No Lethal High-Level Waste To New Mexico

Background

No Nuclear Waste
Photo Courtesy of No Nuclear Waste Aqui

"The most toxic and dangerous type of radioactive waste created by the nuclear industry"

This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.

It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.

Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.

Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.

The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.

Holtec proposal:

  • New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
  • Shallow sub-surface burial system

New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.

These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.

New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.

New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.

NRC Environmental Report

Here's the Federal Register Notice

Consolidated Interim Storage Handout

A Better Option: Hardened On-Site Storage (HOSS)

Hardened On-Site Storage

Overview

Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.


History

For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.

Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.

cask storage at reactor sites
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.

Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.

Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:

  • Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
  • HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
  • The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
  • The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
  • Placement of individual canisters that makes detection difficult from outside the site boundary.

Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes

HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.

Nuclear Power Has No Place in a Green Energy Future

Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes

from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.

Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian

The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs

A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation

There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times

More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature

Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal

Atomic Histories & Nuclear Testing

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

It seems we can’t find what you’re looking for. Perhaps searching can help.

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

National Nuclear Security Administration Gives Green Light For Expanded Plutonium Pit Production at Los Alamos

 For immediate release January 15, 2016

Contacts:       Jay Coghlan, NWNM, 505.989.7342, c. 505.470.3154, jay[at]nukewatch.org

National Nuclear Security Administration Gives Green Light

For Expanded Plutonium Pit Production at Los Alamos

Santa Fe, NM – Today the Defense Nuclear Facilities Safety Board, an independent agency commissioned by Congress, posted a weekly report that makes explicit a decision by the National Nuclear Security Administration (NNSA) to expand plutonium pit production at the Los Alamos National Laboratory (LANL). Plutonium pits are the fissile cores or “triggers” of modern two-stage thermonuclear weapons, but they are also atomic weapons in their own right (a plutonium bomb incinerated Nagasaki in August 1945). Plutonium pit production has always been the chokepoint preventing industrial-scale U.S. nuclear weapons production ever since a FBI raid investigating environmental crimes shut down the notorious Rocky Flats Plant near Denver in 1989.

Jay Coghlan, Nuclear Watch Director, commented, “Expanded plutonium pit production at the Los Alamos Lab is really all about future new-design nuclear weapons with new military capabilities produced through so-called Life Extension Programs for existing nuclear weapons.” The relevant case-in-point is that LANL is now tooling up to produce pits for one type of warhead (the W87) to use in an “Interoperable Warhead” that will combine two other warheads (the W78, a land-based ICBM warhead, and the W88, a sub-launched warhead), clearly a radically new design even if as claimed only existing nuclear weapons components are used.

Coghlan further commented, “The real irony is that this Interoperable Warhead has been delayed for at least five years, if not forever, because of its enormous estimated expense and Navy skepticism. Yet this doesn’t keep LANL and the NNSA from spending billions of taxpayer dollars to upgrade existing and build new production facilities for unnecessary and provocative expanded plutonium pit production.”

Specifically, NNSA and LANL seek to raise the administrative limit on plutonium in the existing Radiological Lab (“RLUOB” in the Safety Board report below) from an original 8.4 grams to 400 grams, and proceed with the “Plutonium Modular Approach project.” In 2012, in the face of exploding costs and rising citizen opposition, NNSA dropped its proposal to build a $6.5 billion Walmart-sized “Chemistry and Metallurgy Research Replacement Project-Nuclear Facility” for expanded plutonium pit production of up to 80 pits per year. There was no technical justification for this expanded production, other than unspecified “Department of Defense requirements.”

These new moves by NNSA and LANL, which will cost around $4 billion before the usual cost overruns, are just another way to achieve their goal of raising plutonium pit production to up to 80 plutonium pits per year. Raising the amount of plutonium in the Radiological Lab will enable LANL to conduct all needed analytical chemistry quality control samples of new pits, as the Safety Board memo says to “primarily support the increased capacity required for larger pit manufacturing rates.” The Plutonium Modular Approach project will be newly constructed underground facilities for hot operations such as a plutonium foundry, likely beginning with two modules at a billion dollars each. It should be noted that proposed major federal actions require the opportunity for public review and comment under the National Environmental Policy Act, which has not been done for what NNSA calls this alternative plutonium strategy. Nevertheless, increased funding for LANL’s plutonium infrastructure will be likely included in the pending federal budget for FY 2017, scheduled to be released Monday February 9.

There is no need for expanded plutonium pit production to maintain the safety and reliability of the existing nuclear weapons stockpile, but it is vital for future new-designs that the nuclear weaponeers want. In fact, the U.S. government is planning to spend a trillion dollars over the next 30 years to “modernize” and completely rebuild its nuclear forces, despite its pledge in the 1970 NonProliferation Treaty to enter into serious negotiations leading to nuclear disarmament.

Background

In 1996 the plutonium pit production mission was formally relocated to LANL, with an approved upper limit of 20 pits per year. NNSA has tried four times since then to expand plutonium pit production. This started with a proposed “Modern Pit Facility” capable of producing up to 450 pits per year, with no justification of why that Cold War-like level of production was needed. In all four cases, in response to successful citizen activism, Congress either rejected or NNSA dropped efforts to expand production, in large part because of a pit life study that New Mexico Senator Jeff Bingaman required at Nuclear Watch’s request. That 2006 study by independent experts found that plutonium pits last at least 100 years (with no proscribed end date), more than double NNSA’s previous estimates of 45 years.

Nevertheless, NNSA now seeks for the fifth time to expand plutonium pit production beyond the currently approved level of 20 pits per year at LANL. After having produced 30 pits for the W88 sub-launched warhead (which was in production when the Rocky Flats Plant was shut down), there are no current requirements for plutonium pit production to maintain stockpile safety and reliability.

In the meanwhile, funding for cleanup at the Los Alamos Lab is being cut, while nuclear weapons programs that caused the mess to begin with are thriving. As a final irony, these plans to expand plutonium pit production are now being implemented, despite the fact that 1) major operations at LANL’s main plutonium facility have been suspended since June 2013 because of nuclear criticality safety concerns; and 2) the Los Alamos Lab has no place to send its radioactive plutonium pit production wastes ever since it sent a drum that ruptured and closed down the multi-billion dollar Waste Isolation Pilot Plant.

Nuclear Watch New Mexico is confident that this latest attempt to expand plutonium pit production will fall apart as well, but only as a result of continuing strong citizen activism.

# # #

•           Relevant excerpt from Defense Nuclear Facilities Safety Board Weekly LANL Report:

http://www.dnfsb.gov/sites/default/files/Board%20Activities/Reports/Site%20Rep%20Weekly%20Reports/Los%20Alamos%20National%20Laboratory/2015/wr_20151218_65.pdf
Los Alamos Report for Week Ending December 18, 2015

MEMORANDUM FOR: S.A. Stokes, Technical Director FROM: R.K. Verhaagen and J.W. Plaue

DNFSB Staff Activity: R. L. Jackson was onsite to plan oversight activities associated with Plutonium Infrastructure Strategy. Accordingly, he met with key project staff and walked down the Plutonium Facility, the Chemistry and Metallurgy Research (CMR) building, and the Radiological Laboratory Utility Office Building (RLUOB).

Plutonium Infrastructure Strategy: Late last month, the Deputy Secretary of Energy approved a restructuring of the subprojects covered under the CMR Replacement project. There are now four subprojects: (1) RLUOB Equipment Installation, Phase 2; (2) Plutonium Facility Equipment Installation, Phase 1; (3) Plutonium Facility Equipment Installation, Phase 2; and (4) Re- categorizing the RLUOB to Hazard Category 3 with a material-at-risk limit of 400 g plutonium- 239 equivalent. The first two subprojects enable LANL to cease programmatic activities in the CMR by 2019, while the latter two subprojects primarily support the increased capacity required for larger pit manufacturing rates. The memo requests an updated project execution plan within 90 days and indicates approval authority will remain with the DOE Deputy Secretary for subprojects 2–4 and with the NNSA Administrator for subproject 1.

In a separate action, the DOE Deputy Secretary also approved the mission need Critical Decision (CD)-0 for the Plutonium Modular Approach project. This project addresses life extension needs for the existing Plutonium Facility in support of Department of Defense requirements and Congressional Direction. The CD-0 schedule range for project completion is December 2025 to December 2027.

 

•           For an extensive history of successful citizen activism against plutonium pit production see https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

Updates

It seems we can’t find what you’re looking for. Perhaps searching can help.

________________________________

Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

Atomic Histories & Nuclear Testing

NukeWatch Compilation of the DOE/NNSA FY 2020 Budget Request – VIEW

National Nuclear Security Administration Gives Green Light For Expanded Plutonium Pit Production at Los Alamos

 For immediate release January 15, 2016

Contacts:       Jay Coghlan, NWNM, 505.989.7342, c. 505.470.3154, jay[at]nukewatch.org

National Nuclear Security Administration Gives Green Light

For Expanded Plutonium Pit Production at Los Alamos

Santa Fe, NM – Today the Defense Nuclear Facilities Safety Board, an independent agency commissioned by Congress, posted a weekly report that makes explicit a decision by the National Nuclear Security Administration (NNSA) to expand plutonium pit production at the Los Alamos National Laboratory (LANL). Plutonium pits are the fissile cores or “triggers” of modern two-stage thermonuclear weapons, but they are also atomic weapons in their own right (a plutonium bomb incinerated Nagasaki in August 1945). Plutonium pit production has always been the chokepoint preventing industrial-scale U.S. nuclear weapons production ever since a FBI raid investigating environmental crimes shut down the notorious Rocky Flats Plant near Denver in 1989.

Jay Coghlan, Nuclear Watch Director, commented, “Expanded plutonium pit production at the Los Alamos Lab is really all about future new-design nuclear weapons with new military capabilities produced through so-called Life Extension Programs for existing nuclear weapons.” The relevant case-in-point is that LANL is now tooling up to produce pits for one type of warhead (the W87) to use in an “Interoperable Warhead” that will combine two other warheads (the W78, a land-based ICBM warhead, and the W88, a sub-launched warhead), clearly a radically new design even if as claimed only existing nuclear weapons components are used.

Coghlan further commented, “The real irony is that this Interoperable Warhead has been delayed for at least five years, if not forever, because of its enormous estimated expense and Navy skepticism. Yet this doesn’t keep LANL and the NNSA from spending billions of taxpayer dollars to upgrade existing and build new production facilities for unnecessary and provocative expanded plutonium pit production.”

Specifically, NNSA and LANL seek to raise the administrative limit on plutonium in the existing Radiological Lab (“RLUOB” in the Safety Board report below) from an original 8.4 grams to 400 grams, and proceed with the “Plutonium Modular Approach project.” In 2012, in the face of exploding costs and rising citizen opposition, NNSA dropped its proposal to build a $6.5 billion Walmart-sized “Chemistry and Metallurgy Research Replacement Project-Nuclear Facility” for expanded plutonium pit production of up to 80 pits per year. There was no technical justification for this expanded production, other than unspecified “Department of Defense requirements.”

These new moves by NNSA and LANL, which will cost around $4 billion before the usual cost overruns, are just another way to achieve their goal of raising plutonium pit production to up to 80 plutonium pits per year. Raising the amount of plutonium in the Radiological Lab will enable LANL to conduct all needed analytical chemistry quality control samples of new pits, as the Safety Board memo says to “primarily support the increased capacity required for larger pit manufacturing rates.” The Plutonium Modular Approach project will be newly constructed underground facilities for hot operations such as a plutonium foundry, likely beginning with two modules at a billion dollars each. It should be noted that proposed major federal actions require the opportunity for public review and comment under the National Environmental Policy Act, which has not been done for what NNSA calls this alternative plutonium strategy. Nevertheless, increased funding for LANL’s plutonium infrastructure will be likely included in the pending federal budget for FY 2017, scheduled to be released Monday February 9.

There is no need for expanded plutonium pit production to maintain the safety and reliability of the existing nuclear weapons stockpile, but it is vital for future new-designs that the nuclear weaponeers want. In fact, the U.S. government is planning to spend a trillion dollars over the next 30 years to “modernize” and completely rebuild its nuclear forces, despite its pledge in the 1970 NonProliferation Treaty to enter into serious negotiations leading to nuclear disarmament.

Background

In 1996 the plutonium pit production mission was formally relocated to LANL, with an approved upper limit of 20 pits per year. NNSA has tried four times since then to expand plutonium pit production. This started with a proposed “Modern Pit Facility” capable of producing up to 450 pits per year, with no justification of why that Cold War-like level of production was needed. In all four cases, in response to successful citizen activism, Congress either rejected or NNSA dropped efforts to expand production, in large part because of a pit life study that New Mexico Senator Jeff Bingaman required at Nuclear Watch’s request. That 2006 study by independent experts found that plutonium pits last at least 100 years (with no proscribed end date), more than double NNSA’s previous estimates of 45 years.

Nevertheless, NNSA now seeks for the fifth time to expand plutonium pit production beyond the currently approved level of 20 pits per year at LANL. After having produced 30 pits for the W88 sub-launched warhead (which was in production when the Rocky Flats Plant was shut down), there are no current requirements for plutonium pit production to maintain stockpile safety and reliability.

In the meanwhile, funding for cleanup at the Los Alamos Lab is being cut, while nuclear weapons programs that caused the mess to begin with are thriving. As a final irony, these plans to expand plutonium pit production are now being implemented, despite the fact that 1) major operations at LANL’s main plutonium facility have been suspended since June 2013 because of nuclear criticality safety concerns; and 2) the Los Alamos Lab has no place to send its radioactive plutonium pit production wastes ever since it sent a drum that ruptured and closed down the multi-billion dollar Waste Isolation Pilot Plant.

Nuclear Watch New Mexico is confident that this latest attempt to expand plutonium pit production will fall apart as well, but only as a result of continuing strong citizen activism.

# # #

•           Relevant excerpt from Defense Nuclear Facilities Safety Board Weekly LANL Report:

http://www.dnfsb.gov/sites/default/files/Board%20Activities/Reports/Site%20Rep%20Weekly%20Reports/Los%20Alamos%20National%20Laboratory/2015/wr_20151218_65.pdf
Los Alamos Report for Week Ending December 18, 2015

MEMORANDUM FOR: S.A. Stokes, Technical Director FROM: R.K. Verhaagen and J.W. Plaue

DNFSB Staff Activity: R. L. Jackson was onsite to plan oversight activities associated with Plutonium Infrastructure Strategy. Accordingly, he met with key project staff and walked down the Plutonium Facility, the Chemistry and Metallurgy Research (CMR) building, and the Radiological Laboratory Utility Office Building (RLUOB).

Plutonium Infrastructure Strategy: Late last month, the Deputy Secretary of Energy approved a restructuring of the subprojects covered under the CMR Replacement project. There are now four subprojects: (1) RLUOB Equipment Installation, Phase 2; (2) Plutonium Facility Equipment Installation, Phase 1; (3) Plutonium Facility Equipment Installation, Phase 2; and (4) Re- categorizing the RLUOB to Hazard Category 3 with a material-at-risk limit of 400 g plutonium- 239 equivalent. The first two subprojects enable LANL to cease programmatic activities in the CMR by 2019, while the latter two subprojects primarily support the increased capacity required for larger pit manufacturing rates. The memo requests an updated project execution plan within 90 days and indicates approval authority will remain with the DOE Deputy Secretary for subprojects 2–4 and with the NNSA Administrator for subproject 1.

In a separate action, the DOE Deputy Secretary also approved the mission need Critical Decision (CD)-0 for the Plutonium Modular Approach project. This project addresses life extension needs for the existing Plutonium Facility in support of Department of Defense requirements and Congressional Direction. The CD-0 schedule range for project completion is December 2025 to December 2027.

 

•           For an extensive history of successful citizen activism against plutonium pit production see https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

LANL FY 2020 Budget Request – VIEW

Sandia FY 2020 Budget Request – VIEW

Livermore Lab FY 2020 Budget Chart – Courtesy TriValley CAREs – VIEW

NUCLEAR POWER

Important Documents & Articles Related to Nuclear Energy Production

Most Recent

It seems we can’t find what you’re looking for. Perhaps searching can help.

Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11