"The most toxic and dangerous type of radioactive waste created by the nuclear industry"
This is waste generated by nuclear power plants called 'high-level radioactive waste' (HLW), also known as 'spent' or 'irradiated' fuel. This waste contains plutonium, uranium, strontium, and cesium; and will be radioactive for millions of years.
It is not like the waste currently stored at the Waste Isolation Pilot Project (WIPP) or any other waste site that exists today in the U.S.: it is far worse.
Two companies are proposing to build waste facilities near Carlsbad and Hobbs for the most toxic and dangerous type of radioactive waste created by the nuclear industry.
Holtec International is working with the Eddy-Lea Energy Alliance, LLC (ELEA) to apply for a license to build a Consolidated Interim Storage (CIS) facility approximately halfway between Carlsbad and Hobbs, and 16 miles north of WIPP.
The Nuclear Regulatory Commission (NRC) has declared the Holtec/ELEA application complete, NRC initiated a public comment period with 60 days for public comment. Note that transport of this waste poses risks to the environment and all life located near transportation routes.
Holtec proposal:
New CIS facility to store 100,000 metric tons of HLRW, with the potential to increase to 120,000 metric tons for 120 years
Shallow sub-surface burial system
New Mexicans and Texans are fighting the attempted licensing of these two proposed CIS facilities - Waste Control Specialists near Andrews, Texas and Eddy Lee/Holtec International east of Carlsbad, New Mexico.
These sites and any transport to these sites are not only dangerous but environmentally unjust. These sites present clear examples of environmental racism.
New Mexico's demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. People of color would be disproportionately affected if the Eddy Lee/Holtec CIS site were licensed and constructed.
New Mexico and Texas do not consent to either proposed CIS facility and are fighting to avoid the environmental injustice and the unnecessary shipment of irradiated high-level nuclear waste through their communities.
Hardened On-Site Storage (HOSS) is a community-based concept that aims to protect the public from the threats posed by the current vulnerable storage of commercial irradiated fuel.
History
For decades, high level radioactive waste has accumulated at reactor sites and continues to do so as nuclear reactors generate more waste. Without a credible plan to permanently isolate it, storage pools, where irradiated nuclear waste is currently stored until it becomes less hot, have been tightly packed and re-racked to accommodate all the waste.
Unfortunately, the pools and dry casks have no robust containment. If the cooling pumps stopped operating or the water in the pools drained out, temperatures would quickly increase, as happened in Fukushima Japan, and could result in a similar disaster.
Current dry cask storage at reactor sites (pictured above) is extremely vulnerable. There is often nothing more than a chain-link fence and a short distance that separates the highly radioactive waste containers and public access.
Establishing interim hardened on-site storage (HOSS) is a top priority. Hardened on-site storage allows waste generators to store high level waste as close to the site of generation as possible, thereby exposing fewer people to radiation, as safely as possible.
Rather than storing dozens of vulnerable dry-casks next to each other in the open air, the HOSS Principles established by concerned citizens mandate:
Irradiated fuel must be stored as safely as possible as close to the site of generation as possible;
HOSS facilities must not be regarded as a permanent waste solution, and thus should not be constructed underground and the waste must be retrievable;
The facility must have real-time radiation and heat monitoring for early detection of problems with containers;
The overall objective of HOSS should be that the amount of releases projected in even severe attacks should be low enough that the storage system would be unattractive as a terrorist target;
Placement of individual canisters that makes detection difficult from outside the site boundary.
Hardened On-Site Storage (HOSS) is supported by organizations in all 50 states. The Principles of Securing Nuclear Waste at Nuclear Reactor Sites are posted here. It would provide better security at reactor sites with robust dry storage and community oversight, including real-time monitoring of heat and radiation. HOSS is rooted in values of community protection and environmental justice and will provide increased protection from human or natural disasters, like terrorist attacks and earthquakes
HOSS facilities are not permanent waste solutions, and therefore should not be constructed deep underground as the waste must be retrievable. However, they are a workable solution that will allow us to explore scientifically sound, and socially and environmentally just long-term management systems.
Nuclear Power Has No Place in a Green Energy Future
Because of: Time Delay, Success of Renewables, Huge Costs, Dangers, Weapons Connection, and Wastes
from Yahoo News, 21 Oct 21, ”…….Practical concerns also temper enthusiasm for a nuclear future. The next generation of reactors, heralded as a game changer by supporters, still haven’t been proven in the real world. Even if those technologies are as revolutionary as advertised, skeptics say it could take decades before they make a real difference in the global energy grid — too long if the worst outcomes of climate change are to be avoided.
Renewable energy technologies can be enough on their own
“The drawbacks to nuclear are compounded by the burgeoning success of renewables — both solar and wind are getting cheaper and more efficient, year after year. There is also a growing realisation that a combination of renewables, smart storage, energy efficiency and more flexible grids can now be delivered at scale and at speed — anywhere in the world.” — Jonathon Porritt, Guardian
The world doesn’t have time to wait for next-gen nuclear
“When it comes to averting the imminent effects of climate change, even the cutting edge of nuclear technology will prove to be too little, too late. Put simply, given the economic trends in existing plants and those under construction, nuclear power cannot positively impact climate change in the next ten years or more.” — Allison Macfarlane, Foreign Affairs
A major ramp-up in nuclear technologies isn’t economically feasible
“While nuclear power may have once been cheaper than wind or solar, the economics have since changed dramatically. Nuclear power plants are very expensive to build and the economics of nuclear power are getting steadily worse. By contrast, renewables continue to come down in price.” — Ian Lowe, Conversation
There’s no way to guarantee that nuclear plants will be safe
“People around the world have witnessed the Three Mile Island, Chernobyl and Fukushima accidents. It is more than enough to believe that a safe nuclear power plant is nothing but a myth.” — Jang Daul, Korea Times
More nuclear power could lead to more nuclear weapons
“Some nations — India and Pakistan, and in all probability Israel — became nuclear powers after originally seeking nuclear technology for research or to develop nuclear power. … This is important: The technology used to turn on lights or charge mobile phones shouldn’t need to involve national or international defence apparatus.” — Editorial, Nature
Nuclear waste is still a major problem
“Nuclear waste lasts for hundreds of thousands of years before they are half-decayed. Our United States government — perhaps the longest continuous government in the world — is only 232 years old. Who will be around to manage uranium wastes?” — David Ross, Courier-Journal
LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:
LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11
FOR IMMEDIATE RELEASE February 2, 2015
Contact: Jay Coghlan, Nuclear Watch NM, 505.989.7342
DOE Nuclear Weapons Budget Up 10%, Equals Cold War Record
Huge Startup for Nuclear Cruise Missile Warhead
$4 Billion Slated for LANL Plutonium Pit Production Facilities
Cleanup and Dismantlement Funding Remain Flat
Santa Fe, NM – Today, the Obama Administration released its proposed federal budget for fiscal year 2016, which starts October 1, 2015.
The National Nuclear Security Administration (NNSA) is the semi-autonomous nuclear weapons agency within the Department of Energy, and has perennially been on the Government Accountability Office’s High Risk List for wasting taxpayers’ money. Despite that, the Obama Administration is giving NNSA nuclear weapons programs a 10.5% jump in funding to $8.85 billion. (1) This is statistically equal to the Cold War high point in 1985 under President Reagan’s military buildup. (2) Moreover, the NNSA’s nuclear weapons budget is slated to rise to $9.8 billion by 2020, nearly double that of the Cold War average. All of this is the beginning of the planned one trillion dollar modernization of U.S. nuclear weapons forces over the next 30 years.
The large increases in NNSA budgets are due to 1) aggressive “Life Extension Programs” that seek to indefinitely preserve existing nuclear weapons while giving them new military capabilities; and 2) new production plants for these rebuilt nuclear weapons, expected to be operational until ~2075. As an example of the former, the current $12 billion B61 Life Extension Program will create the world’s first nuclear “smart” bomb, and will soon begin production at existing facilities.
NNSA’s FY 2016 budget launches a whole new Life Extension Program for a nuclear warhead for a new air-launched cruise missile. (3) Requested FY 2016 funding is $195 million, a 20-fold increase from $9 million for conceptual studies in FY 2015. This program is slated to rise to $459 million in annual appropriations by FY 2020. This nuclear warhead has been scheduled before Pentagon development of the new air-launched cruise missile itself, in effect putting the cart before the horse. This costly program is arguably redundant as well, given that rebuilt B61 nuclear bombs will be delivered on future super-stealthy fighters advertised as capable of penetrating any adversary’s air defenses. Finally, a nuclear-armed cruise missile is destabilizing from an arms control perspective because they can fly below radar, delivering the proverbial bolt from the blue.
On the flip side of production, the Obama Administration’s funding request for dismantlements is $48 million, less than 4% of the funding for all Life Extension Programs to rebuild nuclear weapons. Obama’s request itself is an improvement from last year, when the Administration asked for only $30 million, a 45% cut compared to the year before. Congress refused to go along with that, earmarking $50 million for dismantlements in FY 2015. Besides providing a good example to the rest of the world, nuclear weapons dismantlements deliver real savings to the American taxpayer by eliminating otherwise permanent security costs.
Concerning new production facilities, NNSA is asking for a 28% increase to $430 million for the Uranium Processing Facility (UPF) near Oak Ridge, TN. The UPF is to produce up to 80 “secondaries” each year, the components that give weapons thermonuclear capabilities capable of killing millions. The previous “big box” design for the UPF was canceled after out-of-control costs rose as high as $19 billion by one Pentagon estimate. UPF also had a half-billion dollar design mistake for which no one has been held accountable, in which all planned equipment could not fit within the building’s footprint. Because of all this, the UPF’s mission has been downscoped to production only, eliminating dismantlements, in order to help contain costs, currently capped at $6.5 billion. Again, dismantlements seem dispensable to the Obama Administration.
NNSA also plans to begin spending $2 billion to upgrade existing facilities for the expanded production of the plutonium pit cores of nuclear weapons at the Los Alamos National Laboratory (LANL), beginning with $155.6 million in FY 2016. The controversial CMRR “Nuclear Facility” is formally canceled. In its place, up to $675 million is planned to be spent on additional equipment for the already built Radiological Laboratory to quadruple the amount of plutonium that can be handled there, and up to $1.4 billion to upgrade PF-4, LANL’s existing main plutonium facility.
In addition, “The third step of the plutonium strategy extends the lifetime of PF-4 and supports increases in pit production capacity beyond 30 pits per year by proposing to build new modular facilities and move selected processes into new space… The NNSA is planning to construct not less than two modular structures that will achieve full operating capability not later than 2027.” Although still far from final design, those modular facilities will likely cost a billion dollars each. Given the usual cost overruns, eventual costs may meet or exceed the CMRR’s estimated cost of $6.5 billion when it included the Nuclear Facility.
In New Mexico-related news, the DOE budget request for the Waste Isolation Pilot Plant (WIPP) is decreased by $76 million to $248 million. Of that, $87 million is for “base activities” while WIPP is shut down because of a radiation release in February 2104. The rest of funding is for “Recovery Activities” to resume underground disposal by March 2016 of radioactive wastes that were already stored above ground at WIPP when the accident happened. Meanwhile, plutonium-contaminated wastes across the country already prepared for shipment to WIPP will have to wait. Total costs to reopen WIPP remain unknown.
Inflation-adjusted funding for cleanup across the nation-wide nuclear weapons complex remains flat at $5.5 billion, even though estimated cleanup costs of the massive widespread contamination continue to climb. The funding request for cleanup at Los Alamos Lab is flat at $185 million. It includes repackaging radioactive waste drums stored at LANL that are similar to the one that ruptured and contaminated WIPP. It will also fund investigation and corrective measures for the large chromium plume in our groundwater aquifer, with an emphasis on preventing it from crossing the boundary of neighboring San Ildefonso Pueblo. Current contamination maps show the plume stopping at exactly the boundary, which is nearly impossible.
Jay Coghlan, Nuclear Watch New Mexico Director, commented, “Thousands of nuclear weapons rebuilt at enormous costs won’t protect us from ISIS, a dirty bomb in Manhattan, Ebola or climate change. NNSA’s nuclear weapons programs should be cut to help pay for the expansion of nonproliferation programs that actually enhance national security, cleanup programs that protect the environment while creating jobs, and dismantlement programs that get rid of nuclear weapons forever and save taxpayers money.”
(1) As topline numbers, NNSA’s budget category “Total Weapons Activities” increase from $8.23 billion in FY 2015 to $8.85 billion in FY 2016, or 7.5%. However, the true increase is masked by the fact that two counterproliferation programs formerly within NNSA’s “Total Weapons Activities” are moved to Defense Nuclear Nonproliferation. Once that is factored in the real increase for NNSA’s nuclear weapons programs is 10.5%
(2) The FY 2016 DOE nuclear weapons request is calculated as statistically equal to the Cold War record using data from Atomic Audit, Brookings Institute, 1998, Stephen Schwartz editor, Table A-2. It gives 5.494 billion in 1996 dollars as the cost for DOE nuclear weapons research, production and testing programs in 1985, the height of the Cold War military build up under Ronald Reagan. Adjusted for inflation that is $8.99 billion in 2015 dollars.
(3) Called the Long-Range Stand-Off weapon in the budget because heavy bombers can launch the nuclear-armed cruise missiles at a great distance from their intended targets.
Click the image to view and download this large printable map of DOE sites, commercial reactors, nuclear waste dumps, nuclear transportation routes, surface waters near sites and transport routes, and underlying aquifers. This map was prepared by Deborah Reade for the Alliance for Nuclear Accountability.
Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex
Waste Lands: America’s Forgotten Nuclear Legacy
The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com
FOR IMMEDIATE RELEASE February 2, 2015
Contact: Jay Coghlan, Nuclear Watch NM, 505.989.7342
DOE Nuclear Weapons Budget Up 10%, Equals Cold War Record
Huge Startup for Nuclear Cruise Missile Warhead
$4 Billion Slated for LANL Plutonium Pit Production Facilities
Cleanup and Dismantlement Funding Remain Flat
Santa Fe, NM – Today, the Obama Administration released its proposed federal budget for fiscal year 2016, which starts October 1, 2015.
The National Nuclear Security Administration (NNSA) is the semi-autonomous nuclear weapons agency within the Department of Energy, and has perennially been on the Government Accountability Office’s High Risk List for wasting taxpayers’ money. Despite that, the Obama Administration is giving NNSA nuclear weapons programs a 10.5% jump in funding to $8.85 billion. (1) This is statistically equal to the Cold War high point in 1985 under President Reagan’s military buildup. (2) Moreover, the NNSA’s nuclear weapons budget is slated to rise to $9.8 billion by 2020, nearly double that of the Cold War average. All of this is the beginning of the planned one trillion dollar modernization of U.S. nuclear weapons forces over the next 30 years.
The large increases in NNSA budgets are due to 1) aggressive “Life Extension Programs” that seek to indefinitely preserve existing nuclear weapons while giving them new military capabilities; and 2) new production plants for these rebuilt nuclear weapons, expected to be operational until ~2075. As an example of the former, the current $12 billion B61 Life Extension Program will create the world’s first nuclear “smart” bomb, and will soon begin production at existing facilities.
NNSA’s FY 2016 budget launches a whole new Life Extension Program for a nuclear warhead for a new air-launched cruise missile. (3) Requested FY 2016 funding is $195 million, a 20-fold increase from $9 million for conceptual studies in FY 2015. This program is slated to rise to $459 million in annual appropriations by FY 2020. This nuclear warhead has been scheduled before Pentagon development of the new air-launched cruise missile itself, in effect putting the cart before the horse. This costly program is arguably redundant as well, given that rebuilt B61 nuclear bombs will be delivered on future super-stealthy fighters advertised as capable of penetrating any adversary’s air defenses. Finally, a nuclear-armed cruise missile is destabilizing from an arms control perspective because they can fly below radar, delivering the proverbial bolt from the blue.
On the flip side of production, the Obama Administration’s funding request for dismantlements is $48 million, less than 4% of the funding for all Life Extension Programs to rebuild nuclear weapons. Obama’s request itself is an improvement from last year, when the Administration asked for only $30 million, a 45% cut compared to the year before. Congress refused to go along with that, earmarking $50 million for dismantlements in FY 2015. Besides providing a good example to the rest of the world, nuclear weapons dismantlements deliver real savings to the American taxpayer by eliminating otherwise permanent security costs.
Concerning new production facilities, NNSA is asking for a 28% increase to $430 million for the Uranium Processing Facility (UPF) near Oak Ridge, TN. The UPF is to produce up to 80 “secondaries” each year, the components that give weapons thermonuclear capabilities capable of killing millions. The previous “big box” design for the UPF was canceled after out-of-control costs rose as high as $19 billion by one Pentagon estimate. UPF also had a half-billion dollar design mistake for which no one has been held accountable, in which all planned equipment could not fit within the building’s footprint. Because of all this, the UPF’s mission has been downscoped to production only, eliminating dismantlements, in order to help contain costs, currently capped at $6.5 billion. Again, dismantlements seem dispensable to the Obama Administration.
NNSA also plans to begin spending $2 billion to upgrade existing facilities for the expanded production of the plutonium pit cores of nuclear weapons at the Los Alamos National Laboratory (LANL), beginning with $155.6 million in FY 2016. The controversial CMRR “Nuclear Facility” is formally canceled. In its place, up to $675 million is planned to be spent on additional equipment for the already built Radiological Laboratory to quadruple the amount of plutonium that can be handled there, and up to $1.4 billion to upgrade PF-4, LANL’s existing main plutonium facility.
In addition, “The third step of the plutonium strategy extends the lifetime of PF-4 and supports increases in pit production capacity beyond 30 pits per year by proposing to build new modular facilities and move selected processes into new space… The NNSA is planning to construct not less than two modular structures that will achieve full operating capability not later than 2027.” Although still far from final design, those modular facilities will likely cost a billion dollars each. Given the usual cost overruns, eventual costs may meet or exceed the CMRR’s estimated cost of $6.5 billion when it included the Nuclear Facility.
In New Mexico-related news, the DOE budget request for the Waste Isolation Pilot Plant (WIPP) is decreased by $76 million to $248 million. Of that, $87 million is for “base activities” while WIPP is shut down because of a radiation release in February 2104. The rest of funding is for “Recovery Activities” to resume underground disposal by March 2016 of radioactive wastes that were already stored above ground at WIPP when the accident happened. Meanwhile, plutonium-contaminated wastes across the country already prepared for shipment to WIPP will have to wait. Total costs to reopen WIPP remain unknown.
Inflation-adjusted funding for cleanup across the nation-wide nuclear weapons complex remains flat at $5.5 billion, even though estimated cleanup costs of the massive widespread contamination continue to climb. The funding request for cleanup at Los Alamos Lab is flat at $185 million. It includes repackaging radioactive waste drums stored at LANL that are similar to the one that ruptured and contaminated WIPP. It will also fund investigation and corrective measures for the large chromium plume in our groundwater aquifer, with an emphasis on preventing it from crossing the boundary of neighboring San Ildefonso Pueblo. Current contamination maps show the plume stopping at exactly the boundary, which is nearly impossible.
Jay Coghlan, Nuclear Watch New Mexico Director, commented, “Thousands of nuclear weapons rebuilt at enormous costs won’t protect us from ISIS, a dirty bomb in Manhattan, Ebola or climate change. NNSA’s nuclear weapons programs should be cut to help pay for the expansion of nonproliferation programs that actually enhance national security, cleanup programs that protect the environment while creating jobs, and dismantlement programs that get rid of nuclear weapons forever and save taxpayers money.”
(1) As topline numbers, NNSA’s budget category “Total Weapons Activities” increase from $8.23 billion in FY 2015 to $8.85 billion in FY 2016, or 7.5%. However, the true increase is masked by the fact that two counterproliferation programs formerly within NNSA’s “Total Weapons Activities” are moved to Defense Nuclear Nonproliferation. Once that is factored in the real increase for NNSA’s nuclear weapons programs is 10.5%
(2) The FY 2016 DOE nuclear weapons request is calculated as statistically equal to the Cold War record using data from Atomic Audit, Brookings Institute, 1998, Stephen Schwartz editor, Table A-2. It gives 5.494 billion in 1996 dollars as the cost for DOE nuclear weapons research, production and testing programs in 1985, the height of the Cold War military build up under Ronald Reagan. Adjusted for inflation that is $8.99 billion in 2015 dollars.
(3) Called the Long-Range Stand-Off weapon in the budget because heavy bombers can launch the nuclear-armed cruise missiles at a great distance from their intended targets.
Important Documents & Articles Related to Nuclear Energy Production
Most Recent
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
See Also
Nuclear Watch Interactive Map – U.S. Nuclear Weapons Complex
Waste Lands: America’s Forgotten Nuclear Legacy
The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com
LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:
LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11