This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.

It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.

Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.

Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.

The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.

Holtec proposal:

  • New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
  • Shallow sub-surface burial system

New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.

These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.

New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.

New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.

NRC Environmental Report

Here's the Federal Register Notice

Consolidated Interim Storage Handout

A Better Option: Hardened On-Site Storage (HOSS)

Hardened On-Site Storage

Overview

Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.


History

For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.

Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.

cask storage at reactor sites
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.

Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.

Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:

  • Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
  • HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
  • The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
  • The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
  • Placement of individual canisters that makes detection difficult from outside the site boundary.

Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes

HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.

Nuclear Power Has No Place in a Green Energy Future

Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes

from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.

Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian

The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs

A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation

There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times

More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature

Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal

Atomic Histories & Nuclear Testing

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

It seems we can’t find what you’re looking for. Perhaps searching can help.

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

NNSA Governance Advisory Panel Condones Diminishing Federal Oversight Of Failing Contractors

Santa Fe, NM – Yesterday, the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise released its long awaited report, entitled “A New Foundation for the Nuclear Enterprise.” According to enabling language in the FY 2013 Defense Authorization Act, “The purpose of the advisory panel is to examine options and make recommendations for revising the governance structure, mission, and management of the nuclear security enterprise.” This means the nuclear weapons complex owned by the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) and run by its contractors. In an attempt to give increased prominence to nuclear weapons programs, the Panel goes so far as to recommend that the Department of Energy be renamed the Department of Energy and Nuclear Security.

The Panel itself is full of conflicts-of-interest. It is co-chaired by Norman Augustine, the former CEO of Lockheed Martin, which is the sole manager of the Sandia Labs and runs the Y-12 and Pantex nuclear weapons production plants in partnership with the Bechtel Corp. The other co-chair, Admiral Robert Mies, sits on the Board of Governors of both for-profit contractors that run the Los Alamos and Lawrence Livermore Labs, as do former congresswoman Ellen Tauscher and Michael Anastasio, former director of both labs. Yet another panel member, Franklin C. Miller, sits on the Sandia Corporation Board of Directors.

But the most questionable panel member is former Congresswoman Heather Wilson (ex.-R-NM). While still in office she signed a contract for “consulting” services with the Sandia National Laboratories that had no written work requirements. The day after she stepped down from office she started being paid $10,000 a month, and went on to secure a similar contract from the Los Alamos Lab for the same amount of money. The DOE Inspector General has recently found that the Sandia contractor (wholly owned by Lockheed Martin) had engaged in highly improper, if not illegal, lobbying of Congress for contract extensions, in which Heather Wilson was “deeply, deeply involved.” Both Sandia and LANL were forced to return to the government the $450,000 they had paid to Wilson, but she has not returned any money.

The Panel’s report laments the dysfunctional relationship between NNSA and its contractors, and deplores the loss of mutual trust. But while profits are rising, contractors are being held to fewer and fewer performance benchmarks, which the Panel does little if anything to fix. Performance benchmarks were previously codified in annual Performance Evaluation Plans (PEPs), but have been subsequently stripped. As a case in point, the FY 2012 Performance Evaluation Plan for the Los Alamos Lab contractor was 89 pages long, full of concrete performance benchmarks. The restructured FY 2013 Plan was nine pages long, with vague performance benchmarks.

This diminishing federal oversight flies in the face of a long history of project delays and immense cost increases for which contractors are responsible, but not held accountable. For example, the former contractor for the Y-12 nuclear weapons plant committed a half-billion dollar design mistake for the Uranium Processing Facility, but has not been publicly disciplined. Y-12’s new contractor just awarded Bechtel a no-bid UPF construction contract, which in effect awards itself since the contractor is principally composed of Lockheed Martin and Bechtel. This is despite the fact that under Bechtel management the Chemistry and Metallurgy Research Replacement Project at Los Alamos exploded in costs from ~$600 million to ~$.6.5 billion, and the Waste Treatment Plant at Hanford from ~$3.5 billion to ~$13.5 billion.

Contractors have also committed very serious operational mistakes. The LANL contractor used unapproved waste handling methods to prepare plutonium-contaminated radioactive wastes for disposal at the Waste Isolation Pilot Plant (WIPP). A waste drum subsequently ruptured, contaminating 21 workers and closing WIPP, causing estimated reopening costs of a half-billion dollars (which will no doubt increase) and $54 million in New Mexico state fines.

As another example, the former Y-12 contractor self-appraised its security management program as “excellent” and its physical security as “good,” which the National Nuclear Security Administration (NNSA) approved while awarding management fees. Both were shaken to their cores when an 82-year old nun and two elderly colleagues cut through three security fences to protest nuclear weapons in a very sensitive area previously thought impregnable.

Despite all this, the Panel makes no specific recommendations to put performance benchmarks back into management contracts. Instead, it proposes that the number of budget line items be reduced, which could further erode transparency, accountability, and congressional oversight, and increase the ability of NNSA and its contractors to move money around.

Perhaps most alarmingly, the Panel recommends that congressional oversight be strengthened by having the DOE Secretary report to the Senate Energy and Natural Resources and Armed Services Committees, and to the House Energy and Commerce and Armed Services Committees. This would likely have the opposite effect, as it seems to preclude the traditional jurisdiction of the House and Senate Energy and Water Development Appropriations Subcommittees, which have provided key oversight in the past, and have often cut certain nuclear weapons programs. Indeed, later in the report, the Panel suggests (short of a formal recommendation) that funding authority for NNSA nuclear weapons programs be invested in the Defense Subcommittees of the House and Senate Appropriations Committees. Again, this appears to exclude Energy and Water Appropriations, which could have profound implications by weakening congressional fiscal constraints on the nuclear weapons complex.

Jay Coghlan, Nuclear Watch Director, commented, “The Panel’s self-interested premise that the Nuclear Security Enterprise needs a new foundation is wrong. First, call it what it is, not some kind of innocuous sounding “enterprise,” but rather a massive research and production complex that is pushing an unaffordable trillion dollar modernization program for nuclear warheads, missiles, subs and bombers. This will divert taxpayers’ dollars from meeting the real national security threats of nuclear weapons proliferation and climate change. The Panel failed by not arguing for prudent maintenance of the stockpile, instead supporting a perpetual work program of risky life extension programs for existing nuclear weapons that will enrich contractors.”

# # #


“A New Foundation for the Nuclear Enterprise” by the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise is available at
http://cdn.knoxblogs.com/atomiccity/wp-content/uploads/sites/11/2014/12/Governance.pdf?_ga=1.136311025.1198700939.1418359009

The DOE Inspector General “Special Inquiry: Alleged Attempts by Sandia National Laboratories to Influence Congress and Federal Officials on a Contract Extension” is available at
http://www.energy.gov/sites/prod/files/2014/11/f19/IG-0927.pdf

The DOE’s Inspector General’s quote of Heather Wilson’s deep involvement in improper lobbying on behalf of the Sandia Labs is from
http://rapidcityjournal.com/news/local/mines-president-named-in-doe-inspector-general-s-probe/article_b984ab84-d593-5578-8007-e70e7c9e986f.html

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

Updates

It seems we can’t find what you’re looking for. Perhaps searching can help.

________________________________

Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

Atomic Histories & Nuclear Testing

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

NNSA Governance Advisory Panel Condones Diminishing Federal Oversight Of Failing Contractors

Santa Fe, NM – Yesterday, the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise released its long awaited report, entitled “A New Foundation for the Nuclear Enterprise.” According to enabling language in the FY 2013 Defense Authorization Act, “The purpose of the advisory panel is to examine options and make recommendations for revising the governance structure, mission, and management of the nuclear security enterprise.” This means the nuclear weapons complex owned by the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) and run by its contractors. In an attempt to give increased prominence to nuclear weapons programs, the Panel goes so far as to recommend that the Department of Energy be renamed the Department of Energy and Nuclear Security.

The Panel itself is full of conflicts-of-interest. It is co-chaired by Norman Augustine, the former CEO of Lockheed Martin, which is the sole manager of the Sandia Labs and runs the Y-12 and Pantex nuclear weapons production plants in partnership with the Bechtel Corp. The other co-chair, Admiral Robert Mies, sits on the Board of Governors of both for-profit contractors that run the Los Alamos and Lawrence Livermore Labs, as do former congresswoman Ellen Tauscher and Michael Anastasio, former director of both labs. Yet another panel member, Franklin C. Miller, sits on the Sandia Corporation Board of Directors.

But the most questionable panel member is former Congresswoman Heather Wilson (ex.-R-NM). While still in office she signed a contract for “consulting” services with the Sandia National Laboratories that had no written work requirements. The day after she stepped down from office she started being paid $10,000 a month, and went on to secure a similar contract from the Los Alamos Lab for the same amount of money. The DOE Inspector General has recently found that the Sandia contractor (wholly owned by Lockheed Martin) had engaged in highly improper, if not illegal, lobbying of Congress for contract extensions, in which Heather Wilson was “deeply, deeply involved.” Both Sandia and LANL were forced to return to the government the $450,000 they had paid to Wilson, but she has not returned any money.

The Panel’s report laments the dysfunctional relationship between NNSA and its contractors, and deplores the loss of mutual trust. But while profits are rising, contractors are being held to fewer and fewer performance benchmarks, which the Panel does little if anything to fix. Performance benchmarks were previously codified in annual Performance Evaluation Plans (PEPs), but have been subsequently stripped. As a case in point, the FY 2012 Performance Evaluation Plan for the Los Alamos Lab contractor was 89 pages long, full of concrete performance benchmarks. The restructured FY 2013 Plan was nine pages long, with vague performance benchmarks.

This diminishing federal oversight flies in the face of a long history of project delays and immense cost increases for which contractors are responsible, but not held accountable. For example, the former contractor for the Y-12 nuclear weapons plant committed a half-billion dollar design mistake for the Uranium Processing Facility, but has not been publicly disciplined. Y-12’s new contractor just awarded Bechtel a no-bid UPF construction contract, which in effect awards itself since the contractor is principally composed of Lockheed Martin and Bechtel. This is despite the fact that under Bechtel management the Chemistry and Metallurgy Research Replacement Project at Los Alamos exploded in costs from ~$600 million to ~$.6.5 billion, and the Waste Treatment Plant at Hanford from ~$3.5 billion to ~$13.5 billion.

Contractors have also committed very serious operational mistakes. The LANL contractor used unapproved waste handling methods to prepare plutonium-contaminated radioactive wastes for disposal at the Waste Isolation Pilot Plant (WIPP). A waste drum subsequently ruptured, contaminating 21 workers and closing WIPP, causing estimated reopening costs of a half-billion dollars (which will no doubt increase) and $54 million in New Mexico state fines.

As another example, the former Y-12 contractor self-appraised its security management program as “excellent” and its physical security as “good,” which the National Nuclear Security Administration (NNSA) approved while awarding management fees. Both were shaken to their cores when an 82-year old nun and two elderly colleagues cut through three security fences to protest nuclear weapons in a very sensitive area previously thought impregnable.

Despite all this, the Panel makes no specific recommendations to put performance benchmarks back into management contracts. Instead, it proposes that the number of budget line items be reduced, which could further erode transparency, accountability, and congressional oversight, and increase the ability of NNSA and its contractors to move money around.

Perhaps most alarmingly, the Panel recommends that congressional oversight be strengthened by having the DOE Secretary report to the Senate Energy and Natural Resources and Armed Services Committees, and to the House Energy and Commerce and Armed Services Committees. This would likely have the opposite effect, as it seems to preclude the traditional jurisdiction of the House and Senate Energy and Water Development Appropriations Subcommittees, which have provided key oversight in the past, and have often cut certain nuclear weapons programs. Indeed, later in the report, the Panel suggests (short of a formal recommendation) that funding authority for NNSA nuclear weapons programs be invested in the Defense Subcommittees of the House and Senate Appropriations Committees. Again, this appears to exclude Energy and Water Appropriations, which could have profound implications by weakening congressional fiscal constraints on the nuclear weapons complex.

Jay Coghlan, Nuclear Watch Director, commented, “The Panel’s self-interested premise that the Nuclear Security Enterprise needs a new foundation is wrong. First, call it what it is, not some kind of innocuous sounding “enterprise,” but rather a massive research and production complex that is pushing an unaffordable trillion dollar modernization program for nuclear warheads, missiles, subs and bombers. This will divert taxpayers’ dollars from meeting the real national security threats of nuclear weapons proliferation and climate change. The Panel failed by not arguing for prudent maintenance of the stockpile, instead supporting a perpetual work program of risky life extension programs for existing nuclear weapons that will enrich contractors.”

# # #


“A New Foundation for the Nuclear Enterprise” by the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise is available at
http://cdn.knoxblogs.com/atomiccity/wp-content/uploads/sites/11/2014/12/Governance.pdf?_ga=1.136311025.1198700939.1418359009

The DOE Inspector General “Special Inquiry: Alleged Attempts by Sandia National Laboratories to Influence Congress and Federal Officials on a Contract Extension” is available at
http://www.energy.gov/sites/prod/files/2014/11/f19/IG-0927.pdf

The DOE’s Inspector General’s quote of Heather Wilson’s deep involvement in improper lobbying on behalf of the Sandia Labs is from
http://rapidcityjournal.com/news/local/mines-president-named-in-doe-inspector-general-s-probe/article_b984ab84-d593-5578-8007-e70e7c9e986f.html

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

NUCLEAR POWER

Important Documents & Articles Related to Nuclear Energy Production

Most Recent

It seems we can’t find what you’re looking for. Perhaps searching can help.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11