No Lethal High-Level Waste To New Mexico

Background

No Nuclear Waste
Photo Courtesy of No Nuclear Waste Aqui

"The most toxic and dangerous type of radioactive waste created by the nuclear industry"

This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.

It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.

Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.

Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.

The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.

Holtec proposal:

  • New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
  • Shallow sub-surface burial system

New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.

These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.

New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.

New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.

NRC Environmental Report

Here's the Federal Register Notice

Consolidated Interim Storage Handout

A Better Option: Hardened On-Site Storage (HOSS)

Hardened On-Site Storage

Overview

Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.


History

For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.

Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.

cask storage at reactor sites
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.

Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.

Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:

  • Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
  • HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
  • The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
  • The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
  • Placement of individual canisters that makes detection difficult from outside the site boundary.

Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes

HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.

Nuclear Power Has No Place in a Green Energy Future

Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes

from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.

Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian

The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs

A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation

There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times

More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature

Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal

Atomic Histories & Nuclear Testing

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

It seems we can’t find what you’re looking for. Perhaps searching can help.

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Audit Cites Lack of Contractor Integration For Delay in Reestablishing Criticality Capability

The Oct 2013 Department of Energy Inspector General (DOE IG) audit report “The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site” informs us that a move from Technical Area 18 (TA-18) at Los Alamos to the Nevada National Security Site, like many other DOE projects, is taking longer than planned. The report didn’t mention it but it, but the move is, no doubt, costing us more, too.

The move centers on relocating four criticality assemblies. Criticality experiments use “assemblies” of enriched uranium and/or plutonium to create self-sustaining nuclear chain reactions. These assemblies differ from nuclear reactors in that the nuclear reaction is not sustained (assuming there are no accidents). Another significant difference is that the critical assemblies have no containment or shielding.

A DOE fact sheet tells us that:

[National Criticality Experiments Research Center] NCERC contains the largest collection of nuclear critical mass assembly machines in the western hemisphere. These assemblies can be broadly categorized as benchmark critical assemblies, general-purpose assemblies, and fast- burst assemblies that were designed to accommodate a broad range of experiments. Godiva is a bare metal uranium fast burst assembly designed to provide an intense burst of neutrons during an extremely short pulse. Flattop is a unique fast-spectrum assembly used for cross section testing and training. Planet and Comet are general purpose vertical assembly machines that are designed to accommodate experiments in which neutron multiplication is measured as a function of separation distance between experimental components. Fuel materials include uranium, plutonium, and neptunium.

Clearly, safety and careful planning would be of the utmost importance with these operations, which include conducting nuclear criticality experiments along with hands-on, criticality safety, and emergency response training.

The fact sheet gives the reason for the move as, “As a result of the extensive inventory of SNM and the resulting requirements for physical security and operational safety, it was decided to relocate…”

The DOE IG report also explains that criticality experiments at Los Alamos were halted and moved to Nevada “Citing safety and security concerns in 2004…”

But both of these accounts leave out some interesting history. A Project On Government Oversight (POGO) article gives an account of a security training exercise at TA-18 at Los Alamos –

In 1997, a special unit of the U.S. Army Special Forces was the adversary during a force-on-force exercise. The normal theft scenario is to “steal” enough SNM for a crude nuclear weapon that would fit in rucksacks. But, according to the Wall Street Journal, this exercise required that they “steal” more HEU than a person can carry. Not to be outmaneuvered, the Army Special Forces commandos went to Home Depot and bought a garden cart. They attacked TA-18, loaded the garden cart with nuclear materials, and left the facility. “[T]he invaders reached the simulated objective of the game: enough nuclear material to make an atom bomb.”

And they did so with relative ease. As the Wall Street Journal reported,

“The Garden Cart attackers. . .used snipers hidden in the hills to “kill” the first guards [protective forces] who arrived. Because they happened to be the commanders of the guard force, the rest of the force was thrown into disarray. Many of them also were “killed” as they arrived in small groups down a narrow road leading to TA-18. ‘[The Special Forces] took them out piecemeal as they came in,’ says one participant in the game, whose account wasn’t challenged by DOE or lab officials.”

As the Wall Street Journal further noted, “The 1997 mock invasion succeeded despite months of guard [protective forces] training and dozens of computerized battle simulations showing that newly beefed-up defenders of the facility would win.”

In April 2000, then DOE Secretary Bill Richardson ordered that TA-18 be shut down and all the nuclear materials be completely removed by 2004. So instead of completing the move the 2004, DOE and Los Alamos Lab had only started the move by 2004. Nuclear Watch NM voiced our concerns many times, including when we learned that a Federal Safety Board concluded fatal doses were possible if there was an accident.

As far as operational safety goes, neither the fact sheet nor the DOE IG Report mentioned that TA-18 was intentionally located at the bottom of Parajito Canyon so that the 200-foot canyon walls could provide some natural radiation shielding. This meant that TA-18, with its estimated three tons of highly enriched uranium and plutonium, sat in a flood plain.

The results of the DOE IG audit states that many of the former capabilities of the were restored in Nevada. However, several problems resulted in delays in restoring the full array of experimental capabilities. NNSA was unable to authorize operations until May 2011, approximately 1 year after the planned date. The program experienced further delays in the start-up activities of each criticality machine, with completion of all planned startup activities for one machine delayed about 2 years.
DOE has not been able to restore full capability to perform plutonium-based criticality experiments.

The Report results state that delays occurred because contractors had not developed adequate procedures for correcting concerns identified during the process to authorize the start-ups. Also, procured safety equipment did not meet standards. Additionally, the Report claimed that DOE had not ensured effective management of the multiple contractors involved and had struggled to successfully integrate and resolve issues between the multiple contractors. Which is odd, because there were only four contractors mentioned in the report – Los Alamos, Lawrence Livermore National Laboratory, National Security Technology, LLC, Wackenhut Services International. Exactly what Wackenhut (which provides security, fire rescue and aviation services) did for the move was not stated.

We do appreciate the focus on safety, but if these operations are so important, DOE must emphasize completing the job to avoid wasting any more taxpayers’ money. Once again the Department of Energy proves that its contractors cannot juggle safety, schedule, and cost without dropping as least two. And apparently DOE has trouble efficiently juggling contractors, which is too bad because contractors attempt to perform over 90% of DOE’s work.

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

Updates

It seems we can’t find what you’re looking for. Perhaps searching can help.

________________________________

Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

Atomic Histories & Nuclear Testing

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

Audit Cites Lack of Contractor Integration For Delay in Reestablishing Criticality Capability

The Oct 2013 Department of Energy Inspector General (DOE IG) audit report “The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site” informs us that a move from Technical Area 18 (TA-18) at Los Alamos to the Nevada National Security Site, like many other DOE projects, is taking longer than planned. The report didn’t mention it but it, but the move is, no doubt, costing us more, too.

The move centers on relocating four criticality assemblies. Criticality experiments use “assemblies” of enriched uranium and/or plutonium to create self-sustaining nuclear chain reactions. These assemblies differ from nuclear reactors in that the nuclear reaction is not sustained (assuming there are no accidents). Another significant difference is that the critical assemblies have no containment or shielding.

A DOE fact sheet tells us that:

[National Criticality Experiments Research Center] NCERC contains the largest collection of nuclear critical mass assembly machines in the western hemisphere. These assemblies can be broadly categorized as benchmark critical assemblies, general-purpose assemblies, and fast- burst assemblies that were designed to accommodate a broad range of experiments. Godiva is a bare metal uranium fast burst assembly designed to provide an intense burst of neutrons during an extremely short pulse. Flattop is a unique fast-spectrum assembly used for cross section testing and training. Planet and Comet are general purpose vertical assembly machines that are designed to accommodate experiments in which neutron multiplication is measured as a function of separation distance between experimental components. Fuel materials include uranium, plutonium, and neptunium.

Clearly, safety and careful planning would be of the utmost importance with these operations, which include conducting nuclear criticality experiments along with hands-on, criticality safety, and emergency response training.

The fact sheet gives the reason for the move as, “As a result of the extensive inventory of SNM and the resulting requirements for physical security and operational safety, it was decided to relocate…”

The DOE IG report also explains that criticality experiments at Los Alamos were halted and moved to Nevada “Citing safety and security concerns in 2004…”

But both of these accounts leave out some interesting history. A Project On Government Oversight (POGO) article gives an account of a security training exercise at TA-18 at Los Alamos –

In 1997, a special unit of the U.S. Army Special Forces was the adversary during a force-on-force exercise. The normal theft scenario is to “steal” enough SNM for a crude nuclear weapon that would fit in rucksacks. But, according to the Wall Street Journal, this exercise required that they “steal” more HEU than a person can carry. Not to be outmaneuvered, the Army Special Forces commandos went to Home Depot and bought a garden cart. They attacked TA-18, loaded the garden cart with nuclear materials, and left the facility. “[T]he invaders reached the simulated objective of the game: enough nuclear material to make an atom bomb.”

And they did so with relative ease. As the Wall Street Journal reported,

“The Garden Cart attackers. . .used snipers hidden in the hills to “kill” the first guards [protective forces] who arrived. Because they happened to be the commanders of the guard force, the rest of the force was thrown into disarray. Many of them also were “killed” as they arrived in small groups down a narrow road leading to TA-18. ‘[The Special Forces] took them out piecemeal as they came in,’ says one participant in the game, whose account wasn’t challenged by DOE or lab officials.”

As the Wall Street Journal further noted, “The 1997 mock invasion succeeded despite months of guard [protective forces] training and dozens of computerized battle simulations showing that newly beefed-up defenders of the facility would win.”

In April 2000, then DOE Secretary Bill Richardson ordered that TA-18 be shut down and all the nuclear materials be completely removed by 2004. So instead of completing the move the 2004, DOE and Los Alamos Lab had only started the move by 2004. Nuclear Watch NM voiced our concerns many times, including when we learned that a Federal Safety Board concluded fatal doses were possible if there was an accident.

As far as operational safety goes, neither the fact sheet nor the DOE IG Report mentioned that TA-18 was intentionally located at the bottom of Parajito Canyon so that the 200-foot canyon walls could provide some natural radiation shielding. This meant that TA-18, with its estimated three tons of highly enriched uranium and plutonium, sat in a flood plain.

The results of the DOE IG audit states that many of the former capabilities of the were restored in Nevada. However, several problems resulted in delays in restoring the full array of experimental capabilities. NNSA was unable to authorize operations until May 2011, approximately 1 year after the planned date. The program experienced further delays in the start-up activities of each criticality machine, with completion of all planned startup activities for one machine delayed about 2 years.
DOE has not been able to restore full capability to perform plutonium-based criticality experiments.

The Report results state that delays occurred because contractors had not developed adequate procedures for correcting concerns identified during the process to authorize the start-ups. Also, procured safety equipment did not meet standards. Additionally, the Report claimed that DOE had not ensured effective management of the multiple contractors involved and had struggled to successfully integrate and resolve issues between the multiple contractors. Which is odd, because there were only four contractors mentioned in the report – Los Alamos, Lawrence Livermore National Laboratory, National Security Technology, LLC, Wackenhut Services International. Exactly what Wackenhut (which provides security, fire rescue and aviation services) did for the move was not stated.

We do appreciate the focus on safety, but if these operations are so important, DOE must emphasize completing the job to avoid wasting any more taxpayers’ money. Once again the Department of Energy proves that its contractors cannot juggle safety, schedule, and cost without dropping as least two. And apparently DOE has trouble efficiently juggling contractors, which is too bad because contractors attempt to perform over 90% of DOE’s work.

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

NUCLEAR POWER

Important Documents & Articles Related to Nuclear Energy Production

Most Recent

It seems we can’t find what you’re looking for. Perhaps searching can help.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11