Through comprehensive research, public education and effective citizen action, Nuclear Watch New Mexico seeks to promote safety and environmental protection at regional nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

UPDATED JULY 2024

Plutonium Sampling at Los Alamos National Laboratory

Cost of RECA Chart

QUOTE OF THE WEEK

It seems we can’t find what you’re looking for. Perhaps searching can help.

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

Banner displaying “Nuclear Weapons Are Now Illegal” at the entrance in front of the Los Alamos National Lab to celebrate the Entry Into Force of the Nuclear Weapon Ban Treaty on January 22, 2021

It seems we can’t find what you’re looking for. Perhaps searching can help.

Follow the Money!

Map of “Nuclear New Mexico”

In 1985, US President Ronald Reagan and Russian President Mikhail Gorbachev declared that “a nuclear war cannot be won and must never be fought.”

President Ronald Reagan and Soviet General Secretary Mikhail Gorbachev shake hands after signing the arms control agreement banning the use of intermediate-range nuclear missles, the Intermediate Nuclear Forces Reduction Treaty.

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

New & Updated

It seems we can’t find what you’re looking for. Perhaps searching can help.

High Detections of Plutonium in Los Alamos’ Acid Canyon

Full Video Recording: NukeWatch and Dr. Michael Ketterer Present Results from Recent Sampling for Plutonium Contamination Around the Los Alamos National Lab

Dr. Michael Ketterer's Presentation of Results Showing High Detections of Plutonium in Los Alamos Neighborhood

It seems we can’t find what you’re looking for. Perhaps searching can help.

Regional Coalition Of LANL Communities Struggles To Survive

Jay Coghlan, executive director of Nuclear Watch New Mexico complained that the RCLC main selling point was to lobby for mission diversification and accelerated cleanup and said he would argue that the Coalition has been a spectacular failure on both counts.

“When the Coalition was founded in 2011, LANL’s nuclear weapons budget was $1.9 billion. A decade later that budget is $2.9 billion and the total spending on core nuclear weapons research and production has risen year after year to where now it’s a full 70 percent of all funding and all of the remaining 30 percent either directly or indirectly supports those nuclear weapons,” Coghlan said.

By: MAIRE O’NEILL [email protected] | losalamosreporter.com May 3, 2021

The next couple of months may determine the demise of the Regional Coalition of LANL Communities. The City of Santa Fe opted last month not to approve the RCLC’s amended and restated joint powers agreement which has been hanging out there waiting for the City’s decision since March 2019. The City is slated to decide whether to withdraw completely from the RCLC later this month.

The Taos County Commission is slated to decide Tuesday whether it wishes to continue as a member and Santa Fe County Commissioners have the same decision to make at their May 11 meeting.

Los Alamos County Council is expected to discuss its RCLC status in June which will be the first time the Council will have had an agenda item on the RCLC since it approved the amended JPA in July of 2020. The discussion is at the request of Council Vice Chair James Robinson. Councilor David Izraelevitz, who serves as RCLC treasurer, has been a strong advocate of the RCLC and has recently addressed several meetings of members of the Santa Fe City Council at the behest of Councilor Michael Garcia to encourage them to approve the amended JPA. City of Espanola Mayor Javier Sanchez also attended a Santa Fe City Council meeting to advocate and answer questions.

Continue reading

NNSA approves Critical Decision 1 for Los Alamos Plutonium Pit Production Project

“Recommended approach to producing 30 plutonium pits per year identified”

WASHINGTON – The Department of Energy’s National Nuclear Security Administration (DOE/NNSA) announced the approval of the Critical Decision 1 (CD-1) milestone for the Los Alamos Plutonium Pit Production Project (LAP4) at Los Alamos National Laboratory (LANL).

CD-1 approval marks the completion of the project definition phase and the conceptual design as part of DOE’s Order 413.3B process for the acquisition of capital assets. NNSA identified its recommended approach to produce at least 30 plutonium pits per year to meet national security needs.

The CD-1 cost estimate for LAP4 is $2.7-$3.9 billion, with an overall project completion range of 2027-2028. Critical equipment is scheduled to be installed in time to achieve the 30 pits per year production capacity in 2026. The CD-1 cost estimate and project completion date ranges are preliminary estimates that will be refined as the project conceptual design is matured to the 90% design level required to achieve CD-2 (approval of the performance baseline). Consistent with industry best practices and DOE policy, NNSA will set the performance cost and schedule baseline at CD-2, which is expected in 2023.

NNSA leadership and LANL will continue to review this project to improve the fidelity of the current price estimate and schedule.

###

Los Alamos lab sees two mishaps in a week

The water spill should be a reminder that the plutonium facility’s work is done by people, and people make mistakes, said Scott Kovac, research and operations director for the nonprofit Nuclear Watch New Mexico.

“Pit production will place a real time-pressure crunch on the workers and lead to more accidents,” Kovac said.

“It should lead us to consider the consequences if someone left a plutonium furnace on or something that could endanger the public…these kinds of missteps are likely to increase as the lab ramps up production of plutonium pits used to trigger nuclear warheads. Current plans call for the lab to make 30 of the nuclear bomb cores a year by 2026,”

| santafenewmexican.com April 26, 2021

Los Alamos National Laboratory had two mishaps in one week: a glove box breach that contaminated workers’ protective equipment and a spill of 1,800 gallons of water into a vault corridor after an employee left a valve open.

The incidents were the latest in a series of accidents in recent months at the lab, as reported by the Defense Nuclear Facilities Safety Board.

In the board’s most recent report, an alarm sounded March 29 when a worker tore a protective glove attached to a sealed compartment known as a glove box while handling a piece of plutonium.
Continue reading

CHERNOBYL: 35 YEAR ANNIVERSARY OF THE WORLD’S WORST NUCLEAR ACCIDENT

Women mourn near a tomb of a victim of the Chernobyl nuclear power plant disaster at the Mitino cemetery in Moscow...
Women mourn near a tomb of a victim of the Chernobyl nuclear power plant disaster at the Mitino cemetery in Moscow. PHOTO: EPA-EFE

CLICK ON THE PHOTO ABOVE FOR A GALLERY OF CHERNOBYL: 35 YEARS LATER, FROM THE SOUTH CHINA MORNING POST

ON THIS DAY in 1986, workers ran a safety test at the Chernobyl Nuclear Power Plant in northern Ukraine. But the test went awry, starting a fire in a reactor and leading to one of the largest nuclear disasters in history. Smoke from the fire and a second explosion launched radioactive elements into the atmosphere, scattering them over the surrounding fields and towns.

Chernobyl is generally recognized as the worst nuclear accident on record, directly killing 31 people and causing widespread contamination in Eurasia. It’s estimated that thousands of people will eventually die earlier than they would have due to the cancers caused by their exposure.

Today, 35 years later, scientists are still uncovering the extent of the damage and starting to answer questions about the long-term legacy of radiation exposure on power plant workers, the people in the nearby community, and even their family members born years later.

READ: New studies highlight the possible impact of Chernobyl on genes
  • Published on Science Daily, the studies—both conducted by the National Cancer Institute (NCI), a branch of the National Institute of Health (NIH)—sought to find what kind of changes the exposure to carcinogenic ionizing radiation had on those who came into contact with the explosion.

WIPP completes maintenance outage, intends to up shipments of nuclear waste post-pandemic

Reinhard Knerr, manager of the U.S. Department of Energy’s Carlsbad Field Office said WIPP will resume accepting shipments of low-level transuranic waste from DOE sites around the country and will continue to emplace the waste for final disposal in WIPP’s underground mine.

By:  | currentargus.com April 26, 2021

Shipments and disposal of nuclear waste resumed at the Waste Isolation Pilot Plant after a two-month pause in the repository’s primary operations to allow personnel to complete several maintenance projects underground and on the surface.

WIPP completed 97 projects during the maintenance outage which ran from Feb. 15 to April 15, upgrading infrastructure throughout the facility.

The work involved mine operations, waste handling, hoisting, ground control, safety and engineering, and the break included a site-wide power outage to allow electrical work to be completed safely.

Continue reading

Notice of Impending Lawsuit to DOE & NNSA Over Nuclear Bomb Core Plans from Environmental Groups

Nuclear Watch New Mexico, as part of a larger coalition of environmental groups, has threatened the federal government with a lawsuit over cross-country plans to produce plutonium pits, the cores at the heart of modern nuclear weapons.

A more comprehensive review should have been done on the plans to produce plutonium cores at Los Alamos and at the Savannah River Site in South Carolina. This lack of review violates the National Environmental Policy Act (NEPA) and would saddle already-burdened communities nearby the two DOE sites with significant quantities of toxic and radioactive waste, contravening President Biden’s executive order of making environmental justice a part of the mission of every agency. Here in New Mexico, we are well aware of how much our local community has already have been burdened with legacy contamination from previous defense work. While the budget continues to be cut and slashed for cleanup funding, the astronomical cost of modernizing the U.S. nuclear weapons arsenal continues to balloon out of proportion without NNSA or DOE batting an eyelash. The federal government’s plans are unnecessary and provocative – more plutonium pit production will result in more waste and help to fuel a new arms race.

Continue reading

The Nuclear Bomb Is Ready: In Italy Soon. The B61-12 has a Nuclear Warhead with 4 “Selectable Power Options”

“It has been officially announced that the new nuclear bomb series production  will begin in the fiscal year 2022, beginning October 1, 2021. It is  unknown the number of B61-12 bombs that the US will  deploy in Italy, Germany, Belgium and Holland to replace the B61s, whose actual number is secret. Satellite photos show renovations that have been carried out at Aviano and Ghedi bases in preparation for the new nuclear bombs’ arrival, the US Air Force F-35A,  and Italian Air Force F-35A under US command will be armed with these bombs.”

BY: Manlio Dinucci | globalresearch.ca April 24, 2021

First published on December 3, 2020

***

A video was released on November 23 2020 by Sandia National Laboratories that shows a US F-35A fighter flying at supersonic speed  3000 meters above sea level, launching a B61-12 nuclear bomb (non-nuclear warhead equipped). The bomb did not fall vertically but glided until the tail section rocket ignition gave a rotational motion and the B61-12 (satellite-guided system) headed for the target and hit 42 seconds after launch. The test was carried out on August 25 at the Tonopah shooting range in the Nevada desert.

An official statement confirmed its full success: it was a real nuclear attack, proof that the fighter carried out at supersonic speed and in stealth attitude (with  nuclear bombs placed in its internal hold) has the capability to penetrate through enemy defenses.

The B61-12 has a nuclear warhead with four selectable power options at launch depending on the target to  hit. It has the ability to penetrate underground, exploding deep to destroy command center bunkers and other underground structures. The Pentagon’s program foresees the construction of about five hundred B61-12 with an estimated cost of roughly 10 billion dollars (so each bomb will cost double what it would cost if it were built entirely of gold).

Continue reading

It seems we can’t find what you’re looking for. Perhaps searching can help.

CRITICAL EVENTS

It seems we can’t find what you’re looking for. Perhaps searching can help.

It seems we can’t find what you’re looking for. Perhaps searching can help.

New Nuclear Media: Art, Films, Books & More

It seems we can’t find what you’re looking for. Perhaps searching can help.