No Lethal High-Level Waste To New Mexico

Background

No Nuclear Waste
Photo Courtesy of No Nuclear Waste Aqui

"The most toxic and dangerous type of radioactive waste created by the nuclear industry"

This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.

It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.

Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.

Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.

The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.

Holtec proposal:

  • New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
  • Shallow sub-surface burial system

New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.

These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.

New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.

New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.

NRC Environmental Report

Here's the Federal Register Notice

Consolidated Interim Storage Handout

A Better Option: Hardened On-Site Storage (HOSS)

Hardened On-Site Storage

Overview

Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.


History

For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.

Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.

cask storage at reactor sites
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.

Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.

Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:

  • Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
  • HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
  • The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
  • The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
  • Placement of individual canisters that makes detection difficult from outside the site boundary.

Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes

HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.

Nuclear Power Has No Place in a Green Energy Future

Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes

from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.

Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian

The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs

A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation

There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times

More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature

Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal

Atomic Histories & Nuclear Testing

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

It seems we can’t find what you’re looking for. Perhaps searching can help.

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Four Reasons Why U.S. Claims of NPT Compliance Are False

 Four Reasons Why U.S. Claims of NPT Compliance Are False

 In April 2015 the U.S. State Department issued a so-called Fact Sheet entitled Myths and Facts Regarding the Nuclear Non-Proliferation Treaty and Regime. Its targeted audience was international delegations attending the 2015 NonProliferation Treaty (NPT) Review Conference. Given the increasing dissatisfaction of non-nuclear weapons states, the State Department argued that numerical stockpile reductions since the end of the Cold War is ample evidence that the U.S. is complying with the NPT’s Article VI obligation for nuclear disarmament. It also claimed:

 The United States is committed not to pursue new nuclear warheads, and life extension programs will not provide for new military capabilities… infrastructure modernization, stockpile stewardship, and life extension programs for U.S. warheads will contribute to and do not detract from progress on our NPT nuclear disarmament obligations. [1]

 There are four immediate reasons why these claims by the United States Government are false:

1)   While it’s true that the number of weapons is being reduced (albeit more slowly now), the U.S.’ nuclear stockpile is being indefinitely preserved and qualitatively improved through new military capabilities. Clearly this is not the nuclear disarmament required by NPT Article VI.

2)   The United States Government is preparing to spend more than one trillion dollars over the next thirty years for nuclear weapons modernization and new ballistic and cruise missiles, submarines and bombers.[2] [3] This too is obviously not nuclear disarmament.

3)   The new Kansas City Plant has begun operations to produce or procure up to 100,000 nonnuclear components every year for nuclear weapons life extension programs.[4] Multi-billion dollar upgrades and new facilities are planned for expanded production of plutonium pit cores at the Los Alamos Lab and for thermonuclear components (“secondaries”) at the Y-12 Plant near Oak Ridge, Tennessee.[5] These upgrades and new facilities are being designed to produce up to 80 plutonium pits and secondaries per year. Once completed, these three new complexes comprehensively rebuild the production side of the U.S. nuclear weapons complex. Moreover, they are expected to be operational until ~2075.  That is not nuclear disarmament.

4)   The United States Government has a high-level annual plan to indefinitely preserve its nuclear weapons stockpile [6] and a new high-level plan to prevent other countries from acquiring or proliferating nuclear weapons.[7] But the United States Government has no high-level policy plan to implement its NPT Article VI nuclear disarmament obligation.

Concerning indefinite preservation of the nuclear stockpile, the U.S. National Nuclear Security Administration has scheduled programs out to 2040 and beyond that extend the service lives of nuclear weapons by at least 30 years. Moreover, the current B61-12 life extension program will be followed by another program in 2038 to produce the B61-13 nuclear bomb, indicating a perpetual cycle of life extension programs.[8] It also suggests that some form of the B61 nuclear bomb is planned to be forward deployed in Europe until around the year 2070.

Concerning new military capabilities, the B61-12 blurs the line between strategic and tactical nuclear weapons. The B61 life extension program is creating the world’s first nuclear smart bomb through the installation of a new guided tail fin kit that will dramatically increase its accuracy. It is also slated for delivery by the new super stealthy F-35. Yet the United States continues to assert that it would never give existing nuclear weapons new military capabilities.[9]

This is part of a long pattern. Then-U.S. Secretary of State Hillary Clinton told the international delegations at the 2010 NPT Review Conference that “[o]ur Nuclear Posture Review ruled out the development of new U.S. nuclear weapons and new missions and capabilities for our existing weapons.” [10] But at the same time the U.S. was ramping up a life extension program for the 100 kiloton W76 warhead that gave it the capability of assuming the hard target kill mission of the 475 kiloton W88 warhead.[11]  Going further back, in the late 1990’s the 9 megaton surface-burst B53 bomb was replaced by the 400 kiloton B61-11 earth-penetrating modification to destroy hardened deeply buried targets. The point is that the general direction of post-Cold War planning for nuclear warfighting has been toward more accurate weapons with lower yields and reduced fallout, all of which make them arguably more usable.

Nevertheless, the United States maintains that these are not new military capabilities. It apparently avoids talking about the characteristics of individual nuclear weapons types and adopts the position that there are no new military capabilities because of the incalculable amount of extremely destructive military capabilities already in the stockpile as a whole. Thus, by this logic, if a lower yield, more precise nuclear weapon assumes the mission of a higher yield weapon, then that is not a new military capability. If so, then the United States Government’s assertion that it will never give existing nuclear weapons new military capabilities is essentially meaningless, giving it carte blanche to do whatever it wants with its existing stockpile.

The international community should demand that the United States Government fully explain and justify its claim that it would never give existing nuclear weapons new military capabilities, when the evidence points to the contrary. Perhaps that would be a step toward getting serious about global, verifiable nuclear disarmament.


[1]     https://web.archive.org/web/20171105070826/https://www.state.gov/t/isn/rls/fs/2015/240650.htm

[2]     Projected Costs of U.S. Nuclear Forces, 2015 to 2024, Congressional Budget Office, January 22, 2015,

“CBO estimates the Administration’s plans for nuclear forces would cost $348 billion over the next decade… For each leg of the triad, most of the cost to procure new systems would occur after 2023.” https://www.cbo.gov/publication/4987

[3]     The Trillion Dollar Triad, James Martin Center, Jan. 7, 2014, http://cns.miis.edu/trillion_dollar_nuclear_triad/

[4]     https://web.archive.org/web/20150419000659/http://www.nnsa.energy.gov:80/aboutus/ourlocations/kansas-city-plant

[5]     See the National Nuclear Security Administration’s FY 2016 Stockpile Stewardship and Management Plan, March 2015, Section 2.4.6.3 “Uranium Sustainment” and Section 4.3.3.1 “Strategy for Key Commodities,” https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[6]     FY 2016 Stockpile Stewardship and Management Plan, National Nuclear Security Administration, March 2015, https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[7]     Prevent, Counter, and Respond – A Strategic Plan to Reduce Global Nuclear Threats, National Nuclear Security Administration, March 2015, https://www.scribd.com/doc/259397464/Prevent-Counter-and-Respond-A-Strategic-Plan-to-Reduce-Global-Nuclear-Threats-FY-2016-2020

[8]        FY 2016 Stockpile Stewardship and Management Plan, National Nuclear Security Administration, March 2015, chapter 2, page 19 and chapter 8, page 18, https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[9]       For more, see General Confirms Enhanced Targeting Capabilities of B61-12 Nuclear Bomb, Hans Kristensen, January 23, 2014, http://fas.org/blogs/security/2014/01/b61capability/

[10]    Hillary Clinton’s Remarks before the 2010 NPT Review Conference, May 3, 2010, https://web.archive.org/web/20120930181944/http://www.cfr.org/united-states/hillary-clintons-remarks-before-2010-npt-review-conference/p22042

[11]    For more, see Administration Increases Submarine Nuclear Warhead Production Plan, Hans Kristensen, August 30, 2007, http://fas.org/blogs/security/2007/08/us_tripples_submarine_warhead/

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

Updates

It seems we can’t find what you’re looking for. Perhaps searching can help.

________________________________

Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

Atomic Histories & Nuclear Testing

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Four Reasons Why U.S. Claims of NPT Compliance Are False

 Four Reasons Why U.S. Claims of NPT Compliance Are False

 In April 2015 the U.S. State Department issued a so-called Fact Sheet entitled Myths and Facts Regarding the Nuclear Non-Proliferation Treaty and Regime. Its targeted audience was international delegations attending the 2015 NonProliferation Treaty (NPT) Review Conference. Given the increasing dissatisfaction of non-nuclear weapons states, the State Department argued that numerical stockpile reductions since the end of the Cold War is ample evidence that the U.S. is complying with the NPT’s Article VI obligation for nuclear disarmament. It also claimed:

 The United States is committed not to pursue new nuclear warheads, and life extension programs will not provide for new military capabilities… infrastructure modernization, stockpile stewardship, and life extension programs for U.S. warheads will contribute to and do not detract from progress on our NPT nuclear disarmament obligations. [1]

 There are four immediate reasons why these claims by the United States Government are false:

1)   While it’s true that the number of weapons is being reduced (albeit more slowly now), the U.S.’ nuclear stockpile is being indefinitely preserved and qualitatively improved through new military capabilities. Clearly this is not the nuclear disarmament required by NPT Article VI.

2)   The United States Government is preparing to spend more than one trillion dollars over the next thirty years for nuclear weapons modernization and new ballistic and cruise missiles, submarines and bombers.[2] [3] This too is obviously not nuclear disarmament.

3)   The new Kansas City Plant has begun operations to produce or procure up to 100,000 nonnuclear components every year for nuclear weapons life extension programs.[4] Multi-billion dollar upgrades and new facilities are planned for expanded production of plutonium pit cores at the Los Alamos Lab and for thermonuclear components (“secondaries”) at the Y-12 Plant near Oak Ridge, Tennessee.[5] These upgrades and new facilities are being designed to produce up to 80 plutonium pits and secondaries per year. Once completed, these three new complexes comprehensively rebuild the production side of the U.S. nuclear weapons complex. Moreover, they are expected to be operational until ~2075.  That is not nuclear disarmament.

4)   The United States Government has a high-level annual plan to indefinitely preserve its nuclear weapons stockpile [6] and a new high-level plan to prevent other countries from acquiring or proliferating nuclear weapons.[7] But the United States Government has no high-level policy plan to implement its NPT Article VI nuclear disarmament obligation.

Concerning indefinite preservation of the nuclear stockpile, the U.S. National Nuclear Security Administration has scheduled programs out to 2040 and beyond that extend the service lives of nuclear weapons by at least 30 years. Moreover, the current B61-12 life extension program will be followed by another program in 2038 to produce the B61-13 nuclear bomb, indicating a perpetual cycle of life extension programs.[8] It also suggests that some form of the B61 nuclear bomb is planned to be forward deployed in Europe until around the year 2070.

Concerning new military capabilities, the B61-12 blurs the line between strategic and tactical nuclear weapons. The B61 life extension program is creating the world’s first nuclear smart bomb through the installation of a new guided tail fin kit that will dramatically increase its accuracy. It is also slated for delivery by the new super stealthy F-35. Yet the United States continues to assert that it would never give existing nuclear weapons new military capabilities.[9]

This is part of a long pattern. Then-U.S. Secretary of State Hillary Clinton told the international delegations at the 2010 NPT Review Conference that “[o]ur Nuclear Posture Review ruled out the development of new U.S. nuclear weapons and new missions and capabilities for our existing weapons.” [10] But at the same time the U.S. was ramping up a life extension program for the 100 kiloton W76 warhead that gave it the capability of assuming the hard target kill mission of the 475 kiloton W88 warhead.[11]  Going further back, in the late 1990’s the 9 megaton surface-burst B53 bomb was replaced by the 400 kiloton B61-11 earth-penetrating modification to destroy hardened deeply buried targets. The point is that the general direction of post-Cold War planning for nuclear warfighting has been toward more accurate weapons with lower yields and reduced fallout, all of which make them arguably more usable.

Nevertheless, the United States maintains that these are not new military capabilities. It apparently avoids talking about the characteristics of individual nuclear weapons types and adopts the position that there are no new military capabilities because of the incalculable amount of extremely destructive military capabilities already in the stockpile as a whole. Thus, by this logic, if a lower yield, more precise nuclear weapon assumes the mission of a higher yield weapon, then that is not a new military capability. If so, then the United States Government’s assertion that it will never give existing nuclear weapons new military capabilities is essentially meaningless, giving it carte blanche to do whatever it wants with its existing stockpile.

The international community should demand that the United States Government fully explain and justify its claim that it would never give existing nuclear weapons new military capabilities, when the evidence points to the contrary. Perhaps that would be a step toward getting serious about global, verifiable nuclear disarmament.


[1]     https://web.archive.org/web/20171105070826/https://www.state.gov/t/isn/rls/fs/2015/240650.htm

[2]     Projected Costs of U.S. Nuclear Forces, 2015 to 2024, Congressional Budget Office, January 22, 2015,

“CBO estimates the Administration’s plans for nuclear forces would cost $348 billion over the next decade… For each leg of the triad, most of the cost to procure new systems would occur after 2023.” https://www.cbo.gov/publication/4987

[3]     The Trillion Dollar Triad, James Martin Center, Jan. 7, 2014, http://cns.miis.edu/trillion_dollar_nuclear_triad/

[4]     https://web.archive.org/web/20150419000659/http://www.nnsa.energy.gov:80/aboutus/ourlocations/kansas-city-plant

[5]     See the National Nuclear Security Administration’s FY 2016 Stockpile Stewardship and Management Plan, March 2015, Section 2.4.6.3 “Uranium Sustainment” and Section 4.3.3.1 “Strategy for Key Commodities,” https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[6]     FY 2016 Stockpile Stewardship and Management Plan, National Nuclear Security Administration, March 2015, https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[7]     Prevent, Counter, and Respond – A Strategic Plan to Reduce Global Nuclear Threats, National Nuclear Security Administration, March 2015, https://www.scribd.com/doc/259397464/Prevent-Counter-and-Respond-A-Strategic-Plan-to-Reduce-Global-Nuclear-Threats-FY-2016-2020

[8]        FY 2016 Stockpile Stewardship and Management Plan, National Nuclear Security Administration, March 2015, chapter 2, page 19 and chapter 8, page 18, https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[9]       For more, see General Confirms Enhanced Targeting Capabilities of B61-12 Nuclear Bomb, Hans Kristensen, January 23, 2014, http://fas.org/blogs/security/2014/01/b61capability/

[10]    Hillary Clinton’s Remarks before the 2010 NPT Review Conference, May 3, 2010, https://web.archive.org/web/20120930181944/http://www.cfr.org/united-states/hillary-clintons-remarks-before-2010-npt-review-conference/p22042

[11]    For more, see Administration Increases Submarine Nuclear Warhead Production Plan, Hans Kristensen, August 30, 2007, http://fas.org/blogs/security/2007/08/us_tripples_submarine_warhead/

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

NUCLEAR POWER

Important Documents & Articles Related to Nuclear Energy Production

Most Recent

It seems we can’t find what you’re looking for. Perhaps searching can help.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11