Through comprehensive research, public education and effective citizen action, Nuclear Watch New Mexico seeks to promote safety and environmental protection at regional nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

Plutonium Sampling at Los Alamos National Laboratory

Cost of RECA Chart

QUOTE OF THE WEEK

It seems we can’t find what you’re looking for. Perhaps searching can help.

LANL’s Central Mission: Los Alamos Lab officials have recently claimed that LANL has moved away from primarily nuclear weapons to “national security”, but what truly remains as the Labs central mission? Here’s the answer from one of its own documents:

LANL’s “Central Mission”- Presented at: RPI Nuclear Data 2011 Symposium for Criticality Safety and Reactor Applications (PDF) 4/27/11

Banner displaying “Nuclear Weapons Are Now Illegal” at the entrance in front of the Los Alamos National Lab to celebrate the Entry Into Force of the Nuclear Weapon Ban Treaty on January 22, 2021

It seems we can’t find what you’re looking for. Perhaps searching can help.

Follow the Money!

Map of “Nuclear New Mexico”

In 1985, US President Ronald Reagan and Russian President Mikhail Gorbachev declared that “a nuclear war cannot be won and must never be fought.”

President Ronald Reagan and Soviet General Secretary Mikhail Gorbachev shake hands after signing the arms control agreement banning the use of intermediate-range nuclear missles, the Intermediate Nuclear Forces Reduction Treaty.

Waste Lands: America’s Forgotten Nuclear Legacy

The Wall St. Journal has compiled a searchable database of contaminated sites across the US. (view)
Related WSJ report: https://www.wsj.com

New & Updated

Nuclear Watch NM Amends LANL Cleanup Lawsuit – Claims New Consent Order To Be Invalid

Santa Fe, NM

Nuclear Watch New Mexico has amended its federal lawsuit against the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) that alleges twelve violations of a 2005 Consent Order governing cleanup at the Los Alamos National Laboratory (LANL). Those violations could result in potential penalties of more than $300 million dollars that would go to the state, if only the New Mexico Environment Department (NMED) were to enforce them. Nuclear Watch now asks the court to declare the new 2016 Consent Order to be invalid because the requirement for the opportunity of a public hearing was not met.

Read More…

NM Environment Dept Finalizes Consent Order on Los Alamos Lab Cleanup Surrenders Enforcement to Nuclear Weaponeers

NM Environment Dept Finalizes Consent Order

on Los Alamos Lab Cleanup

Surrenders Enforcement to Nuclear Weaponeers

 

Santa Fe, NM – In a classic move to avoid publicity, the New Mexico Environment Department (NMED) announced late Friday afternoon June 24 that it had finalized a new “Consent Order” to replace a 2005 Order governing cleanup at the Los Alamos National Laboratory (LANL). The Environment Department’s brief press release headlined “Agreement Focuses on Cleanup & Supporting Stronger Federal Funding Requests.” This is doublespeak, as the new Consent Order is a giveaway to the Department of Energy and the Lab, surrendering the strong enforceability of the old Consent Order. The new Order is also clearly the opposite of the old Consent Order, whose underlying intent was to make DOE and LANL get more money from Congress for accelerated cleanup. In contrast, the new Consent Order allows them to get out of future cleanup by simply claiming that it’s too expensive or impractical to clean up.

The nuclear weaponeers are now openly talking about the “The Second Nuclear Age” before cleaning up form the first nuclear age. They are actively seeking to expand nuclear weapons production that caused the widespread contamination to begin with, particularly plutonium pit production at LANL.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers plan to spend a trillion dollars over the next 30 years completely rebuilding U.S. nuclear forces. Meanwhile, cleanup at the Los Alamos Lab, the birthplace of nuclear weapons, continues to be delayed, delayed, delayed. Real cleanup would be a win-win for New Mexicans, permanently protecting our water and environment while creating hundreds of high paying jobs. But yet the Environment Department fails New Mexicans by failing to enforce cleanup at Los Alamos.”

When NMED Secretary Ryan Flynn announced a draft new Consent Order on March 30, he claimed that the old Consent Order did not work. Nuclear Watch agrees, but that’s because Secretary Flynn granted more than 150 compliance milestone extensions at the Lab’s request, effectively eviscerating the old Consent Order. While finalizing the new Consent Order NMED ignored the explicit public participation requirements of the old Order, which among other things requires a public hearing on major modifications. Instead, NMED rammed through the final Consent Order, largely brushing aside the formal comments of some 40 concerned citizens and the Santa Clara Pueblo.

LANL is key to the trillion dollar rebuilding of nuclear forces as the premier nuclear weapons design lab and the nation’s sole production site for plutonium pit triggers, the most critical nuclear weapons components. Funding for Department of Energy (DOE) nuclear weapons programs is nearly double historic Cold War averages, with around $1.5 billion spent annually at LANL alone. In contrast, funding for Lab cleanup has been cut to $189 million for FY 2017 (down from $225 million in FY 2014), with only approximately a third going to actual cleanup (one-third goes to pensions and another third to safeguard improperly treated radioactive waste barrels, one of which ruptured and closed the multi-billion dollar Waste Isolation Pilot Plant).

The original 2005 Consent Order required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It also stipulated a detailed compliance schedule that the Lab was required to meet. Ironically, the last milestone, due December 6, 2015, required a report from LANL on how it successfully cleaned up Area G, its largest waste dump. However, real cleanup remains decades away, if ever. Instead, the Lab plans to “cap and cover” Area G, thereby creating a permanent nuclear waste dump in unlined pits and shafts, with an estimated 200,000 cubic yards of toxic and radioactive wastes buried above the regional groundwater aquifer, four miles uphill from the Rio Grande.

 

A few of the serious deficiencies of the new Consent Order are:

[Quotes are from the new Consent Order followed by page numbers]

• “The Parties agree that DOE’s project’s plans and tools will be used to identify proposed milestones and targets.” P. 28. “DOE shall define the use of screening levels and cleanup levels at a site…”  P. 32. This puts the Department of Energy in the driver’s seat, not the New Mexico Environment Department.

• “DOE shall update the milestones and targets in Appendix B on an annual basis, accounting for such factors as… changes in anticipated funding levels.” P. 29. Therefore the new Consent Order will be held hostage to DOE’s budget, which recently cut LANL’s cleanup funding.

• “… [DOE and NMED] shall meet to discuss the appropriation and any necessary revision to the forecast, e.g. DOE did not receive adequate appropriations from Congress…” P. 30. Again, the new Consent Order and therefore cleanup at LANL will be held hostage to DOE funding, when DOE’s own track record makes clear that its priority is expanded nuclear weapons production paid for in part by cutting cleanup and nonproliferation programs.

• “If attainment of established cleanup objectives is demonstrated to be technically infeasible, DOE may perform risk-based alternative cleanup objectives…” P. 34. DOE can opt out because of “impracticability” or cost of cleanup. P. 35. This creates giant loopholes that threaten comprehensive cleanup at LANL.

• The new draft Consent Order explicitly states that public participation requirements do NOT apply to future modifications of the Order. P. 25. This is the opposite of what the original Consent Order required, which made a point of incorporating the public process requirements of federal environmental law. Nuclear Watch New Mexico maintains that full public participation requirements apply to the new Consent Order as well, including its very formulation as a major modification of the old Consent Order. That full public participation process requires a public hearing if there are unresolved issues, which NMED has rejected, a position that may be of questionable legality.

 

On May 12, 2016, Nuclear Watch New Mexico filed a lawsuit against LANL and DOE for failing to meet compliance milestones in the old Consent Order. These violations incur around $300 million dollars in potential penalties, which NMED shows no sign of enforcing. To the contrary, NMED has filed a motion to intervene against Nuclear Watch New Mexico in its lawsuit, raising the question of whose side the Environment Department is on, the environment or the polluter (in this case a for-profit nuclear weapons lab)?

Moreover, when Nuclear Watch NM filed a notice of intent to sue on January 21, NMED Secretary Flynn sought to intimidate our lawyers by declaring “If a suit is filed, and the Environment Department becomes involved, we would insist on collecting any and all labor and legal costs from the (New Mexico Environmental Law Center) to reimburse New Mexico’s taxpayers for the costs resulting from this groundless and frivolous action.”

Far from being a frivolous action, Nuclear Watch and the New Mexico Environmental Law Center seek to compel full and genuine environmental restoration at the Los Alamos Lab, which the new Consent Order blocks by giving the nuclear weaponeers giant loopholes to avoid cleanup.

 

#  #  #

NMED’s June 24 press release and the new Consent Order are available here

Public comment on the draft Consent Order (including Nuclear Watch NM and Santa Clara Pueblo) is available here

Nuclear Watch New Mexico’s lawsuit complaint, filed May 12, 2016, is available here

  • Our complaint alleged twelve counts of milestone compliance violations where NMED did not grant extensions. At that time we calculated 7,853 total days of noncompliance at $37,500.00 per day, equal to $294,487,500, with the clock still ticking.

Our May 5, 2016 second notice of intent to sue (which is a good summary of our complaint) is available here

Our January 20, 2016 notice of intent to sue is available here

NMED Secretary Flynn’s quote is from “Nuclear Watch to sue over LANL cleanup problems”, Mark Oswald, Albuquerque Journal, January 21, 2016, is here.

 

Underground Pits and shafts at Area G
LANL Area G Underground Disposal Pits and Shafts

NM Environment Dept. Finalizes Consent Order on Los Alamos Lab Cleanup; Surrenders Enforcement to Nuclear Weaponeers

Santa Fe, NM

The new Consent Order is a giveaway to the Department of Energy and the Lab, surrendering the strong enforceability of the old Consent Order. The new Order is also clearly the opposite of the old Consent Order, whose underlying intent was to make DOE and LANL get more money from Congress for accelerated cleanup. In contrast, the new Consent Order allows them to get out of future cleanup by simply claiming that it’s too expensive or impractical to clean up…

Read More…

University of New Mexico’s growing involvement in nuclear weapons prograns

See Honeywell, UNM sign accord to pursue joint research

This is more evidence of the University of New Mexico’s deepening involvement in nuclear weapons programs. UNM recently announced that with Boeing, the U. of Texas and others that it was going to bid on the Sandia Labs management contract.

Honeywell runs the new Kansas City Plant, which is manufacturing and/or procuring ~100,000 nonnuclear nuclear weapons components every year for increasingly aggressive Life Extension Programs. These programs not only extend the service lives of nuclear weapons for up to 60 years, but also give them new military capabilities, despite denials at the highest levels of the U.S. government.

UNM is also the host site for the June 21 Strategic Deterrence Symposium featuring top military and Energy Dept. nuclear brass. Nuclear Watch NM will be there to see what they are to.

Obama’s Speech in Hiroshima

Obama’s speech is  beautiful and very moving.

But he’ll be gone soon while the one trillion dollar modernization of U.S. nuclear forces that begins under him will go on for 30 years and then some (unless we stop it, that is).

http://www.nytimes.com/2016/05/28/world/asia/text-of-president-obamas-speech-in-hiroshima-japan.html?smid=tw-nytimes&smtyp=cur&_r=0

 

Text of President Obama’s Speech in Hiroshima, Japan

MAY 27, 2016

 

Sign the Petition – No Loopholes, No Excuses – Full Cleanup at Los Alamos!

Dear Friends,

Thanks to those who made it to the meeting last night!

 

NukeWatch has a new petition –

The New Mexico Environment Department (NMED) has issued a proposed new “Consent Order” governing cleanup at the Los Alamos National Laboratory, the birthplace of nuclear weapons.

We demand NMED close the giant loophole in the proposed Consent Order that would allow Los Alamos Lab and DOE to get out of cleanup by simply saying that they don’t have enough money.

And we demand NMED hold a public hearing on the proposed Consent Order, given the intense public interest in cleaning up the Lab.

For more info –

https://www.change.org/p/kathryn-roberts-no-excuses-no-loopholes-full-cleanup-at-los-alamos-lab

AND WE HAVE EXPANDED OUR SAMPLE COMMENTS FOR YOU TO USE AS YOU SEE FIT

Please let your voice be heard and turn in public comments.

Copy the sample comments below and paste into an email.

Please modify as you see fit, then email to the address below.

If you don’t mind, please cc: us at: info(at)nukewatch(dot)org

 

[date]

 

Ms. Kathryn Roberts

New Mexico Environment Department

Post Office Box 5469

Santa Fe, New Mexico 87502

 

Via email to [email protected] 

 

Dear Ms. Roberts,

I urge the New Mexico Environment Department (NMED) to abandon the proposed 2016 Compliance Order on Consent, or Consent Order, for Los Alamos National Laboratory (LANL), released for public comment on March 30, 2016.  It creates serious problems and represents a giant step backwards in achieving the goal of genuine cleanup of the Laboratory.

The Environment Department should keep the existing Consent Order that went into effect March 1, 2005, while modifying and updating a cleanup schedule that includes a realistic final compliance date.  I also formally request that NMED provide the opportunity for a public hearing on the revised cleanup schedule and new completion date, in accordance with the New Mexico Hazardous Waste Act and the 2005 Consent Order.

 

GENERAL COMMENTS

The opportunity for a public hearing must be provided

  • Any extension of a final compliance date must be treated as a Class 3 permit modification to the 2005 Consent Order and therefore requires a 60-day public comment period.
  • Any extension of a final compliance date under the 2005 Consent Order can be implemented only after the opportunity for public comment and a public hearing, including formal testimony and cross-examination of witnesses.
  • The Environment Department is legally required to follow these public participation requirements that explicitly incorporated into the 2005 Consent Order.

Withdraw the proposed draft 2016 Consent Order 

  • The proposed draft represents a big step backwards in achieving the goal of genuine cleanup of the Laboratory.
  • The Environment Department should keep the current 2005 Consent Order and revise the Section XII cleanup schedule and final compliance date.
  • I request that the Environment Department withdraw the proposed draft 2016 Consent Order.

The public deserves the opportunity to comment on all following drafts 

  • It seems likely that a later draft – after the Lab’s and public comments are incorporated into a revised draft – and after closed-door negotiations between the Environment Department and the Laboratory – could be substantially different from the current draft.
  • I request that the public have the opportunity to review and comment on any further drafts of a revised proposed 2016 Consent Order.

Public participation provisions in the existing 2005 Consent Order must be incorporated into the proposed draft 2016 Consent Order

  • The proposed draft 2016 Consent Order explicitly limits public participation requirements incorporated into the existing 2005 Consent Order.
  • I request that all notices, milestones, targets, annual negotiations, and modifications require public review and comment, and the opportunity for a public hearing.

The current state of cleanup must be updated and next steps scheduled

  • Work under the existing 2005 Consent Order needs to be subject to public review.  In 2005 DOE agreed to complete cleanup under the Consent Order by December 6, 2015, which did not happen.  In order for the public to understand where the work under the existing Consent Order stands, LANL should be required to provide a current, publicly available list of the status of all cleanup projects under the 2005 Consent Order.
  • Further, I request that next steps for cleanup at every site listed in the 2005 Consent Order be documented in detail and given a scheduled completion date, or alternatively verified as already completed.
  • All documents submitted under the 2005 Consent Order must be incorporated into any revised Consent Order.

All documents must be made public as required in the 2005 Consent Order

  • The State and the Lab must make all communications, documents, submittals, approvals, notices of deficiencies and denials under any revised Consent Order readily and electronically available to the public.
  • The State and the Lab must notify individuals by e-mail of all submittals, as required in the 2005 Consent Order.

The Environment Department must respond in writing to all public comments

  • I request that the State reply individually to each and every comment submitted.
  • The Lab’s comments and NMED’s response to comments must be made public.

All future work must have enforceable deadlines

  • The proposed draft 2016 Consent Order proposes a “Campaign” approach with enforceable cleanup deadlines limited to the work scheduled only for that year.
  • I request that all anticipated cleanup projects have scheduled, enforceable cleanup deadlines from the beginning of any revised Consent Order.

The Consent Order cannot be open-ended

  • Any Consent Order for LANL cleanup must have a final compliance date to which the State and the Lab agree to and are so bound.
  • The public should be given an opportunity for a public hearing on the new final compliance date as required by New Mexico’s hazardous waste regulations.

 

SPECIFIC COMMENTS

The Proposed 2016 Consent Order Must Not Extend the Original Final Compliance Date Without Required Public Participation

The proposed 2016 consent order would indefinitely extend the final compliance date for completing corrective action at the Laboratory, without the opportunity for a public hearing with formal testimony and cross-examination of witnesses. Any extension of a final compliance date under the 2005 Consent Order requires a 60-day public comment period and the opportunity for a public hearing, including formal testimony and cross-examination.  The Environment Department is legally required to follow these procedural requirements.

The legal requirements that mandate a public hearing are clear. Section XII of the 2005 Consent Order establishes the compliance schedule for implementation and completion of corrective actions at specific sites at the Laboratory. This schedule is mandatory. The final report that was to be submitted under the 2005 Consent Order – therefore, the final compliance date – was the remedy completion report for the huge Area G waste dump, required to be submitted by December 6, 2015. The proposed 2016 Consent Order would indefinitely extend this final compliance date by not designating a specific final compliance date.

But this revision must be treated as a major Class 3 permit modification. Section III.W.5 of the 2005 Consent Order explicitly provides for the preservation of full procedural rights for the public as follows:

This Consent Order hereby incorporates all rights, procedures and other protections afforded the Respondents [DOE and UC, now LANS] and the public pursuant to the regulations at 20.4.1.900 NMAC (incorporating 40 C.F.R. § 270.42) and 20.4.1.901 NMAC, including, but not limited to, opportunities for public participation, including public notice and comment, administrative hearings, and judicial appeals concerning, for example, remedy selection decisions of the [Environment] Department.

Thus, extension of a final compliance date under the 2005 Consent Order requires a 60-day public comment period and the opportunity for a public hearing, including formal testimony and cross-examination.

 

The Proposed New Consent Order Must Not Limit Other Public Participation Procedures

The proposed 2016 Consent Order expressly limits public participation requirements in a way that completely diverges from those provided in the 2005 Consent Order.  As explained above, the 2005 Consent Order explicitly protects procedural due process rights available to the public.  The proposed 2016 Consent Order explicitly removes these protections, as follows:

The Parties agree that the rights, procedures and other protections set forth at 20.4.1.900 NMAC (incorporating 40 C.F.R. § 270.42), 20.4.1.901 NMAC, and 20.4.1.902 NMAC, including, but not limited to, opportunities for public participation, including public notice and comment, administrative hearings, and judicial appeals, do not apply to modification of the Consent Order itself. [Emphasis added]

Thus, as proposed in the above language, the Parties (the Environment Department, Department of Energy and Los Alamos National Security, LLC) have inappropriately agreed to remove the due process rights, procedures and other protections provided to the public under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act.  This provision must be stripped from the proposed 2016 Consent Order.

 

The Proposed New Consent Order Must Not Eliminate Enforceable Deadlines

The proposed 2016 consent order would eliminate all the deadlines for completing cleanup under the 2005 Consent Order, and replace them with an open-ended and vague scheduling process, with limited enforcement opportunities.

The 2005 Consent Order, in Section XII, established dozens of deadlines for the completion of corrective action tasks, including completion of investigations at individual sites, installation of groundwater monitoring wells, submittal of groundwater monitoring reports, evaluation of remedial alternatives for individual sites, and completion of final remedies. These deadlines are enforceable under section III.G.

The proposed 2016 Consent Order would abandon the 2005 Consent Order provisions and replace them with a so-called “Campaign Approach” under Section VIII.  Under Section VIII.A.3, it would be up to the DOE, not the regulator at the New Mexico Environment Department, to select the timing and scope of each “campaign.”

Enforceable deadlines for cleanup tasks would apply no more than one year into the future. Deadlines would be based on “Campaigns” negotiated each year with DOE with no public participation and opportunity to comment on the schedule. To add insult to injury, the annual schedule would be determined by funding at DOE’s discretion, rather than the schedule driving the funding, which was the fundamental approach of the 2005 Consent Order.

All cleanup projects must mandatory completion dates scheduled from the beginning date of any revised Consent Order, and must be fully enforceable.

 

Existing Violations Must Not Be Eliminated

Section II.A of the proposed 2016 Consent Order would “settle any outstanding violations of the 2005 Consent Order.” This is a get out of jail free card.  Without enforceable schedules from the beginning, any consent order is not truly unenforceable, and the Environment Department would be abdicating its responsibility to protect human health and the environment as required by the federal Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act.  NMED must not surrender its regulatory and enforcement powers!

 

Attorney General Approval Must Be Obtained

The 2005 Consent Order was signed by the Attorney General of New Mexico for purposes of the Covenant Not to Sue (section III.) and the Reservation of Rights (section III.). As indicated on the draft signature page, there is no indication of the NM Attorney General plans to sign the proposed 2016 Consent Order. Yet it would provide the State of New Mexico with a covenant not to sue DOE on behalf of the State of New Mexico, not merely on behalf of the Environment Department. The Attorney General was an active participant, representing the People of New Mexico, in the 2005 Consent Order.  The Environment Department has a responsibility to ensure that the NM Attorney General is consulted, and his approval obtained, before any consent order is adopted.

 

The Proposed 2016 Consent Order Must Not Omit Detailed Requirements Found in the 2005 Consent Order

The 2005 Consent Order includes numerous detailed requirements for such things as well installation, sample collection, and preparation of work plans and reports. These ensure that the cleanup work is done properly, consistently, and according to standard industry practices.  They also ensured that work plans and reports were consistent, easy for the Environment Department to review, and easy for the public to understand.  The proposed 2016 Consent Order omits many such requirements, which should be corrected.

 

The Proposed 2016 Consent Order Must Not Allow Budget To Dictate Cleanup 

The proposed 2016 Consent Order allows DOE to provide cleanup priorities based on anticipated budget, which is backwards. . By the time NMED receives an estimated annual cleanup budget from DOE, the horse has left the barn. The original purpose of the 2005 Consent Order was to compel DOE and LANL to ask Congress for additional funds to accelerate cleanup. The giant loophole in the proposed 2016 Consent Order that allows DOE and LANL to say that they don’t have sufficient funding and therefore can choose to exempt themselves from cleanup should be eliminated.

 

Cleanup Levels Must Remain Strict

Section IX Cleanup Objectives and Cleanup Levels of the proposed 2016 Consent Order would allow DOE to “develop site specific ecological cleanup levels” to mitigate unacceptable ecological risk due to release of site-related contaminants. There is no mention of NMED’s role in this process. DOE would be allowed to demonstrate to NMED that any particular “cleanup objective is impracticable.” To do this, DOE may consider such things as technical difficulty, the cost of the project, hazards to workers or to the public, and any other basis that may support a finding of impracticability. If NMED approves the impracticability request, DOE can then propose alternative cleanup methods using site-specific risk assessments. All of this could take place behind closed doors, as there are no public participation requirements in this section. Please clarify what cleanup levels will be used and when and where they will be applied.

 

New Mexico deserves better

In closing, the Environment Department’s proposed 2016 Consent Order allows the federal government to leave Northern New Mexico contaminated if DOE believes that cleanup is too difficult or costly– a sorry situation indeed for a nuclear weapons facility that receives over 2 billion taxpayer dollars a year. Instead, the New Mexico Environment Department should implement a new revised Consent Order that is aggressive and enforceable and in which the State of New Mexico stays in the driver’s seat, not LANL and DOE. That would be a real win-win for New Mexicans, helping to permanently protect the environment and our precious water resources while creating hundreds of high-paying cleanup jobs. .

 

Sincerely,

Name

City

 

The new draft Consent Order is available at

https://www.env.nm.gov/HWB/lanlperm.html#COOC

 

NMED’s public notice for the draft Consent Order is available at

https://www.env.nm.gov/HWB/documents/PublicNotice__English.pdf

 

The public comment period ends 5:00 pm May 31, 2016.

Comments should be submitted to [email protected]

Public Meeting: Los Alamos Cleanup at the Crossroads

Dear Friends,

Please join us for an informal public meeting Tuesday, May 24 at 6pm.

Main Library Community Room, 145 Washington Ave, Santa Fe, NM

Please remember that no refreshments are allowed at the Library.

See you there!

 

Los Alamos Cleanup at the Crossroads
A Discussion on the Future of Cleanup at Los Alamos

 

We have opportunities to take new directions

How do we get to the Northern New Mexico we want leave for future generations?

Learn how your input can help make better cleanup decisions at Los Alamos National Laboratory

 

Join us for a
Public Meeting: Tuesday May 24, 2016, 6 – 7:30pm
at the
Main Library Community Room, 145 Washington Ave, Santa Fe

Topics to be Addressed
Los Alamos Cleanup Order

  • For “fence-to-fence” cleanup of legacy Cold War wastes
  • The 10-year trip since the original Consent Order was signed in 2005
  • New “Consent Order” Proposed by the NM Environment Department
    • Proposed changes from the existing
    • What can be improved?
    • Who is in the driver’s seat?
    • Just along for the ride, or will the public have real input?
    • Public comments due May 31

 

Department of Energy’s new Environmental Management at Los Alamos

  • Cleanup work no longer under nuclear weapons work
  • Looking for a new contractor
  • Can cleanup accelerate?

 

Nuclear Watch’s lawsuit

  • Alleging violations of the 2005 Consent Order

 

Questions, answers, and discussion

  • What’s on your mind
  • Your comments are important

 

Brought to you by Nuclear Watch New Mexico

(505) 989-7342

[email protected]

www.nukewatch.org

 

Materials Disposal Area B (MDA B) Contamination Excavation at LANL - Will removal of wastes continue?
Inside a protective enclosure, Cold War wastes are excavated at Los Alamos - Will it continue? (LANL photo)

 

CRITICAL EVENTS

It seems we can’t find what you’re looking for. Perhaps searching can help.

It seems we can’t find what you’re looking for. Perhaps searching can help.

New Nuclear Media: Art, Films, Books & More

It seems we can’t find what you’re looking for. Perhaps searching can help.