No Lethal High-Level Waste To New Mexico

Background

No Nuclear Waste
Photo Courtesy of No Nuclear Waste Aqui

"The most toxic and dangerous type of radioactive waste created by the nuclear industry"

This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.

It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.

Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.

Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.

The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.

Holtec proposal:

  • New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
  • Shallow sub-surface burial system

New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.

These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.

New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.

New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.

NRC Environmental Report

Here's the Federal Register Notice

Consolidated Interim Storage Handout

A Better Option: Hardened On-Site Storage (HOSS)

Hardened On-Site Storage

Overview

Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.


History

For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.

Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.

cask storage at reactor sites
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.

Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.

Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:

  • Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
  • HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
  • The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
  • The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
  • Placement of individual canisters that makes detection difficult from outside the site boundary.

Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes

HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.

Nuclear Power Has No Place in a Green Energy Future

Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes

from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.

Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian

The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs

A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation

There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times

More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature

Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal

Atomic Histories & Nuclear Testing

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

It seems we can’t find what you’re looking for. Perhaps searching can help.

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Each B61 nuclear warhead will cost ten times W76 warhead to refurbish

The over budget costs of near everything that the National Nuclear Security Administration touches is growing increasingly controversial. Of particular interest now is the Life Extension Program for some 400 B61 nuclear bombs. That program was originally going to cost $4 billion, but is now estimated at  ~$10.4 billion. At this point each 700 lb. bomb will cost more than twice its weight in gold. And this doesn’t include original production costs and ongoing support costs since they were first produced in the late 1960’s (which under “Stockpile Systems” is currently ~$80 million annually). And of course it doesn’t include the cost of the bombers over the years that were designed to deliver them.

In lockstep with NNSA’s Life Extension Program, a synchronized Pentagon program will provide new tail fin guidance kits that will transform the B61 into the world’s first nuclear “smart” bomb, for delivery by future super stealthy (and exorbitantly expensive) F-35 Joint Strike Fighters. That clearly constitutes new military capabilities, despite policy declarations at the highest levels of government (for example at the 2010 NonProliferation Treaty Review Conference) that the U.S. would never endow existing nuclear weapons with new military capabilities. An unarmed prototype of the refurbished bomb, designated the B61-12, is to be “flight tested” and dropped with the new tail fin kit in this FY 2014.

Stephen Young of the Union of Concerned Scientists recently made available an August 2012 JASON Report on the B61 Life Extension Program while providing his own excellent analysis http://allthingsnuclear.org/jason-on-the-b61/ [The JASONs are pretigious scientists periodically consulted with by the government on nuclear weapons issues.] Among their findings the JASONs reported “In implementing important and desirable, but not essential, elements in the 3B program [the 2nd most expensive B61 LEP option picked by the NNSA], there should be a clear understanding of their cost and impact on the schedule. These elements should be prioritized in the event that unanticipated program delays or cost overruns are encountered that could threaten meeting the FPU [first production unit] deadline.” The JASONs also noted “the Pentagon’s already strongly expressed displeasure at the inability to complete the W76 as scheduled.”

The W76 is one of two warheads for the Navy’s sub-launched Trident missiles, and is the single most common nuclear warhead in the U.S. stockpile. This got me wondering how much the W76 Life Extension Programs will cost, which I tracked down as follows:

In millions of dollars

Original appropriation         NNSA data source     Inflation adjustment

2003     $72                    FY 2005 budget request              $91.52

2004   $139                     FY 2006 budget request           $172.10

2005   $181                     FY 2006 budget request           $216.75

2006   $182                     FY 2008 budget request          $211.14

2007   $152                     FY 2008 budget request          $171.45

2008   $190                     FY 2010 budget request          $206.39

2009   $203                     FY 2010 budget request          $221.30

2010   $232                      FY 2012 budget request         $248.83

2011   $249                      FY 2012 budget request         $258.89

2012   $254                      FY 2012 budget request         $258.74

2013   $198                      FY 2014 budget request          $198

2014   $235                      FY 2014 budget request          $235

2015   $242               Future Years Nuclear Security Plan in NNSA’s FY 14 request

2016   $237                          ditto                                     $237

2017   $235                          ditto                                     $235

2018   $230                         ditto                                      $230

2019   $200               NNSA’s FY 2014 Stockpile Stewardship and Management Plan

2020     $60                         ditto                                        $60

Total (adjusted for inflation)                                            $3.694 billion

The number of W76’s to be refurbished is classified, but is believed to be around 1,600. [In 2007 Hans Kristensen of the Federation of American Scientists estimated ~2,000 https://web.archive.org/web/20130630203617/http://blogs.fas.org/security/2007/08/us_tripples_submarine_warhead/), but told me that number has since been scaled down.] Using 1,600, then each W76 warhead will cost ~$2.31 million to refurbish. This is in contrast to the B61, more than ten times that at $26 million per warhead ($10.4 billion/400), or more than twice its weigh in gold.

The Senate Appropriations Committee has cut the NNSA’s FY 2014 budget request of $537 million for the B61 LEP (that request is a 45% increase above FY 2013) by $168 million. Its report said:

The Committee is concerned that NNSA’s proposed scope of work for extending the life of the B61 bomb is not the lowest cost, lowest risk option that meets military requirements and replaces aging components before they affect weapon performance.

According to the budget figures that I have compiled the W76 LEP is a 17-year program start to finish. In its FY 2014 Stockpile Stewardship and Management Plan NNSA claims that the much more complex (and hence much more expensive) B61 LEP will be completed in 10 years by 2024. Granted we’re talking about 4 times fewer nuclear weapons being refurbished, but the work is much more aggressive and involves 100’s of parts, all of which cannot be full-scale tested as a weapon (thank God!). And NNSA’s track record of staying on budget and on schedule is becoming a matter of scorn even amongst congressional staff.

The take away lesson is that NNSA and the labs should simplify. For the sake of stockpile maintenance limited life components such as neutron generators and tritium reservoirs should be replaced as needed, which is a near routine practice, and perhaps the B61’s radar needs replacement as well (which NNSA is fond of pointing out uses old style vacuum tubes). All of that would bring the costs down somewhere along the lines of the W76 LEP. It would also be better aligned with declared nonproliferation policy by not introducing new military capabilities, and better align with national security concerns by not possibly eroding confidence in stockpile reliability through major changes that can’t be full-scale tested. In addition, Congress should require NNSA to disclose in its budget requests annual costs per warhead type, as once was the practice, so that the public can be fully appreciate just how much each warhead costs for arguably archaic missions.

Finally, New Mexico’s Tom Udall sits on the Senate’s Appropriations Committee. He opposed the cut to the B61 LEP, among other things saying that he wanted to save 200 in-state jobs. That is no way to formulate nuclear weapons policy, especially given that the B61 Life Extension Program far exceeds mere maintenance. Tom Udall should support his own committee’s cut.

 

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

Updates

It seems we can’t find what you’re looking for. Perhaps searching can help.

________________________________

Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

Atomic Histories & Nuclear Testing

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Each B61 nuclear warhead will cost ten times W76 warhead to refurbish

The over budget costs of near everything that the National Nuclear Security Administration touches is growing increasingly controversial. Of particular interest now is the Life Extension Program for some 400 B61 nuclear bombs. That program was originally going to cost $4 billion, but is now estimated at  ~$10.4 billion. At this point each 700 lb. bomb will cost more than twice its weight in gold. And this doesn’t include original production costs and ongoing support costs since they were first produced in the late 1960’s (which under “Stockpile Systems” is currently ~$80 million annually). And of course it doesn’t include the cost of the bombers over the years that were designed to deliver them.

In lockstep with NNSA’s Life Extension Program, a synchronized Pentagon program will provide new tail fin guidance kits that will transform the B61 into the world’s first nuclear “smart” bomb, for delivery by future super stealthy (and exorbitantly expensive) F-35 Joint Strike Fighters. That clearly constitutes new military capabilities, despite policy declarations at the highest levels of government (for example at the 2010 NonProliferation Treaty Review Conference) that the U.S. would never endow existing nuclear weapons with new military capabilities. An unarmed prototype of the refurbished bomb, designated the B61-12, is to be “flight tested” and dropped with the new tail fin kit in this FY 2014.

Stephen Young of the Union of Concerned Scientists recently made available an August 2012 JASON Report on the B61 Life Extension Program while providing his own excellent analysis http://allthingsnuclear.org/jason-on-the-b61/ [The JASONs are pretigious scientists periodically consulted with by the government on nuclear weapons issues.] Among their findings the JASONs reported “In implementing important and desirable, but not essential, elements in the 3B program [the 2nd most expensive B61 LEP option picked by the NNSA], there should be a clear understanding of their cost and impact on the schedule. These elements should be prioritized in the event that unanticipated program delays or cost overruns are encountered that could threaten meeting the FPU [first production unit] deadline.” The JASONs also noted “the Pentagon’s already strongly expressed displeasure at the inability to complete the W76 as scheduled.”

The W76 is one of two warheads for the Navy’s sub-launched Trident missiles, and is the single most common nuclear warhead in the U.S. stockpile. This got me wondering how much the W76 Life Extension Programs will cost, which I tracked down as follows:

In millions of dollars

Original appropriation         NNSA data source     Inflation adjustment

2003     $72                    FY 2005 budget request              $91.52

2004   $139                     FY 2006 budget request           $172.10

2005   $181                     FY 2006 budget request           $216.75

2006   $182                     FY 2008 budget request          $211.14

2007   $152                     FY 2008 budget request          $171.45

2008   $190                     FY 2010 budget request          $206.39

2009   $203                     FY 2010 budget request          $221.30

2010   $232                      FY 2012 budget request         $248.83

2011   $249                      FY 2012 budget request         $258.89

2012   $254                      FY 2012 budget request         $258.74

2013   $198                      FY 2014 budget request          $198

2014   $235                      FY 2014 budget request          $235

2015   $242               Future Years Nuclear Security Plan in NNSA’s FY 14 request

2016   $237                          ditto                                     $237

2017   $235                          ditto                                     $235

2018   $230                         ditto                                      $230

2019   $200               NNSA’s FY 2014 Stockpile Stewardship and Management Plan

2020     $60                         ditto                                        $60

Total (adjusted for inflation)                                            $3.694 billion

The number of W76’s to be refurbished is classified, but is believed to be around 1,600. [In 2007 Hans Kristensen of the Federation of American Scientists estimated ~2,000 https://web.archive.org/web/20130630203617/http://blogs.fas.org/security/2007/08/us_tripples_submarine_warhead/), but told me that number has since been scaled down.] Using 1,600, then each W76 warhead will cost ~$2.31 million to refurbish. This is in contrast to the B61, more than ten times that at $26 million per warhead ($10.4 billion/400), or more than twice its weigh in gold.

The Senate Appropriations Committee has cut the NNSA’s FY 2014 budget request of $537 million for the B61 LEP (that request is a 45% increase above FY 2013) by $168 million. Its report said:

The Committee is concerned that NNSA’s proposed scope of work for extending the life of the B61 bomb is not the lowest cost, lowest risk option that meets military requirements and replaces aging components before they affect weapon performance.

According to the budget figures that I have compiled the W76 LEP is a 17-year program start to finish. In its FY 2014 Stockpile Stewardship and Management Plan NNSA claims that the much more complex (and hence much more expensive) B61 LEP will be completed in 10 years by 2024. Granted we’re talking about 4 times fewer nuclear weapons being refurbished, but the work is much more aggressive and involves 100’s of parts, all of which cannot be full-scale tested as a weapon (thank God!). And NNSA’s track record of staying on budget and on schedule is becoming a matter of scorn even amongst congressional staff.

The take away lesson is that NNSA and the labs should simplify. For the sake of stockpile maintenance limited life components such as neutron generators and tritium reservoirs should be replaced as needed, which is a near routine practice, and perhaps the B61’s radar needs replacement as well (which NNSA is fond of pointing out uses old style vacuum tubes). All of that would bring the costs down somewhere along the lines of the W76 LEP. It would also be better aligned with declared nonproliferation policy by not introducing new military capabilities, and better align with national security concerns by not possibly eroding confidence in stockpile reliability through major changes that can’t be full-scale tested. In addition, Congress should require NNSA to disclose in its budget requests annual costs per warhead type, as once was the practice, so that the public can be fully appreciate just how much each warhead costs for arguably archaic missions.

Finally, New Mexico’s Tom Udall sits on the Senate’s Appropriations Committee. He opposed the cut to the B61 LEP, among other things saying that he wanted to save 200 in-state jobs. That is no way to formulate nuclear weapons policy, especially given that the B61 Life Extension Program far exceeds mere maintenance. Tom Udall should support his own committee’s cut.

 

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

NUCLEAR POWER

Important Documents & Articles Related to Nuclear Energy Production

Most Recent

It seems we can’t find what you’re looking for. Perhaps searching can help.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11