FY-2019-Volume-1.pdf
[1] Some 2,500 retired nuclear weapons are estimated to be in the dismantlement queue.
[2] “Standoff” means that a B52 carrying the LRSO nuclear weapon can position itself some 1,500 miles from the intended target.
[3] See 2012 Navy memo leaked to Nuclear Watch and Tri-Valley CAREs at https://nukewatch.org/importantdocs/resources/Navy-Memo-W87W88.pdf
[4] It should also be noted that major proposed federal actions are required to have public review and comment under the National Environmental Policy Act (NEPA), followed by an agency’s formal Record of Decision (ROD). After completing a 1996 a Stockpile Stewardship and Management Programmatic Environmental Impact Statement to relocate pit production to LANL from the Rocky Flats Plant, DOE issued a ROD limiting production to 20 pits per year. Nuclear Watch believes that NNSA plans to expand production beyond 20 pits per year require a new programmatic environmental impact statement.
[5] An engineering study, reportedly based on an assumed production rate of 50 pits per year, is reportedly due this week, which may soon clarify this situation (however, it may be classified).
[6] The 30-day public comment period ends March 26, 2018. Comments should be sent to emailed to RLUOBEA@hq.doe.gov or mailed to NNSA Los Alamos Field Office, ATTN: CMRR Project Management Office, 3747 West Jemez Road, Los Alamos, NM 87544. Nuclear Watch will post sample comments at www.nukewatch.org by March 16.
[7] Materials characterization ensures that the plutonium and/or highly enriched uranium are of sufficient “weapons-grade” to begin pit production to begin with.
[8] Analytical chemistry performs up to a hundred quality control samples per pit as it is being produced.
[9] For more, please see https://web.archive.org/web/20220816162742/https://www.nukewatch.org/pressreleases/PR-2-22-18-CMRR_Rad_Lab_draft_EA.pdf
[10] In addition, the independent Defense Nuclear Facilities Safety Board says these two old facilities can never be brought up to modern seismic standards, while a few years ago the US Geologic Survey dramatically raised projected potential seismic risks in eastern Tennessee.
Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.
Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex
Waste Lands: America’s Forgotten Nuclear Legacy
The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com
Late Friday February 23 the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] “Weapons Activities”, 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office’s High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990.
Under Trump’s budget, funding for nuclear warhead dismantlements stay flat at $56 million, (point).5% of NNSA’s total nuclear weapons budget, despite the fact that dismantlements save taxpayers by eliminating constant security costs.[1] NNSA’s Nonproliferation Programs are budgeted at $1.86 billion, only 16% the size of the nuclear weapons budget. Funding for DOE cleanup of Cold War legacy wastes remains flat, in a number of cases insufficient to meet legal milestones. Meanwhile, the Department of Energy cuts sustainable transportation, renewable energy and energy efficiency by 33%.
Some selected NNSA FY 2019 nuclear weapons budget highlights are:
Funding is tripled from $218.76 million to $654.77 million for the W80-4 Life Extension Program for a Long Range Standoff nuclear warhead,[2] (slated for $804 million in FY 2022). This is for a new dual-use air launched cruise missile (ALCM), which is particularly destabilizing because ALCMs can evade radar by hugging topography. In addition, the targeted adversary has no way of knowing until it is hit whether the payload is conventional or nuclear. The LRSO nuclear weapon is arguably redundant to the new B61-12 nuclear bomb, to be delivered by the new super-stealthy new B21 Raider heavy bomber (whose astronomical costs are kept classified by the Air Force).
Funding for the world’s first nuclear smart bomb, the B61-12, is increased from $611.9 million to $794 million, with a First Production Unit scheduled for March 2020. As part of the escalating Cold War II arms race, its main mission is to be forward deployed in NATO countries against Russia.
The Obama Administration had delayed the Interoperable Warhead (IW) for five years. The IW-1 is very much back as a $53 million FY 2019 budget line item, up from $0 in FY 2018. The NNSA and the nuclear weapons labs are proposing three different types of interoperable warheads, which all together could cost more than $40 billion.
The IW-1 is supposed to be interoperable between the Air Force’s W78 intercontinental ballistic missile warhead and the Navy’s W88 sub-launched warhead. However, a 2012 memo leaked to Nuclear Watch and Tri-Valley CAREs shows that the Navy never supported it.[3] In addition, NNSA is beginning a $3 billion “alteration” to the W88 that will refresh its high explosives and give it a new fuze, making the Navy even less inclined to support the IW. The Interoperable Warhead is a huge make work project for the labs, particularly the Lawrence Livermore National Laboratory.
Nevertheless, the IW is the programmatic drive for expanded production of plutonium pits at the Los Alamos National Laboratory (LANL), which will incur many more billions in costs.
Trump’s recently released Nuclear Posture Review proposed quick development of a low-yield sub-launched Trident missile warhead. While not yet a separate budget line item, NNSA’s FY 2019 hints at dedicated funding next year:
The 2018 Nuclear Posture Review states that the United States will modify a small quantity of existing SLBM [submarine launched ballistic missiles] warheads to provide a low-yield option in the near-term. As the Nuclear Weapons Council translates policy into military requirements, the Administration will work with Congress for appropriate authorizations and appropriations to develop options that support the modification. (P. 80)
“Plutonium Sustainment” is nearly doubled from $184 million to $361 million. NNSA’s FY 2019 budget says this will:
[S]upport fabrication of four to five development (DEV) W87 pits… and the selection of a single preferred alternative for plutonium pit production beyond 30 war reserve pits per year… (P. 57)
The increase represents the following:
Supports additional personnel, equipment, and certification activities needed to ramp pit production to meet mandated pit production requirements.
Supports additional infrastructure investments to meet requirements by the Nuclear Weapons Council to produce no fewer than 80 war reserve pits per year. (P. 117)
This is significant for a number of reasons. First, as mentioned above, “plutonium pit production beyond 30 war reserve pits per year” is driven by the Interoperable Warhead, which the Navy doesn’t want and is a radically different design that could prompt a return to full-scale nuclear weapons testing. The existing stockpile does not need pit production. Future production is all about future new nuclear weapons designs.
The W87 pits mentioned above are for the Interoperable Warhead. Inside sources indicate that they will not be exact replicas, but instead may have additional built-in “surety” mechanisms to prevent unauthorized use. A serious concern is that any changes to the pit design could perturb the symmetrical implosion process of the plutonium pit, thereby potentially degrading confidence in weapons reliability.
Finally, there are serious doubts that the Los Alamos National Laboratory, the current site of plutonium pit production, is capable of more producing more than 30 pits per year.[4] This may lead to the relocation of the plutonium pit production mission to the Savannah River Site in South Carolina, or more likely in Nuclear Watch’s view production at both places.[5]
Despite the uncertainty of where future expanded plutonium pit production is going to be located, the Chemistry and Metallurgy Research Replacement Project at LANL is slated to be increased from $181 million in FY 2018 to $235 million in FY 2019. Increasing the plutonium limit 10-fold to 400 grams in the CMRR “Rad Lab” is the main priority, for which NNSA has just issued notice of an environmental assessment.[6] The purpose of the increase is to dramatically expand the Rad Lab’s capabilities for materials characterization[7] and analytical chemistry,[8] all in direct support of expanded plutonium pit production.[9]
The Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, TN, is increased to $703 million from $663 million, and is projected to go to $750 million in FY 2021, with construction to start soon. The UPF will produce future thermonuclear components that put the “H” in H-bomb. It was halted after a half-billion design mistake for which no one was held responsible, and a Defense Department estimate that it would cost $19 billion.
NNSA’s FY 2019 budget repeats the original claim that the UPF will cost only $6.5 billion. However, after downscoping the original UPF because of costs, NNSA now omits the costs of continued operations at two dangerous old facilities previously slated for decontamination and decommissioning.[10] Moreover, after a team of Lockheed Martin and Bechtel won the Y-12 management contract, it awarded UPF construction to Bechtel without competition. Bechtel is responsible for some of the biggest cost overruns in the DOE complex, for example the Waste Treatment Facility at Hanford (originally $3.5 billion, now $13.5 billion and may never work).
Jay Coghlan, Nuclear Watch Director, commented, “This rapid arms race build up is not going to make us safer. We don’t need thousands of nuclear weapons to deter North Korea. A new arms race with Russia is a giant step backwards. Further enriching the usual nuclear weapons contractors is the wrong priority when instead taxpayers’ money should be making our schools safe and rebuilding our country.”
# # #
NNSA’s FY 2019 detailed Congressional Budget Request is available at https://www.energy.gov/sites/default/files/2018/03/f49/FY-2019-Volume-1.pdf
[1] Some 2,500 retired nuclear weapons are estimated to be in the dismantlement queue.
[2] “Standoff” means that a B52 carrying the LRSO nuclear weapon can position itself some 1,500 miles from the intended target.
[3] See 2012 Navy memo leaked to Nuclear Watch and Tri-Valley CAREs at https://nukewatch.org/importantdocs/resources/Navy-Memo-W87W88.pdf
[4] It should also be noted that major proposed federal actions are required to have public review and comment under the National Environmental Policy Act (NEPA), followed by an agency’s formal Record of Decision (ROD). After completing a 1996 a Stockpile Stewardship and Management Programmatic Environmental Impact Statement to relocate pit production to LANL from the Rocky Flats Plant, DOE issued a ROD limiting production to 20 pits per year. Nuclear Watch believes that NNSA plans to expand production beyond 20 pits per year require a new programmatic environmental impact statement.
[5] An engineering study, reportedly based on an assumed production rate of 50 pits per year, is reportedly due this week, which may soon clarify this situation (however, it may be classified).
[6] The 30-day public comment period ends March 26, 2018. Comments should be sent to emailed to RLUOBEA@hq.doe.gov or mailed to NNSA Los Alamos Field Office, ATTN: CMRR Project Management Office, 3747 West Jemez Road, Los Alamos, NM 87544. Nuclear Watch will post sample comments at www.nukewatch.org by March 16.
[7] Materials characterization ensures that the plutonium and/or highly enriched uranium are of sufficient “weapons-grade” to begin pit production to begin with.
[8] Analytical chemistry performs up to a hundred quality control samples per pit as it is being produced.
[9] For more, please see https://web.archive.org/web/20220816162742/https://www.nukewatch.org/pressreleases/PR-2-22-18-CMRR_Rad_Lab_draft_EA.pdf
[10] In addition, the independent Defense Nuclear Facilities Safety Board says these two old facilities can never be brought up to modern seismic standards, while a few years ago the US Geologic Survey dramatically raised projected potential seismic risks in eastern Tennessee.
Important Documents & Articles Related to Nuclear Energy Production
Most Recent
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
See Also
Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex
Waste Lands: America’s Forgotten Nuclear Legacy
The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com
LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:
LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11