Through comprehensive research, public education and effective citizen action, Nuclear Watch New Mexico seeks to promote safety and environmental protection at regional nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

Plutonium Sampling at Los Alamos National Laboratory

Cost of RECA Chart

QUOTE OF THE WEEK

It seems we can’t find what you’re looking for. Perhaps searching can help.

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

Banner displaying “Nuclear Weapons Are Now Illegal” at the entrance in front of the Los Alamos National Lab to celebrate the Entry Into Force of the Nuclear Weapon Ban Treaty on January 22, 2021

It seems we can’t find what you’re looking for. Perhaps searching can help.

Follow the Money!

Map of “Nuclear New Mexico”

In 1985, US President Ronald Reagan and Russian President Mikhail Gorbachev declared that “a nuclear war cannot be won and must never be fought.”

President Ronald Reagan and Soviet General Secretary Mikhail Gorbachev shake hands after signing the arms control agreement banning the use of intermediate-range nuclear missles, the Intermediate Nuclear Forces Reduction Treaty.

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

New & Updated

WIPP update Feb 26 2014

The New York Times ran a WIPP story today, NUCLEAR WASTE REPOSITORY SET TO REOPEN AFTER LEAK, New York Times — February 26, 2014, By Matthew L. Wald

This is a good example of what is known, what is being said, and what is not being said.

1. One shaft has a filter with a monitor and three don’t. The article, and many others, quotes a WIPP press release,

But late on Feb. 14, at an hour when no one was in the mine, an air monitor indicated the presence of radioactive contamination. An automated system cut off most of the ventilation and routed the exhaust through filters that are supposed to capture 99.97 percent of all contamination, turning off fans and changing the air flow, in less than one minute. 

At WIPP, there are 4 ways for air to get to the surface – the Exhaust Shaft, the Salt Shaft, the Air Intake Shaft, and the Waste Handling Shaft. When radioactive contamination is detected, airflow is directed to the Exhaust Shaft as its filter is put into place. This shaft has the only filter and monitors on any of the shafts. WIPP officials claim that it was a monitor in Panel 7 that detected radiation and set into action the sending of all the air to the Exhaust Shaft. The Panel 7 monitor is around 2000 feet from the shafts. This means that the WIPP officials were relying on any contamination to set off the monitor before any contamination went up a shaft. We need a layout of the monitors, and if they were working, in the underground.

 

2. “Safe levels” of radioactivity? The article quotes a WIPP monitor,

“For someone living in town, I would say the dose was probably zero,” Russell Hardy, director of the Carlsbad Environmental Monitoring and Research Center, an independent monitoring organization that is part of New Mexico State University, said in a telephone interview Tuesday. He said that the event would not add to background levels of radiation — including bomb fallout — any more than an eyedropper full of water would contribute to the rise in the level of the Pacific Ocean.

Seriously, an eyedropper in the Pacific? I had to look it up

There are over 70 cubic million miles in the Pacific Ocean. Meaning there are 188,000,000,000,000,000,000 gallons in the pacific ocean. That is 187 quintillion gallons.

No problem, unless you eat the fish that drank that drop. Anyway, I don’t believe anyone knows how much radiation was released. The preliminary results are based on a ridiculously small number of air samples. The official projections are based on the implication that the samples represent the maximum contamination, which is unlikely.

 

3. Then, it was explained how to get dosed –

Even in the desert, the danger to humans was small, the mine’s operators said. The highest reading from the monitors indicated that a person could have inhaled radioactive material that would emit a dose, over the person’s lifetime, of 3.4 millirem, an amount roughly equal to three days of natural background radiation. But to get the dose, the person would have had to stand for hours in the desert, on the downwind side of the plant.

Again, the official projections are based on the implication that the samples represent the maximum contamination, which is unlikely. We await the many soil samples that will shed light on the actual amounts.

 

 

WIPP Update Feb 25 2014

Let’s start with what we know.

The Waste Isolation Pilot Plant (WIPP) is the Nation’s only operating geologic repository for nuclear waste. WIPP can legally only accept a very specific type of waste – transuranic (TRU) waste generated at defense-related nuclear facilities.  “Transuranic” refers to atoms of man-made elements that are heavier (higher in atomic number) than uranium. The most prominent element in most TRU waste is plutonium. Some TRU waste consists of items such as soil, rags, tools, and laboratory equipment contaminated with radioactive materials. Other forms of TRU waste include organic and inorganic residues or even entire enclosed contaminated cases in which radioactive materials were handled.

The WIPP underground is 2150 feet below the surface. And will consist of 8 separate panels with 7 football field-sized rooms per panel. (Two additional panels, 9 & 10, are to be placed in the existing tunnels that lead to Panels 1 – 8.) WIPP has a legal maximum capacity of 175,564 m3 and is currently starting to fill Panel 7.

 

Timeline –

At 12:25 p.m.  February 5, 2014, – Shortly after 11 a.m., an underground vehicle used to transport salt is on fire in the underground.

At 11:30 PM Friday February 14, 2014, a continuous air monitor detected airborne radiation in the underground.

Sometime on Saturday February 15, 2014, a filter aboveground at the fence line of the WIPP facility (Location A) was sampled. The field preliminary analysis showed .87 Bq. (EPA’s action level for the isotopes of concern is 37 Bq.)

Sometime on February 17 & 18, 2014, more samples were taken from other monitors and also from Location A, which showed a much lower reading (.04 Bq) than it did three days earlier. http://www.wipp.energy.gov/Special/WIPP%20Environmental%20Sampling%20Results.pdf

 

Are the fire and the release related?

On the surface I would have to say yes. The first large fire in the underground was followed by first release 9 days later. But the 9 days is a problem. Apparently nothing happened for 9 days after the fire then something happened to cause the release of radionuclides aboveground. Did the fire somehow loosen the ceiling 2000’ away? Maybe, but right now, I have to think that it is a freak coincidence, because we don’t know the cause of the release.

 

Is the release serious?

Yes, WIPP is not supposed to leak for 10,000 years.

 

Is the release a threat?

Elevated levels of radionuclides can always pose a threat. The primary threat of alpha-emitters like plutonium is inhalation. Inhalation of very small amounts of plutonium can cause cancer.

The Location A monitor was some 6750 feet from the assumed source of the release, Panel 7. (2000’ from Panel 7 to the bottom of the exhaust shafts + 2150’ to the surface + ½ mile (2600’) to the monitor) Did Location A pick up a representative sample of the release? Unlikely. There are too many variables to know if the Feb 15 sample from Location A was higher or lower than the main part of the release. But the results do show that any higher risk is more than likely localized.

The map shows the seven monitoring locations. I have always thought that this was not enough monitoring locations.

 

What about the plume maps floating around the internet?

One in particular is getting some attention.

Please remember that these maps represent one possible outcome of a group of inputs entered into a NOAA computer program. We don’t know the input parameters that were used, therefore we do not know what this map is based on. This is not an actual map of where any actual plutonium actually went.

Also please notice the units.

The yellow is “1.0E-13 mass/m3”.

That would be .000,000,000,000,1 of something per cubic meter.

The blue is “1.0E-16 mass/m3”

That would be .000,000,000,000,000,1 of something per cubic meter.

It’s not nothing, but it’s not much. I would like to see what this map is based upon. This does show how well computers can crunch numbers.

 

What about claims of nuclear salt water rocket explosions in the WIPP underground?

There is a website in HungaryThat has an alert

A grim “Of Special Importance” (highest classification level) report prepared by the Russian State Atomic Energy Corporation (ROSATOM) circulating in the Kremlin warned that the “potentially catastrophic nuclear event” currently unfolding at the US atomic Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico has prompted the White House to begin pre-staging government forces and equipment in the event a large-scale evacuation is needed, Whatdoesitmean.com reported.

I’m sorry, but I don’t have time to respond to Whatdoesitmean.com. There was no Rosatom/WIPP report. There are no nuclear salt-water rockets in the underground at WIPP, exploded or otherwise.

 

What to do?

In the short term let’s keep a critical ear open to the DOE story and separate out the spin. I’m waiting for the next batch of samples to be released to the public. WIPP has several proposals modify its permit in the works. Clearly, at this time, those all need to be put on hold until details of the exact cause of this accident are released to the public. The health and environmental impacts must be fully known and cleanup must be completed to everyone’s satisfaction.

The official WIPP page.

 

Budget Deal Mixed Bag for Nuclear Weapons Programs

Budget Deal Mixed Bag for Nuclear Weapons Programs

Planned Long-Term Trend Not Sustainable

 

Following December’s budget deal Congressional appropriators have completed a one trillion dollar omnibus appropriations bill for this fiscal year, expected to pass given that neither political party wants another shutdown. The federal government has been running on a Continuing Resolution since October 1, and the omnibus bill now provides funding levels for the entire fiscal year 2014. Concerning the National Nuclear Security Administration’s nuclear weapons programs, the appropriators made a slight cut to Obama’s requested $7.87 billion, funding “Total Weapons Activities” at $7.78 billion.

All of this, of course, takes place within a larger context. The nonpartisan Congressional Budget Office (CBO) recently released a study entitled Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will cost $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars. This is simply not sustainable, given the nation’s continuing budget constraints.

The new omnibus appropriations bill has fully funded the most controversial program, the B61 nuclear bomb Life Extension Program (LEP), at the president’s request of $537 million. This overrode a proposed cut by Senate Energy and Water Development Appropriations, a key subcommittee that Senator Tom Udall sits on. Udall vigorously opposed that cut, saying that he wanted to save a few hundred jobs in New Mexico.

The B61 LEP has exploded in costs from an original $4 billion dollars to $12 billion, including a program synchronized with the Pentagon to give the bomb a new tail fin guidance kit that would transform it into the world’s first nuclear “smart” bomb. Its main mission is forward deployment in NATO countries, a relic of the Cold War, contradicting Obama’s rhetoric of lowering the presence of battlefield nuclear weapons in Europe.

But this is not a clear-cut victory for NNSA and the nuclear weapons labs. The appropriators cut funding for the B83 nuclear bomb that NNSA claims the B61 LEP will enable it to retire (leaving aside the fact that it was already planned for retirement). The appropriators made clear that they wanted to hold NNSA to its word.  Moreover, the appropriators demanded detailed reporting on major warhead refurbishments, which they applied retroactively to the B61 LEP, and cut the requested amount for the tail fin guidance kit in half. Finally, the fight over the B61 LEP will soon start all over again with the release of the proposed FY 2015 federal budget, expected in late February or early March.

So whereas the NNSA and the labs have won an ambiguous victory in the B61 LEP, the rest of the omnibus appropriations bill demonstrates how deeply troubled their nuclear weapons programs are. Foremost amongst these is a planned Life Extension Program for the W78 ICBM warhead, proposed to be “interoperable” with the W88 sub-launched warhead. This is the first of three proposed interoperable warheads, which the NNSA and labs want to use to transform both the nuclear weapons stockpile and the research and production complex that supports it, with requisite exorbitant appropriations to fund them. In a serious blow to this scheme, the appropriators funded only $38 million out of $72.69 million requested for paper studies. Although not yet officially reported, conventional wisdom in Washington, DC is that the Nuclear Weapons Council (composed of senior officials from both NNSA and the Pentagon) has already canceled the interoperable warhead.

The appropriators also require NNSA to submit a report by May 1 explaining the costs and benefits of stress testing plutonium pits at the Lawrence Livermore National Laboratory in California. These radioactive nuclear weapons cores would have to be transported back and forth from the Los Alamos Lab. This is significant because Livermore’s continuing future in nuclear weapons programs is becoming increasingly questionable, given the failure of its flagship National Ignition Facility to initiate fusion, its loss of security status to handle large amounts of plutonium, and now the doubtful future of interoperable warheads, which it was banking on.

Concerning the proposed Uranium Processing Facility (UPF) near Oak Ridge, TN, the appropriators provided $309 out of $325.8 million requested, but noted that it is an adjustment caused by the necessity to consider additional alternatives. The UPF has been under increasing fire after a half-billion dollar design mistake and a recent Pentagon estimate that it would cost $12 to $19 billion, up from $6 billion. Conspicuous in its absence is any mention of follow-on to the deferred plutonium facility at LANL (the “CMRR-Nuclear Facility”) whose mission is to expand plutonium pit production, or NNSA’s “alternative plutonium strategy.”

The appropriators also provided $343.5 million for the Mixed Oxide (MOX) Fuel Fabrication Facility, adding to the $320 million requested. However, they directed NNSA to identify the root causes of cost increases and prioritize recommended solutions and corrective measures, showing that this program too is in serious jeopardy.

The appropriators funded $224.79 million for “cleanup” at the Los Alamos National Laboratory, which primarily consists of removing radioactive transuranic wastes that were suppose to be shipped to the Waste Isolation Pilot Plant a decade ago. In contrast, LANL is planning to “cap and cover” around one million cubic meters of radioactive and toxic wastes and backfill, creating a de facto permanent, unlined nuclear waste dump above groundwater and the Rio Grande.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers have won for now the battle over funding for the gold-plated B61 bomb Life Extension Program, but we look forward to the coming fight over next year’s budget. The rest of their plans are falling apart because they are so often their own worst enemy with constant cost overruns and lack of clear need. We are confident that given the trillion dollar cost for future nuclear weapons, subs, bombers, and missiles, the public will increasingly demand cleanup and related jobs, not more nuclear bombs.”

 

# # #

 

The omnibus appropriations bill can be viewed at http://docs.house.gov/billsthisweek/20140113/113-HR3547-JSOM-D-F.pdf

The NNSA section begins at p. 34 or PDF p. 70.

 

 

Nukes Will Cost One Trillion over 30 Years; Cleanup, Job Creation Imperiled

Nuclear Weapons “Modernization” Will Cost One Trillion Dollars Over Thirty Years;

Locally, Los Alamos Lab Cleanup and Job Creation Are Imperiled

The nonpartisan Congressional Budget Office (CBO) has just released its study Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that estimated costs for maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will total $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars.

Approximately two-thirds of the modernization costs will be for new submarines, bombers and missiles that could be operational for the rest of this century, contrary to the Obama Administration’s rhetoric of a future world free of nuclear weapons. The remaining third will be for the Department of Energy’s research and production complex, which includes the Los Alamos, Lawrence Livermore and Sandia nuclear weapons labs.

While the American public at large is experiencing growing income inequality and limited economic opportunity, nuclear weapons contractors are experiencing increasing profits and decreasing federal oversight. The for-profit corporations running the labs, comprised of Lockheed Martin (the world’s biggest defense contractor), Bechtel, and the University of California, plan a never-ending cycle of exorbitantly expensive “Life Extension Programs.” These programs will not only extend the service lives of existing nuclear weapons for decades, but also give them new military capabilities, contrary to declared U.S. international policy. Ironically, the contractors’ drive for profits may undermine national security, as confidence in our nuclear weapons could be eroded by planned massive changes to an extensively tested stockpile that has been proven to be reliable.

The Los Alamos National Laboratory (LANL) had planned to “modernize” with a new facility to support expanded production of plutonium pit cores (or “primaries”) for nuclear weapons. Because of budget constraints, the Obama Administration decided to defer it in favor of the Uranium Processing Facility near Oak Ridge, TN, for production of nuclear weapons “secondaries.” The LANL plutonium project, known as the Chemistry and Metallurgy Research Replacement (CMRR)-Nuclear Facility, had grown from an original estimate of $600 million to around $6 billion, for which it would not have created a single new permanent job (it would have merely relocating existing Lab jobs). But the Uranium Processing Facility has now grown from a similarly estimated $600 million to an astounding worse case $19 billion, in part due to a simple design error that cost a half-billion dollars just to correct on paper.

So-called nuclear weapons modernization at these costs is clearly not sustainable, especially when they create few if any new permanent jobs. Moreover, they exist for a product that must never be used (i.e. nuclear weapons). Therefore, they are of little economic benefit to society outside of the privileged enclaves that benefit from nuclear weapons research and production (for example, Los Alamos County is the second richest county out of 3,077 counties in the USA).

Funding for nuclear weapons modernization programs will rob taxpayers’ dollars for programs that local citizens really need. For example, the Los Alamos Lab plans to “cap and cover” its largest waste dump (called “Area G”), leaving up to one million cubic meters of poorly characterized radioactive and toxic wastes and backfill permanently buried in unlined pits and shafts. This will create a de facto permanent nuclear waste dump above the Rio Grande, and most importantly above a sole source groundwater aquifer that supplies 270,000 people in the arid Southwest.

The Cities of Santa Fe and Taos, New Mexico, oppose LANL’s plans to create a permanent nuclear waste dump, passing resolutions demanding full characterization of the wastes and offsite disposal. The resolutions note that, “full cleanup of Area G would be a win-win for New Mexicans, permanently protecting our precious groundwater and the Rio Grande while creating 100’s of high paying jobs for twenty years or more.” The costs for full cleanup of Area G would be about the same as four to five years’ worth of the Lab’s nuclear weapons programs that caused the mess to begin with.

Jay Coghlan, Nuclear Watch NM Director, commented, “We simply can’t afford to squander precious taxpayers’ money on programs that enrich contractors while introducing radical changes to fully tested nuclear weapons. This may harm national security by undermining confidence in stockpile reliability. Instead, New Mexicans should demand that their elected officials invest taxpayers’ money in programs that create real security for citizens, such as creating jobs that protect diminishing water resources, rather than their habitual support for unneeded, mismanaged and exorbitantly expensive nuclear weapons programs.”

# # #

 The Congressional Budget Office report Projected Costs of Nuclear Forces 2014 -2023 is available at http://www.cbo.gov/sites/default/files/cbofiles/attachments/12-19-2013-NuclearForces.pdf

The Santa Fe City press release announcing passage of its resolution opposing “cap and cover’ of Los Alamos Lab’s largest radioactive and toxic waste dump is available at https://web.archive.org/web/20220819151417/https://www.santafenm.gov/news/detail/santa_fe_city_council_unanimously_passed_resolution

For a comparative estimate of cleaning up LANL’s Area G radioactive and toxic waste dump see https://nukewatch.org/facts/nwd/Area_G_Comparison_Costs-11-14-12.pdf

For a history of successful citizen activism against expanded plutonium pit production see https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

Op ed on Area G resolution had outdated info

The op-ed below ran in the New Mexican yesterday (Sunday 12/8/13) .  It had some outdated information.

The first iteration of the draft City resolution on Area G cleanup called for reburial of low-level wastes in a modern landfill, while specifically calling for any high level and transuranic wastes to be disposed offsite. Most low-level wastes are  mixed with hazardous wastes, which legally would have to be disposed offsite. Unfortunately DOE has sole regulatory authority over “purely” radioactive low-level wastes.

The resolution has now gone through several iterations, and the final draft that will presented to the Council does not have reburial. See
and scroll down.

Rather than being fast tracked this resolution has gone through 2 City committees and a 3rd today, before being presented to the full council on Wednesday.

FYI, two back-to-back events:

Wednesday, Dec. 11, 6:00-6:45 pm, Santa FePublic info session presented by Nuclear Watch NM and others (TBD) on Santa Fe City resolution calling for comprehensive cleanup of LANL’s largest radioactive waste dump (see below). First Presbyterian Church, 208 Grant Ave. From there we’ll walk two blocks to City Hall.

Wednesday, Dec. 11, 7:00 pm.

Santa Fe Santa Fe City Council hearing and public comment on a resolution introduced by Mayor Coss calling on LANL to examine alternatives to planned “cap and cover” of radioactive wastes at TA-54 Area G. This will be followed by the City Council’s yes or no vote to adopt. We are encouraging citizens to come and show their support for comprehensive cleanup of the Lab’s largest radioactive waste dump! Council Chambers, Santa Fe City Hall, 200 Lincoln Ave.

http://www.santafenewmexican.com/opinion/my_view/reader-view-city-resolution-on-waste-doesn-t-do-enough/article_559a0ec0-1e7d-5239-b6b9-2e480eec11f6.html

Reader View: City resolution on waste doesn’t do enough

ShannYn Sollitt

 Posted: Saturday, December 7, 2013 7:00 pm

By ShannYn Sollitt | 0 comments

On Dec. 2, the Finance Committee of the Santa Fe City Council considered a resolution requesting a consideration of the alternatives to Los Alamos National Laboratory’s current plan to deal with their highly radioactive legacy nuclear waste by leaving it buried in illegal landfills.

The laboratory’s only plan is to leave it in place and cover it. The highly toxic waste dumps in Los Alamos at the top of the watershed are leaking deadly contaminants into the Rio Grande, directly upstream from the city’s new water source — posing serious health threats to Santa Feans.

Thank you, Mayor David Coss, for your awareness, concern and willingness to bring this issue to the forefront, and for your foresight and compassion for the future generations of our community. However, if the intent is to assure a secure and potable water supply for the coming generations, the resolution falls short.

It relies on a cleanup proposal to rebury the low-level, yet still highly radioactive, waste in lined landfills. This approach postpones the problem for the coming generations while solutions to remediate it are available and being utilized now. American scientists are currently effectively remediating the nuclear devastation of land around the Fukushima nuclear plant in Japan.

For 55 years, Los Alamos National Laboratory has known of the serious health threats presented by the seepage of radionuclides into the groundwater and has done nothing more than “study” the problem — costing taxpayers billions. Clearly, the laboratory scientists have neither the environmental intelligence nor the will to cope with this problem. Sadly, the resolution is being fast-tracked through the council before the members of the community with considered solutions have been given the opportunity to present their ideas.

The resolution will come before the full City Council on Wednesday. Please help us broaden the discourse by contacting the mayor. Concerned citizens are asking for a seat at the table to share views of the viable alternatives to protect our bioregion from the scourge of the nuclear industry.

ShannYn Sollitt is founder and director of NetWorks Productions, a nonprofit communication arts production company dedicated to creating and disseminating media designed to inspire a peaceful and sustainable world.

Mayor’s Resolution Makes Sense

Mayor’s Resolution Makes Sense

The article in today’s Santa Fe New Mexican(11/13/13) criticizing the proposed City of Santa Fe resolution is long on rhetoric and short on solutions. I appreciate that it may be a slow news day, but this article belongs in the Opinion Section, in my humble opinion…

The resolution calls on Los Alamos Lab to complete a thorough clean up of its wastes left over from the Cold War. How can that be a bad thing? The resolution is just one of Mayor Coss’ efforts to address the economic and environmental issues facing Santa Fe. It works in conjunction with economic development because the waste must be dealt with and it will provide jobs into the future. The Mayor’s efforts for increasing spending at the Lab have been focused on obtaining much-needed cleanup dollars, not expanding the nuclear weapons production budgets.

The article claims that “other non-lethal waste that has been used since the mid 1940s has been buried and capped on LANL property.” It sounds like there is no problem. The term ‘non-lethal’ is misleading, and not really a term used to describe the millions of cubic meters of radiological and hazardous wastes in the ground around Los Alamos. Granted, much of the low-level radioactive wastes and solvents are in less dangerous concentrations, but there are buried radioactive wastes that will have to be remotely handled by robots when they are removed.

The resolution uses an example of the recent cleanup of Materials Disposal Area B that was accomplished using Stimulus Dollars. MDA B at LANL was excavated, characterized and the wastes were shipped to different sites. During cleanup at the Fernald site in Ohio, higher-level wastes were shipped off-site and the low-level waste was replaced on-site in modern landfills with monitoring wells. The resolution shares elements of these real-life completed cleanups. It is easy to criticize while not having one’s own plan. The criticism seems to imply that no action is needed.

Not every resolution can address every issue at LANL. But a resolution that proposes a better cleanup plan that will protect our drinking water and land, protect New Mexicans, and provide jobs is neither  “hypocritical” nor “propaganda.”

I invite alternative clean up proposals to be put on the table for discussion.

Santa Fe Mayor Calls to Not Allow the Creation of a Permanent Nuclear Waste Dump at Los Alamos

Santa Fe Mayor Calls to Not Allow the Creation of a Permanent Nuclear Waste Dump at Los Alamos

Santa Fe, NM – Nuclear Watch New Mexico applauds the demand by the Mayor of Santa Fe that the Los Alamos National Laboratory (LANL) not rule out alternatives to their so-called “cleanup” plan for Area G, the Lab’s largest radioactive waste dump. LANL plans to “cap and cover” and permanently leave one million cubic meters of radioactive and hazardous wastes buried forever.

Mayor David Coss will ask the Santa Fe City Council to approve his resolution to seek real cleanup alternatives at their December 11th meeting. Mayor Coss is also chairman of the Regional Coalition of LANL Communities that lobbies Congress for increased Lab funding. Yesterday he introduced his resolution to the Regional Coalition as well.

LANL is relying on their own outrageous estimate of $29 billion for removal of the waste at Area G as a rationale to leave the waste in place. Nuclear Watch has performed a cost comparison that compares the Lab’s estimate on a recent cleanup actually performed by the Lab and also to another Laboratory estimate. Our cost comparison shows that removal of the waste could actually cost less than $6 billion. The Lab’s preference is to cap and cover and leave the waste in place at Area G.

Scott Kovac, NukeWatch Program Director, commented, “LANL should quit playing games that cap and cover somehow represents genuine cleanup. For the same price as 5 years’ worth of nuclear weapons work that caused this mess to begin with, Area G could be fully cleaned up. I echo the Mayor’s words that this could be a real win-win for New Mexicans, permanently protecting groundwater and the Rio Grande while creating hundreds of long-term high-paying jobs. I call on other local governments and everyone to pick up the Santa Fe Mayor’s challenge.”

# # #

Read the Santa Fe Mayor’s press release
Read the Santa Fe City Resolution
Read Nuclear Watch’s cost comparison here and Area G fact sheet

CRITICAL EVENTS

It seems we can’t find what you’re looking for. Perhaps searching can help.

It seems we can’t find what you’re looking for. Perhaps searching can help.

New Nuclear Media: Art, Films, Books & More

It seems we can’t find what you’re looking for. Perhaps searching can help.