"The most toxic and dangerous type of radioactive waste created by the nuclear industry"
This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.
It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.
Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.
Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.
The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.
Holtec proposal:
New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
Shallow sub-surface burial system
New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.
These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.
New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.
New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.
Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.
History
For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.
Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.
Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.
Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:
Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
Placement of individual canisters that makes detection difficult from outside the site boundary.
Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes
HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.
Nuclear Power Has No Place in a Green Energy Future
Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes
from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.
Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian
The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs
A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation
There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times
More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature
Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal
LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:
LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11
Nuclear Weapons defects graph from 1993 Sandia Stockpile Life Study
How US Nuclear Force Modernization is Undermining Strategic Stability:
The Burst-Height Compensating Super-Fuze
By Hans M. Kristensen, Matthew McKinzie, Theodore A. Postol
“The US nuclear forces modernization program has been portrayed to the public as an effort to ensure the reliability and safety of warheads in the US nuclear arsenal, rather than to enhance their military capabilities. In reality, however, that program has implemented revolutionary new technologies that will vastly increase the targeting capability of the US ballistic missile arsenal. This increase in capability is astonishing- boosting the overall killing power of existing US ballistic missile forces by a factor of roughly three- and it creates exactly what one would expect to see, if a nuclear-armed state were planning to have the capacity to fight and win a nuclear war by disarming enemies with a surprise first strike.”
This is a super outstanding analysis by Mssrs. Kristensen, McKinzie and Postol. I’m no doubt naïve, but I’m hoping it will have some real political and geopolitical impact.
And how in keeping with the 2013 Defense Dept. guidance, which Kristensen was the first to point out to me. It helps to demonstrate that the American public doesn’t really have nuclear “deterrence” as claimed for a half-century. Instead, the U.S. has always had a nuclear war-fighting strategy, as first demonstrated in Hiroshima and Nagasaki.
To quote:
The new guidance requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a “counter-value’ or “minimum deterrence” strategy.
As Kristensen, McKinzie and Postol point out, the geopolitical risks in radical improvements to U.S. nuclear warfighting capabilities are enormous. A secondary concern I’d like to point out is the risk to nuclear weapons reliability posed by intentionally introducing major changes to an extensively tested stockpile.
The Pantex Plant (final assembly site for US nuclear weapons) has a newsletter called The Pantexan (duh!). I recall circa 2009 that it had an article concerning the fact that the MC 4700 “super fuze” that was being installed in the then-ramping up W76 Life Extension Program had initial design and production problems. As the article boasted, those defects were detected and swiftly corrected.
However, the principle remains that introducing intentional changes can undermine confidence in stockpile reliability. The grand irony is that the Stockpile Stewardship Program has been lavishly funded because of the official rationale of preserving stockpile reliability, but I believe it has been a Trojan horse all along for using Life Extension Programs to create new military capabilities (and which the excellent analysis above reinforces).
[I have tried a few times to again find that Pantexan article, unfortunately without success.]
Below is a graph (pending) from the 1993 Sandia Stockpile Life Study which shows that the supermajority of nuclear weapons defects occur within the first 5 years from the First Production Unit. Marylia Kelley (Executive Director of TriValley CAREs that watchdogs Livermore Lab ) and I met with Vic Reis, commonly regarded as the “father” of the Stockpile Stewardship Program, in 2004 or 2005. He explicitly said to us that the whole purpose of the Stockpile Stewardship Program was for the “other side of the bathtub curve”, i.e. when defects were going to multiply because of aging.
Guess what? That hasn’t happened, given long-established stockpile surveillance, rigorous maintenance and well-understood replacement of “limited life components” (e.g., batteries, neutron generators, tritium).
Indeed, the 1993 Sandia Stockpile Life Study itself said
We undertook this study to understand how long nuclear weapons last. We quickly learned that this is the wrong question. It is clear that, although nuclear weapons age, they do not wear out; they last as long as the nuclear weapons community (DOE and DOD) desire. In fact, we can find no example of a nuclear weapon retirement where age was ever a major factor in the retirement decision.
The more significant question is “what does it take to sustain a weapon while it is in the stockpile?”… Failures, defects, and aging problems have been rare…
So again, I think the Stockpile Stewardship Program has been a ruse to indefinitely preserve U.S. nuclear weapons while giving them new military capabilities. And now we have the trillion dollar-plus “modernization” to vastly expand U.S. nuclear warfighting capabilities.
Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.
Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex
Waste Lands: America’s Forgotten Nuclear Legacy
The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com
Nuclear Weapons defects graph from 1993 Sandia Stockpile Life Study
How US Nuclear Force Modernization is Undermining Strategic Stability:
The Burst-Height Compensating Super-Fuze
By Hans M. Kristensen, Matthew McKinzie, Theodore A. Postol
“The US nuclear forces modernization program has been portrayed to the public as an effort to ensure the reliability and safety of warheads in the US nuclear arsenal, rather than to enhance their military capabilities. In reality, however, that program has implemented revolutionary new technologies that will vastly increase the targeting capability of the US ballistic missile arsenal. This increase in capability is astonishing- boosting the overall killing power of existing US ballistic missile forces by a factor of roughly three- and it creates exactly what one would expect to see, if a nuclear-armed state were planning to have the capacity to fight and win a nuclear war by disarming enemies with a surprise first strike.”
This is a super outstanding analysis by Mssrs. Kristensen, McKinzie and Postol. I’m no doubt naïve, but I’m hoping it will have some real political and geopolitical impact.
And how in keeping with the 2013 Defense Dept. guidance, which Kristensen was the first to point out to me. It helps to demonstrate that the American public doesn’t really have nuclear “deterrence” as claimed for a half-century. Instead, the U.S. has always had a nuclear war-fighting strategy, as first demonstrated in Hiroshima and Nagasaki.
To quote:
The new guidance requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a “counter-value’ or “minimum deterrence” strategy.
As Kristensen, McKinzie and Postol point out, the geopolitical risks in radical improvements to U.S. nuclear warfighting capabilities are enormous. A secondary concern I’d like to point out is the risk to nuclear weapons reliability posed by intentionally introducing major changes to an extensively tested stockpile.
The Pantex Plant (final assembly site for US nuclear weapons) has a newsletter called The Pantexan (duh!). I recall circa 2009 that it had an article concerning the fact that the MC 4700 “super fuze” that was being installed in the then-ramping up W76 Life Extension Program had initial design and production problems. As the article boasted, those defects were detected and swiftly corrected.
However, the principle remains that introducing intentional changes can undermine confidence in stockpile reliability. The grand irony is that the Stockpile Stewardship Program has been lavishly funded because of the official rationale of preserving stockpile reliability, but I believe it has been a Trojan horse all along for using Life Extension Programs to create new military capabilities (and which the excellent analysis above reinforces).
[I have tried a few times to again find that Pantexan article, unfortunately without success.]
Below is a graph (pending) from the 1993 Sandia Stockpile Life Study which shows that the supermajority of nuclear weapons defects occur within the first 5 years from the First Production Unit. Marylia Kelley (Executive Director of TriValley CAREs that watchdogs Livermore Lab ) and I met with Vic Reis, commonly regarded as the “father” of the Stockpile Stewardship Program, in 2004 or 2005. He explicitly said to us that the whole purpose of the Stockpile Stewardship Program was for the “other side of the bathtub curve”, i.e. when defects were going to multiply because of aging.
Guess what? That hasn’t happened, given long-established stockpile surveillance, rigorous maintenance and well-understood replacement of “limited life components” (e.g., batteries, neutron generators, tritium).
Indeed, the 1993 Sandia Stockpile Life Study itself said
We undertook this study to understand how long nuclear weapons last. We quickly learned that this is the wrong question. It is clear that, although nuclear weapons age, they do not wear out; they last as long as the nuclear weapons community (DOE and DOD) desire. In fact, we can find no example of a nuclear weapon retirement where age was ever a major factor in the retirement decision.
The more significant question is “what does it take to sustain a weapon while it is in the stockpile?”… Failures, defects, and aging problems have been rare…
So again, I think the Stockpile Stewardship Program has been a ruse to indefinitely preserve U.S. nuclear weapons while giving them new military capabilities. And now we have the trillion dollar-plus “modernization” to vastly expand U.S. nuclear warfighting capabilities.
Important Documents & Articles Related to Nuclear Energy Production
Most Recent
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
See Also
Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex
Waste Lands: America’s Forgotten Nuclear Legacy
The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com
LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:
LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11