Nuclear Watch New Mexico

Through comprehensive research, public education and effective citizen action, Nuclear Watch New Mexico seeks to promote safety and environmental protection at regional nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

QUOTE OF THE WEEK

It seems we can’t find what you’re looking for. Perhaps searching can help.

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

Banner displaying “Nuclear Weapons Are Now Illegal” at the entrance in front of the Los Alamos National Lab to celebrate the Entry Into Force of the Nuclear Weapon Ban Treaty on January 22, 2021

It seems we can’t find what you’re looking for. Perhaps searching can help.

Follow the Money!

Map of “Nuclear New Mexico”

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

In 1985, US President Ronald Reagan and and Russian President Mikhail Gorbachev declared that “a nuclear war cannot be won and must never be fought.”

President Ronald Reagan and Soviet General Secretary Mikhail Gorbachev shake hands after signing the arms control agreement banning the use of intermediate-range nuclear missles, the Intermediate Nuclear Forces Reduction Treaty.

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

2022 BLOG POSTS

It seems we can’t find what you’re looking for. Perhaps searching can help.

New & Updated

Plutonium-238 needs should be met through accelerated nuclear weapons dismantlements

Wired Magazine’s alarmist article NASA’s Plutonium Problem Could End Deep-Space Exploration argues that virgin production of plutonium-238 in nuclear reactors is needed, or U.S. space exploration is dead. Instead the nation’s future Pu-238 needs should be met through accelerated nuclear weapons dismantlements and recycling/scrap recovery efforts.

Processing and encapsulation of Pu-238 currently takes place at the Los Alamos National Laboratory in northern New Mexico. [Having said that, all plutonium operations at the Lab have been shut down since the end of June because of nuclear criticality safety issues, which is a story in and of itself]. A Pu-238 scrap recovery line capable of recovering 2-8 kilograms per year was slated to start in 2005, but apparently has never become fully operational. In fact, LANL claimed in a 2008 site-wide environmental impact statement that it was capable of recycling/recovering up to 18 kilograms of Pu-238 per year, far more than needed to take care of the nation’s needs.

LANL has a large existing inventory of Pu-238 scrap material. Moreover, the Pantex Plant was supposed to ship radioisotope thermoelectric generators (RTGs) from dismantled nuclear weapons to the Lab to harvest Pu-238. That hasn’t happened either, we conjecture because the LANL’s scrap recovery line hasn’t been properly working (or perhaps never really started in the Lab’s troubled Plutonium Facility-4). Indeed, the government estimated that approximately 3,200 RTGs would become available for recycling between 2009 and 2022 through nuclear weapons dismantlements. Significantly, increased dismantlements could also supply sufficient recycled tritium for existing nuclear weapons instead of current military production in civilian reactors, a big nonproliferation no-no. But unfortunately dismantlements at the Pantex Plant are substantially blocked by exorbitant “Life Extension Programs” that extend the service lives of existing nuclear weapons by three decades or more while giving them new military capabilities.

Before the U.S. resumes virgin Pu-238 production, the government should make LANL straighten out its Pu-238 recovery operations. Safely that is, because Pu-238 is a very energetic gamma emitter and therefore very dangerous to handle. But the nation’s future Pu-238 needs should be met through accelerated nuclear weapons dismantlements (instead of Life Extension Programs) and recycling/scrap recovery efforts, not new virgin production in nuclear reactors.

 

Abolish NNSA, but increase federal oversight and independent review

The Albuquerque Journal ran a really good editorial on Tuesday, September 17:

 

Editorial: Time past for coddling bloated nuclear agency

By Albuquerque Journal Editorial Board |

 It’s big government on steroids.

 The National Nuclear Security Administration, a division of the U.S. Department of Energy, is tasked with securing and maintaining the nation’s nuclear arsenal. It oversees Los Alamos National Laboratory and Sandia National Laboratories in New Mexico.

For years the agency’s MO has included expectations of nearly automatic budget increases, bloated projects that are never finished, duplicative red tape and a bureaucracy that resists efforts to rein it in.

Critics say it has become a massive jobs program.

Ten of its major projects are collectively over budget to the tune of $16 billion and behind schedule by 38 years, according to the U.S. Government Accountability Office. For instance, at LANL a new $213 million security system to protect sensitive nuclear bomb-making facilities doesn’t work. So, taxpayers are being asked to lay out an additional $41 million to fix it.

The chairwoman of the Senate Homeland Security subcommittee that oversees finances and contracts largely blames the agency’s reliance on private contractors – more than 92,000. LANL and Sandia are operated by private contractors, LANL by a consortium led by Bechtel, and Sandia by Lockheed Martin.

Former Lockheed Martin CEO Norman Augustine told Congress this spring that accountability and internal structure problems pose a national security risk. And there’s no doubt NNSA’s work is critical to U.S. national security, but taxpayers also are tired of watching their money being thrown at an insatiable beast that too often fails to deliver results.

As long as the NNSA remains impervious to calls for improving its culture and tightening up its accountability, the inefficiencies and waste will keep coming.

A congressionally appointed panel recently began studying whether to overhaul the agency. (Former Sen. Jeff Bingaman had said he was open to just getting rid of it.) Energy Secretary Ernest Moniz says the review is a chance to “have this dialogue and reach a conclusion.”

It’s way past time for that talk. The panel should come up with a well-thought-out plan to either overhaul NNSA from top to bottom or outright kill it and let the DOE take on its oversight duties.

This editorial first appeared in the Albuquerque Journal. It was written by members of the editorial board and is unsigned as it represents the opinion of the newspaper rather than the writers.

 

My response:

Abolish NNSA, but increase federal oversight and independent review

Kudos for the editorial “Time past for coddling bloated nuclear agency.” The money the National Nuclear Security Administration (NNSA) has wasted on out-of-control nuclear weapons projects is appalling. Some examples are the Chemistry and Metallurgy Research Replacement Project at Los Alamos (estimated costs exploded from $660 million to $5.8 billion), the failed National Ignition Facility at the Livermore Lab in California ($1 billion to $5 billion), the MOX Fuel Fabrication Facility in South Carolina ($1 billion to $7 billion), and now the Uranium Processing Facility at the Y-12 Plant in Tennessee ($1 billion to $10 billion).

Despite all this chronic mismanagement NNSA’s proposed budget was increased 17% above FY 2013 sequester levels. That’s right, the guilty were rewarded, while schools, firefighting, environmental protection, etc. were cut.

But while NNSA is truly dysfunctional, its contractors deserve more scrutiny as well. After all, the agency is simply out manned, with some 2,600 (and declining) employees trying to oversee more than 50,000 contractor employees nation-wide. Moreover, these contractors have inherent conflicts-of-interest. For instance, the lab directors wear two hats, first as those responsible for annual certification of the safety, security and reliability of the nuclear weapons stockpile, which gives them enormous leverage. Their second hat is as presidents of the executive boards of the for-profit corporations running the labs. How can we be sure they are always acting in the best interests of the country while they are pushing a never-ending cycle of extremely costly “Life Extension Programs” for existing nuclear weapons? Ironically, these programs may actually erode confidence in stockpile reliability by intentionally introducing major changes that can’t be full-scale tested.

As your editorial noted a congressionally appointed panel is beginning to study the NNSA’s future. I make some recommendations for that panel:

•     The NNSA is a failed experiment and should be abolished. Its nuclear weapons programs should revert back to “Defense Programs” within the Department of Energy, as it was pre-2000.

•     As guarantors of the nuclear weapons stockpile, the lab directors should be just lab directors, their jobs institutionally insulated from the for-profit motivations of the private corporations running the labs.

•     Duplicative bureaucratic red tape should be eliminated, but federal oversight should be increased, not decreased (witness a protesting 82-year-old nun infiltrating an extremely sensitive area at Y-12 despite contractor security assurances). Concrete benchmarks need to be put back into now toothless annual Performance Evaluation Plans so that contractors are held truly accountable. NNSA’s past practice of granting waivers for poor performance while handing out contract extensions (as was done for the Los Alamos and Livermore Labs) must end.

•     DOE should be required to seek concurrence from the congressionally chartered Defense Nuclear Facilities Safety Board early in the design of nuclear facilities. Past NNSA delays in meeting safety concerns have been a prime driver of exploding project costs.

•     Congress should establish a stringent change control process for nuclear weapons, including a requirement for outside review of all proposed major changes. Because the labs lack conservatism in maintaining the pedigree of tested, reliable designs, independent expert review could save 100’s of billion of dollars over the next few decades and help maintain confidence in stockpile reliability. As a past example, a group of eminent independent scientists called the JASONs found that the cores of nuclear weapons, the plutonium pits, have reliable life times of around a century, in contrast to NNSA’s previous claims of 45 years. This helped to convince Congress to delete funding for NNSA’s proposed, enormously expensive new-design nuclear weapons and related expanded plutonium pit production.

•     Finally, the congressionally appointed panel deliberating on NNSA’s future should itself be above reproach. One member, former Congresswoman Heather Wilson, pocketed $450,000 in no-bid “consulting” contracts with the Los Alamos and Sandia Labs, in between her terms representing New Mexico’s First District and her Senate campaign that largely championed the labs. She should resign from the panel so that its future recommendations are not tainted by her clear conflict-of-interest.

Jay Coghlan

Nuclear Watch New Mexico

Report Reveals That Little is Known About Lab’s Future Plutonium Needs

Report Reveals That Little is Known About Lab’s Future Plutonium Needs
Except LANL Contractor Needs Money

A Government Accountability Office (GAO) report reveals how the future of expanded nuclear weapon component production at Los Alamos is unknown. The public has had enough of half-baked billion-dollar plans for nuclear facilities that do nothing but line contractors’ pockets. Congress must put away the check book and realize that the Lab’s plutonium future is unknown because it is unneeded.

Let’s get some details out of the way –

Los Alamos National Laboratory (LANL) houses most of the nation’s capabilities for plutonium research and development in support of the nuclear weapons mission. In addition, LANL’s scientists and technicians also perform research on plutonium to support other missions, such as conducting research on recycling plutonium for use as fuel in commercial nuclear reactors (MOX).

The National Nuclear Security Administration (NNSA), a separately organized agency within the Department of Energy (DOE), is responsible for the management of the nation’s nuclear weapons.

Plutonium pits are the fissile cores of modern nuclear weapons (fissile means capable of sustaining a nuclear reaction). When a nuclear weapon is detonated the pit is explosively compressed into a critical mass that rapidly begins atomic fission. In modern two-stage weapons the plutonium pit acts as the primary (or “trigger”) that initiates fusion in the thermonuclear secondary. Each pit is an atomic bomb in its own right, similar to the Trinity and Nagasaki bombs, both of which were plutonium bombs. In thermonuclear or hydrogen bombs the plutonium pit serves as the trigger that detonates the far more powerful fusion explosion characteristic of hydrogen bombs.

(The need for any more nuclear weapons production ever is actually zero.)

NNSA claims that the need is unknown –
Because of public participation, lack of need, and budget concerns, construction of the Lab’s $6 billion Chemistry and Metallurgy Research Replacement (CMRR) nuclear facility was deferred for at least five years starting in 2012. The CMRR would have enabled a production capacity of 50-80 pits per year. Theoretically, the Lab is currently capable of producing 10-20 pits per year, maybe. But it produced zero this year.

It is now unclear when or if the CMRR nuclear facility will be built, which the Lab claims may lead to insufficient capabilities to meet LANL’s plutonium research requirements. But no one really can say what these requirements are.

The report states the uncertainty–

The Nuclear Weapons Council is still evaluating specifications for nuclear weapons and their corresponding life extension program schedules, and it may take another year or two before final decisions are made, according to NNSA officials. Since the schedule has not been finalized, the number of pits that will be needed is uncertain as well. (Pg. 10)

Officials have announced that they are seeking alternatives to the CMRR that would provide the capabilities planned for the CMRR nuclear facility using existing facilities. This would be replacing deferred unneeded capabilities with unneeded capabilities. Instead of trying to replace the lacking capabilities of the CMRR, NNSA should first describe the actual pit needs, which are none.

Meanwhile, “NNSA has estimated that it needs to be able to ramp up its capabilities to manufacture about 30 pits each year by 2021” to meet expected life extension program requirements. (Life extension programs are intended to lengthen the lives of existing nuclear weapons by 20 to 30 years by repairing or replacing nuclear weapons components as needed.)

But the 30 number is just a guess “for planning purposes”.
For planning purposes, NNSA is studying the possibility of manufacturing about 30 pits per year… (Pg.10)
“Studying the possibility” is not a need.

NNSA now believes that LANL can support the manufacture of 30 pits per year just by upgrading its radiological laboratory and by repurposing available space in its existing plutonium facility. (Pg. 12)

Also,
Costs are unknown –
The cost estimates were characterized as “high-level and a rough order of magnitude and noted that the estimates should be viewed as preliminary and preconceptual that would not be useful for program definition or scoping.” (pg.15)

Staffing is unknown.

NNSA and LANL officials told us that recruiting additional staff for plutonium-related research necessarily takes years of advance planning, but that the uncertainty of where the new capabilities will be located or what the level of capacity is needed has complicated planning efforts. (Pg. 17)

What is know is the public is a problem –

Plans for transporting plutonium or other radioactive materials from LANL to facilities at other sites could also spur public opposition that may cause schedule delays or create other impediments…

Other impediments?
Like speaking up?

NNSA life extension program and Pentagon tail fin kit create new military capabilities

The NNSA press release below reports on a limited drop test of a mocked up B61-12 nuclear bomb from a helicopter, not its slated delivery systems (B-2 bombers and various sophisticated NATO aircraft). But this press release is of course misleading, focusing on replacing radar vacuum tubes in order “to increase the safety and security of the bomb.”

The real action will begin soon. Note the press release’s phrase “With the incorporation of a new Air Force tail kit assembly…” In its last budget request NNSA marks the following milestone “In FY 2014, NNSA will integrate the nuclear bomb assembly components and the Air Force Tail Kit Assembly into functional Compatibility Test Units (CTUs) for integration testing with Air Force nuclear certified aircraft.” NNSA FY 2014 Congressional Budget Request, page WA-32.

This is a good example of how the NNSA’s ~$10 billion B61 Life Extension Program and the Air Force’s ~$3.2 billion Tail Kit Assembly program are co-joined. Together they will create the world’s first nuclear “smart” bomb for delivery by future super stealthy F-35s (with each bomb costing more than twice their weight in gold). This clearly creates new military capabilities for an existing nuclear weapon, contrary to official U.S. policy declared at the 2010 NonProliferation Treaty Review Conference and elsewhere.

National Nuclear Security Administration
U.S. Department of Energy

For Immediate Release
August 29, 2013
Contact: NNSA Public Affairs, (202) 586-7371

B61-12 Life Extension Program Radar Drop Tests Completed Successfully

WASHINGTON, D.C. – As part of the ongoing effort to refurbish the aging B61 nuclear bomb without resorting to underground nuclear testing, two successful B61-12 radar drop tests were successfully completed at the Tonopah Test Range in Nevada on Aug. 14 and 15, 2013, by engineers from Sandia National Laboratories.

Current B61s use decades-old vacuum tubes as part of their radar system. The new radar system, which had not been tested outside of a laboratory environment, was assembled in a gravity bomb configuration and successfully functioned as it was dropped from a helicopter.

“The B61 contains the oldest components in the U.S. arsenal,” said Don Cook, National Nuclear Security Administration Deputy Administrator for Defense Programs. “As long as the United States continues to have nuclear weapons, we must ensure that they remain safe, secure and effective without the use of underground testing. The B61 has been in service a decade longer than planned, and our refurbishment program is a scientific and engineering challenge. These successful tests have given us confidence in our ability to integrate the new radar design and move forward with our efforts to increase the safety and security of the bomb.”

The Nuclear Weapons Council, a joint Department of Defense and Department of Energy/NNSA organization established by Congress, moved the B61 Life Extension Program (LEP) from the planning stages to development engineering in February 2012. The scope of this LEP includes refurbishment of both nuclear and non-nuclear components to address aging, ensure extended service life, and improve safety, reliability and security of the bomb. With the incorporation of a new Air Force tail kit assembly, the design will also enable consolidation and replacement of the existing B61-3, -4, -7, and -10 bombs by the B61-12 bomb. The LEP will reuse or remanufacture existing components to the extent possible.

This radar drop test is one of several critical milestones for the B61-12 LEP this year. Radar testing will continue with integration of other B61-12 components, including the weapon and firing control units to demonstrate the arming, fuzing and firing subsystem. The B61-12 LEP is an essential element of the U.S. strategic nuclear deterrent and of the nation’s commitments to extended deterrence and it ensures the continued vitality of the air-delivered leg of the U.S. nuclear triad.

Established by Congress in 2000, NNSA is a semi-autonomous agency within the U.S. Department of Energy responsible for enhancing national security through the military application of nuclear science. NNSA maintains and enhances the safety, security, reliability and performance of the U.S. nuclear weapons stockpile without nuclear testing; works to reduce global danger from weapons of mass destruction; provides the U.S. Navy with safe and effective nuclear propulsion; and responds to nuclear and radiological emergencies in the U.S. and abroad. Visit www.nnsa.energy.gov for more information.

 

Excellence Unfulfilled at the LANL’s Plutonium Facility

A Los Alamos National Laboratory fact sheet touts the Lab as a plutonium “center of excellence”. However, the Laboratory Director paused operations in the Plutonium Facility on June 27, 2013. (The Plutonium Facility, called PF-4, is located at Technical Area 55 at Los Alamos National Laboratory (LANL). PF-4 is home for the Lab’s plutonium work, including nuclear weapons component production.) The pause was based on issues identified during safety reviews and findings from recent assessments. For one, the Defense Nuclear Facilities Safety Board (Board) performed a review of the Criticality Safety Program at Los Alamos National Laboratory (LANL) in May 2013. (The Board is an independent organization within the executive branch chartered with the responsibility of providing recommendations and advice to the President and the Secretary of Energy regarding public health and safety issues at Department of Energy (DOE) defense nuclear facilities.) This review identified significant non-compliances with DOE requirements and industry standards in the Lab’s Criticality Safety Program (CSP). In addition, this review identified criticality safety concerns around operations at the Plutonium Facility. The Board noted that some of these deficiencies are long standing and indicated flaws in federal oversight and contractor assurance. Much plutonium work, especially work with a high potential for criticality, will be stopped through the rest of 2013.

Nuclear criticality safety is defined as “protection against the consequences of an inadvertent nuclear chain reaction, preferably by prevention of the reaction.” The most potentially dangerous aspect of a criticality accident is the release of nuclear radiation if it maintains a self-sustaining nuclear chain reaction.

To date, the only thing self-sustaining is the Lab’s inability to address its criticality issues and yet still convince Congress to keep funding plutonium work there. To prevent bad things from happening, DOE’s regulations and directives require contractors to evaluate potential accident conditions and put in place appropriate controls and safety measures. History shows that the Los Alamos Laboratory just cannot do this, even though much of the work is performed on plutonium pits, the primaries of nuclear weapons. Even though actual need for this work has not been proven, the Lab has entrenched itself as the only place in the country where plutonium pits can be made, developed, and tested.

For fiscal year 2014, the budget request for nuclear ‘weapons activities’ at LANL was $1.4 billion. The exact amount that is spent on plutonium operations in PF-4 is unknown to us, but the budget request for 2014 for Directed Stockpile Work, which is where major parts of the plutonium operations are located, was $460 million. This is a 23% increase over last year’s budget. The funding pours into the Lab regardless of whether the Lab is actually doing any work, which is frequently stopped.

Here’s history of criticality problems and work stoppages at Los Alamos Laboratory:
In 2005, an assessment determined that LANL’s expert-based Criticality Safety Program (CSP) was not compliant with applicable DOE requirements and industry standards.

In 2006, LANS developed a Nuclear Criticality Safety Program Improvement Plan.

In 2007, in response to concerns raised by the Board’s staff, LANL determined that the authorized loading of vault storage rooms in PF-4 could lead to a critical configuration.

In 2008, the Government Accountability Office reported concerns about nuclear safety at LANL are long-standing. Problems included 19 occasions since 2003 where criticality safety requirements were violated, such as storing materials in quantities higher than safety limits allow, 17 of 19 of the site’s nuclear facilities operating without proper safety documentation, reported inadequacies in safety systems, radiological releases, and four enforcement actions for significant violations of nuclear safety rules.

Los Alamos Report for Week Ending April 3, 2009
LANL management placed the facility in stand-by mode until roughly 125 safety evaluations could be re-evaluated.

Los Alamos Report for Week Ending October 2, 2009
The Plutonium Facility was placed in standby mode because management declared the fire suppression system inoperable based on recent hydraulic calculations that concluded the system was not able to achieve the water coverage required. LANL had performed a system adequacy analysis in 2008. The hydraulic calculation completed for the system identified that 13 of approximately 100 hydraulic areas did not meet the requirement.

Los Alamos Report for Week Ending October 16, 2009
A general evacuation alarm was caused by a Criticality Alarm System signal because of a loss of all facility ventilation and failure of the Facility Control System at the Plutonium Facility. The facility was in standby mode during this event due to previously identified issues with the fire suppression system and, therefore, limited personnel were in the facility.

Los Alamos Report for Week Ending September 10, 2010
Operations in Plutonium Facility were suspended because potentially explosive ammonium nitrate was discovered in two filter ducts.

Los Alamos Report for Week Ending December 3, 2010
It was revealed that greater than 1000 items, or about 20%, of the total vault holdings are items packaged in potentially vulnerable containers with taped slip-top lids rather than in robust safety-significant containers that include a HEPA-filtered vent. The presence of these slip-top containers requires respirator use whenever operators access the vault. In FY10, LANL made meaningful progress in addressing these legacy materials.

In 2011, an event occurred at PF-4 in which fissile material handlers violated procedural requirements and criticality safety controls while moving and photographing plutonium rods.

Beginning in 2012, LANS experienced an 18-month exodus of criticality safety professionals from its criticality safety group. LANS currently employs 2 full-time and 2 part-time qualified criticality safety analysts, in addition to 3 part-time subcontractors—far fewer than the 17 criticality safety analysts it has determined to be necessary to support operations, meet mission goals, and maintain the CSP.

Los Alamos Report for Week Ending April 20, 2012
Plutonium Facility personnel use a software program called MAR Tracker to track plutonium that is used in the facility. A system engineer discovered an error in
MAR Tracker that caused only a small subset of applicable facility containers (roughly 1700 out of 13000 containers) to be checked during the required annual MAR surveillance. The Plutonium Facility was placed in Standby Mode.

Los Alamos Report for Week Ending June 15, 2012
LANL identified a number of fuel rods in TA-35 Building 27 that were not consistent with the criticality safety evaluation for the facility. Operations at this building had previously been suspended in late-May due to the discovery of three fuel rods that were not in the facility or institutional tracking systems.

Los Alamos Report for Week Ending December 14, 2012
LANL identified that the Criticality Safety Evaluations (CSEs) for two rooms did not adequately address the potential for interaction effects between storage locations. Plutonium Facility management suspended operations in these two vault rooms.

Los Alamos Report for Week Ending February 15, 2013
LANL began a focused training program (“boot camp”) to provide an intensive learning environment for new criticality safety staff. The program consisted of nine modules including: nuclear theory; criticality safety calculation methods; ANSI/ANS, DOE and LANL criticality safety standards and requirements; criticality safety evaluations; and criticality alarm and detection systems. This program along with on-the-job training and performance demonstrations was to provide a mechanism for achieving full qualification as a LANL criticality safety analyst. Conduct of the boot camp was part of the LANL corrective action plan for improving the nuclear criticality safety program.

Los Alamos Report for Week Ending May 3, 2013
The laboratory completed criticality safety assessments at LANL nuclear facilities. The review teams identified 3, 4, and 6 findings for TA-55, CMR, and Area G, respectively. In all cases, the assessments concluded adequate implementation of the Criticality Safety Program with the exception of identified findings. Notably, one of the findings at Area G identified that supervisors and operations center personnel did not have an adequate understanding of criticality safety requirements. Area G management paused operations based on this finding and conducted appropriate training to resolve this issue.

In May 2013, the staff of the Defense Nuclear Facilities Safety Board (Board) performed a review of the Criticality Safety Program at Los Alamos National Laboratory. This review identified significant non-compliances with applicable Department of Energy requirements and industry standards in the implementation of the Criticality Safety Program. The Board’s staff identified the following non-compliances during its review:
• Most criticality safety controls are not incorporated into operating procedures.
• Operators typically do not utilize written procedures when performing work.
• Fissile material labels do not list parameters relevant to criticality safety (e.g., mass).
• Some fissile material operations lack Criticality Safety Evaluations (CSEs).
• Some CSEs do not analyze all credible abnormal conditions.

Los Alamos Report for Week Ending June 28, 2013
The Laboratory Director paused programmatic activities at the Plutonium Facility. The pause was directed based on issues identified during procedural and criticality safety reviews and findings from recent assessments. Reviews at PF-4 have identified a number of procedural issues and the need for clarification and improvement of criticality safety controls.

Los Alamos Report for Week Ending July 26, 2013
Plutonium Facility personnel identified several criticality safety issues associated with recent construction activity. Even though plutonium work was paused, the Laboratory Director and the Facility Operations Director (FOD) approved construction activities that had the potential to affect nuclear materials.

For more information, please read the LAMonitor article By John Severance
Safety board visits LANL

Nuclear weapons are “the world’s most heinous weapons”

Secretary of State John Kerry correctly condemned the Syrian regime’s apparent use of chemical weapons, but he’s wrong calling them “the world’s most heinous weapons.” Instead that awful distinction belongs to nuclear weapons, a class of weapons far above any other. If ever used again nuclear weapons would indiscriminately kill far more people, including women, children and non-combatants, than chemical weapons ever could, and poison the planet with radioactive fallout. Nevertheless our country is planning repeating cycles of “Life Extension Programs” costing $100 billion or more, giving existing nuclear weapons new military capabilities. This is directly contrary to what Kerry’s predecessor ex-Secretary Hillary Clinton declared as official U.S. policy at the 2010 NonProliferation Treaty Review Conference.

The cost of the mismanaged Los Alamos and Sandia Labs’ Life Extension Program for the B61 nuclear bomb has more than doubled from $4 billion to $10 billion. A related $3.2 billion Pentagon program will produce a new tail fin guidance kit. Together these programs will create the world’s first nuclear “smart” bomb for delivery by future super stealthy aircraft, while each bomb will cost more than twice their weight in gold.

The U.S. should review its own moral authority while preparing for military action in Syria. In particular our New Mexican congressional delegation must stop automatically supporting expanded nuclear weapons programs without deeply questioning their own consciences. Our politicians’  justifications to date have been to protect a few hundred jobs at the Labs, which don’t really trickle down to average New Mexicans anyway.

As evidence of the lack of broad benefit to New Mexicans, according to the U.S. Census Bureau our state was 37th in per capita income in 1959. In 2010 we were 44th, despite the vaunted economic presence of the nuclear weapons industry in New Mexico, and in 2013 we were rated dead last for the well being of our children by the KIDS COUNT Data Center. Our politicians should be striving mightily that New Mexicans increasingly benefit from our vast renewable solar, wind, biomass and geothermal resources that would employ far more citizens, instead of pandering to nuclear weapons programs that produce a commodity that we can only hope will never be used.

 

 

 

On my soap box about Sandia Labs

John Fleck of the Albuquerque Journal had an article today entitled “Sandia Labs manager gets 6 more months,”  describing Lockheed Martin’s half year contract extension. John knows all three nuclear weapons labs well, and I won’t be telling him things that he doesn’t already know. But I’ll use his article as an excuse to stand on my soap box about Sandia Labs.

To my taste, John’s article makes Sandia sound a little too benign with phrases like “the nuclear weapons research center” and “Sandia is one of the nation’s three nuclear weapons design and maintenance laboratories.” What is left unreported is that Sandia is a major production site that, for example, manufactured 850 neutron generators for nuclear weapons in 2010, and loads them with radioactive tritium. In addition to design responsibility for non-nuclear components, Sandia’s secondary mission has long been “weapons effects” research for making sure nuclear weapons continue to work in lethal radiation environments. This enables multi-strike nuclear warfighting rather than the simple deterrence sold as doctrine to the American public.

Further, instead of mere “maintenance,” all three nuclear weapons labs (Sandia, Los Alamos and Lawrence Livermore) are lobbying for a never-ending cycle of so-called Life Extension Programs that will intentionally introduce profound changes to existing nuclear weapons. Major changes are the last thing we should do to a stockpile that has been extensively tested and proven to be even more reliable than previously thought, when we can no longer full-scale test. All of this will be of enormous expense to the American taxpayer, where for example the currently proposed Life Extension Program for the B61 bomb has exploded in costs from $4 billion to more than $10 billion, resulting in each bomb costing twice its weight in gold. Added to this is a related $3.2 billion Pentagon program giving the B61 a new tail fin guidance kit, transforming it into the world’s first nuclear “smart” bomb for delivery by planned super stealthy aircraft.

In addition to prolonging their service lives for 30 years or more, these Life Extension Programs have and will create new military capabilities for existing nuclear weapons, despite denials at the highest levels of the U.S. government to the world at large (for example, at the United Nations’ 2010 NonProliferation Treaty Review Conference). The lab directors wear two hats, the first as directors who are required to annually certify to the president and Congress that the nuclear weapons stockpile is safe, secure and reliable. The second hat is that as presidents of the executive board of the for-profit corporations running the labs, which will directly benefit from never-ending Life Extension Programs that may actually undermine stockpile reliability. So far from mere “research” and “maintenance” we have a deep seated conflict-of-interest driven by profit that will stymie our global leadership toward getting rid of nuclear weapons while continuing to fleece the American taxpayer.

Foremost in this is the Sandia National Laboratories, which amongst the three labs now has the largest nuclear weapons budget. In the past, Sandia has been singled out as a model of lab mission diversification, with its total annual institutional budget falling below 50% nuclear weapons. That is no longer true given recent large increases to its nuclear weapons research and production programs, which now comprise ~55% of Sandia’s total budget.

 

 

Nuclear weapon research at the universities

A July 5th article in the Deseret News reported on an NNSA program that gives millions of dollars to universities for “predictive science”, which is defined as:

Predictive science is the application of verified and validated computational simulations to predict the behavior of complex systems where routine experiments are not feasible. The selected PSAAP II centers will focus on unclassified applications of interest to NNSA and its national laboratories — Lawrence Livermore National Laboratory, Los Alamos National Laboratory and Sandia National Laboratories.

Funny, nuclear weapons are not mentioned.
The good news, and few know this better than Utah, is that testing nuclear weapons no longer requires full-scale explosions. The bad news is that predictive science, to the NNSA, is the “science” of predicting whether nuclear warheads will work after they have been refurbished, modernized, and given new military characteristics. We know that the old versions work. Do the students know that they helping to prolong the nuclear menace by testing newly designed versions of the old weapons on their computers?
It should be called nuclear weapons perpetuating science 101.

New Mexico Members of Congress Vote for Exorbitant Nuclear Bomb While State Is Ranked as the Worst for Children

Yesterday all three House members of the New Mexican congressional delegation voted against an amendment that would cut money added to a wasteful nuclear weapons program. In April the Obama Administration asked for $537 million in fiscal year 2014 for a “Life Extension Program” for the B61 Cold War nuclear bomb, 45% above the 2013 level. The House Appropriations Committee added $23.7 million to that bloated request, which the amendment would have cut. Overall, the B61 Life Extension Program has exploded in estimated costs to where each warhead will cost twice their weight in gold just to “refurbish” (which does not include original production and ongoing maintenance costs).

 The sponsor of the amendment, Rep. Mike Quigley, D-Ill., testified during floor debate:

At a time when we are slashing funds for disease research at the NIH [National Institute of Health], failing to fund our crumbling infrastructure, and underinvesting in our children¹s education, we are increasing funding to keep hundreds of nuclear bombs in operation that we will never use. The Cold War is over.

The Albuquerque Journal reported that Rep. Ben Ray Luján, D-N.M.,

…supported the full $551 million for the B61 Life Extension Program because it is a national security priority. “This funding is important for Los Alamos and Sandia labs’ effort to ensure the safety of the nuclear weapons stockpile, and cuts to that funding impact the ability to keep it secure,” Luján said.

Rather just ensuring safety and security the program will radically improve the bomb, giving it new military capabilities by turning it into a precisely targeted smart bomb and mating it to future bombers for supersonic stealthy delivery. Currently the main mission of B61 bombs is as tactical nuclear weapons in NATO countries, a relic of the Cold War. Improved B61’s fly in the face of Obama’s newly declared goal of reducing the presence of battlefield nuclear weapons in Europe, even as he proposes to negotiate with the Russians for further arms reductions. Moreover, if security is really the issue, the sure solution that saves taxpayers money and encourages nonproliferation is to withdraw the nuclear bombs from forward deployment in Europe, where a few years ago protesting peace activists were able to infiltrate within a few hundred yards of them.

Ironically, the B61 Life Extension Program may actually undermine our own national security by introducing major changes to existing bombs. Our stockpile has been extensively full-scale tested, and repeated studies have found our nuclear weapons to be even more reliable than previously believed. The Los Alamos and Sandia Labs propose to create a “frankenbomb” by mixing and matching four variants of the B61 bomb into a single new modification. Common sense dictates that the last thing we should do while seeking to maintain confidence in our reliable nuclear weapons stockpile is to introduce major changes that can’t be tested.

Our New Mexican congressional delegation represents a state that was just ranked as the worst of all fifty for the well-being of its children, where more than 25% live in poverty. In stark contrast, Los Alamos County, dominated by the lab, is the second richest county in the entire USA. Nuclear weapons programs are a poor producer of jobs, where for example according to the government’s own documents a new $6 billion plutonium facility was not going to produce a single new permanent job at Los Alamos Lab.

Contrary to the claimed economic benefits of the Los Alamos and Sandia Labs, New Mexico as a whole continues to fall from 37th in per capita personal income in 1959 to 44th in 2011. Nevertheless, the Labs have always had inordinate influence over New Mexican politicians. One extreme example is the recent starling revelation that in between unsuccessful Senate campaigns former Rep. Heather Wilson was paid more than $450,000 by the Los Alamos and Sandia Labs for “consulting” contracts that had no written work requirements.

The nuclear weapons labs have voracious appetites for federal funding, with their directors simultaneously acting as the presidents of the executive board of the for-profit limited liability corporations that run the labs (those private LLCs pay 2/3’s of the directors’ annual compensation of around one million dollars). Business will boom with never-ending Life Extension Programs, and Sandia and Los Alamos are not satisfied with just one Life Extension Program for the B61. They already plan yet another one 20 years from now that initial figures indicate would be even more expensive. In fact, the labs plan a never-ending cycle of Life Extension Programs that intentionally seek to implement major design changes for all existing types of nuclear weapons in our stockpile, costing at least $60 billion (while the doubling of costs has so far been the rule).

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “Congressman Ben Ray Luján should ask himself the question what good does a Cold War nuclear bomb that the for-profit labs want to endlessly tinker with do for New Mexican children? Pork for the labs should not drive nuclear weapons policies, especially when it’s of little if any tangible benefit to average New Mexicans. Luján should, instead, dedicate himself to boosting funding for programs that would really help our children but are facing painful sequester cuts, such as education, medical care and food assistance. Those investments would really brighten their future, and help raise New Mexico from its shameful position as the worst state for kids.”

# # # 

See House rejects effort to trim $23.7M in funding for B61, Michael Coleman, Albuquerque Journal, July 11, 2013.

For New Mexico’s ranking as the worst state for kids see Kids Count Data Center http://datacenter.kidscount.org/updates/show/20-2013-data-book-rankings
For the scope and schedule of perpetual Life Extension Programs for existing nuclear weapons see NNSA’s FY 2014 Stockpile Stewardship and Management Plan
https://nukewatch.org/importantdocs/resources/SSMP-FY2014.pdf

NM Environment Department Reclassifies WIPP Request!

Thanks to everyone’s work, the NM Environment Department has decided to get more information before allowing any leaky Hanford high-level tank waste to come to New Mexico!

NMED issued its determination to reclassify the DOE request as a class 3 – which requires a public hearing – “because there is significant public interest.”

Public comments made the difference!

There will be much more to do.

See https://nukewatch.org/watchblog/?p=1503 for background.

From the NMED release –
July 2, 2013
RE: ELEVATION OF CLASS 2 MODIFICATION TO REMOVE EXCLUDED WASTE PROHIBITION WASTE ISOLATION PILOT PLANT

The New Mexico Environment Department (Department) received a permit modification
request dated April 8,2013 from the U.S. Department of Energy Carlsbad Field Office and
Nuclear Waste Partnership, LLC (the Permittees) on April 9,2013. The Permittees seek to
modify the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (Permit) and
request that the Department process the request as a Class 2 modification under the
regulations at 20.4.1.900 NMAC, incorporating 40 CFR § 270.42(b).
The request modifies the prohibition of excluded waste from the WIPP Permit.

Page 2
Under 40 CFR § 270.42(b)(6)(i)(C), the Secretary may determine that the modification
request must follow the procedures in § 270.42(c) for Class 3 modifications for the following
reasons: (1) There is significant public concern about the proposed modification; or (2) The
complex nature of the change requires the more extensive procedures of Class 3.
In this matter, I have determined that it is appropriate for the Department to process the
modification request as a Class 3 modification under 40 CFR § 270.42( c) because there is
significant public interest.
If you have questions regarding this matter please address them to Trais Kliphuis, of the
Hazardous Waste Bureau, at 476-6051 or [email protected].
Sincerely,
Ryan Flynn
Cabinet Secretary-Designate

Help Stop Increased Nuclear Weapons Funding

Immediate Action Required

The House of Representatives Energy & Water Appropriations bill is coming up for a vote this week of July 8, 2013. It will come up tomorrow, with votes on amendments as soon as Tuesday or Wednesday. Rep. Quigley (D-IL) will be offering a floor amendment cutting the increase that the Energy & Water subcommittee added to the B61 Life Extension Program.

Please call urging your Representative to vote yes on the Quigley amendment to cut funding on the B61 nuclear warhead program. Please call rather than email at this point, to DC offices, as the timeline is very short.

Over the last few years, spending on nuclear weapons and nuclear bomb plants has continued to grow despite massive cost overruns. Especially wasteful is the plan to overhaul the B61 nuclear bomb, with an eventual total cost of $10 billion by 2019. This is way too much money for a bomb that is dangerous and outdated, and it is urgent that we slow down the spending before it is too late.

Cutting nukes spending in the Republican-controlled House can be an uphill battle. But we have been working with allies in Congress to stop this program that would overhaul 400 B61 nuclear bombs at a total price tag of $25 million each (almost double their weight in gold). We can see some wins, if our representatives feel the pressure.

Call your representative now at (202) 224-3121 to vote for the Quigley amendment to cut funds for the B61 nuclear bomb. [Direct phone numbers for the New Mexican delegation below.]

Subject Line: Budget Cut for Nuclear Bombs

Dear [Name],

Call your representative at (202) 224-3121 right now. To look up your representative click here: http://www.house.gov/representatives/find/
Use this sample message and add your own words:

“My name is [your name] and I live in [your city]. I am calling to tell Rep. [your rep’s name] to vote for the Quigley amendment to the Appropriations bill to cut excess funds for the B61 nuclear bomb.”
This is an important chance to cut wasteful spending on dangerous and outdated nuclear weapons. You can convince Congress to make this a priority.

Thank you,

Your name

New Mexico Representatives
Rep. Ben Ray Luján
http://lujan.house.gov/
Washington D.C. Office • Ph: (202) 225-6190

Rep. Michelle Lujan Grisham
http://lujangrisham.house.gov/
Washington, DC Office?•?Phone: 202-225-6316?

Rep. Steve Pearce
http://pearce.house.gov/
Washington, DC Office • Phone: 855-4-PEARCE (732723) or (202) 225-2365

Senate Appropriations Cuts Nuclear Bomb Life Extension Program; NM’s Tom Udall Tries to Restore Funding to Bloated Program

Santa Fe, NM – Today the Senate Energy and Water Development Appropriations Subcommittee reported that it cut funding for the National Nuclear Security Administration’s B61 nuclear bomb Life Extension Program (LEP). This is a significant victory for good governance, and it could positively influence future nuclear arms control.  The Obama Administration’s request for the B61 LEP was $537 million for FY 2014, a 45% increase above FY 2013. Senate Energy and Water cut it by $168 million to $369 million, and directed NNSA to look at alternatives since the full-blown program is experiencing massive cost overruns.

Senator Tom Udall opposed this cut since most of the B61 work will take place at the Los Alamos and Sandia nuclear weapons labs in New Mexico. Udall now sits on Senate Energy and Water, and successfully engineered a provision that would restore B61 LEP funding if certain cost and schedule requirements are met. Meanwhile House appropriators have added $23 million to the already bloated program, which sets up a sharp difference that must be reconciled in conference. This is where “deals” tend to be cut, and Tom Udall’s position on the B61 LEP could be critical.

In the past few years Senator Tom Udall actively supported a Walmart-sized “CMRR-Nuclear Facility” at Los Alamos that exploded in costs from $600 million to ~$6 billion, which for fiscal reasons the Obama Administration prudently decided to delay.  The CMRR’s main mission is to quadruple LANL’s production of plutonium cores (or “pits”) for nuclear weapons. Expanded pit production is necessary only for new-design nuclear weapons or heavily modified existing weapons.

If the full Life Extension Program that Tom Udall currently supports goes forward the estimated 400 B61 nuclear bombs will literally cost more than their weight in gold to refurbish (and that does not include original production costs). Moreover, the program will radically improve the bomb, giving it new military capabilities by turning it into a precisely targeted smart bomb and mating it to future bombers for supersonic stealthy delivery. Currently the main mission of B61’s is as tactical nuclear weapons in NATO countries, a relic of the Cold War. Improved B61’s fly in the face of Obama’s just declared goal of reducing the presence of battlefield nuclear weapons in Europe, even as he proposes to negotiate with the Russians for further arms reductions.

The nuclear weapons labs’ have voracious appetites for federal funding, with their directors simultaneously acting as the presidents of the executive board of the for-profit limited liability corporations that run the labs (those private LLCs pay 2/3’s of the directors’ annual compensation of around one million dollars). Business will boom with never-ending Life Extension Programs, and Sandia and Los Alamos are not satisfied with just one Life Extension Program for the B61. They already plan yet another one 20 years from now that initial figures indicate would be even more expensive.

In fact, the labs plan a never-ending cycle of Life Extension Programs that intentionally seek to implement major design changes for all existing types of nuclear weapons in our stockpile, costing at least $60 billion (while the doubling of costs has so far been the rule). Further, these major changes may undermine our own national security by eroding confidence in performance reliability when major modifications cannot be full-scale tested. We should instead stick to proven existing nuclear weapons designs, and avoid serious changes which arguably profit only nuclear weapons contractors.  Genuine maintenance of our nuclear weapons stockpile, such as the well-understood replacement of limited life components, would be prudent, technically sound and relatively inexpensive.

New Mexico, the state that Tom Udall represents, was just ranked as the worst state of all fifty for the well-being of its children, where more than 25% live in poverty. In sharp contrast, Los Alamos County, dominated by the lab, is the second richest county in the entire USA.

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “Tom Udall could better serve all New Mexicans if he focused more on improving the lives of our children instead of the nuclear weapons labs and the service life of an archaic Cold War nuclear bomb. Specifically, he should drop his opposition to the cut in funding for the exorbitant and unneeded B61 nuclear bomb Life Extension Program, and make that clear in House-Senate conference. He should, instead, seek to boost funding for programs that really benefit New Mexican children but are facing painful sequester cuts, such as education, medical care and food assistance. And given our state’s increasingly crippling drought, Tom Udall could better serve all New Mexicans while sitting on the Senate Energy and Water Subcommittee by expanding water conservation and wildfire prevention programs, instead of favoring the labs through so-called Energy appropriations with increased funding for worse than useless nuclear weapons programs.”

# # #

Obama Calls For Further Nuclear Weapons Reductions While Increased Production and New Facilities at Los Alamos Are Still On the Table

Obama Calls For Further Nuclear Weapons Reductions
While Increased Production and New Facilities at Los Alamos Are Still On the Table

On June 19, in Berlin, President Barack Obama declared that, in concert with Russia, he plans to seek to cut the deployed strategic nuclear arsenal by up to one-third. He also said he will pursue significant bilateral cuts in tactical or battlefield nuclear weapons in Europe. In contrast, Obama’s National Nuclear Security Administration (NNSA) recently released plans for unneeded upgrades and dangerous improvements to existing nuclear weapons, which could force expanded nuclear component production and construction of new facilities at Los Alamos.

In the just released “FY 2014 Stockpile Stewardship and Management Plan” (SSMP), NNSA proposes perpetual Life Extension Programs for nuclear warheads that will result in three types of ballistic missile warheads and two types of nuclear air bombs. Although it’s still vague, the three so-called interoperable warheads would replace four types of existing warheads, which make little sense given the staggering estimated costs. These radical upgrades, if implemented, could not be full-scale tested, which would undermine confidence in their reliability. Our existing nuclear weapons designs have been extensively tested and subsequent studies have found them to be even more reliable and long-lived than originally thought.

The President’s speech is also incongruous with the SSMP in the area of plutonium pit production, and states “Preliminary plans call for pit production of potentially up to 80 pits per year starting as early as FY 2030.” (SSMP Pg. 62) With Obama’s further proposed arsenal reductions, any planned increase in weapons production is only a concession the nuclear weapons contractors profits. The alleged need for more plutonium pits cascades into a misplaced call for more production facilities. NNSA is “…evaluating the feasibility of constructing small laboratory modules connected to existing nuclear facilities…” (SSMP Pg. 8) to meet future claimed plutonium-manufacturing requirements. The SSMP states that Los Alamos can produce up to 30 pits per year without new facilities.

The need for increased pit production has never been explained adequately to the public, but the claim likely is centered on one of the interoperable warhead plans – the W78/88. In a May 7, 2013 testimony to the Senate Subcommittee on Strategic Forces, Dr. Penrose C. Albright, Director, Lawrence Livermore National Laboratory claimed that the W78/88 would require increased pit production at Los Alamos. He goes on to try to scare the Committee by saying that without construction funding for new pit facilities now, the W78/88 warhead upgrade could cost even more. He stated, “without going into the detail, the most likely option for the primary on the 78/88 does require the stand-up and operation of plutonium pit production capabilities at Los Alamos. And so any delay by the Government—any delay in funding to get that stood up—and that really has to start now—is going to add significant schedule risks to the program.” (Hearing Pg. 17)

The President should adopt the more fiscally prudent and technically sound alternative of replacing limited life components while he actually works to eliminate nukes altogether. This unending cycle of proposed Life Extension Program will waste huge sums of taxpayers money and is in direct conflict with the President’s own long-term goal of a future world free of nuclear weapons.

The full text of President’s Obama’s speech is available at http://www.whitehouse.gov/the-press-office/2013/06/19/remarks-president-obam

NNSA’s FY 2014 Stockpile Stewardship and Management Plan (SSMP) is available at https://nukewatch.org/importantdocs/resources/SSMP-FY2014.pdf

Hearing To Receive Testimony On National Nuclear Security Administration Management Of Its National Security Laboratories In Review Of The Defense Authorization Request For Fiscal Year 2014 And The Future Years Defense Program, Tuesday, May 7, 2013, U.S. Senate Subcommittee On Strategic Forces, Committee On Armed Services, Washington, DC.
http://www.armed-services.senate.gov/Transcripts/2013/05%20May/13-36%20-%205-7-13.pdf

The NNSA/DoD “3+2” strategy – hold on to your wallets

John Harvey is Principal Deputy Assistant Secretary of Defense for Nuclear, Chemical, and Biological Defense Programs, where “he advises on plans, policy and oversight of the U.S. nuclear weapons program.” See his full bio at http://www.acq.osd.mil/ncbdp/bio_harvey.htm

On June 13 he made some comments that offer some good insights into the relationship between the Department of Defense and the National Nuclear Security Administration (NNSA) on nuclear weapons, and their current “3+2” strategy for the “end state” stockpile. See https://nukewatch.org/importantdocs/resources/JRH-remarks-NDUF-breakfast-13Jun.pdf

According to Harvey that future stockpile will consist of not one, but three “interoperable” ballistic missile warheads, one gravity bomb (the B61) and one air-launched cruise missile warhead (which could be yet another variant of the B61). For details, see the just released NNSA FY 2014 Stockpile Stewardship and Management Plan at https://nukewatch.org/importantdocs/resources/SSMP-FY2014.pdf

The costs will be astronomical, which the FY14 SSMP projects at ~$60 billion (and that’s without the usual cost overruns). And all this strategy does is take 4+3, the existing 4 ballistic missile warheads (W76, W78, W87, W88) and three air delivered bombs/warheads (B61, W80, B83) down to 3+2, but it includes bringing back deployed air-launched cruise missile warheads (which are currently declining in numbers). The gravity bomb that would be retired is the B83, but how useful is that at 1.2 megatons?

Moreover, NNSA and DoD were probably going to get rid of W80 cruise missile warheads anyway. Bush Sr. withdrew many W80’s from active deployment circa 1992 following the break up of the Soviet Union. The W80 life extension program was canceled ~5 years ago, all W80-0’s have already been dismantled, but now the entire class of W80’s might be retired. However, the W80 design was based on the B61 to begin with, so all of this is kind of a distinction without a difference anyway.

The overall trend is lower-yield, more accurate nuclear weapons substituting for higher yield weapons, which I contend on the face of it are new military capabilities, contrary to declared U.S. nuclear weapons policy. Reducing the number of the types of nuclear weapons is a smoke screen.

Harvey notes that the ballistic missile warheads will be “interoperable” because they could share the same nuclear explosives package, but that does not a truly swappable warhead make. And at what point do heavily modified nuclear weapon become “new,” and at what point are original designs so changed that confidence in reliability is eroded without full-scale testing?

With respect to the NNSA/DoD relationship, I continue to think that it is largely the tail wagging the dog, that is the nuclear weapons labs wagging both NNSA and the Pentagon. Related, my concerns increase over the congressional panel on the future of the NNSA because of heavy representation on it by the labs and their contractors. Two examples are former LLNL/LANL Director Mike Anatasio and ex.-NM Rep. Heather Wilson. Regarding Wilson, the DOE Inspector General recently reported how she was the recipient of $450,000 in open-ended consulting agreements that lacked deliverables with Sandia and Los Alamos Labs. They had to pay the government back for these unallowable costs, but in turn Wilson should be barred from the panel.

ACTION ALERTS

It seems we can’t find what you’re looking for. Perhaps searching can help.

Let’s Keep New Mexico the Land of Enchantment, Not the Land of Nuclear Weapons & Radioactive Wastes! 

It seems we can’t find what you’re looking for. Perhaps searching can help.

Interfaith Panel Discussion on Nuclear Disarmament - August 9

Interfaith Panel Discussion on the 77th Anniversary of the Atomic Bombing of Nagasaki, Japan

It seems we can’t find what you’re looking for. Perhaps searching can help.

New Nuclear Media

It seems we can’t find what you’re looking for. Perhaps searching can help.