No Lethal High-Level Waste To New Mexico

Background

No Nuclear Waste
Photo Courtesy of No Nuclear Waste Aqui

"The most toxic and dangerous type of radioactive waste created by the nuclear industry"

This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.

It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.

Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.

Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.

The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.

Holtec proposal:

  • New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
  • Shallow sub-surface burial system

New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.

These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.

New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.

New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.

NRC Environmental Report

Here's the Federal Register Notice

Consolidated Interim Storage Handout

A Better Option: Hardened On-Site Storage (HOSS)

Hardened On-Site Storage

Overview

Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.


History

For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.

Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.

cask storage at reactor sites
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.

Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.

Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:

  • Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
  • HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
  • The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
  • The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
  • Placement of individual canisters that makes detection difficult from outside the site boundary.

Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes

HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.

Nuclear Power Has No Place in a Green Energy Future

Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes

from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.

Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian

The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs

A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation

There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times

More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature

Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal

Atomic Histories & Nuclear Testing

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

It seems we can’t find what you’re looking for. Perhaps searching can help.

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Budget Deal Mixed Bag for Nuclear Weapons Programs

Budget Deal Mixed Bag for Nuclear Weapons Programs

Planned Long-Term Trend Not Sustainable

 

Following December’s budget deal Congressional appropriators have completed a one trillion dollar omnibus appropriations bill for this fiscal year, expected to pass given that neither political party wants another shutdown. The federal government has been running on a Continuing Resolution since October 1, and the omnibus bill now provides funding levels for the entire fiscal year 2014. Concerning the National Nuclear Security Administration’s nuclear weapons programs, the appropriators made a slight cut to Obama’s requested $7.87 billion, funding “Total Weapons Activities” at $7.78 billion.

All of this, of course, takes place within a larger context. The nonpartisan Congressional Budget Office (CBO) recently released a study entitled Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will cost $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars. This is simply not sustainable, given the nation’s continuing budget constraints.

The new omnibus appropriations bill has fully funded the most controversial program, the B61 nuclear bomb Life Extension Program (LEP), at the president’s request of $537 million. This overrode a proposed cut by Senate Energy and Water Development Appropriations, a key subcommittee that Senator Tom Udall sits on. Udall vigorously opposed that cut, saying that he wanted to save a few hundred jobs in New Mexico.

The B61 LEP has exploded in costs from an original $4 billion dollars to $12 billion, including a program synchronized with the Pentagon to give the bomb a new tail fin guidance kit that would transform it into the world’s first nuclear “smart” bomb. Its main mission is forward deployment in NATO countries, a relic of the Cold War, contradicting Obama’s rhetoric of lowering the presence of battlefield nuclear weapons in Europe.

But this is not a clear-cut victory for NNSA and the nuclear weapons labs. The appropriators cut funding for the B83 nuclear bomb that NNSA claims the B61 LEP will enable it to retire (leaving aside the fact that it was already planned for retirement). The appropriators made clear that they wanted to hold NNSA to its word.  Moreover, the appropriators demanded detailed reporting on major warhead refurbishments, which they applied retroactively to the B61 LEP, and cut the requested amount for the tail fin guidance kit in half. Finally, the fight over the B61 LEP will soon start all over again with the release of the proposed FY 2015 federal budget, expected in late February or early March.

So whereas the NNSA and the labs have won an ambiguous victory in the B61 LEP, the rest of the omnibus appropriations bill demonstrates how deeply troubled their nuclear weapons programs are. Foremost amongst these is a planned Life Extension Program for the W78 ICBM warhead, proposed to be “interoperable” with the W88 sub-launched warhead. This is the first of three proposed interoperable warheads, which the NNSA and labs want to use to transform both the nuclear weapons stockpile and the research and production complex that supports it, with requisite exorbitant appropriations to fund them. In a serious blow to this scheme, the appropriators funded only $38 million out of $72.69 million requested for paper studies. Although not yet officially reported, conventional wisdom in Washington, DC is that the Nuclear Weapons Council (composed of senior officials from both NNSA and the Pentagon) has already canceled the interoperable warhead.

The appropriators also require NNSA to submit a report by May 1 explaining the costs and benefits of stress testing plutonium pits at the Lawrence Livermore National Laboratory in California. These radioactive nuclear weapons cores would have to be transported back and forth from the Los Alamos Lab. This is significant because Livermore’s continuing future in nuclear weapons programs is becoming increasingly questionable, given the failure of its flagship National Ignition Facility to initiate fusion, its loss of security status to handle large amounts of plutonium, and now the doubtful future of interoperable warheads, which it was banking on.

Concerning the proposed Uranium Processing Facility (UPF) near Oak Ridge, TN, the appropriators provided $309 out of $325.8 million requested, but noted that it is an adjustment caused by the necessity to consider additional alternatives. The UPF has been under increasing fire after a half-billion dollar design mistake and a recent Pentagon estimate that it would cost $12 to $19 billion, up from $6 billion. Conspicuous in its absence is any mention of follow-on to the deferred plutonium facility at LANL (the “CMRR-Nuclear Facility”) whose mission is to expand plutonium pit production, or NNSA’s “alternative plutonium strategy.”

The appropriators also provided $343.5 million for the Mixed Oxide (MOX) Fuel Fabrication Facility, adding to the $320 million requested. However, they directed NNSA to identify the root causes of cost increases and prioritize recommended solutions and corrective measures, showing that this program too is in serious jeopardy.

The appropriators funded $224.79 million for “cleanup” at the Los Alamos National Laboratory, which primarily consists of removing radioactive transuranic wastes that were suppose to be shipped to the Waste Isolation Pilot Plant a decade ago. In contrast, LANL is planning to “cap and cover” around one million cubic meters of radioactive and toxic wastes and backfill, creating a de facto permanent, unlined nuclear waste dump above groundwater and the Rio Grande.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers have won for now the battle over funding for the gold-plated B61 bomb Life Extension Program, but we look forward to the coming fight over next year’s budget. The rest of their plans are falling apart because they are so often their own worst enemy with constant cost overruns and lack of clear need. We are confident that given the trillion dollar cost for future nuclear weapons, subs, bombers, and missiles, the public will increasingly demand cleanup and related jobs, not more nuclear bombs.”

 

# # #

 

The omnibus appropriations bill can be viewed at http://docs.house.gov/billsthisweek/20140113/113-HR3547-JSOM-D-F.pdf

The NNSA section begins at p. 34 or PDF p. 70.

 

 

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

Updates

It seems we can’t find what you’re looking for. Perhaps searching can help.

________________________________

Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

Atomic Histories & Nuclear Testing

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Budget Deal Mixed Bag for Nuclear Weapons Programs

Budget Deal Mixed Bag for Nuclear Weapons Programs

Planned Long-Term Trend Not Sustainable

 

Following December’s budget deal Congressional appropriators have completed a one trillion dollar omnibus appropriations bill for this fiscal year, expected to pass given that neither political party wants another shutdown. The federal government has been running on a Continuing Resolution since October 1, and the omnibus bill now provides funding levels for the entire fiscal year 2014. Concerning the National Nuclear Security Administration’s nuclear weapons programs, the appropriators made a slight cut to Obama’s requested $7.87 billion, funding “Total Weapons Activities” at $7.78 billion.

All of this, of course, takes place within a larger context. The nonpartisan Congressional Budget Office (CBO) recently released a study entitled Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will cost $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars. This is simply not sustainable, given the nation’s continuing budget constraints.

The new omnibus appropriations bill has fully funded the most controversial program, the B61 nuclear bomb Life Extension Program (LEP), at the president’s request of $537 million. This overrode a proposed cut by Senate Energy and Water Development Appropriations, a key subcommittee that Senator Tom Udall sits on. Udall vigorously opposed that cut, saying that he wanted to save a few hundred jobs in New Mexico.

The B61 LEP has exploded in costs from an original $4 billion dollars to $12 billion, including a program synchronized with the Pentagon to give the bomb a new tail fin guidance kit that would transform it into the world’s first nuclear “smart” bomb. Its main mission is forward deployment in NATO countries, a relic of the Cold War, contradicting Obama’s rhetoric of lowering the presence of battlefield nuclear weapons in Europe.

But this is not a clear-cut victory for NNSA and the nuclear weapons labs. The appropriators cut funding for the B83 nuclear bomb that NNSA claims the B61 LEP will enable it to retire (leaving aside the fact that it was already planned for retirement). The appropriators made clear that they wanted to hold NNSA to its word.  Moreover, the appropriators demanded detailed reporting on major warhead refurbishments, which they applied retroactively to the B61 LEP, and cut the requested amount for the tail fin guidance kit in half. Finally, the fight over the B61 LEP will soon start all over again with the release of the proposed FY 2015 federal budget, expected in late February or early March.

So whereas the NNSA and the labs have won an ambiguous victory in the B61 LEP, the rest of the omnibus appropriations bill demonstrates how deeply troubled their nuclear weapons programs are. Foremost amongst these is a planned Life Extension Program for the W78 ICBM warhead, proposed to be “interoperable” with the W88 sub-launched warhead. This is the first of three proposed interoperable warheads, which the NNSA and labs want to use to transform both the nuclear weapons stockpile and the research and production complex that supports it, with requisite exorbitant appropriations to fund them. In a serious blow to this scheme, the appropriators funded only $38 million out of $72.69 million requested for paper studies. Although not yet officially reported, conventional wisdom in Washington, DC is that the Nuclear Weapons Council (composed of senior officials from both NNSA and the Pentagon) has already canceled the interoperable warhead.

The appropriators also require NNSA to submit a report by May 1 explaining the costs and benefits of stress testing plutonium pits at the Lawrence Livermore National Laboratory in California. These radioactive nuclear weapons cores would have to be transported back and forth from the Los Alamos Lab. This is significant because Livermore’s continuing future in nuclear weapons programs is becoming increasingly questionable, given the failure of its flagship National Ignition Facility to initiate fusion, its loss of security status to handle large amounts of plutonium, and now the doubtful future of interoperable warheads, which it was banking on.

Concerning the proposed Uranium Processing Facility (UPF) near Oak Ridge, TN, the appropriators provided $309 out of $325.8 million requested, but noted that it is an adjustment caused by the necessity to consider additional alternatives. The UPF has been under increasing fire after a half-billion dollar design mistake and a recent Pentagon estimate that it would cost $12 to $19 billion, up from $6 billion. Conspicuous in its absence is any mention of follow-on to the deferred plutonium facility at LANL (the “CMRR-Nuclear Facility”) whose mission is to expand plutonium pit production, or NNSA’s “alternative plutonium strategy.”

The appropriators also provided $343.5 million for the Mixed Oxide (MOX) Fuel Fabrication Facility, adding to the $320 million requested. However, they directed NNSA to identify the root causes of cost increases and prioritize recommended solutions and corrective measures, showing that this program too is in serious jeopardy.

The appropriators funded $224.79 million for “cleanup” at the Los Alamos National Laboratory, which primarily consists of removing radioactive transuranic wastes that were suppose to be shipped to the Waste Isolation Pilot Plant a decade ago. In contrast, LANL is planning to “cap and cover” around one million cubic meters of radioactive and toxic wastes and backfill, creating a de facto permanent, unlined nuclear waste dump above groundwater and the Rio Grande.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers have won for now the battle over funding for the gold-plated B61 bomb Life Extension Program, but we look forward to the coming fight over next year’s budget. The rest of their plans are falling apart because they are so often their own worst enemy with constant cost overruns and lack of clear need. We are confident that given the trillion dollar cost for future nuclear weapons, subs, bombers, and missiles, the public will increasingly demand cleanup and related jobs, not more nuclear bombs.”

 

# # #

 

The omnibus appropriations bill can be viewed at http://docs.house.gov/billsthisweek/20140113/113-HR3547-JSOM-D-F.pdf

The NNSA section begins at p. 34 or PDF p. 70.

 

 

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

NUCLEAR POWER

Important Documents & Articles Related to Nuclear Energy Production

Most Recent

It seems we can’t find what you’re looking for. Perhaps searching can help.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11