Watchdogs Urge Big Cut to Contractor Fees at the Sandia Labs

Watchdogs Urge Big Cut to Contractor Fees at the Sandia Labs

December 19, 2014 – The Project On Government Oversight and Nuclear Watch New Mexico sent the Department of Energy Secretary a letter urging that the FY 2014 contractor incentive award fee for the Sandia National Laboratories be completely denied. The two watchdog organizations wrote to the Secretary earlier this month to urge him to cut performance incentive award fees at least in half for the Los Alamos Lab contractor because of substandard performance that led to the contamination of 21 workers at the Waste Isolation Pilot Plant and the indefinite closure of that multi-billion facility. As deplorable as the Los Alamos situation is, the Sandia case is arguably worse because it involves direct violations of federal law that prohibit contractor use of taxpayers’ dollars to lobby the government for further work.

The Sandia Labs are run by the for-profit Sandia Corporation, wholly owned by the country’s largest contractor, the Lockheed Martin Corporation. According to its current contract with the federal government, the Sandia Corporation could earn up to $9.8 million in FY 2014 performance incentive award fees (it also stands to receive $18.3 million in fixed fees). In addition, Lockheed Martin could receive $2.8 million for “Home Office And Other Corporate Support,” which includes the subcategory “Provision of Corporate Ethics.” The Department of Energy should refuse to pay both because of improper lobbying of Congress and federal officials and Lockheed Martin’s ethical failure while doing so.

The Sandia Corporation’s unlawful lobbying has been well documented in two recent Department of Energy Inspector General reports. The first report concluded that Sandia had improperly paid ex-Congresswoman Heather Wilson (R.-NM) around $226,000 in consulting fees to lobby for additional work for the Sandia Labs. This began in January 2009, the day after she stepped down from office representing the congressional district in which Sandia is located. The DOE IG investigation forced the Sandia Corporation to reimburse the government the monies it had received to pay Wilson.

The second DOE IG report concluded: We believe that the use of federal funds for the development of a plan to influence members of Congress and federal officials to, in essence, prevent competition was inexplicable and unjustified… The evidence indicated that SNL and LMC [Lockheed Martin Corp.] officials had conversations with members of Congress and federal officials to convince the department, NNSA and Congress of the merits of contract extension without competition.

Peter Stockton, POGO’s senior investigator, commented, “This blatant attempt to pass along lobbying costs to taxpayers is revolting. Another example of catch me if you can. Reimbursement isn’t enough; DOE must punish Sandia for violating the law.”

Jay Coghlan, Nuclear Watch Director, commented, “The for-profit Sandia Corporation has made no public acknowledgment of responsibility or remorse. The Department of Energy must seriously cut Sandia’s award fees to make sure contractors get the message that business as usual corrupted by unlawful lobbying will no longer be tolerated. There should be no more contract extensions. Instead the management contract should be put out to bid as previously planned, until it was short-circuited by the Sandia Corporation’s illegal actions.”

# # #

The POGO/Nuclear Watch NM letter to DOE Secretary Ernest Moniz urging reduced award fees for the Sandia Labs contractor is here.

For the DOE IG reports, see:

Concerns with Consulting Contract Administration at Various Department Sites, Inspection Report: DOE/IG-0889, June 7, 2013, and

Alleged Attempts by Sandia National Laboratories to Influence Congress and Federal Officials on a Contract Extension, Special Inquiry: DOE/IG-0927, November 2014

 

NNSA Governance Advisory Panel Condones Diminishing Federal Oversight Of Failing Contractors

Santa Fe, NM – Yesterday, the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise released its long awaited report, entitled “A New Foundation for the Nuclear Enterprise.” According to enabling language in the FY 2013 Defense Authorization Act, “The purpose of the advisory panel is to examine options and make recommendations for revising the governance structure, mission, and management of the nuclear security enterprise.” This means the nuclear weapons complex owned by the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) and run by its contractors. In an attempt to give increased prominence to nuclear weapons programs, the Panel goes so far as to recommend that the Department of Energy be renamed the Department of Energy and Nuclear Security.

The Panel itself is full of conflicts-of-interest. It is co-chaired by Norman Augustine, the former CEO of Lockheed Martin, which is the sole manager of the Sandia Labs and runs the Y-12 and Pantex nuclear weapons production plants in partnership with the Bechtel Corp. The other co-chair, Admiral Robert Mies, sits on the Board of Governors of both for-profit contractors that run the Los Alamos and Lawrence Livermore Labs, as do former congresswoman Ellen Tauscher and Michael Anastasio, former director of both labs. Yet another panel member, Franklin C. Miller, sits on the Sandia Corporation Board of Directors.

But the most questionable panel member is former Congresswoman Heather Wilson (ex.-R-NM). While still in office she signed a contract for “consulting” services with the Sandia National Laboratories that had no written work requirements. The day after she stepped down from office she started being paid $10,000 a month, and went on to secure a similar contract from the Los Alamos Lab for the same amount of money. The DOE Inspector General has recently found that the Sandia contractor (wholly owned by Lockheed Martin) had engaged in highly improper, if not illegal, lobbying of Congress for contract extensions, in which Heather Wilson was “deeply, deeply involved.” Both Sandia and LANL were forced to return to the government the $450,000 they had paid to Wilson, but she has not returned any money.

The Panel’s report laments the dysfunctional relationship between NNSA and its contractors, and deplores the loss of mutual trust. But while profits are rising, contractors are being held to fewer and fewer performance benchmarks, which the Panel does little if anything to fix. Performance benchmarks were previously codified in annual Performance Evaluation Plans (PEPs), but have been subsequently stripped. As a case in point, the FY 2012 Performance Evaluation Plan for the Los Alamos Lab contractor was 89 pages long, full of concrete performance benchmarks. The restructured FY 2013 Plan was nine pages long, with vague performance benchmarks.

This diminishing federal oversight flies in the face of a long history of project delays and immense cost increases for which contractors are responsible, but not held accountable. For example, the former contractor for the Y-12 nuclear weapons plant committed a half-billion dollar design mistake for the Uranium Processing Facility, but has not been publicly disciplined. Y-12’s new contractor just awarded Bechtel a no-bid UPF construction contract, which in effect awards itself since the contractor is principally composed of Lockheed Martin and Bechtel. This is despite the fact that under Bechtel management the Chemistry and Metallurgy Research Replacement Project at Los Alamos exploded in costs from ~$600 million to ~$.6.5 billion, and the Waste Treatment Plant at Hanford from ~$3.5 billion to ~$13.5 billion.

Contractors have also committed very serious operational mistakes. The LANL contractor used unapproved waste handling methods to prepare plutonium-contaminated radioactive wastes for disposal at the Waste Isolation Pilot Plant (WIPP). A waste drum subsequently ruptured, contaminating 21 workers and closing WIPP, causing estimated reopening costs of a half-billion dollars (which will no doubt increase) and $54 million in New Mexico state fines.

As another example, the former Y-12 contractor self-appraised its security management program as “excellent” and its physical security as “good,” which the National Nuclear Security Administration (NNSA) approved while awarding management fees. Both were shaken to their cores when an 82-year old nun and two elderly colleagues cut through three security fences to protest nuclear weapons in a very sensitive area previously thought impregnable.

Despite all this, the Panel makes no specific recommendations to put performance benchmarks back into management contracts. Instead, it proposes that the number of budget line items be reduced, which could further erode transparency, accountability, and congressional oversight, and increase the ability of NNSA and its contractors to move money around.

Perhaps most alarmingly, the Panel recommends that congressional oversight be strengthened by having the DOE Secretary report to the Senate Energy and Natural Resources and Armed Services Committees, and to the House Energy and Commerce and Armed Services Committees. This would likely have the opposite effect, as it seems to preclude the traditional jurisdiction of the House and Senate Energy and Water Development Appropriations Subcommittees, which have provided key oversight in the past, and have often cut certain nuclear weapons programs. Indeed, later in the report, the Panel suggests (short of a formal recommendation) that funding authority for NNSA nuclear weapons programs be invested in the Defense Subcommittees of the House and Senate Appropriations Committees. Again, this appears to exclude Energy and Water Appropriations, which could have profound implications by weakening congressional fiscal constraints on the nuclear weapons complex.

Jay Coghlan, Nuclear Watch Director, commented, “The Panel’s self-interested premise that the Nuclear Security Enterprise needs a new foundation is wrong. First, call it what it is, not some kind of innocuous sounding “enterprise,” but rather a massive research and production complex that is pushing an unaffordable trillion dollar modernization program for nuclear warheads, missiles, subs and bombers. This will divert taxpayers’ dollars from meeting the real national security threats of nuclear weapons proliferation and climate change. The Panel failed by not arguing for prudent maintenance of the stockpile, instead supporting a perpetual work program of risky life extension programs for existing nuclear weapons that will enrich contractors.”

# # #


“A New Foundation for the Nuclear Enterprise” by the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise is available at
http://cdn.knoxblogs.com/atomiccity/wp-content/uploads/sites/11/2014/12/Governance.pdf?_ga=1.136311025.1198700939.1418359009

The DOE Inspector General “Special Inquiry: Alleged Attempts by Sandia National Laboratories to Influence Congress and Federal Officials on a Contract Extension” is available at
http://www.energy.gov/sites/prod/files/2014/11/f19/IG-0927.pdf

The DOE’s Inspector General’s quote of Heather Wilson’s deep involvement in improper lobbying on behalf of the Sandia Labs is from
http://rapidcityjournal.com/news/local/mines-president-named-in-doe-inspector-general-s-probe/article_b984ab84-d593-5578-8007-e70e7c9e986f.html

DOE Nuclear Weapons Budget Surpasses Cold War Record

FOR IMMEDIATE RELEASE March 17, 2014

DOE Nuclear Weapons Budget Surpasses Cold War Record

Bomb with New Military Capabilities up 20%

Dismantlements Cut By Nearly Half

Nonproliferation Programs Down 21%

Cleanup Funding Flat

 

Santa Fe, NM – The Obama Administration has finally released its detailed budget for fiscal year 2015, which starts October 1. By law the president’s proposed budget is required to be released not later than the first Monday of February.

Contrary to President Obama’s rhetoric about a future world free of nuclear weapons, most famously expressed in his April 2009 speech in Prague, the President asks for a 7% increase for nuclear weapons research and production programs under the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA). NNSA’s “Total Weapons Activities” are slated to rise to $8.3 billion in FY 2015, and to an astounding $9.7 billion by FY 2019, 24% above this current fiscal year 2014. Obama FY 2015 budget request sets a new record for DOE nuclear weapons spending, even exceeding the Cold War high point in 1985 under President Reagan’s military buildup.

Of particular interest is the hands-on nuclear weapons work in the budget category “Directed Stockpile Work,” increased by $305 million (or 12.5% above FY 2014), whose overwhelming focus is Life Extension Programs (LEPs). President Obama wants $634 million (+20%) for the B61 nuclear bomb LEP, which has already exploded in costs from an originally estimated $4 billion to more than $10 billion. Each bomb will end up costing more than twice its weight in gold.

In addition to extending the service life of the bomb by decades, this Life Extension Program will combine three tactical or “battlefield” variants and one strategic variant together into one all-purpose nuclear bomb. The LEP will also transform the B61 from a simple analogue bomb into a digital bomb that interfaces with future super-stealthy fighter aircraft, which themselves will cost an astronomical $1 trillion (although not all will be assigned to a nuclear mission). A separate $1.8 billion Defense Department program for a new tail fin guidance kit will transform the B61 into the world’s first nuclear smart bomb. Despite all this, the U.S. government denies that it would ever endow existing nuclear weapons with new military capabilities.

While rebuilding nuclear weapons at exorbitant expense, the Obama Administration proposes to slash dismantlements by nearly half (45%), from an already paltry $54.2 million to $30 million. Dismantlement work at the Pantex Plant will be cut by 40%. Ironically, much of the dismantlement work that remains is “to provide parts for the life extension programs (B61 and W80-1).” Dismantlements will continue at the same rate at the Y-12 Plant, but its primary aim is to produce “feedstock [highly enriched uranium] for internal and external customers (e.g. Naval Reactors).” Dismantlements are described as a “a workload leveler across all programs,” indicating that instead of being a prioritized step toward a future world free of nuclear weapons, it is merely filler work in between rebuilding nuclear weapons during Life Extension Programs. NNSA FY15 budget, PDF page 109. [All following page numbers are in the same format.]

The construction of the Uranium Processing Facility at the Y-12 plant is capped at $6.5 billion. A recent study by the Pentagon’s Office of Cost Assessment and Project Evaluation predicted that this exorbitant facility, originally estimated by NNSA at ~$600 million, would cost between $12 to 19 billion. To bring it in at $6.5 billion NNSA has cut out all dismantlement and HEU downblending operations, making it a production-only nuclear weapons plant (pp. 319-323).

NNSA’s budget “Defer[s] the W78/88-1 LEP to some date beyond FY 2019” (p.  84), effectively meaning its cancellation. The W78/88-1 LEP was to produce a proposed “interoperable warhead,” using the plutonium pit from a third warhead, the W87. Nevertheless, the Los Alamos National Laboratory plans to “Build W87-design developmental pits each year to sustaining [sic] fabrication capability” (p. 117). The controversial Chemistry and Metallurgy Research Replacement (CMRR) Project for expanded plutonium pit production remains abandoned, but NNSA plans to raise the amount of plutonium used in the already constructed Rad Lab and pursue “pre-conceptual design efforts for the modular acquisition concept” to substitute for the CMRR (p. 219). NNSA still plans to “Execute a plutonium strategy [at LANL] that achieves a 30 pit per year capacity by 2026,” (p. 70) for which it gives no clear requirement or reason.

Key nonproliferation programs designed to halt the spread of nuclear weapons have been slashed by $300 million (-21%), even though nuclear weapons are recognized as the greatest existential threat to the United States. “Defense Environmental Cleanup”, the nation-wide program to clean up the Cold War legacy of radioactive and toxic contamination, is being cut from $5.8 billion to $5.6 billion, despite the fact that estimated costs keep climbing.

All of this is evidence of a pattern where the U.S. will spend massive amounts on nuclear weapons “modernization,” while nonmilitary domestic services are cut or flat lined. In December 2013 the nonpartisan Congressional Budget Office (CBO) released its study Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion was that estimated costs for maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex would total $355 billion over the next decade. The CBO also reported that costs after 2023 would increase yet more rapidly since “modernization” is only now beginning. The report did not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars.

In one piece of good news the NNSA is finally putting the Mixed Oxide (MOX) Fuel Fabrication Facility at the Savannah River Site in South Carolina in “cold standby.” The MOX program is a failed attempt in the laudable goal of disposing of 34 metric tons of weapons-grade plutonium. The MOX Program’s life cycle costs have exploded to an estimated $30 billion, and NNSA is now studying cheaper alternatives. This has major positive impacts on the Los Alamos National Laboratory (LANL), which was slated to process 2.5 metric tons of plutonium every year as feedstock for the MOX Fuel Fabrication Facility. It also further undermines the need to build massive new plutonium facilities at LANL.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “Increased budgets for nuclear weapons are being paid off the back of dismantlements, nonproliferation and cleanup programs, which is just plain wrong. It’s common knowledge that NNSA’s nuclear weapons programs have a staggering track record of cost overruns, schedule delays and security breaches. It’s less well known that these programs may undermine stockpile reliability by introducing unneeded, incredibly expensive changes to existing nuclear weapons that have been extensively tested and are known to be even more reliable than originally thought. Clearly, NNSA’s nuclear weapons programs should be cut to help pay for the expansion of nonproliferation programs that actually enhance national security, cleanup programs that protect the environment while creating jobs, and dismantlement programs that get of nuclear weapons forever.”

# # #

For budget release requirement not later than the first Monday of February see U.S. Code, Title 31, Subtitle II, Chapter 11, § 1105, “Budget contents and submission to Congress.”

The FY 2015 DOE nuclear weapons request is calculated as the highest ever using data from Atomic Audit, Brookings Institute, 1998, Stephen Schwartz editor, Table A-2. It gives 5.494 billion in 1996 dollars as the cost for DOE nuclear weapons research, production and testing programs in 1985. Adjusted for inflation that is $8.259 billion in 2014 dollars.

The NNSA’s FY 2015 budget is available at http://energy.gov/sites/prod/files/2014/03/f12/Volume_1_NNSA.pdf

The Congressional Budget Office report Projected Costs of Nuclear Forces 2014 -2023 is available at http://www.cbo.gov/sites/default/files/cbofiles/attachments/12-19-2013-NuclearForces.pdf

 

Budget Deal Mixed Bag for Nuclear Weapons Programs

Budget Deal Mixed Bag for Nuclear Weapons Programs

Planned Long-Term Trend Not Sustainable

 

Following December’s budget deal Congressional appropriators have completed a one trillion dollar omnibus appropriations bill for this fiscal year, expected to pass given that neither political party wants another shutdown. The federal government has been running on a Continuing Resolution since October 1, and the omnibus bill now provides funding levels for the entire fiscal year 2014. Concerning the National Nuclear Security Administration’s nuclear weapons programs, the appropriators made a slight cut to Obama’s requested $7.87 billion, funding “Total Weapons Activities” at $7.78 billion.

All of this, of course, takes place within a larger context. The nonpartisan Congressional Budget Office (CBO) recently released a study entitled Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will cost $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars. This is simply not sustainable, given the nation’s continuing budget constraints.

The new omnibus appropriations bill has fully funded the most controversial program, the B61 nuclear bomb Life Extension Program (LEP), at the president’s request of $537 million. This overrode a proposed cut by Senate Energy and Water Development Appropriations, a key subcommittee that Senator Tom Udall sits on. Udall vigorously opposed that cut, saying that he wanted to save a few hundred jobs in New Mexico.

The B61 LEP has exploded in costs from an original $4 billion dollars to $12 billion, including a program synchronized with the Pentagon to give the bomb a new tail fin guidance kit that would transform it into the world’s first nuclear “smart” bomb. Its main mission is forward deployment in NATO countries, a relic of the Cold War, contradicting Obama’s rhetoric of lowering the presence of battlefield nuclear weapons in Europe.

But this is not a clear-cut victory for NNSA and the nuclear weapons labs. The appropriators cut funding for the B83 nuclear bomb that NNSA claims the B61 LEP will enable it to retire (leaving aside the fact that it was already planned for retirement). The appropriators made clear that they wanted to hold NNSA to its word.  Moreover, the appropriators demanded detailed reporting on major warhead refurbishments, which they applied retroactively to the B61 LEP, and cut the requested amount for the tail fin guidance kit in half. Finally, the fight over the B61 LEP will soon start all over again with the release of the proposed FY 2015 federal budget, expected in late February or early March.

So whereas the NNSA and the labs have won an ambiguous victory in the B61 LEP, the rest of the omnibus appropriations bill demonstrates how deeply troubled their nuclear weapons programs are. Foremost amongst these is a planned Life Extension Program for the W78 ICBM warhead, proposed to be “interoperable” with the W88 sub-launched warhead. This is the first of three proposed interoperable warheads, which the NNSA and labs want to use to transform both the nuclear weapons stockpile and the research and production complex that supports it, with requisite exorbitant appropriations to fund them. In a serious blow to this scheme, the appropriators funded only $38 million out of $72.69 million requested for paper studies. Although not yet officially reported, conventional wisdom in Washington, DC is that the Nuclear Weapons Council (composed of senior officials from both NNSA and the Pentagon) has already canceled the interoperable warhead.

The appropriators also require NNSA to submit a report by May 1 explaining the costs and benefits of stress testing plutonium pits at the Lawrence Livermore National Laboratory in California. These radioactive nuclear weapons cores would have to be transported back and forth from the Los Alamos Lab. This is significant because Livermore’s continuing future in nuclear weapons programs is becoming increasingly questionable, given the failure of its flagship National Ignition Facility to initiate fusion, its loss of security status to handle large amounts of plutonium, and now the doubtful future of interoperable warheads, which it was banking on.

Concerning the proposed Uranium Processing Facility (UPF) near Oak Ridge, TN, the appropriators provided $309 out of $325.8 million requested, but noted that it is an adjustment caused by the necessity to consider additional alternatives. The UPF has been under increasing fire after a half-billion dollar design mistake and a recent Pentagon estimate that it would cost $12 to $19 billion, up from $6 billion. Conspicuous in its absence is any mention of follow-on to the deferred plutonium facility at LANL (the “CMRR-Nuclear Facility”) whose mission is to expand plutonium pit production, or NNSA’s “alternative plutonium strategy.”

The appropriators also provided $343.5 million for the Mixed Oxide (MOX) Fuel Fabrication Facility, adding to the $320 million requested. However, they directed NNSA to identify the root causes of cost increases and prioritize recommended solutions and corrective measures, showing that this program too is in serious jeopardy.

The appropriators funded $224.79 million for “cleanup” at the Los Alamos National Laboratory, which primarily consists of removing radioactive transuranic wastes that were suppose to be shipped to the Waste Isolation Pilot Plant a decade ago. In contrast, LANL is planning to “cap and cover” around one million cubic meters of radioactive and toxic wastes and backfill, creating a de facto permanent, unlined nuclear waste dump above groundwater and the Rio Grande.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers have won for now the battle over funding for the gold-plated B61 bomb Life Extension Program, but we look forward to the coming fight over next year’s budget. The rest of their plans are falling apart because they are so often their own worst enemy with constant cost overruns and lack of clear need. We are confident that given the trillion dollar cost for future nuclear weapons, subs, bombers, and missiles, the public will increasingly demand cleanup and related jobs, not more nuclear bombs.”

 

# # #

 

The omnibus appropriations bill can be viewed at http://docs.house.gov/billsthisweek/20140113/113-HR3547-JSOM-D-F.pdf

The NNSA section begins at p. 34 or PDF p. 70.

 

 

Nukes Will Cost One Trillion over 30 Years; Cleanup, Job Creation Imperiled

Nuclear Weapons “Modernization” Will Cost One Trillion Dollars Over Thirty Years;

Locally, Los Alamos Lab Cleanup and Job Creation Are Imperiled

The nonpartisan Congressional Budget Office (CBO) has just released its study Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that estimated costs for maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will total $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars.

Approximately two-thirds of the modernization costs will be for new submarines, bombers and missiles that could be operational for the rest of this century, contrary to the Obama Administration’s rhetoric of a future world free of nuclear weapons. The remaining third will be for the Department of Energy’s research and production complex, which includes the Los Alamos, Lawrence Livermore and Sandia nuclear weapons labs.

While the American public at large is experiencing growing income inequality and limited economic opportunity, nuclear weapons contractors are experiencing increasing profits and decreasing federal oversight. The for-profit corporations running the labs, comprised of Lockheed Martin (the world’s biggest defense contractor), Bechtel, and the University of California, plan a never-ending cycle of exorbitantly expensive “Life Extension Programs.” These programs will not only extend the service lives of existing nuclear weapons for decades, but also give them new military capabilities, contrary to declared U.S. international policy. Ironically, the contractors’ drive for profits may undermine national security, as confidence in our nuclear weapons could be eroded by planned massive changes to an extensively tested stockpile that has been proven to be reliable.

The Los Alamos National Laboratory (LANL) had planned to “modernize” with a new facility to support expanded production of plutonium pit cores (or “primaries”) for nuclear weapons. Because of budget constraints, the Obama Administration decided to defer it in favor of the Uranium Processing Facility near Oak Ridge, TN, for production of nuclear weapons “secondaries.” The LANL plutonium project, known as the Chemistry and Metallurgy Research Replacement (CMRR)-Nuclear Facility, had grown from an original estimate of $600 million to around $6 billion, for which it would not have created a single new permanent job (it would have merely relocating existing Lab jobs). But the Uranium Processing Facility has now grown from a similarly estimated $600 million to an astounding worse case $19 billion, in part due to a simple design error that cost a half-billion dollars just to correct on paper.

So-called nuclear weapons modernization at these costs is clearly not sustainable, especially when they create few if any new permanent jobs. Moreover, they exist for a product that must never be used (i.e. nuclear weapons). Therefore, they are of little economic benefit to society outside of the privileged enclaves that benefit from nuclear weapons research and production (for example, Los Alamos County is the second richest county out of 3,077 counties in the USA).

Funding for nuclear weapons modernization programs will rob taxpayers’ dollars for programs that local citizens really need. For example, the Los Alamos Lab plans to “cap and cover” its largest waste dump (called “Area G”), leaving up to one million cubic meters of poorly characterized radioactive and toxic wastes and backfill permanently buried in unlined pits and shafts. This will create a de facto permanent nuclear waste dump above the Rio Grande, and most importantly above a sole source groundwater aquifer that supplies 270,000 people in the arid Southwest.

The Cities of Santa Fe and Taos, New Mexico, oppose LANL’s plans to create a permanent nuclear waste dump, passing resolutions demanding full characterization of the wastes and offsite disposal. The resolutions note that, “full cleanup of Area G would be a win-win for New Mexicans, permanently protecting our precious groundwater and the Rio Grande while creating 100’s of high paying jobs for twenty years or more.” The costs for full cleanup of Area G would be about the same as four to five years’ worth of the Lab’s nuclear weapons programs that caused the mess to begin with.

Jay Coghlan, Nuclear Watch NM Director, commented, “We simply can’t afford to squander precious taxpayers’ money on programs that enrich contractors while introducing radical changes to fully tested nuclear weapons. This may harm national security by undermining confidence in stockpile reliability. Instead, New Mexicans should demand that their elected officials invest taxpayers’ money in programs that create real security for citizens, such as creating jobs that protect diminishing water resources, rather than their habitual support for unneeded, mismanaged and exorbitantly expensive nuclear weapons programs.”

# # #

 The Congressional Budget Office report Projected Costs of Nuclear Forces 2014 -2023 is available at http://www.cbo.gov/sites/default/files/cbofiles/attachments/12-19-2013-NuclearForces.pdf

The Santa Fe City press release announcing passage of its resolution opposing “cap and cover’ of Los Alamos Lab’s largest radioactive and toxic waste dump is available at https://web.archive.org/web/20220819151417/https://www.santafenm.gov/news/detail/santa_fe_city_council_unanimously_passed_resolution

For a comparative estimate of cleaning up LANL’s Area G radioactive and toxic waste dump see https://nukewatch.org/facts/nwd/Area_G_Comparison_Costs-11-14-12.pdf

For a history of successful citizen activism against expanded plutonium pit production see https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

Ex-Congresswoman Heather Wilson paid by nuclear weapons labs the day after she leaves office

Heather Wilson Finalized Contract with Sandia Labs While in Congress;

Payments Started the First Day She Left Congress;

Wilson Should Resign from Council Determining Labs’ Futures

 

Santa Fe, NM  – Today, The Albuquerque Journal reported that former Congresswoman Heather Wilson (R. – New Mexico) finalized her first contract with the Sandia National Laboratories on December 19, 2008, while she was still representing the district that includes that nuclear weapons facility. Moreover, her first invoice documents that she began to be paid $10,000 a month for “Consultant/Advisory Services” that had no written work requirements on January 4, 2009, her very first day out of office. A few months later she was also being paid $10,000 a month by the Los Alamos National Laboratory (LANL) for a similar contract.

The Albuquerque Journal article builds upon a Department of Energy (DOE) Inspector General investigation, which determined that the Sandia and Los Alamos Labs had made approximately $450,000 in improper payments to Wilson up until March 2011, when she began to campaign for the Senate. The DOE IG report said that the facts indicate that federal funds were used for prohibited lobbying activities, which that office is still investigating. The Labs were forced to return that money to the government, but not Wilson.

The Albuquerque Journal received the new information concerning the dates of Wilson’s contract with Sandia from Nuclear Watch New Mexico. The watchdog organization obtained the documents by appealing an initially rejected federal Freedom of Information Act (FOIA) request.

During her unsuccessful 2012 Senate campaign Wilson repeatedly attacked her opponent Martin Heinrich for not supporting the labs strongly enough. In particular, while invoking a jobs argument, she repeatedly criticized the Obama Administration for delaying a controversial facility at LANL for expanded production of plutonium pit cores for nuclear weapons. However, despite its estimated $6 billion cost to the taxpayer, the government’s own documents clearly disclosed that the facility would not create a single new permanent job because it would merely relocate existing Lab jobs. In contrast, during her entire Senate campaign, Wilson did not disclose the full extent of her financial ties to the nuclear weapons labs.

In February 2013, House Speaker John Boehner appointed Wilson to a congressional advisory council that will recommend how the nuclear weapons laboratories should be managed and operated in the future. Jay Coghlan, Director of Nuclear Watch New Mexico, commented, “Heather Wilson should resign from this advisory council immediately because of her clear conflict-of interest. If she does not step down voluntarily, congressional leaders must replace her.”

“Other Members of Congress should take heed of Heather Wilson’s highly questionable ethical behavior,” Coghlan continued. “They should remember that they were elected to represent their constituents, not the for-profit corporations running the labs. Our politicians should avoid even the appearance of favoring the interests of the nuclear weapons labs above the public’s best interests, which Wilson so clearly failed to do.”

# # #

Ex-Congresswoman Wilson’s contract with Sandia and invoices obtained through Nuclear Watch New Mexico’s Freedom of Information Act request are available at

https://nukewatch.org/facts/nwd/HeatherWilson-Sandia contract-invoices.pdf

The Nov. 3, 2013 Albuquerque Journal article From Congress to contract: Heather Wilson says 10K per month Sandia Labs deal met ethics rules is available at

http://www.abqjournal.com/293472/news/from-congress-to-contract.html

(a paid subscription is necessary for the full article).

The June 2013 DOE IG Report Concerns with Consulting Contract Administration at Various Department Sites (DOE/IG-0889) that focuses on Heather Wilson’s contracts with the Los Alamos and Sandia National Laboratories is available at http://energy.gov/ig/downloads/inspection-report-doeig-0889

 

903 W. Alameda #325, Santa Fe, NM 87501 • Voice and fax: 505.989.7342

[email protected] • www.nukewatch.org • https://nukewatch.org/watchblog/

http://www.facebook.com/NukeWatch.NM

 

Comments on House Armed Services Hearing on the B61 Life Extension Program

House Armed Services Hearing on the B61 Life Extension Program 

October 29, 2013

As expected, this was a rah rah session for the B61 Life Extension Program. My opposing comments are mostly in response to the testimonies of witnesses. Their prepared statements are available at

http://armedservices.house.gov/index.cfm/hearings-display?ContentRecord_id=a186ee67-acf8-45fd-9364-f907f967c1d3&ContentType_id=14f995b9-dfa5-407a-9d35-56cc7152a7ed&Group_id=41030bc2-0d05-4138-841f-90b0fbaa0f88&MonthDisplay=10&YearDisplay=2013

Unless otherwise indicated the quotes herein are from their prepared statements.

Two background notes:

Cost: The estimated weight of individual B61 bombs is ~700 lbs. Gold is currentlly priced at $1,353 per troy ounce. Up to 500 B61s will be refurbished, costing ~$11.8 billion (including DoD tail fin kit). Therefore each bomb will cost more than twice its weight in gold.

The National Nuclear Security Administration (NNSA) proposes a “3+2” strategy for the future stockpile of three ballistic missile warheads and two air-delivered warheads (one gravity bomb and one air-launched cruise missile warhead). All four witnesses claimed the 3+2 strategy will lead to stockpile reductions. However, a comparison of NNSA’s FY 2014 Stockpile Stewardship and Management Plan (in which the 3+2 strategy is first introduced) to previous years’ plans shows no further reductions to the stockpile than what is already incrementally planned. Despite their testimony there is no demonstrable link between 3+2 and stockpile reductions. In fact stockpile size may be bumped up while keeping old warheads as a hedge while seeing how the new warheads work out.

 

Donald Cook, Deputy Administrator for Defense Programs, National Nuclear Security Administration

Cook touted the virtues of “interoperable” warheads, the first on deck being for the Air Force’s W78 ICBM warhead and the Navy’s sub-launched W88 warhead. However, a recent GAO report has noted that “the Navy has not fully engaged in the effort because (1) other, ongoing modernization programs are higher Navy priorities, and (2) it has concerns about changing the design of the warhead.” [1] This understates the Navy’s concerns, when the service actually seems very skeptical about so-called interoperable warheads. The Navy’s lack of keen endorsement can be enough to kill this concept, especially in combination with inevitably exorbitant costs.

“…let me be clear that the resulting decision supported the lowest cost option that meets threshold military requirements.” With that Cook is pushing back against the Senate Appropriations Committee, which cut $168 million from the Obama Administration’s FY 2014 request of $537 million for the B61 LEP, while stating:

 The Committee is concerned that NNSA’s proposed scope of work for extending the life of the B61 bomb is not the lowest cost, lowest risk option that meets military requirements and replaces aging components before they affect weapon performance. [2]

The question of military requirements is key, and whether that may be synonymous with new military capabilities. NNSA and the nuclear weapons labs chose Option 3b for the B61 LEP. As Cook testified, “…Option 3B architecture allows for consolidation of existing B61 variants (B61-3/4/7/10) with the integration of an Air Force provided tail kit assembly.” That tailfin kit will dramatically increase targeting accuracy, functionally melding tactical and strategic variants. The NNSA LEP itself will transform a dumb analogue bomb into a digital nuclear “smart” bomb for delivery by future super stealthy aircraft (the F-35 Joint Strike Fighter). In my view, this combination clearly creates new military capabilities.

Senate Appropriations favors Option 1E, a non-nuclear LEP. The difference in House and Senate funding levels represents a struggle over new military capabilities or not.

Cook stated that sequester cuts made the B61 LEP slip 6 months, so NNSA added $244 million to “management reserve” to offset potential increased costs and risks.

“The B61-12 LEP is making great progress. We are in the second year of full scale engineering development. The program has met its development milestones, it is on schedule and it is on budget.”  That is laughable. On budget? Really?

“…cascading effect on the integrated schedule of LEP work….” The likely failure of the B61 LEP will have cascading impact on subsequent LEPs.

“Sustained support for the completion of the B61-12 will enable the retirement of the B83…”  Not so, the B83 was already planned for retirement (B83-0s are already being dismantled as per the Pantex Ten-Year Site Plan). The proof is the absence of any proposed LEP for the B83-1 in NNSA’s FY 2014 Stockpile Stewardship and Management Plan.

Right at the end of Q&A Cook made the outrageous statement that to descope the LEP and do anything else would cost more than the LEP itself. He gave no supporting evidence or justification for that.

 

Madelyn Creedon, Assistant Secretary of Defense for Global Strategic Affairs, Department of Defense

She said 3+2 will save money. Where is the proof? The track record suggests otherwise. Simple maintenance (“curatorship”) is what would save money while not risking reliability through major changes.

 

General C. Robert Kehler, USAF Commander, US Strategic Command

“Through a series of synchronized life extension programs like the B61-12, we plan to improve confidence in the reliability, safety and intrinsic security of our nuclear weapons.” To the contrary, introducing major changes that can’t be tested to a stockpile that has been extensively tested could be exactly what undermines confidence in reliability.

 

Paul Hommert, Sandia Labs Director

Bear in mind that Hommert wears two hats: the first as Sandia Labs Director, the second as president of the executive board of the for-profit limited liability corporation that runs Sandia. Sandia Corporation, LLC stands to make a lot of money off of perpetual Life Extension Programs.

“…it is our technical judgment that we must complete the life extension program currently being executed.” Ditto to the above.


[1]     “ICBM Modernization: Approaches to Basing Options and Interoperable Warhead Designs Need Better Planning and Synchronization,” GAO-13-831, Sep 20, 2013.

[2]       Energy and Water Development Appropriations Bill, 2014, June 27, 2013, Senate Report 113–47, page 102.

Each B61 nuclear warhead will cost ten times W76 warhead to refurbish

The over budget costs of near everything that the National Nuclear Security Administration touches is growing increasingly controversial. Of particular interest now is the Life Extension Program for some 400 B61 nuclear bombs. That program was originally going to cost $4 billion, but is now estimated at  ~$10.4 billion. At this point each 700 lb. bomb will cost more than twice its weight in gold. And this doesn’t include original production costs and ongoing support costs since they were first produced in the late 1960’s (which under “Stockpile Systems” is currently ~$80 million annually). And of course it doesn’t include the cost of the bombers over the years that were designed to deliver them.

In lockstep with NNSA’s Life Extension Program, a synchronized Pentagon program will provide new tail fin guidance kits that will transform the B61 into the world’s first nuclear “smart” bomb, for delivery by future super stealthy (and exorbitantly expensive) F-35 Joint Strike Fighters. That clearly constitutes new military capabilities, despite policy declarations at the highest levels of government (for example at the 2010 NonProliferation Treaty Review Conference) that the U.S. would never endow existing nuclear weapons with new military capabilities. An unarmed prototype of the refurbished bomb, designated the B61-12, is to be “flight tested” and dropped with the new tail fin kit in this FY 2014.

Stephen Young of the Union of Concerned Scientists recently made available an August 2012 JASON Report on the B61 Life Extension Program while providing his own excellent analysis http://allthingsnuclear.org/jason-on-the-b61/ [The JASONs are pretigious scientists periodically consulted with by the government on nuclear weapons issues.] Among their findings the JASONs reported “In implementing important and desirable, but not essential, elements in the 3B program [the 2nd most expensive B61 LEP option picked by the NNSA], there should be a clear understanding of their cost and impact on the schedule. These elements should be prioritized in the event that unanticipated program delays or cost overruns are encountered that could threaten meeting the FPU [first production unit] deadline.” The JASONs also noted “the Pentagon’s already strongly expressed displeasure at the inability to complete the W76 as scheduled.”

The W76 is one of two warheads for the Navy’s sub-launched Trident missiles, and is the single most common nuclear warhead in the U.S. stockpile. This got me wondering how much the W76 Life Extension Programs will cost, which I tracked down as follows:

In millions of dollars

Original appropriation         NNSA data source     Inflation adjustment

2003     $72                    FY 2005 budget request              $91.52

2004   $139                     FY 2006 budget request           $172.10

2005   $181                     FY 2006 budget request           $216.75

2006   $182                     FY 2008 budget request          $211.14

2007   $152                     FY 2008 budget request          $171.45

2008   $190                     FY 2010 budget request          $206.39

2009   $203                     FY 2010 budget request          $221.30

2010   $232                      FY 2012 budget request         $248.83

2011   $249                      FY 2012 budget request         $258.89

2012   $254                      FY 2012 budget request         $258.74

2013   $198                      FY 2014 budget request          $198

2014   $235                      FY 2014 budget request          $235

2015   $242               Future Years Nuclear Security Plan in NNSA’s FY 14 request

2016   $237                          ditto                                     $237

2017   $235                          ditto                                     $235

2018   $230                         ditto                                      $230

2019   $200               NNSA’s FY 2014 Stockpile Stewardship and Management Plan

2020     $60                         ditto                                        $60

Total (adjusted for inflation)                                            $3.694 billion

The number of W76’s to be refurbished is classified, but is believed to be around 1,600. [In 2007 Hans Kristensen of the Federation of American Scientists estimated ~2,000 https://web.archive.org/web/20130630203617/http://blogs.fas.org/security/2007/08/us_tripples_submarine_warhead/), but told me that number has since been scaled down.] Using 1,600, then each W76 warhead will cost ~$2.31 million to refurbish. This is in contrast to the B61, more than ten times that at $26 million per warhead ($10.4 billion/400), or more than twice its weigh in gold.

The Senate Appropriations Committee has cut the NNSA’s FY 2014 budget request of $537 million for the B61 LEP (that request is a 45% increase above FY 2013) by $168 million. Its report said:

The Committee is concerned that NNSA’s proposed scope of work for extending the life of the B61 bomb is not the lowest cost, lowest risk option that meets military requirements and replaces aging components before they affect weapon performance.

According to the budget figures that I have compiled the W76 LEP is a 17-year program start to finish. In its FY 2014 Stockpile Stewardship and Management Plan NNSA claims that the much more complex (and hence much more expensive) B61 LEP will be completed in 10 years by 2024. Granted we’re talking about 4 times fewer nuclear weapons being refurbished, but the work is much more aggressive and involves 100’s of parts, all of which cannot be full-scale tested as a weapon (thank God!). And NNSA’s track record of staying on budget and on schedule is becoming a matter of scorn even amongst congressional staff.

The take away lesson is that NNSA and the labs should simplify. For the sake of stockpile maintenance limited life components such as neutron generators and tritium reservoirs should be replaced as needed, which is a near routine practice, and perhaps the B61’s radar needs replacement as well (which NNSA is fond of pointing out uses old style vacuum tubes). All of that would bring the costs down somewhere along the lines of the W76 LEP. It would also be better aligned with declared nonproliferation policy by not introducing new military capabilities, and better align with national security concerns by not possibly eroding confidence in stockpile reliability through major changes that can’t be full-scale tested. In addition, Congress should require NNSA to disclose in its budget requests annual costs per warhead type, as once was the practice, so that the public can be fully appreciate just how much each warhead costs for arguably archaic missions.

Finally, New Mexico’s Tom Udall sits on the Senate’s Appropriations Committee. He opposed the cut to the B61 LEP, among other things saying that he wanted to save 200 in-state jobs. That is no way to formulate nuclear weapons policy, especially given that the B61 Life Extension Program far exceeds mere maintenance. Tom Udall should support his own committee’s cut.

 

The B61 Life Extension Program is in increasing trouble

A well-placed source says the B61 Life Extension Program is in increasing trouble because:

•    In the just ended Fiscal year 2013 the sequester caused a $30 million cut to the program, resulting in a 6 month slip to the schedule and therefore added $230 million to the total cost of the program. [My comment: only in government can you cut 10’s of millions and end up adding 100’s of millions.]

•    If the current government shut down lasts more than 2 weeks, B61 activities will be curtailed, causing additional delays and therefore increasing costs.

•    Regardless of the present difference in House and Senate appropriations, the B61 LEP faces a $60 million cut in FY 2014 from sequestration and management efficiencies that cut 5% from the needed budget request.

•    Under the Continuing Resolution, since nuclear weapons activities did not get an anomaly, the B61 program cannot spend beyond FY 13 levels because of the Senate Energy and Water Appropriations bill.

•    At this point an omnibus appropriations bill is unlikely. But if House and Senate Appropriations were to go to conference (which is also unlikely) then there will be a battle over the different levels of funding for the B61 LEP.

•    There is already infighting within the Air Force about the future of the B61 and whether the cruise missile is more important to them. [My comment: this point is completely new to me and strikes as very exploitable, roughly analogous to the Navy’s fiscal predicament of new strategic subs vs. the rest of its fleet.]

•    As a subset to the point above, there is some talk about making the B61-12 the warhead for the new cruise missile, but that is very preliminary and wishful thinking. The B61 is not well suited for the environmental conditions and loads of a cruise missile and there needs to be sufficient diversity in the stockpile — you can’t make everything a B61.

The bottom line is that given opposition from both Senate Energy and Water and Defense Appropriations, which zeroed out the tail kit for the B61, the National Nuclear Security Administration and the Department of Defense may be finally realizing that they need to find alternatives to the full B61 Life Extension Program.

 

Abolish NNSA, but increase federal oversight and independent review

The Albuquerque Journal ran a really good editorial on Tuesday, September 17:

 

Editorial: Time past for coddling bloated nuclear agency

By Albuquerque Journal Editorial Board |

 It’s big government on steroids.

 The National Nuclear Security Administration, a division of the U.S. Department of Energy, is tasked with securing and maintaining the nation’s nuclear arsenal. It oversees Los Alamos National Laboratory and Sandia National Laboratories in New Mexico.

For years the agency’s MO has included expectations of nearly automatic budget increases, bloated projects that are never finished, duplicative red tape and a bureaucracy that resists efforts to rein it in.

Critics say it has become a massive jobs program.

Ten of its major projects are collectively over budget to the tune of $16 billion and behind schedule by 38 years, according to the U.S. Government Accountability Office. For instance, at LANL a new $213 million security system to protect sensitive nuclear bomb-making facilities doesn’t work. So, taxpayers are being asked to lay out an additional $41 million to fix it.

The chairwoman of the Senate Homeland Security subcommittee that oversees finances and contracts largely blames the agency’s reliance on private contractors – more than 92,000. LANL and Sandia are operated by private contractors, LANL by a consortium led by Bechtel, and Sandia by Lockheed Martin.

Former Lockheed Martin CEO Norman Augustine told Congress this spring that accountability and internal structure problems pose a national security risk. And there’s no doubt NNSA’s work is critical to U.S. national security, but taxpayers also are tired of watching their money being thrown at an insatiable beast that too often fails to deliver results.

As long as the NNSA remains impervious to calls for improving its culture and tightening up its accountability, the inefficiencies and waste will keep coming.

A congressionally appointed panel recently began studying whether to overhaul the agency. (Former Sen. Jeff Bingaman had said he was open to just getting rid of it.) Energy Secretary Ernest Moniz says the review is a chance to “have this dialogue and reach a conclusion.”

It’s way past time for that talk. The panel should come up with a well-thought-out plan to either overhaul NNSA from top to bottom or outright kill it and let the DOE take on its oversight duties.

This editorial first appeared in the Albuquerque Journal. It was written by members of the editorial board and is unsigned as it represents the opinion of the newspaper rather than the writers.

 

My response:

Abolish NNSA, but increase federal oversight and independent review

Kudos for the editorial “Time past for coddling bloated nuclear agency.” The money the National Nuclear Security Administration (NNSA) has wasted on out-of-control nuclear weapons projects is appalling. Some examples are the Chemistry and Metallurgy Research Replacement Project at Los Alamos (estimated costs exploded from $660 million to $5.8 billion), the failed National Ignition Facility at the Livermore Lab in California ($1 billion to $5 billion), the MOX Fuel Fabrication Facility in South Carolina ($1 billion to $7 billion), and now the Uranium Processing Facility at the Y-12 Plant in Tennessee ($1 billion to $10 billion).

Despite all this chronic mismanagement NNSA’s proposed budget was increased 17% above FY 2013 sequester levels. That’s right, the guilty were rewarded, while schools, firefighting, environmental protection, etc. were cut.

But while NNSA is truly dysfunctional, its contractors deserve more scrutiny as well. After all, the agency is simply out manned, with some 2,600 (and declining) employees trying to oversee more than 50,000 contractor employees nation-wide. Moreover, these contractors have inherent conflicts-of-interest. For instance, the lab directors wear two hats, first as those responsible for annual certification of the safety, security and reliability of the nuclear weapons stockpile, which gives them enormous leverage. Their second hat is as presidents of the executive boards of the for-profit corporations running the labs. How can we be sure they are always acting in the best interests of the country while they are pushing a never-ending cycle of extremely costly “Life Extension Programs” for existing nuclear weapons? Ironically, these programs may actually erode confidence in stockpile reliability by intentionally introducing major changes that can’t be full-scale tested.

As your editorial noted a congressionally appointed panel is beginning to study the NNSA’s future. I make some recommendations for that panel:

•     The NNSA is a failed experiment and should be abolished. Its nuclear weapons programs should revert back to “Defense Programs” within the Department of Energy, as it was pre-2000.

•     As guarantors of the nuclear weapons stockpile, the lab directors should be just lab directors, their jobs institutionally insulated from the for-profit motivations of the private corporations running the labs.

•     Duplicative bureaucratic red tape should be eliminated, but federal oversight should be increased, not decreased (witness a protesting 82-year-old nun infiltrating an extremely sensitive area at Y-12 despite contractor security assurances). Concrete benchmarks need to be put back into now toothless annual Performance Evaluation Plans so that contractors are held truly accountable. NNSA’s past practice of granting waivers for poor performance while handing out contract extensions (as was done for the Los Alamos and Livermore Labs) must end.

•     DOE should be required to seek concurrence from the congressionally chartered Defense Nuclear Facilities Safety Board early in the design of nuclear facilities. Past NNSA delays in meeting safety concerns have been a prime driver of exploding project costs.

•     Congress should establish a stringent change control process for nuclear weapons, including a requirement for outside review of all proposed major changes. Because the labs lack conservatism in maintaining the pedigree of tested, reliable designs, independent expert review could save 100’s of billion of dollars over the next few decades and help maintain confidence in stockpile reliability. As a past example, a group of eminent independent scientists called the JASONs found that the cores of nuclear weapons, the plutonium pits, have reliable life times of around a century, in contrast to NNSA’s previous claims of 45 years. This helped to convince Congress to delete funding for NNSA’s proposed, enormously expensive new-design nuclear weapons and related expanded plutonium pit production.

•     Finally, the congressionally appointed panel deliberating on NNSA’s future should itself be above reproach. One member, former Congresswoman Heather Wilson, pocketed $450,000 in no-bid “consulting” contracts with the Los Alamos and Sandia Labs, in between her terms representing New Mexico’s First District and her Senate campaign that largely championed the labs. She should resign from the panel so that its future recommendations are not tainted by her clear conflict-of-interest.

Jay Coghlan

Nuclear Watch New Mexico

On my soap box about Sandia Labs

John Fleck of the Albuquerque Journal had an article today entitled “Sandia Labs manager gets 6 more months,”  describing Lockheed Martin’s half year contract extension. John knows all three nuclear weapons labs well, and I won’t be telling him things that he doesn’t already know. But I’ll use his article as an excuse to stand on my soap box about Sandia Labs.

To my taste, John’s article makes Sandia sound a little too benign with phrases like “the nuclear weapons research center” and “Sandia is one of the nation’s three nuclear weapons design and maintenance laboratories.” What is left unreported is that Sandia is a major production site that, for example, manufactured 850 neutron generators for nuclear weapons in 2010, and loads them with radioactive tritium. In addition to design responsibility for non-nuclear components, Sandia’s secondary mission has long been “weapons effects” research for making sure nuclear weapons continue to work in lethal radiation environments. This enables multi-strike nuclear warfighting rather than the simple deterrence sold as doctrine to the American public.

Further, instead of mere “maintenance,” all three nuclear weapons labs (Sandia, Los Alamos and Lawrence Livermore) are lobbying for a never-ending cycle of so-called Life Extension Programs that will intentionally introduce profound changes to existing nuclear weapons. Major changes are the last thing we should do to a stockpile that has been extensively tested and proven to be even more reliable than previously thought, when we can no longer full-scale test. All of this will be of enormous expense to the American taxpayer, where for example the currently proposed Life Extension Program for the B61 bomb has exploded in costs from $4 billion to more than $10 billion, resulting in each bomb costing twice its weight in gold. Added to this is a related $3.2 billion Pentagon program giving the B61 a new tail fin guidance kit, transforming it into the world’s first nuclear “smart” bomb for delivery by planned super stealthy aircraft.

In addition to prolonging their service lives for 30 years or more, these Life Extension Programs have and will create new military capabilities for existing nuclear weapons, despite denials at the highest levels of the U.S. government to the world at large (for example, at the United Nations’ 2010 NonProliferation Treaty Review Conference). The lab directors wear two hats, the first as directors who are required to annually certify to the president and Congress that the nuclear weapons stockpile is safe, secure and reliable. The second hat is that as presidents of the executive board of the for-profit corporations running the labs, which will directly benefit from never-ending Life Extension Programs that may actually undermine stockpile reliability. So far from mere “research” and “maintenance” we have a deep seated conflict-of-interest driven by profit that will stymie our global leadership toward getting rid of nuclear weapons while continuing to fleece the American taxpayer.

Foremost in this is the Sandia National Laboratories, which amongst the three labs now has the largest nuclear weapons budget. In the past, Sandia has been singled out as a model of lab mission diversification, with its total annual institutional budget falling below 50% nuclear weapons. That is no longer true given recent large increases to its nuclear weapons research and production programs, which now comprise ~55% of Sandia’s total budget.

 

 

Senate Appropriations Cuts Nuclear Bomb Life Extension Program; NM’s Tom Udall Tries to Restore Funding to Bloated Program

Santa Fe, NM – Today the Senate Energy and Water Development Appropriations Subcommittee reported that it cut funding for the National Nuclear Security Administration’s B61 nuclear bomb Life Extension Program (LEP). This is a significant victory for good governance, and it could positively influence future nuclear arms control.  The Obama Administration’s request for the B61 LEP was $537 million for FY 2014, a 45% increase above FY 2013. Senate Energy and Water cut it by $168 million to $369 million, and directed NNSA to look at alternatives since the full-blown program is experiencing massive cost overruns.

Senator Tom Udall opposed this cut since most of the B61 work will take place at the Los Alamos and Sandia nuclear weapons labs in New Mexico. Udall now sits on Senate Energy and Water, and successfully engineered a provision that would restore B61 LEP funding if certain cost and schedule requirements are met. Meanwhile House appropriators have added $23 million to the already bloated program, which sets up a sharp difference that must be reconciled in conference. This is where “deals” tend to be cut, and Tom Udall’s position on the B61 LEP could be critical.

In the past few years Senator Tom Udall actively supported a Walmart-sized “CMRR-Nuclear Facility” at Los Alamos that exploded in costs from $600 million to ~$6 billion, which for fiscal reasons the Obama Administration prudently decided to delay.  The CMRR’s main mission is to quadruple LANL’s production of plutonium cores (or “pits”) for nuclear weapons. Expanded pit production is necessary only for new-design nuclear weapons or heavily modified existing weapons.

If the full Life Extension Program that Tom Udall currently supports goes forward the estimated 400 B61 nuclear bombs will literally cost more than their weight in gold to refurbish (and that does not include original production costs). Moreover, the program will radically improve the bomb, giving it new military capabilities by turning it into a precisely targeted smart bomb and mating it to future bombers for supersonic stealthy delivery. Currently the main mission of B61’s is as tactical nuclear weapons in NATO countries, a relic of the Cold War. Improved B61’s fly in the face of Obama’s just declared goal of reducing the presence of battlefield nuclear weapons in Europe, even as he proposes to negotiate with the Russians for further arms reductions.

The nuclear weapons labs’ have voracious appetites for federal funding, with their directors simultaneously acting as the presidents of the executive board of the for-profit limited liability corporations that run the labs (those private LLCs pay 2/3’s of the directors’ annual compensation of around one million dollars). Business will boom with never-ending Life Extension Programs, and Sandia and Los Alamos are not satisfied with just one Life Extension Program for the B61. They already plan yet another one 20 years from now that initial figures indicate would be even more expensive.

In fact, the labs plan a never-ending cycle of Life Extension Programs that intentionally seek to implement major design changes for all existing types of nuclear weapons in our stockpile, costing at least $60 billion (while the doubling of costs has so far been the rule). Further, these major changes may undermine our own national security by eroding confidence in performance reliability when major modifications cannot be full-scale tested. We should instead stick to proven existing nuclear weapons designs, and avoid serious changes which arguably profit only nuclear weapons contractors.  Genuine maintenance of our nuclear weapons stockpile, such as the well-understood replacement of limited life components, would be prudent, technically sound and relatively inexpensive.

New Mexico, the state that Tom Udall represents, was just ranked as the worst state of all fifty for the well-being of its children, where more than 25% live in poverty. In sharp contrast, Los Alamos County, dominated by the lab, is the second richest county in the entire USA.

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “Tom Udall could better serve all New Mexicans if he focused more on improving the lives of our children instead of the nuclear weapons labs and the service life of an archaic Cold War nuclear bomb. Specifically, he should drop his opposition to the cut in funding for the exorbitant and unneeded B61 nuclear bomb Life Extension Program, and make that clear in House-Senate conference. He should, instead, seek to boost funding for programs that really benefit New Mexican children but are facing painful sequester cuts, such as education, medical care and food assistance. And given our state’s increasingly crippling drought, Tom Udall could better serve all New Mexicans while sitting on the Senate Energy and Water Subcommittee by expanding water conservation and wildfire prevention programs, instead of favoring the labs through so-called Energy appropriations with increased funding for worse than useless nuclear weapons programs.”

# # #

Obama Announces Up to One-Third Cut in Nuclear Arms; In Contrast U.S. Nuclear Agency Plans ~$60 Billion In Weapons Upgrades and Improvements

Santa Fe, NM  – Today, standing in front of the historic Brandenburg gate in Berlin, President Barack Obama declared that he will seek to cut the arsenal of deployed strategic nuclear arms by up to one-third in concert with Russia. He also said he will pursue significant bilateral cuts in tactical or battlefield nuclear weapons in Europe. In contrast, just two days ago, Obama’s National Nuclear Security Administration (NNSA) released it plans for over 60 billion dollars in upgrades and improvements to existing nuclear weapons, beginning with a $10 billion upgrade to the B61 tactical bomb based in Europe.

In its just released “FY 2014 Stockpile Stewardship and Management Plan,” the NNSA proposes perpetual Life Extension Programs that will result in three types of ballistic missile warheads, two types of nuclear bombs (including the refurbished B61), and one redeployed cruise missile warhead (which is not currently active). Much of the drive for this comes from the Directors of the nuclear weapons labs, who simultaneously act as the presidents of the for-profit limited liability corporations that run the labs. According to the Directors and the NNSA, the three modified ballistic missile warheads would be “interoperable” between delivery platforms. However, these warheads can never be truly interoperable between land and sub-based missiles, but at most will have some interchangeable components.

Further, although it’s still vague, the three so-called interoperable warheads would replace only four types of existing warheads, which other than profits for the labs makes little sense given their staggering estimated costs. Moreover, these proposals will also require untold sums of taxpayers money for facility upgrades and new construction and then production by 2030 of 80 new plutonium pits at Los Alamos, NM and uranium secondaries at Oak Ridge, TN. Finally, these radical modifications, if implemented, cannot be full-scale tested, therefore perhaps undermining confidence in reliability. In contrast, our existing nuclear weapons designs have been extensively tested, and subsequent studies have found them to be even more reliable and long-lived than originally thought.

NNSA’s Stockpile Stewardship and Management Plan also claims that new military capabilities for existing nuclear weapons will never be pursued through improvements, echoing previous claims made internationally at the highest levels of government (for example by the Secretary of State at the United Nations’ 2010 NonProliferation Treaty Review conference). But past and planned modifications and Life Extension Programs contradict that claim. In 1997 the U.S. rushed a B61 bomb modified as an earth-penetrator to the stockpile. This significantly changed weapon, with an estimated yield of 350 kilotons, assumed the mission of the 9 megaton surface-burst B53 bomb to destroy hardened, deeply buried targets.

The U.S. is currently conducting a Life Extension Program for the sub-launched W76 warhead. This is extending its service life by three decades or more, and giving it a new fuze that is likely capable of more precise heights of burst. As far back as 1997 the head of the Navy’s Strategic Systems pointed out that the combination of increased accuracy and a changed fuze could transform the 100 kiloton W76 from a weapon of deterrence targeting soft targets such as cities into a hard target killer of missile silos and command centers.

NNSA now proposes an overly ambitious Life Extension Program for the existing battlefield variants of the B61 gravity bomb, an estimated 180 of which are forward deployed in NATO countries as a relic of the Cold War. This, of course, seems to contradict Obama’s newly declared goal of reducing the presence of tactical nuclear weapons in Europe. While future numbers may be lowered, the government’s plans will radically improve the B61, which the Russians will be keenly aware of.

NNSA’s proposed B61 Life Extension Program has exploded in costs from an estimated $4 billion to more than $10 billion. Among other things it will mate the bomb to the future F35 Joint Strike Fighter (which itself is estimated to have life cycle costs of more than $1 trillion). Separately, a ~$1.2 billion Pentagon program will upgrade the B61 with a new tailfin guidance kit. This combination of an improved nuclear “smart” bomb delivered by highly stealthy supersonic aircraft will create a lower yield nuclear weapon that can assume the mission of existing higher yield B61’s.

Together, these three examples firmly establish that the U.S. creates new military capabilities through modifications and improvements of existing nuclear weapons. In Nuclear Watch New Mexico’s opinion, an arguably more usable lower-yield nuclear weapon substituting for a higher-yield weapon is clearly and inherently a new military capability.

In contrast to his rhetoric today, in April President Obama requested an unprecedented $537 million for the B61 Life Extension Program in FY 2014. Senator Dianne Feinstein, chairwoman of the Energy and Water Development Appropriations Subcommittee that funds NNSA programs, has expressed increasing concern over exploding costs. She has indicated in media reports that a reasonable alternative would be to fund a significantly reduced program that replaces limited life components. In our view, this would also have the benefit of not creating new military capabilities.

Jay Coghlan, Director of Nuclear Watch New Mexico, commented, “We naturally welcome President Obama’s declared goal to reduce deployed strategic nuclear weapons and battlefield weapons in Europe. However, as a real disarmament step, he should take a time out on the full B61 Life Extension Program. He should instead adopt the more fiscally prudent and technically sound alternative of replacing limited life components while the ultimate future of B61 forward deployment in Europe is being determined. This unending cycle of proposed Life Extension Program will waste huge sums of taxpayers money and is  in direct conflict with the President’s own long-term goal of a future world free of nuclear weapons.”

# # #

 The full text of President’s Obama’s speech is available at http://www.whitehouse.gov/the-press-office/2013/06/19/remarks-president-obam

NNSA’s FY 2014 Stockpile Stewardship and Management Plan is available at https://nukewatch.org/importantdocs/resources/SSMP-FY2014.pdf

For more on the W76 and B61 Life Extension Programs, in particular their new military capabilities, see the Federation of American Scientists blogs at https://web.archive.org/web/20130630203617/http://blogs.fas.org/security/2007/08/us_tripples_submarine_warhead/ and

http://blogs.fas.org/security/2011/06/b61-12/

 

Nuclear Weapons Labs Made Improper Payments to Heather Wilson; She Should Resign from NNSA Council Determining Their Future

 June 11, 2013

Santa Fe, NM  – The Department of Energy (DOE) Inspector General has found that the Los Alamos and Sandia National Laboratories made improper payments of approximately $450,000 to ex.-NM Rep. Heather Wilson from January 2009 to March 2011. This last February House Speaker John Boehner appointed Wilson to a congressional advisory council that will recommend how the nuclear weapons laboratories will be managed and operated by the National Nuclear Security Administration (NNSA). The stated purpose of this NNSA Council is “to examine options and make recommendations for revising the governance structure, mission, and management of the nuclear security enterprise.” Heather Wilson should resign from the NNSA Council because of her clear conflict-of interest.

 

Wilson was a protégé of the powerful ex-New Mexico Senator Pete Domenici who protected the nuclear weapons labs and engineered lavish appropriations for them. Upon Domenici’s retirement Wilson unsuccessfully ran for his seat, promoting herself as a staunch champion of the labs. For example, during her 2012 campaign she strongly denounced a NNSA decision to delay a controversial nuclear weapons plutonium facility at Los Alamos, playing on employment fears while inaccurately claiming that the delay would cost a thousand jobs (which the government’s own documents contradicted). At the time it was unknown how much she had been paid for her own consulting jobs for Los Alamos and Sandia.

 

The DOE Inspector General report identified a number of issues concerning payments made by the labs to Heather Wilson and Company, LLC (HWC). It found: “• 23 payments totaling $226,378 made by Sandia between January 2009 and March 2011;

• 19 payments totaling $195,718 made by Los Alamos between August 2009 and February 2011; and • Payments totaling approximately $30,000 made by Nevada and Oak Ridge.”

 

The DOE IG report went on to find “[n]one of the 23 invoices submitted by HWC contained details as to the time expended and nature of the actual services provided as required.” Wilson’s billing justifications did “not meet even minimum standards” for federal payments. There was also an “absence of detailed evidence of the actual services provided” and that the Sandia Corporation (a wholly owned subsidiary of Lockheed Martin) “developed an after-the-fact schedule of activities.”

 

The four management contractors at Los Alamos, Sandia, Nevada and Oak Ridge were required to pay the government back $442,000 for their irregular payments to Heather Wilson. Jay Coghlan, Director of Nuclear Watch New Mexico, commented, “The question now becomes whether Wilson should personally be paying the government back. In any event, these new findings on the depth of her conflict-of-interest should bury her political future in New Mexico for once and for all. Further, she should resign from the NNSA Council on the future of the nuclear weapons labs, or replaced by congressional leadership if she doesn’t go voluntarily.”

 

# # #

The DOE IG Report (DOE/IG-0889) is available at

http://energy.gov/ig/downloads/inspection-report-doeig-0889

NNSA Penalizes Sandia; In Response Labs Director Says the Needs of the Nuclear Weapons Stockpile May Not Be Met

May 17, 2013

Santa Fe, NM – Albuquerque’s KRQE TV Channel 13 investigative reporter Larry Barker has found that “[a]fter calling employee safety standards “inexcusable,” the Department of Energy’s National Nuclear Security Administration recently withheld more than $6 million in incentive fees from Sandia [National Laboratories] as punishment… Lab director, Dr. Paul Hommert, defended Sandia’s handling of the Alaskan incident to the federal government. But, in a strongly-worded rebuke, NNSA Acting Director Neile Miller called Hommert’s version of the Kodiak events “disingenuous,” characterized Sandia’s response to the accident as “minimal” and said she was disturbed that no disciplinary action was ever taken against the employees involved.”

In last night’s broadcast Mr. Barker interviewed New Mexico’s senior senator Tom Udall and Nuclear Watch New Mexico’s Jay Coghlan. Both called for Sandia Labs to openly acknowledge and discuss a tragic vehicle accident in Alaska that resulted in the permanent paralysis of two employees. Sandia Labs Director Paul Hommert refused Mr. Barker’s repeated requests to be interviewed.

However, Mr. Barker did manage to comprehensively document NNSA’s process of fee determination that resulted in the penalty. Included is a 7-page letter by Sandia Director Paul Hommert defending the Labs and arguing that Sandia should not be docked for its negligent performance. He concludes by writing”

“…these actions [to penalize Sandia] are interpreted by me and my leadership as intended (whether rightly or wrongly) to send us a message that our broader national security work is not supported by the NNSA… the impact of such a message will impact our ability to support the nation’s national security challenges. First and foremost among these challenges are the needs of our nation’s nuclear deterrent, which we cannot meet without our broader work.”

Paul Hommert wears two hats, the first as Sandia Labs Director, the second as president of the executive board of the for-profit Sandia Corporation, a wholly owned subsidiary of the world’s largest defense contractor, the Lockheed Martin Corporation. Hommert’s salary has not been publicly revealed, but his predecessor Tom Hunter received $1.7 million in total annual compensation.

Sandia’s budget for nuclear weapons now exceeds Los Alamos and Lawrence Livermore National Laboratories. It is the lead lab for a Life Extension Program that will radically change the existing B61 nuclear bomb, whose estimated costs have exploded to over $10 billion. Lockheed Martin is the lead contractor for the controversial F-35 Joint Strike Fighter, whose estimated service life cycle will cost more than one trillion dollars. The future mission of the stealthy F-35 will be in large part to deliver precision-guided B61 bombs forward deployed in Europe (against what threat?), refurbished under Sandia’s leadership.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “In response to NNSA’s criticism and proposed penalty, in effect Sandia Labs Director Paul Hommert tells the federal government to give us the money or the safety and reliability of the nation’s nuclear weapons stockpile is at risk. There is an inherent conflict of interest in having the nuclear weapons labs directors also acting as presidents of the for-profit limited liability corporations that run the labs. As part of badly need reform and strengthening of federal oversight, these two positions should be strictly separated so that the American public can be fully confident that profoundly serious nuclear weapons policy decisions are not being influenced by private for-profit motives.”

# # #

KRQE Channel 13’s investigative report by Larry Barker is available at

http://www.krqe.com/dpp/news/larry_barker/sandia-lab-safety-costs-taxpaers-millions

His compilation of NNSA’s fee determination and Sandia Lab Director Paul Hommert’s letter is available at

http://media2.krqe.com/_local/pdf/SNL%20Fee%20Determination.pdf

NukeWatch NM’s compilation of the National Nuclear Security Administration’s FY 2014 budget request

The National Nuclear Security Administration’s FY 2014 budget request includes a 13% increase for nuclear weapons programs above FY 2013 sequester levels.

NukeWatch NM’s compilation of the NNSA FY 2014 budget request is available at
https://nukewatch.org/economics/FY2014_NNSA_Budget_4-10-13_Print.pdf

Further analysis by us will follow.

Jay

Why the appointment of ex-NM Rep. Heather Wilson to security panel is not a good thing

Reportedly House Speaker Boehner has appointed former Rep. Heather Wilson (R-NM) to the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise. Other appointments have not been yet announced.

That is not good. Wilson (a former protégé of Sen. Pete Domenici) is a self-interested advocate for the Labs. According to an October 16, 2012 Santa Fe Reporter article she has had numerous consulting contracts with defense contractors, including Sandia Labs beginning in 2009 and up to her Senate campaign in 2012 (see .http://www.sfreporter.com/santafe/article-7028-this-is-heather-wils.htm). Moreover, in the past her congressional staff has included Sandia Labs personnel.

She also incorrectly and repeatedly argued in her Senate campaign against Martin Heinrich that the deferral of the CMRR-Nuclear Facility would cost 1,000 jobs at the Los Alamos Lab (my repeated attempts to contact her campaign and correct her had no apparent effect).

The provision in the FY 2013 Defense Authorization Act that enabled the Congressional Advisory Panel on the Governance of the Nuclear Security Enterprise was largely written by a staffer on the House Armed Services Committee who is a former Sandia Labs employee. Its purpose is to create greater autonomy for the nuclear weapons labs with less federal oversight. (See “Governance, Management, and Oversight of the Nuclear Security Enterprise, ” House Report 112–479, National Defense Authorization Act for Fiscal Year 2013, H.R. 4310, page 329).

Given the long string of chronic cost overruns and security infractions, diminished federal oversight and greater autonomy for privatized corporate nuclear weapons contractors is not the way to go. Don’t expect Heather Wilson to help the American taxpayer correct that wrong direction.

On a final note, this Panel should be subject to the Federal Advisory Committee Act.  A 2008 Government Accountability Office report on the Act states “Because advisory committees provide input to federal decision makers on significant national issues, it is essential that their membership be, and be perceived as being, free from conflicts of interest and balanced as a whole.” http://www.gao.gov/products/GAO-08-611T

This should apply to Wilson if she still has consulting jobs with the nuclear weapons labs.

Replacement of Neutron Generators is Routine

At a town hall meeting this week in Oak Ridge, Tennessee, near the proposed location of the new “UPF” nuclear weapons facility at the Y-12 National Security Complex, the state’s junior senator, Bob Corker quipped:

It’s just about the fact that our nuclear arsenal is absolutely obsolete. I saw neutron generators, literally, out in New Mexico that will quit working in the year 2015, which means it renders the weaponry totally obsolete.

Whew. Stunning.

Neutron generators are “limited life components” (LLCs). The NNSA FY 2012 Congressional Budget Request has this to say: Many age-related changes affecting various nuclear warhead components are predictable and well understood. Limited life component exchanges are performed routinely to replace these components periodically throughout the lifetime of the weapon. Components such as power sources, neutron generators and tritium reservoirs deteriorate predictably and must be replaced before their deterioration adversely affects function or personnel safety. Page 50, emphasis added.

Changing out neutron generators in fact appears so routine that it seems the military changes them out in the field. A July 1995 Bulletin of the Atomic Scientists (p. 78) mentions “On April 11, [1995] Sandia delivered 36 recertified neutron generators to the Navy…” Emphasis added.

NNSA says under FY 2010 Accomplishments for Stockpile Systems: “Delivered all scheduled LLCs (GTS [gas transfer systems, meaning tritium] reservoirs and neutron generators (NG)) and alteration kits to the DoD and Pantex to maintain the nuclear weapons stockpile.” NNSA FY 2012 Congressional Budget Request (CBR), p. 61, emphasis added.

Also of interest on the same page: “Selected a common NG for the B61 and B83 that will reduce development, production, and maintenance costs.”

Neutron generators are testable, and the testing devices themselves are being improved. “FY 2010 Accomplishments Stockpile Readiness Nonnuclear Readiness… Deployed Neutron Generator (NG) Testers, which assures neutron generator test capability by modernizing testers as required to support NG production and shelf-life programs.” NNSA FY 2012 Congressional Budget Request, p. 135.

A MC4380 Neutron Generator for the W76-1
Neutron Generator, Sandia Lab News, March 2011

In the current Life Extension Program W76-1’s are being outfitted with new-design neutron generators (the MC4380). Corker is seeing neutron generators in New Mexico because Sandia produces them and loads tritium into the neutron target tubes that are a critical part of neutron generators. Production of neutron generators is being both improved and expanded.

This from Sandia Labs “Labs Accomplishments:”

During FY10, Sandia shipped more than twice as many neutron generator assemblies (NGAs) to its NNSA and military customers than in any previous year. This totaled 850 NGAs and 340 packaging requirement kits. Record completion rates were achieved in four different production areas within the neutron generator supply chain, in concert with a shift to a common neutron generator subassembly that improved production efficiency. Sandia established a balanced supply chain capacity approach to help meet future NG directive schedule challenges with a diverse neutron generator product mix supporting numerous weapon systems.

http://www.sandia.gov/LabNews/labs-accomplish/2011/lab_accomp-2011.pdf, p. 5

Neutron generators themselves are being continuously improved, for example:

In the early 1990s Sandia undertook to design a replacement neutron generator for the W76 nuclear warhead on the Mark 4 reentry body of the Navy’s Trident I system. There were several compelling reasons for doing so, including the need to increase the component’s design margins, simplify its manufacturability, augment its resistance to new profiles of hostile environments, and increase its life span.

http://www.globalsecurity.org/wmd/systems/w76.htm

In 1999 the MC4380 Neutron Generator and its MC4378 Timer, MC4705 Voltage Bar, MC4148 Rod, MC4437 Current Stack, and MC4277 Neutron Tube were qualified for use in the Navy’s W76 weapon system. This culminated a multi-year development effort which included the transfer of production capability from the Pinellas Plant to Sandia. This is the first weaponized neutron generator to employ a focused ion-beam neutron tube for higher reliability, the first produced at Sandia, and the first Sandia component with radiation hardness requirements to be qualified without underground testing.

http://www.globalsecurity.org/wmd/systems/w76.htm

The neutron generator business is very robust, and Corker’s claims of obsolescence are absurd.

 

 

 

Big Money for the B61’s New Ride

In a mid April report to Congress, the Pentagon stated lifetime cycle costs of the dual [nuclear] capable F-35 Joint Strike Fighter  will exceed $1 trillion. The F-35 will have a lot to do with future forward deployment in Europe (or not) of the proposed heavily modified B61-12 tactical nuclear bomb.

According to Inside Defense, problems with development and production aspects of the F-35 program will delay the deployment of the aircraft another two years and require an additional $7.2 to complete the development phase.

Ironically, Lockheed Martin is the lead contractor for the F-35. It is also the contractor that runs the Sandia National Laboratories, which is the lead lab for the B61 Life Extension Program (LEP). One of the main purposes of that LEP is transform the B61 “analog controlled” bomb into a “digitally controlled” bomb that mates with the advanced electronics and avionics of the F-35.

The B61 LEP will begin in FY 2012 with $223.6 million in funding. Total cost is currently estimated at ~$5 billion