Through comprehensive research, public education and effective citizen action, Nuclear Watch New Mexico seeks to promote safety and environmental protection at regional nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

Plutonium Sampling at Los Alamos National Laboratory

Cost of RECA Chart

QUOTE OF THE WEEK

It seems we can’t find what you’re looking for. Perhaps searching can help.

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

Banner displaying “Nuclear Weapons Are Now Illegal” at the entrance in front of the Los Alamos National Lab to celebrate the Entry Into Force of the Nuclear Weapon Ban Treaty on January 22, 2021

It seems we can’t find what you’re looking for. Perhaps searching can help.

Follow the Money!

Map of “Nuclear New Mexico”

In 1985, US President Ronald Reagan and Russian President Mikhail Gorbachev declared that “a nuclear war cannot be won and must never be fought.”

President Ronald Reagan and Soviet General Secretary Mikhail Gorbachev shake hands after signing the arms control agreement banning the use of intermediate-range nuclear missles, the Intermediate Nuclear Forces Reduction Treaty.

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

New & Updated

LANL Regional Coalition Exaggerates Sequester Cuts

Northern New Mexico Needs to Wean Itself From Nuclear Weapons

Santa Fe, NM Today the Regional Coalition of LANL Communities issued a press statement supporting a state House memorial that “recognizes the critical importance of New Mexico’s National Laboratories and DOE facilities to the state’s economic welfare and the dramatic negative effects that sequestration will have on New Mexico’s economy.” Its statement also “recognizes that Northern New Mexico is highly dependent on federal spending in the area of nuclear technology and sequestration may cause tens of thousands of New Mexicans to lose their jobs through direct and indirect job losses at Los Alamos National Laboratory.”

Staffing levels at LANL vary from year to year and up-to-date information is hard to find.  Given those qualifiers there are approximately 10,500 people directly employed by the Lab or its contractors, and perhaps the same amount of people in lesser-paid indirect jobs. Specific impacts of the sequester are nearly impossible to pinpoint in advance, but if general cuts of 10% to military programs are applied to the number of LANL employees and subcontractors and indirect jobs that would be a loss of ~2,000 positions. While not good, it is still a far cry from the “tens of thousands” of lost jobs that the Regional Coalition cries wolf about. Using the Coalition’s own language, sequester cuts could include all of LANL’s direct and indirect jobs, which is simply impossible. In Nuclear Watch New Mexico’s view policy should be based on sound and proven facts, not scare tactics. [As a footnote, according to a February 14 Albuquerque Journal article LANL Director Charlie McMillan said job cuts would not be likely as a result of sequestration.]

The Regional Coalition, composed of politicians from eight northern New Mexico counties and municipalities, lobbies Congress to support LANL’s budget. It is currently funded with $100,000 from the Department of Energy and $150,000 from Los Alamos County. Just under two-thirds of the Lab’s annual ~$2.2 billion institutional budget is for core research, testing and production programs for nuclear weapons, the most destructive class of weapons of mass destruction ever known. Due to the Lab’s nuclear weapons programs Los Alamos County is the 2nd richest county in the USA.

In contrast, despite the claimed economic benefits of the nuclear weapons industry, New Mexico as a whole has slipped from 37th in per capita income in 1959 to 44th now, while 25% of our children remained mired in poverty. There is limited economic benefit from LANL’s nuclear weapons programs outside the privileged enclave of Los Alamos County. Moreover, contractor profits have soared 10-fold since Lab management was privatized in 2006 with co-manager Bechtel.

What the Los Alamos Lab has failed to do is to profoundly diversify its mission to meet 21st century threats (in part because of its prohibitive overhead support costs of just under 50%). For example, in its fiscal year 2013 Congressional Budget Request the Lab asked for only $2.1 million for renewable energies R&D, or a pathetic 00.1% of its total projected budget. New Mexico is one of the leading states in renewable energies production with potential job growth in the tens of thousands, but the Los Alamos National Laboratory has had little if anything to do with that. Similarly, while LANL has advertised itself as having “the world’s greatest science,” but it asked for only $78 million in the budget category of non-nuclear weapons “Science” (only 3.5% of its total budget).

The Lab asked for $235 million in FY 2013 for cleanup (or 10.7% of its total projected budget), but is planning to merely “cap and cover” an estimated ~6 million cubic feet of radioactive and hazardous contaminants at its largest waste dump (known as “Area G”). In contrast, comprehensive cleanup would be a real win-win for New Mexicans, one that permanently protects the environment and our precious groundwater and the Rio Grande while creating hundreds of high paying jobs (for more, see below).

Jay Coghlan, Nuclear Watch New Mexico Director commented, “It’s past time for New Mexican politicians to show bold leadership that lessens dependence on nuclear weapons programs and helps to stimulate local economic growth through cleanup at LANL and the encouragement of sustainable green industries independent of the federal budget. In the interests of their own constituents this is what local counties and municipalities should be pushing for, instead of lobbying for the continued benefit of the Los Alamos Lab and County. But if the Regional Coalition is going to continue to directly lobby for the Lab it should at least use sound facts and figures instead of distorting data to indulge in scare tactics.”

# # #

Nuclear Watch New Mexico’s argument for comprehensive cleanup of Area G while creating hundreds of job is available at https://nukewatch.org/facts/nwd/Cleanup-Jobs-9-9-12.pdf

 

903 W. Alameda, #325 • Santa Fe, NM 87501 • Voice and fax: 505.989.7342

[email protected] • www.nukewatch.org  • https://nukewatch.org/watchblog/

http://www.facebook.com/NukeWatch.NM

 


NNSA Releases Expanded 2012 Performance Evaluation Reports

In response to a request from Nuclear Watch New Mexico, the National Nuclear Security Administration has released to us expanded versions of the 2012 Performance Evaluation Reports (PERs) for seven nuclear weapons complex sites. (The report for the Savannah River Site was not given to us.) The reports are used by NNSA to decide how much Award Fee it will give its nuclear weapons site contractors each year.

Design issues for the proposed Uranium Processing Facility (UPF) cost taxpayers over a 1/2 billion dollars. A statement from the Oak Ridge Environmental Peace Alliance (OREPA) sheds light on the FY2012 Y-12 Performance Evaluation Report

NNSA admitted publicly in October, five months after it first learned about it, that it had run into a “space/fit issue” with the UPF design. The building, as it approached 80% design completion, would not hold all the equipment it needs to hold…
“The engineering plan delivered on October 19, reported a TPC cost impact of $539M and 13 month impact to the overall project schedule as a result of the Space/Fit issue, effectively using 45% of the NNSA contingency established during CD-1 Reaffirmation in April.” (Performance Evaluation Report for Babcock and Wilcox Y-12 Technical Services, LLC, Evaluation Period: October 1, 2011 through September 30, 2012, p.7)

…more soon…

How Do You Spell PASSWORD? LANL Gets Bad Cyber Report

How Do You Spell PASSWORD? LANL Gets Bad Cyber Report

It turns out that cyber security for running supercomputing networks at a national nuclear weapons laboratory may not be much different than cyber security for the rest of us emailing, social networking, and watching kitten videos. All of us need to reasonably vigilant with passwords and software updates. The difference is that when you and I use lame passwords and don’t update our software, we don’t put national security at risk.

The DOE Investigator General (DOE IG) released a report that identified continuing concerns in LANL cyber security program. These concerns have been going on for years. A 2006 report revealed that critical cyber security internal controls and safeguards were not functioning as intended and monitoring by both laboratory and Federal officials was not adequate. Weaknesses with LANL’s cyber security program were also identified at least as far back as 2002.

A temporary shutdown of the Lab for nearly seven months (July 2004 to January 2005) because of a security flap might have cost as much as $370 million, but the exact amount can’t be calculated because of the way the lab recorded its activities according to General Accounting Office congressional investigators in 2005. Apparently, exact amounts are hard for the Lab to come up with. The DOE IG, for its cyber report, said, “Although LANL spends a significant amount of funds on information technology (IT) activities, we were unable to obtain an accurate amount due to the Laboratory’s limited ability to track its IT spending.”

How do you spell PASSWORD?
The DOE IG found that, “Network servers and devices were configured with default or easily guessed login credentials or required no authentication. For example, 15 web applications and 5 servers were configured with default or blank passwords.” Additionally, two network servers had the possibility to accept connections from anybody without the use of authentication or similar access controls. Also, 10 network servers could have allowed unauthorized remote control.

Those pesky software updates –
And, “LANL had not fully implemented existing security patch management and vulnerability management procedures. Specifically, tests of 191 network servers supporting LANL’s financial applications and data or providing core network services revealed that 73 (38 percent) were running operating systems and client applications without current security patches…” The DOE IG also found that LANL continued to maintain a significant number of operating systems, client applications and other various software that was no longer supported.

To be fair, the DOE IG reported that LANL “improved the protection of national security systems and data through the elimination or disablement of data ports on machines containing classified information.” This partially refers to the Lab’s low-tech program of injecting a popular two-stage epoxy into USB ports. I’m not sure that qualifies as an IT solution.

No passwords. No updates. How does this happen at nuclear weapons laboratory? Two things – First, the Lab contractor does not perform. Second, oversight is lacking. The DOE IG stated that, “The issues identified occurred, in part, because of a lack of effective monitoring and oversight of LANL’s cyber security program by the Los Alamos Site Office, including approval of practices that were less rigorous than those required by Federal directives. “ The Los Alamos Site Office is a DOE office and is tasked with providing immediate federal oversight of the Lab and making sure that our taxpayers’ dollars are spent wisely.

Unfortunately, DOE continues to relax its grip of oversight of the Labs. Continuing cyber security issues are only one manifestation of this letting go. We need a strong DOE Secretary, a strong NNSA administrator, and strong Congressional oversight as we head towards zero nukes if we hope to hold the nuclear weapons complex contractor accountable.

Read the Global Security Newswire Article here.

The Lab’s New, $400 million, Plutonium Laboratory Springs Its First Leak

The Lab’s New, $400 million, Plutonium Laboratory Springs Its First Leak

On January 22, 2013 representatives of the Los Alamos National Laboratory discovered the presence of a diesel spill from an above ground storage tank system at the LANL Technical Area 55. The spill was from the new Radiological Laboratory Utilities Office Building’s (RLUOB’s) 12,000-gallon emergency generator diesel storage tank. The RLUOB is the recently completed first phase of the CMRR project. The main phase of the project, the CMRR Nuclear Facility (estimated at #6 billion), has been deferred for at least 5 years and will probably next be proposed next as a smaller project, if at all.

From the reports, it is unclear how long the sump pump union had been leaking before the spill was noticed. A leak detector alarm first went off in November. The Lab estimates that 350 gallons overflowed out a sump and spilled onto the ground, and workers have removed 5 cubic yards of contaminated soil. LANL and the State Environment Department Petroleum Storage TOppie greenank Bureau are working to figure out if more soil needs to be removed.

Read the report there.

WIPP Proposes to Eliminate Waste Sampling – Comments Needed!

WIPP Proposes to Eliminate Waste Sampling – Speak Out!

Since the Department of Energy (DOE) opened the Waste Isolation Pilot Plant (WIPP) in 1999, the transuranic (TRU-plutonium-contaminated) waste has been subjected to chemical sampling and laboratory analysis to determine what toxic chemicals are present before the waste can be shipped to WIPP. The WIPP operating permit issued by the New Mexico Environment Department (NMED) has required headspace gas sampling of non-solidified waste and coring of solidified waste to help determine toxic chemicals and their concentrations. DOE now wants to eliminate all requirements for headspace gas and solids sampling from the WIPP permit. But people can speak out about DOE’s plans!
Read the fact sheet here.

Submit written comments to the New Mexico Environment Department (NMED).
Tell NMED:
I am very concerned that eliminating sampling of waste bound for WIPP would reduce health and safety protections because such analysis is still needed, including for the many waste streams that have not yet been sampled. NMED should deny the request. Any future requests to reduce or eliminate sampling should only be made after the kind of systematic approach recommended by the National Academy of Sciences is carried out and made public and after representative sampling is done for waste streams that have not yet been shipped to WIPP.

The deadline for written comments to NMED is February 18, 2013. Submit to:
Trais Kliphuis, New Mexico Environment Department, 2905 Rodeo Park Drive East, Building 1, Santa Fe, NM 87505, or
E-mail: [email protected]
The complete 301-page permit modification request (13 MB) can be found at:
http://www.wipp.energy.gov/rcradox/rfc/Class_2_PMR.pdf

Proposed Nuke Cuts a Step in the Right Direction

Great news about reported further cuts to deployed strategic nuclear weapons. NukeWatch NM is all in favor of that! But we also want a qualitative change rather that just a quantitative change. By that we mean no new nuclear weapons production facilities meant to last for the next half-century and no new military capabilities for our existing weapons. Make no mistake, those new military capabilities are happening now through Life Extension Programs, despite denials at the highest levels of the U.S. government. More in our press release……

NUCLEAR WATCH NEW MEXICO

FOR IMMEDIATE RELEASE February 8, 2013   

Contact: Jay Coghlan, Nuclear Watch NM, 505.989.7342, c. 505.692.5854 [email protected]

 

Proposed Nuke Cuts a Step in the Right Direction – –

New Nuclear Weapons Production Facilities And Military Capabilities Should Be Cut As Well

Santa Fe, NM – According to a major article published today by the Center for Public Integrity, the Obama Administration is preparing to release a long-awaited “Implementation Study” as a follow on to its 2010 Nuclear Posture Review. This study will reportedly lower the number of deployed strategic nuclear weapons to 1,000 – 1,100 from the 1,550 each pledged to by Russia and the U.S. in the New Strategic Arms Reduction Treaty arms control agreement. In December 2010 the U.S. Senate ratified New START, which Republican senators used to extract funding commitments for “modernization” of both the nuclear weapons stockpile and the National Nuclear Security Administration’s research and production complex.

Nuclear Watch New Mexico applauds further cuts to strategic nuclear weapons as an excellent step in the right direction. But as the Center for Public Integrity points out the Obama Administration considered but rejected a “deterrence only” nuclear posture that would require only some 500 warheads to back up the officially declared policy of deterring others. This is in contrast to the 1,000+ weapons needed for nuclear warfighting and first strike capability (which the U.S. has never renounced).

So-called modernization of the U.S. stockpile involves increasingly aggressive Life Extension Programs (LEPs) that prolong the service lives of existing nuclear weapons 30 years or more. LEPs and/or other modifications also provide existing nuclear weapons with new military capabilities, which generally involve substituting lower yield nuclear weapons for higher yield weapons. Two past examples are: 1) a 1997 modification of the B61 bomb into a 350 kiloton earth-penetrator, taking over the mission of the 9 megaton B53 surface-burst bomb to destroy hardened, deeply buried targets; and 2) the current LEP for the sub-launched W76 Trident warhead, retrofitting it with a new-design fuze that is believed capable of selecting more precise heights-of-burst. In combination with increased warhead accuracy, this gives the 100-kiloton W76 the hard target kill capability of the more powerful 450-kiloton W88 Trident warhead. [For perspective’s sake, the Hiroshima and Nagasaki atomic bombs were ~16 and ~21 kilotons respectively, together instantly killing at least 130,000 people.]

The U.S. has officially and repeatedly declared to the entire world (notably at the United Nations’ 2010 NonProliferation Treaty Review Conference) that it will not produce new-design nuclear weapons. Simultaneously high-level government officials also pledged that the U.S. would never give existing nuclear weapons new military capabilities.

However Jay Coghlan, Nuclear Watch NM Director, points out, “Substituting more usable lower-yield nuclear weapons for higher-yield weapons is undeniably a new military capability in and of itself. At the same time, we are undermining our own national security, first through the bad proliferation example we set for others, and second by possibly lowering confidence in stockpile reliability through the introduction of major changes to our extensively tested nuclear weapons. Further cuts to deployed strategic nuclear weapons are clearly a very good thing. But the next needed step is for all nuclear weapons powers, including the U.S., to adopt a deterrence-only posture that conservatively maintains nuclear arsenals while awaiting negotiated, verified disarmament.”

As a case in point for the need to preserve the tested pedigree of the stockpile, the new-design fuze for the W76 (in part responsible for its new military capability) had initial design problems that delayed start up of its Life Extension Program. Future LEPs could be even more aggressive, with for example a proposed joint warhead replacing both the W78 ICBM warhead and the sub-launched W88 while using the plutonium pit core of yet a third type of warhead. This inevitably raises the question of at what point does a reputedly refurbished nuclear weapon become a “new” weapon, directly contradicting officially declared policy and creating a terrible proliferation example.

Lower stockpile numbers coupled with prudent, conservative maintenance of nuclear weapons creates less need for strategic bombers, subs, missiles and nuclear weapons production facilities, in turn leading to huge, urgently needed taxpayers savings and enhanced national security. Coghlan concluded, “This should be the final straw for the proposed ~$6 billion CMRR facility for expanded plutonium pit production at the Los Alamos Lab, which has been postponed for at least 5 years because of budget pressures. Today’s revelation of lower nuclear stockpile numbers should put a permanent end to this plutonium boondoggle for a shrinking nuclear weapons stockpile, giving some relief to the American taxpayer while promoting a safer world.”

# # #

The Center for Public Integrity’s news article “Obama administration embraces major new nuclear weapons cut” is available at http://www.publicintegrity.org/2013/02/08/12156/obama-administration-embraces-major-new-nuclear-weapons-cut

903 W. Alameda, #325 • Santa Fe, NM 87501 • Voice and fax: 505.989.7342 [email protected] • www.nukewatch.org   https://nukewatch.org/watchblog/ • http://www.facebook.com/NukeWatch.NM

 

 


GOVERNMENT MEMO SLAMS BECHTEL FOR MALFEASANCE, SAFETY VIOLATIONS AT HANFORD NUCLEAR SITE

This is from our friends at Hanford Challenge (www.hanfordchallenge.org). Bechtel is the major operator of Los Alamos National Laboratory.

Press Release
Immediate Release
For more information contact: Tom Carpenter, 206-419-5829 [email protected]
August 28, 2012

GOVERNMENT MEMO SLAMS BECHTEL FOR MALFEASANCE, SAFETY VIOLATIONS AT HANFORD NUCLEAR SITE

Memo Urges DOE to Remove Bechtel as the Design Authority, Warning Bechtel “is not competent to complete their role”

Seattle, WA: Hanford Challenge today released a high-ranking Director’s memorandum that urges termination of the key duties of government contractor, Bechtel National, Inc. (“Bechtel”; “BNI”). A litany of charges question whether Bechtel should continue its role at the Hanford nuclear site, including a long history of incompetence, misleading the government, overcharging, and unsafe designs.

The memo states, “[t]he number and significance of these issues indicate that Bechtel National Inc. is not competent to complete their role as the Design Authority for the WTP [Waste Treatment Plant], and it is questionable that BNI can provide a contract-compliant design as Design Agent.”

The memo continues, noting that “[t]he behavior and performance of Bechtel Engineering places unnecessarily high risk that the WTP design will not be effectively completed. . .”

The August 23, 2012 memo was prepared by the Department of Energy’s WTP Engineering Division Director who oversees the Waste Treatment and Immobilization Plant. It is titled “Summary of Actions and Design Outcomes that Erode Confidence in the ability of Bechtel National Inc. to complete their assigned role as Design Authority for the WTP,” it includes a 19- page attachment, and it is addressed to the Hanford Site Manager. The memo begins:
“This memorandum documents 34 instances and technical issues in which Bechtel National Inc., acting as Design Authority for the Waste Treatment and Immobilization Plant (WTP) has provided design solutions and technical advice to the Department of Energy which either:
• was determined to be factually incorrect,
• provided a design solution that was not technically defensible, technically viable, or was technically flawed considering identified requirements,
• provided a design solution that was not safe for the WTP operators, or designs that did not comply with the safety basis,
• provided a design solution that represented higher River Protection Project life cycle operating costs compared to other alternatives,
• provided a design solution that was difficult and costly to verify considering other alternatives. thereby increasing WTP completion costs and extending the WTP completion schedule,
• provided a design that was new and unique and does not clearly provide benefits compared to existing technologies and which required special qualification testing,
• provided an installed equipment system that did not meet safety requirements or was not adequately inspected following installation even when defects became known, or
• did not represent best value to the Government in terms of design costs, operating costs or completion schedule.”
The Hanford Waste Treatment Plant is one of the world’s largest and most expensive environmental remediation projects. The current plant is the fourth attempt to build a treatment facility to convert radioactive waste into glass at Hanford, it is a decade behind schedule and with a price tag of approximately at $13 billion, it is at least 250% over budget. The Department of Energy (“DOE”) recently suspended much of the project’s design and construction activities, pending resolution of outstanding safety and technical concerns.
The memo further states, “DOE Engineering Staff have uncovered findings at a nearly constant rate since 2008. The rate of identification is constant, indicating systemic problems in the WTP design process and in BNI’s role as Design Authority. The number and rate of problems identified is indicative that issues are not being resolved.”
Hanford Challenge Executive Director, Tom Carpenter, posits: “the leaked memo puts the Waste Treatment Plant’s woes into sharp relief. This memo details exhaustive and disturbing evidence of why Bechtel should be terminated from this project and subject to an independent investigation. We already knew of Bechtel’s record of suppressing its own engineers’ concerns and retaliating against whistleblowers, and now we see evidence that exhibits a shocking and inexcusable lack of attention to safety for both workers and the public.”
The Engineering Director’s memo recommends, “the role of the WTP Design Authority should be immediately removed from BNI. The DOE should evaluate and select a preferred option to establish an Independent Design Authority for the WTP that will represent the interests of the DOE and the DOE operator.”
+++++++++++++++++++
DOE Memo can be found at www.hanfordchallenge.org

CRITICAL EVENTS

It seems we can’t find what you’re looking for. Perhaps searching can help.

It seems we can’t find what you’re looking for. Perhaps searching can help.

New Nuclear Media: Art, Films, Books & More

It seems we can’t find what you’re looking for. Perhaps searching can help.