Y-12 NSC

Y-12 Description and Mission per NNSA Plans

The Y-12 National Security Complex (Y-12) is in Oak Ridge, Tennessee, about 15 miles from Knoxville, and dates from the World War II Manhattan Project. Babcock and Wilcox Technical Services Y-12, LLC primarily operate the facility, but Wackenhut Corporation is contracted to provide security. Y-12 employs approximately 3,800 people in support of NNSA activities. The total Y-12 Site footprint is 7.6 million sq-ft, with a 10-year plan to reduce the footprint to 3 million sq-ft by 2028. According to the 2009 Budget, NNSA planned to spend $843 million for nuclear weapons activities at Y-12 in 2009.

Under NNSA's plans for Complex Transformation, Y-12 would be the 'Uranium Center of Excellence'. Y-12 contains the world's largest repository of highly enriched uranium (HEU) in metal form, storing approximately 400 MT of the material- enough for about 14,000 nuclear warheads. While Y-12 refers to itself as the 'Fort Knox' for storage and management of HEU, there are a number of security risks posed by the site. Roughly 700,000 people live within a 100-mile radius of the facility. The 811-acre compound- over three miles long and half a mile wide- is nestled in a valley between two ridges. Because of its location, Y-12 is a difficult site to defend. Attackers could use the surrounding forested high ground to help gain control of the facility. Most of the HEU at Y-12 is stored in five World War II-era buildings. During NNSA's 2007 force-on-force security test, the mock adversaries were successful in a theft scenario; meaning they were successful in removing mock SNM from Y-12. In addition to storing uranium at Y-12, NNSA also manufactures, evaluates, and tests the uranium nuclear weapons components and canned subassemblies, which includes heavy metal cases and secondaries. The mission for these components and canned subassemblies, and the number produced, is not publicly available. Complex Transformation sets a future production target for canned subassemblies at Y-12 of about 125 per year, but the number could be increased to an annual rate of 200. Y-12 also conducts component dismantlement, storage, and disposition of surplus nuclear materials. Additionally, Y-12 supplies HEU for use in naval reactors and research reactors. The Complex Transformation SPEIS would continue these activities at Y-12.

Major NNSA Facilities at Y-12 
In 2008, Y-12 completed a long-overdue project to build a storage facility called the 'Highly Enriched Uranium Materials Facility' (HEUMF) to store the majority of the weapons-quantities of HEU currently housed in the five above-ground storage buildings. NNSA expects to begin moving HEU into HEUMF in 2010 and to move all HEU, except for processing inventories, into HEUMF by the end of 2011. Without an aggressive plan to down-blend the hundreds of metric tons of excess HEU that is to be stored at HEUMF, there is little room for other functions in the facility. In its December 2008 Record of Decision, the NNSA announced its decision to build a large Uranium Processing Facility (UPF) adjacent to the HEUMF to house the remainder of the HEU mission. UPF is not scheduled to be completed until 2019 at the earliest. Details about the mission of UPF are sketchy, as DOE vaguely states that it will have a 'modern highly-enriched uranium production capability.'

- Official DOE Y-12 website 

Lawsuit aims to halt Uranium Processing Facility construction to review earthquake risks

Lawsuit aims to halt Uranium Processing Facility construction to review earthquake risks
Brittany Crocker, USA TODAY NETWORK – Tennessee Published 11:00 a.m. ET July 28, 2017

Prior to this lawsuit, a federal safety board also raised concerns over seismic risks at the UPF and at two older buildings Y-12 plans to continue using.

A lawsuit filed last week against the Department of Energy and National Nuclear Security Administration (NNSA) alleges the government agencies ignored new information about seismic risks during a second environmental review on Y-12 National Security Complex’s Uranium Processing Facility.

The Oak Ridge Environmental Peace Alliance filed the lawsuit in Washington with Nuclear Watch New Mexico and the Natural Resources Defense Council to stop the building’s construction until another environmental review is completed.

The plaintiff organizations asserted revised plans for the Uranium Processing Facility are significantly different from those the NNSA analyzed in 2011. They said NNSA’s supplementary environmental review of the revised plans only covered earthquake risks at the new facility, and not the two legacy buildings Y-12 plans to continue using.

More

Public Interest Organizations File Lawsuit Against New Nuclear Bomb Plant

Public Interest Organizations File Lawsuit Against New Nuclear Bomb Plant

July 20, 2017

Contact: Jay Coghlan, NWNM, 505.989.7342, c. 505.470.3154, jay[at]nukewatch.org

Washington, DC – Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration’s (NNSA’s) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.’s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants.

“The story of this new bomb plant is a long tale of outrageous waste and mismanagement, false starts and re-dos, a federal agency that refuses to meet its legal obligation to engage the public, and a Senator that is bent on protecting this piece of prime nuclear pork for his home state,” said Ralph Hutchison, coordinator of OREPA. “But the short version is this: when the NNSA made dramatic changes to the UPF, and admitted that it intends to continue to operate dangerous, already contaminated facilities for another twenty or thirty years, they ran afoul of the National Environmental Policy Act. Our complaint demands that the NNSA complete a supplemental environmental impact statement on the latest iteration of its flawed plans.”

The NNSA first issued a formal “Record of Decision” to build the UPF in 2011. Within a year, the agency had to admit it had made a half-billion dollar mistake because the designed footprint of the bomb plant was not big enough to hold all of the required equipment and safety features. The American taxpayer had to eat that half billion dollars, as the NNSA held no contractor responsible for it. The agency’s parent organization, the Department of Energy, has been on the Government Accountability Office’s High Risk List for project mismanagement and chronic cost overruns for 26 consecutive years.

More recently, the House FY 2018 Energy and Water Development Appropriations report noted that the NNSA had to reprogram $403 million out of the UPF’s $1.4 billion contingency fund to address “unforeseen issues” before ground is even broken. Both the NNSA and Sen. Lamar Alexander (R.-TN, chair of Senate Energy and Water Development Appropriations Subcommittee) have repeatedly claimed that UPF construction will not exceed $6.5 billion. That declared budget cap seems increasingly uncertain, which could have serious negative political consequences for the troubled facility.

The UPF started with an original estimated price tag of between $600 million to $1 billion in 2006. In December 2013 an independent cost assessment by the Department of Defense pegged the UPF at more than $19 billion, which stopped the project dead in its tracks and compelled NNSA to develop a new approach. The agency commissioned a “Red Team” to perform a quick, secret study, whose recommendation was eventually adopted. In July 2016, the NNSA published an Amended Record of Decision in the Federal Register describing its new plan.

“It was a dramatic change,” commented Jay Coghlan, Executive Director of Nuclear Watch New Mexico. “Instead of consolidating all enriched uranium operations into one big, new UPF, NNSA decided to build multiple smaller but integrated buildings, only one of which would be designed to modern seismic standards. More importantly, the agency declared it would continue to indefinitely use deteriorating, already contaminated facilities for dangerous highly enriched uranium operations, while admitting that the buildings can not meet current environmental and seismic standards.”

The National Environmental Policy Act requires a federal agency to revisit any environmental analysis when its plan undergoes significant changes that might impact the environment, or when new information comes to light. It also requires public involvement throughout the process. “NEPA’s fundamental purposes are to ensure that agencies take a hard look at consequences before taking action and to ensure that the public has a voice in agency decisions,” said William Lawton, an attorney working on the case at Meyer Glitzenstein & Eubanks, LLP. “Here, the NNSA has chosen to save money by continuing to rely on outdated, deteriorating buildings that run a very real risk of collapsing and releasing nuclear contamination in the event of an earthquake. The agency is putting the public at risk, and the public has a right to make sure that the government has taken the legally required hard look at those serious risks.”

 

“Since 2011, despite our repeated efforts to get information, including filing Freedom of Information Act requests, visiting DOE offices, asking officials for information and writing hundreds of letters, we have been shut out of the process completely,” noted OREPA’s Hutchison. “When we saw the final document, admitting that they were going to continue to use dangerous risky facilities without bringing them up to code, we realized why the NNSA was so determined not to make its plan public.”

Coghlan noted that the NNSA faced a similar scenario several years ago at the Los Alamos National Laboratory in New Mexico when plans for a huge new plutonium pit fabrication facility were substantially changed. “We told NNSA they had to complete more public review, and the agency wisely decided to prepare a supplemental environmental impact statement,” he said. “The proposed changes to the UPF are even more dramatic, and we are invoking that precedent to demand that NNSA follow the law.”

# # #

The complaint is available at https://nukewatch.org/importantdocs/resources/UPFcomplaint.pdf

The Oak Ridge Environmental and Peace Alliance, Nuclear Watch New Mexico and the Natural Resources Defense Council have engaged the well-respected public interest law firm Meyer Glitzenstein and Eubanks, LLP, located in Washington, DC, to represent them in the litigation.

The Oak Ridge Environmental Peace Alliance is an 1,800 member grassroots public interest group that has focused on nuclear weapons and environmental issues at the Department of Energy’s Oak Ridge Nuclear Reservation since 1988.

Nuclear Watch New Mexico had been watchdogging Department of Energy nuclear weapons facilities in New Mexico and across the NNSA’s nuclear weapons complex since 1999.

The Natural Resources Defense Council combines the power of more than two million members and online activists with the expertise of some 500 scientists, lawyers, and policy advocates across the globe to ensure the rights of all people to the air, the water, and the wild.

Plans are to complete UPF by 2025 for no more than $6.5B
UPF at Y-12 proposes to house enriched uranium operations for thermonuclear warhead secondaries. Courtesy NNSA.

What does $4.79 million look like to Lockheed Martin?

What does $4.79 million look like to Lockheed Martin Inc, the world’s biggest defense contractor?

Recently, Lockheed Martin (LM) agreed to pay a $4.79 million settlement to the federal government to settle Justice Department allegations that LM illegally used taxpayer money to lobby for an extension of its Sandia Labs management contract.LM was trying to get its $2.5 billion annual management and operating contract extended without any pesky competition.

What may seem like a large amount to us is just a slap on the wrist to LM, which has scored almost $300 billion in 169,345 different contracts with the US federal government since 2008.

The website USA Spending tells us that LM did $32 billion in business with the federal government in 2014. Of that, $25 billion was contracted with the Department of Defense and almost $3 billion with the Department of Energy (DOE). It is for DOE that LM runs Sandia and co-manages Pantex and Y-12 with Bechtel. These 3 sites are a large part of the US nuclear weapons complex. We are all familiar with LM’s defense contracting, but Lockheed Martin is also contracting to help build the nuclear warheads for the missiles and aircraft that it also builds, for example with the world’s first nuclear “smart” bomb, the B61-12. It’s one-stop nuclear war machine shopping.

Lockheed Martin also has its tentacles in many diverse federal agencies, for instance the Internal Revenue Service where it provides computer-related services. The taxpayer ultimately pays for all contracts.

The settlement on clearly illegal lobbying behavior represents only .015% of LM’s annual total federal contracts and just .16% of the DOE contracts for 2014.

To LM, $4.79 million must look like the cost of doing business.

Here are some Lockheed Martin numbers for 2014:

US Agency Year(s) Amount Contracts Source
Total for LM

2008-2015

$293,176,103,660

169,345

More

Total for LM

2014

$32,496,127,143 20,156

More

Department Of Defense

2014

$25,319,041,531

17,869

 More

Department Of Energy

2014

$2,998,937,872

138

 More

IRS

2014

$27,824,450

83

 More

 

 

 

 

 

Major Protests at U.S. Warhead Facilities Across the Nation Unite to Decry Trillion Dollar Plan for New U.S. Nuclear Weapons

For more information:
Ralph Hutchison, Oak Ridge Environmental Peace Alliance, [email protected]
<mailto:[email protected]> , 865-776-5050
Marylia Kelley, Tri-Valley CAREs, Livermore, mailto:[email protected]
<mailto:[email protected]> , 925-443-7148
Other key national and regional contacts are listed at the end of this release

For immediate release, August 4, 2015

HISTORIC 70TH ANNIVERSARY OF ATOMIC BOMBING OF HIROSHIMA, NAGASAKI:

Major Protests at U.S. Warhead Facilities Across the Nation Unite to Decry Trillion Dollar Plan for New U.S. Nuclear Weapons; Advocate Disarmament

A thousand or more peace advocates, Hibakusha (A-bomb survivors), religious leaders, scientists, economists, attorneys, doctors and nurses, nuclear analysts, former war planners and others across the country are coming together to commemorate the 70th Anniversary of the U.S. atomic bombings of Hiroshima and Nagasaki this August 6 through 9 at key sites in the U.S. nuclear weapons complex.

Major commemorations, rallies, protests and/or nonviolent direct actions will place at the Lawrence Livermore National Laboratory in CA, the Los Alamos National Laboratory in NM, the Kansas City Plant in MO, the Y-12 Plant in TN, the Rocky Flats Plant in CO, the Pantex Plant in TX, and in GA near the Savannah River Site. These events are united by their reflection on the past, and, uniquely, their focus on the present and future with a resolute determination to change U.S. nuclear weapons policy at the very locations that are linchpins in producing the new trillion dollar stockpile of nuclear weapons and their delivery vehicles.

“We stand on the brink of a new, global nuclear arms race,” noted Ralph Hutchison, the longstanding coordinator for the Oak Ridge Environmental Peace Alliance. “This is epitomized by government plans for a new Uranium Processing Facility to produce H-bomb components at Y-12, including for new-design weapons.”

“U.S. plans to ‘modernize’ the arsenal are also underway at Livermore Lab,” stated Marylia Kelley, Tri-Valley CAREs’ executive director. “A new Long-Range Stand Off warhead design and the start of plutonium shots in the Lab’s National Ignition Facility reveal two facets of this new arms race,” Kelley continued. “In contrast to the cold war, which was largely about sheer numbers, the new arms race and its dangers stem from novel military capabilities now being placed into nuclear weapons.”

Around the world, pressure for the U.S. to show leadership toward the abolition of nuclear weapons is growing. Pope Francis has repeatedly pressed the moral argument against nuclear weapons, inveighing not only against their use but also against their possession. In the wake of the successful Iran agreement, many are suggesting that since it has been settled that it would never be legitimate for Iran to obtain a nuclear weapon, shouldn’t we also agree that the 16,000 nuclear weapons in existence have no legitimacy either. Moreover, 113 governments recently signed the “Humanitarian Pledge,” circulated by Austria, to press the U.S. and other nuclear weapons states to fulfill their disarmament obligations.
Actions this week at U.S. nuclear weapons facilities will highlight the mounting international calls for nuclear abolition, with U.S. organizers lending their deep and often unique “on the ground” knowledge from the gates and fence lines of the facilities involved in creating new and modified U.S. nuclear weapons. “This 70th anniversary should be a time to reflect on the absolute horror of a nuclear detonation,” mused Ann Suellentrop of Physicians for Social Responsibility-Kansas City, “yet the new Kansas City Plant is churning out components to extend U.S. nuclear weapons 70 years into the future. The imperative to change that future is what motivates me to organize a peace fast at the gates of the Plant.”

Key events at U.S. nuclear weapons complex sites include:
• Y-12
– pastoral letter, remembrance, rally and nonviolent direct action, peace fast and lanterns. (More at http://orepa.org/action/hiroshimanagasaki-70/ <http://orepa.org/action/hiroshimanagasaki-70/> )
• Livermore Lab – peace camp, August 6 rally and nonviolent direct action, peace fast at the gates. (More info at www.trivalleycares.org <http://www.trivalleycares.org> )
• Los Alamos Lab – film screening, panels, rally and conference (More at www.nuclearwatch.org <http://www.nuclearwatch.org> )
• Kansas City Plant – atomic photographers exhibit, speakers, film screening, and peace fast at the gates. (More info at www.psr.org/chapters/kansas/ <http://www.psr.org/chapters/kansas/> )
• Savannah River Site – film screening, vigil, and circle of hope. (More: www.nonukesyall.org <http://www.nonukesyall.org> )
• Rocky Flats Plant – peace quilt, concert, film screening, labyrinth mourning walk. (More from [email protected] <mailto:[email protected]> )
• Pantex Plant – Hiroshima exhibit, panel discussion. (More at: www.peacefarm.us <http://www.peacefarm.us> )

These and other Hiroshima events and actions at sites in the U.S. nuclear weapons complex are being led by organizations that are members of the Alliance for Nuclear Accountability, which represents about three dozen groups. More about ANA can be found at www.ananuclear.org <http://www.ananuclear.org> .

ANA contacts available for interviews include:
Joni Arends
, Concerned Citizens for Nuclear Safety, [email protected] <mailto:[email protected]> ,  505 986-1973 (NM sites)
Jay Coghlan, Nuclear Watch New Mexico, [email protected] <mailto:[email protected]> , 505-989-7342 (NM sites)
Ann Suellentrop, Physicians for Social Responsibility-KC, [email protected] <mailto:[email protected]> , 913-271-7925 (MO site)
Kevin Kamps, Beyond Nuclear, [email protected] <mailto:[email protected]> , 240-462-3216 (Ohio sites)
Jerry Stein, Peace Farm, [email protected] <mailto:[email protected]> , 806-351-2744 (TX site)
Judith Mohling, Rocky Mountain Peace & Justice Center, [email protected] <mailto:[email protected]> , 303-447-9635 (CO sites)
Glenn Carroll, Nuclear Watch South, [email protected] <mailto:[email protected]> , 404-378-4263 (SC, GA sites)
Paul Kawika Martin, Peace Action, [email protected] <mailto:[email protected]> , 951-217-7285 (in Hiroshima)
Ralph Hutchison, Oak Ridge Environmental Peace Alliance, [email protected] <mailto:[email protected]> , 865-776-5050 (TN sites)
Marylia Kelley, Tri-Valley CAREs. [email protected] <mailto:[email protected]> , 925-443-7148 (CA sites)
Jackie Cabasso, Western States Legal Foundation, United for Peace & Justice, [email protected] <mailto:[email protected]> , 510-839-5877 (CA sites, calendar of national events)

Additional resources for media:
Physicians for Social Responsibility calendar and map of Hiroshima and Nagasaki actions at: www.psr.org/news-events/events/hiroshimadayevents-2015.html <http://www.psr.org/news-events/events/hiroshimadayevents-2015.html>
United for Peace and Justice, Nuclear Free Future Month calendar of events at: www.nuclearfreefuture.org <http://www.nuclearfreefuture.org>

###

 

WATCHDOG GROUPS HEAD TO D.C.TO URGE CONGRESS TO CONFRONT “THE GROWING U.S. NUCLEAR THREAT”

Alliance for Nuclear Accountability

A national network of organizations working to address issues of nuclear weapons production and waste cleanup

Nuclear Watch New Mexico

 

May 14, 2015

 

WATCHDOG GROUPS HEAD TO D.C. TO URGE CONGRESS, OBAMA ADMIN.

TO CONFRONT “THE GROWING U.S. NUCLEAR THREAT;”

NEW REPORT SEEKS CUTS IN BOMB PLANTS, WARHEAD MODERNIZATION

DIVERTING SAVINGS TO CLEANUP AND WEAPONS DISMANTLEMENT

            Dozens of community leaders from around the country will travel to Washington, DC next week to oppose U.S. Department of Energy (DOE) nuclear weapons projects, which they say will waste billions in taxpayer funds, damage the environment and undermine the nation’s non-proliferation goals. The group will meet with leading members of Congress, committee staffers, and top administration officials with responsibility for U. S. nuclear policies to press for new funding priorities.

Activists from nearly a dozen states are participating in the 27th annual Alliance for Nuclear Accountability (ANA) “DC Days.” They will deliver copies of ANA’s just-published report, The Growing U.S. Nuclear Threat (http://bit.ly/growing_nuclear_threat). The new 20-page analysis dissects the Obama Administration’s latest plans to spend hundreds of billions more on nuclear weapons programs without, the authors conclude, enhancing U.S. security.

Joining the Alliance will be four members of Nuclear Watch New Mexico: Dr. James Doyle, a nonproliferation expert fired by the Los Alamos Lab after writing a study arguing for nuclear weapons abolition; Chuck Montano, former LANL auditor and author of his just-released book Los Alamos: A Whistleblower’s Diary (http://losalamosdiary.com/index.html); Jay Coghlan, Executive Director; and Scott Kovac, Operations Director. “We will use this opportunity to represent New Mexicans who oppose the open checkbook policy for nuclear weapons by Congress to the National Labs,” Kovac stated.

Both Doyle and Coghlan have recently returned from the NonProliferation Treaty (NPT) Review Conference at the United Nations in New York City where they witnessed U.S. officials claiming that one trillion dollar plans for nuclear weapons modernization “contribute to and do not detract from progress on our NPT nuclear disarmament obligations.” But as Ralph Hutchison of the Oak Ridge Environmental Peace Alliance, the report’s editor, noted, “Massive spending on nuclear weapons ‘modernization’ increases the nuclear danger for the U.S. Lack of accountability at DOE wastes billions and puts the public at even greater risk. ANA members from across the country will urge policy-makers to cut programs that fund dangerous boondoggles. The money saved should be redirected to cleaning up the legacy of nuclear weapons research, testing and production.” Participants in DC Days include activists from groups that monitor such U.S. nuclear weapons facilities as Hanford, Lawrence Livermore, Rocky Flats, Los Alamos, Kansas City Plant, Pantex, Sandia, Oak Ridge, Savannah River and the Waste Isolation Pilot Plant.

The Alliance for Nuclear Accountability is a network of local, regional and national organizations representing the concerns of communities downwind and downstream from U.S. nuclear weapons production and radioactive waste disposal sites. As part of its DC Days, ANA will sponsor an Awards Reception honoring leaders of the movement for responsible nuclear policies on Monday evening, May 18. Honorees include U.S. Senator Harry Reid, U.S. Representative John Garamendi, Los Alamos whistleblower Dr. James Doyle, former FBI investigator of Rocky Flats Jon Lipsky, and nuclear campaigner Michael Keegan: The event will take place in Room B-340 of the Rayburn House Office Building from 5:30pm to 7:30pm.

After learning of his award, Dr. James Doyle replied, “It is an honor to be recognized by citizen organizations across the country who have been opposing nuclear weapons at the grassroots for decades.  The Alliance for Nuclear Accountability is an important part of the fabric of our civil society and helps create an informed citizenry essential to our freedom and security.  My case shows that even in America you must be careful when you question nuclear weapons.  These groups have been trying to change that since before I knew what nuclear war would mean for humanity.  I am proud to be working with them to eliminate nuclear weapons.”

– – 3 0 – –

Four Reasons Why U.S. Claims of NPT Compliance Are False

 Four Reasons Why U.S. Claims of NPT Compliance Are False

 In April 2015 the U.S. State Department issued a so-called Fact Sheet entitled Myths and Facts Regarding the Nuclear Non-Proliferation Treaty and Regime. Its targeted audience was international delegations attending the 2015 NonProliferation Treaty (NPT) Review Conference. Given the increasing dissatisfaction of non-nuclear weapons states, the State Department argued that numerical stockpile reductions since the end of the Cold War is ample evidence that the U.S. is complying with the NPT’s Article VI obligation for nuclear disarmament. It also claimed:

 The United States is committed not to pursue new nuclear warheads, and life extension programs will not provide for new military capabilities… infrastructure modernization, stockpile stewardship, and life extension programs for U.S. warheads will contribute to and do not detract from progress on our NPT nuclear disarmament obligations. [1]

 There are four immediate reasons why these claims by the United States Government are false:

1)   While it’s true that the number of weapons is being reduced (albeit more slowly now), the U.S.’ nuclear stockpile is being indefinitely preserved and qualitatively improved through new military capabilities. Clearly this is not the nuclear disarmament required by NPT Article VI.

2)   The United States Government is preparing to spend more than one trillion dollars over the next thirty years for nuclear weapons modernization and new ballistic and cruise missiles, submarines and bombers.[2] [3] This too is obviously not nuclear disarmament.

3)   The new Kansas City Plant has begun operations to produce or procure up to 100,000 nonnuclear components every year for nuclear weapons life extension programs.[4] Multi-billion dollar upgrades and new facilities are planned for expanded production of plutonium pit cores at the Los Alamos Lab and for thermonuclear components (“secondaries”) at the Y-12 Plant near Oak Ridge, Tennessee.[5] These upgrades and new facilities are being designed to produce up to 80 plutonium pits and secondaries per year. Once completed, these three new complexes comprehensively rebuild the production side of the U.S. nuclear weapons complex. Moreover, they are expected to be operational until ~2075.  That is not nuclear disarmament.

4)   The United States Government has a high-level annual plan to indefinitely preserve its nuclear weapons stockpile [6] and a new high-level plan to prevent other countries from acquiring or proliferating nuclear weapons.[7] But the United States Government has no high-level policy plan to implement its NPT Article VI nuclear disarmament obligation.

Concerning indefinite preservation of the nuclear stockpile, the U.S. National Nuclear Security Administration has scheduled programs out to 2040 and beyond that extend the service lives of nuclear weapons by at least 30 years. Moreover, the current B61-12 life extension program will be followed by another program in 2038 to produce the B61-13 nuclear bomb, indicating a perpetual cycle of life extension programs.[8] It also suggests that some form of the B61 nuclear bomb is planned to be forward deployed in Europe until around the year 2070.

Concerning new military capabilities, the B61-12 blurs the line between strategic and tactical nuclear weapons. The B61 life extension program is creating the world’s first nuclear smart bomb through the installation of a new guided tail fin kit that will dramatically increase its accuracy. It is also slated for delivery by the new super stealthy F-35. Yet the United States continues to assert that it would never give existing nuclear weapons new military capabilities.[9]

This is part of a long pattern. Then-U.S. Secretary of State Hillary Clinton told the international delegations at the 2010 NPT Review Conference that “[o]ur Nuclear Posture Review ruled out the development of new U.S. nuclear weapons and new missions and capabilities for our existing weapons.” [10] But at the same time the U.S. was ramping up a life extension program for the 100 kiloton W76 warhead that gave it the capability of assuming the hard target kill mission of the 475 kiloton W88 warhead.[11]  Going further back, in the late 1990’s the 9 megaton surface-burst B53 bomb was replaced by the 400 kiloton B61-11 earth-penetrating modification to destroy hardened deeply buried targets. The point is that the general direction of post-Cold War planning for nuclear warfighting has been toward more accurate weapons with lower yields and reduced fallout, all of which make them arguably more usable.

Nevertheless, the United States maintains that these are not new military capabilities. It apparently avoids talking about the characteristics of individual nuclear weapons types and adopts the position that there are no new military capabilities because of the incalculable amount of extremely destructive military capabilities already in the stockpile as a whole. Thus, by this logic, if a lower yield, more precise nuclear weapon assumes the mission of a higher yield weapon, then that is not a new military capability. If so, then the United States Government’s assertion that it will never give existing nuclear weapons new military capabilities is essentially meaningless, giving it carte blanche to do whatever it wants with its existing stockpile.

The international community should demand that the United States Government fully explain and justify its claim that it would never give existing nuclear weapons new military capabilities, when the evidence points to the contrary. Perhaps that would be a step toward getting serious about global, verifiable nuclear disarmament.


[1]     https://web.archive.org/web/20171105070826/https://www.state.gov/t/isn/rls/fs/2015/240650.htm

[2]     Projected Costs of U.S. Nuclear Forces, 2015 to 2024, Congressional Budget Office, January 22, 2015,

CBO estimates the Administration’s plans for nuclear forces would cost $348 billion over the next decade… For each leg of the triad, most of the cost to procure new systems would occur after 2023.” https://www.cbo.gov/publication/4987

[3]     The Trillion Dollar Triad, James Martin Center, Jan. 7, 2014, http://cns.miis.edu/trillion_dollar_nuclear_triad/

[4]     http://www.nnsa.energy.gov/aboutus/ourlocations/kansas-city-plant

[5]     See the National Nuclear Security Administration’s FY 2016 Stockpile Stewardship and Management Plan, March 2015, Section 2.4.6.3 “Uranium Sustainment” and Section 4.3.3.1 “Strategy for Key Commodities,” https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[6]     FY 2016 Stockpile Stewardship and Management Plan, National Nuclear Security Administration, March 2015, https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[7]     Prevent, Counter, and Respond – A Strategic Plan to Reduce Global Nuclear Threats, National Nuclear Security Administration, March 2015, https://www.scribd.com/doc/259397464/Prevent-Counter-and-Respond-A-Strategic-Plan-to-Reduce-Global-Nuclear-Threats-FY-2016-2020

[8]        FY 2016 Stockpile Stewardship and Management Plan, National Nuclear Security Administration, March 2015, chapter 2, page 19 and chapter 8, page 18, https://web.archive.org/web/20171229181847/https://nnsa.energy.gov/sites/default/files/FY16SSMP_FINAL%203_16_2015_reducedsize.pdf

[9]       For more, see General Confirms Enhanced Targeting Capabilities of B61-12 Nuclear Bomb, Hans Kristensen, January 23, 2014, http://fas.org/blogs/security/2014/01/b61capability/

[10]    Hillary Clinton’s Remarks before the 2010 NPT Review Conference, May 3, 2010, https://web.archive.org/web/20120930181944/http://www.cfr.org/united-states/hillary-clintons-remarks-before-2010-npt-review-conference/p22042

[11]    For more, see Administration Increases Submarine Nuclear Warhead Production Plan, Hans Kristensen, August 30, 2007, http://fas.org/blogs/security/2007/08/us_tripples_submarine_warhead/

Appeals court overturns sabotage convictions of Transform Now Plowshares activists

Appeals court overturns sabotage convictions of Transform Now Plowshares activists, vacates sentences of Megan Rice, Michael Walli and Gregory Boertje-Obed on all charges and remands for resentencing.

Court suggests decision may lead to release of Rice, Boertje-Obed and Walli

8 May 2015
for immediate release

The Sixth Circuit Court of Appeals handed down a decision in favor of the Megan Rice, Michael Walli and Greg Boertje-Obed who were convicted in 2013 of sabotage for their July 28, 2012 Transform Now Plowshares protest of nuclear weapons production at the Y12 Nuclear Weapons Complex in Oak Ridge, Tennessee.

“The purpose of the action of Michael, Megan and Greg was to call attention to the ongoing production of thermonuclear weapons components at the bomb plant in Oak Ridge and, more specifically, to oppose plans to build a new, multi-billion dollar bomb plant—the Uranium Processing Facility—at Y12,” said Ralph Hutchison, coordinator of the Oak Ridge Environmental Peace Alliance. “They were nonviolent protestors in the tradition of Gandhi, not saboteurs. We are pleased the Sixth Circuit appreciated the difference.”

The court ruled 2-1 in a decision handed down on May 8, 2015, that the government failed to prove the Transform Now Plowshares activists intended to “injure the national defense,” a requirement for conviction under the sabotage act.  Disposing of the government’ arguments one by one, the court finally states simply: “The defendants’ convictions under §2155(a) must be reversed.”

The circuit court had the option of merely reversing the sabotage conviction but letting the defendants’ sentences stand on the other charge for which they were convicted—depredation of government property. Noting the lesser charge would have resulted in lesser sentences—the men received 62 month sentences and Megan Rice a sentence of 35 months—under federal sentencing guidelines (“it appears that the guidelines ranges for their § 1361 convictions on remand will be substantially less than their time already served in federal custody.“), the court chose to vacate all sentences and remand the their cases for resentencing on the remaining depredation count.
Michael Walli is currently serving his sentence at McKean federal prison in Bradford, PA; Greg Boertje-Obed is in Leavenworth, KS; Megan Rice is in federal prison in Brooklyn, NY. Her release date is currently in mid-November, 2015.
At this time, it is not clear when resentencing will take place.

for more information
Ralph Hutchison  865 776 5050
Paul Magno 202 321 6650

Watchdog Groups Praise NNSA Decision to Obey the Law

Oak Ridge Environmental Peace Alliance

Nuclear Watch New Mexico

For immediate release.  March 4, 2015

Watchdog Groups Praise NNSA Decision to Obey the Law,

Prepare Supplement Analysis on Bomb Plant

Contacts:       Ralph Hutchison, Coordinator OREPA,  orep(at)earthlink.net;
Jay Coghlan, Executive Director NWNM, jay(at)nukewatch.org

The National Nuclear Security Administration’s disclosure that the agency “in the process” of preparing a Supplement Analysis for the much-changed Uranium Processing Facility (UPF) at the Y-12 nuclear weapons production plant brought praise from the Oak Ridge Environmental Peace Alliance (OREPA) and Nuclear Watch New Mexico. Just two days ago the two grassroots watchdog groups filed an expedited Freedom of Information Act request asking for the Supplement Analysis. At the same time the two groups noted that NNSA could be legally vulnerable without one. The issue is that the NNSA has proposed major changes to the UPF. The two groups contend that a Supplement Analysis is needed to determine whether or not past public review required under the National Environmental Policy Act needs to supplemented because of those changes.

The UPF is a highly troubled project whose costs have exploded from an original estimate of $600 million to more than $19 billion by one Pentagon study. More recently, in order to keep costs down, the UPF’s future mission has been stripped of dismantlement operations that would work off a backlog of unneeded nuclear weapons parts that need to be kept secure. Instead, the UPF will be a production-only facility for up to 80 “secondaries” per year, the components that give nuclear weapons immense thermonuclear capabilities. The UPF’s original “big box” design has been abandoned, replaced by a number of smaller modular facilities, plus use of existing nuclear facilities that were previously deemed too unsafe for continuing operations.

“It’s always a good thing when the government decides to obey its own laws and regulations,” said Ralph Hutchison, coordinator of OREPA. “We had been told previously that a decision had already been made to proceed with the Uranium Processing Facility without preparing a Supplemental Environmental Impact Statement. We were surprised, because the law requires NNSA to complete and publish a Supplement Analysis in order to make that bigger decision.”

Jay Coghlan, Executive Director of Nuclear Watch New Mexico commented, “The UPF bomb plant has already been delayed several times by bad management decisions and incompetent design work, which dearly costs the American taxpayer every time. Instead of playing games about whether NNSA is or isn’t going to comply with the law, the agency should do what it did here in Los Alamos—prepare a Supplemental Environmental Impact Statement after making major changes to a proposed nuclear weapons facility.”

“The cart and horse problem continues to bedevil this project,” Hutchison noted. “It cost us half a billion dollars in the space/fit fiasco, where not all planned uranium processing equipment could fit into the designed building, and for which no one has been held accountable. Now we have federal officials saying they are not going to do the environmental analysis until they have spent more hundreds of millions of dollars on the second go around for “conceptual” project design—even though new seismic hazard maps may show it is unsafe to build the plant where they want to. It’s a great plan if your goal is to hand out taxpayer dollars to giant defense contractors. But if you are trying to complete a project in a sensible and timely way, it’s completely backwards.”

NNSA did not indicate when the Supplement Analysis would be complete. The Oak Ridge Peace and Environmental Alliance and Nuclear Watch New Mexico will be closely monitoring the UPF process as it unfolds.

# # #

NNSA’s admission that it is preparing a Supplement Analysis is reported at

http://knoxblogs.com/atomiccity/2015/03/04/nnsa-says-it-is-preparing-supplement-analysis/

GROUPS JOIN TO DEMAND ANSWERS ABOUT BOMB PLANT PLANS

Oak Ridge Environmental Peace Alliance

Nuclear Watch New Mexico

GROUPS JOIN TO DEMAND ANSWERS ABOUT BOMB PLANT PLANS

For immediate release: March 2, 2015

The Oak Ridge Environmental Peace Alliance (Oak Ridge, TN) and Nuclear Watch New Mexico (Santa Fe, NM) today filed a Freedom of Information Act request asking the Department of Energy (DOE) to come clean about its plans for a new, multi-billion dollar nuclear bomb plant proposed for the Y-12 Nuclear Weapons Complex in Oak Ridge, Tennessee.

The Uranium Processing Facility (UPF) is a highly troubled project that has exploded in estimated costs from an original $600 million to as high as $19 billion. Since then, in order to attempt to cap project spending at $6.5 billion, DOE has reduced the scope of the UPF by eliminating dismantlement operations and assuming a mission of production-only for nuclear weapons. After a half-billion dollar design mistake for which no one has been held accountable, DOE has abandoned its previous “big box” concept for the UPF in favor of a modular approach that includes the continuing use of unsafe, aging facilities previously slated for demolition. Despite these major changes, DOE has indicated it does not plan to update the legally required environmental review process it completed in 2011, but which must now address potential impacts of the new plan.

The groups’ FOIA request asks the government to release its Supplement Analysis—a study required by law when a federal agency makes a substantial change to its formally recorded Record of Decision. A Supplement Analysis is used to determine whether the agency needs to prepare a new Environmental Impact Statement, a Supplemental Environmental Impact Statement, or no new environmental analysis. The law requires DOE to make the Supplement Analysis publicly available, and the document would likely provide much valuable and up-to-date information on the UPF project. Alternatively, DOE may be legally vulnerable if no Supplement Analysis has been prepared.

Ralph Hutchison, coordinator of the Oak Ridge Environmental Peace Alliance, stressed that his organization is determined to hold the DOE publicly accountable over its plans for Oak Ridge and Y-12. “We live here. We are the ones placed at risk when people in Washington make decisions to keep building nuclear bombs in buildings that do not meet safety codes or even weakened seismic standards. At the very least, we deserve an explanation. We’ve previously asked DOE politely and got no answer. So now we are resorting to a FOIA request and subsequent steps as needed.”

Jay Coghlan, Executive Director of Nuclear Watch New Mexico, noted, “We had a similar situation at the Los Alamos National Laboratory, when the government changed plans for a new multi-billion dollar plutonium facility. In our case, DOE responded to citizen pressure and prepared a Supplemental Environmental Impact Statement. We believe the same is legally required for the Uranium Processing Facility.”

The Freedom of Information Act requires federal agencies to respond to FOIA requests within twenty working days. OREPA and Nuclear Watch NM have requested expedited processing of their request as provided for by the Freedom of Information Act.

Ralph Hutchison added, “We think informing Congress and the public of the status of the UPF’s compliance with the National Environmental Policy Act is urgently needed because of the project’s substantial changes and the thirty percent increase in funding. Determination of UPF’s NEPA status and updated public review could help prevent further waste of taxpayers’ money after more than a half-billion dollars has already been squandered.”

# # #

OREPA’s and Nuclear Watch NM’s FOIA request is available at:

http://orepa.org/wp-content/uploads/2015/03/OREPA-NWNM-FOIA.pdf

Questions for the DOE FY 2016 Nuclear Weapons and Cleanup Budget Request

The Administration releases its  Congressional Budget Request this Monday, February 2, 2015.

Questions for the U.S. Department of Energy FY 2016 Nuclear Weapons and Cleanup Budget Request

From

Alliance for Nuclear Accountability

A national network of organizations working to address issues of nuclear weapons production and waste cleanup

The US nuclear weapons budget continues to spiral out of control. Look for double-digit increases in Department of Energy (DOE) weapons activities. Core nonproliferation programs will be cut because of funding for mixed-oxide fuel. Cleanup of radioactive and toxic pollution from weapons research, testing, production and waste disposal will fall further behind. The DOE budget for FY 2016 will illuminate the Obama Administration’s misplaced nuclear priorities.

The Alliance for Nuclear Accountability (ANA), a 28-year-old network of groups from communities downwind and downstream of U.S. nuclear sites, will be looking at the following issues. For details, contact the ANA leaders listed at the end of this Advisory.

— Does the budget request boost funding for “modernization” programs that indefinitely maintain nuclear warheads? Such funding is contrary to the Obama Administration’s previously declared goal of a future world free of nuclear weapons.

— Does the budget reflect the Administration’s commitment to reduce funding (currently $335 million) on the multi-billion dollar Uranium Processing Facility at Oak Ridge by downsizing it to the capacity needed to support stockpile surveillance, maintenance and limited life extension?

— Does the budget increase funds for nuclear weapons dismantlement capacity? Will cooperative programs with Russia be maintained?

— Is there increased funding for expanded production of plutonium bomb cores? Why is expanded production needed when expert studies find that existing plutonium pits are durable?

— Is more than $300 million provided for the National Ignition Facility (NIF) at Livermore Lab that has repeatedly failed to achieve “ignition”? What is the funding level for uncontained plutonium shots although they will taint the NIF target chamber and optics with alpha radiation?

— Does the budget seek an increase for the B61 Life Extension Program (currently $643 million)?

— As DOE affirms that the $30-billion plutonium fuel (MOX) project at the Savannah River Site is financially unsustainable, is the MOX plant construction again proposed for “cold standby” (~$200 million) or a level to barely allow it to survive (~300+ million)? Does the budget include the current validated base-line cost of MOX plant, a validated construction and operation schedule and names of nuclear utilities willing to use experimental MOX fuel?

— Does the budget include $0 for Yucca Mountain? No funding is consistent with past requests that terminate this technically flawed site that is strongly opposed by Nevada state officials and the public.

— Does the budget provide additional Environmental Management (EM) funding (currently $5 billion) to meet all legally mandated cleanup milestones? States say cleanup agreements at a dozen major sites are underfunded by hundreds of million dollars.

– How will DOE and its contractors pay fines for missing milestones? In the past three months, the states of New Mexico, Idaho, and Washington have issued fines of tens of millions of dollars, and fines loom in South Carolina. In which other states does DOE face fines and lawsuits for missing milestones?

— What is the high range for total life-cycle cleanup costs (LCC) for EM sites? Because of funding shortfalls, High Range LCC costs have increased from $308.5 billion in the FY 2013 Budget Request, to $330.9 billion in the FY 2014 Request, and were $328.4 billion in the FY 2015 Request.

— How much does the budget include for the shut down of the Waste Isolation Pilot Plant (WIPP)? How much is for recovery and how much for waste emplacement (previously $220 million a year) even though no waste is being emplaced? How much additional funding is requested for the Idaho National Lab, Los Alamos, Savannah River, and Oak Ridge because of the shutdown?

— Does the budget for Hanford (more than $2 billion) protect workers from toxic chemical exposures, provide an Operational Readiness Review of the nuclear safety of the Waste Treatment Plant, and fund construction of new double-shell tanks to replace the leaking ones?

— Does the budget increase funding (currently $28.5 million) for the Defense Nuclear Facilities Safety Board (DNFSB) to provide independent oversight of DOE projects because of the many cost overruns, schedule delays, safety culture issues and technical problems?

— Is the funding for design and licensing of Small Modular Reactors (SMRs) enough to make them viable? As private financing is lacking, will DOE reaffirm that it will not finance SMR construction?

 