How US Nuclear Force Modernization is Undermining Strategic Stability

A must read:

Nuclear Weapons defects graph from 1993 Sandia Stockpile Life Study

How US Nuclear Force Modernization is Undermining Strategic Stability:
The Burst-Height Compensating Super-Fuze

By Hans M. Kristensen, Matthew McKinzie, Theodore A. Postol

https://web.archive.org/web/20180623204508/https://thebulletin.org/how-us-nuclear-force-modernization-undermining-strategic-stability-burst-height-compensating-super10578

Excerpt:

“The US nuclear forces modernization program has been portrayed to the public as an effort to ensure the reliability and safety of warheads in the US nuclear arsenal, rather than to enhance their military capabilities. In reality, however, that program has implemented revolutionary new technologies that will vastly increase the targeting capability of the US ballistic missile arsenal. This increase in capability is astonishing- boosting the overall killing power of existing US ballistic missile forces by a factor of roughly three- and it creates exactly what one would expect to see, if a nuclear-armed state were planning to have the capacity to fight and win a nuclear war by disarming enemies with a surprise first strike.”

This is a super outstanding analysis by Mssrs. Kristensen, McKinzie and Postol.  I’m no doubt naïve, but I’m hoping it will have some real political and geopolitical impact.

And how in keeping with the 2013 Defense Dept. guidance, which Kristensen was the first to point out to me. It helps to demonstrate that the American public doesn’t really have nuclear “deterrence” as claimed for a half-century. Instead, the U.S. has always had a nuclear war-fighting strategy, as first demonstrated in Hiroshima and Nagasaki.

To quote:

The new guidance requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a “counter-value’ or “minimum deterrence” strategy.

Report on Nuclear Implementation Strategy of the United States Specified in Section 491 of 10. U.S.C., Department of Defense, June 2013, page 4 (quotation marks in the original) http://www.globalsecurity.org/wmd/library/policy/dod/us-nuclear-employment-strategy.pdf

As Kristensen, McKinzie and Postol point out, the geopolitical risks in radical improvements to U.S. nuclear warfighting capabilities are enormous. A secondary concern I’d like to point out is the risk to nuclear weapons reliability posed by intentionally introducing major changes to an extensively tested stockpile.

The Pantex Plant (final assembly site for US nuclear weapons) has a newsletter called The Pantexan (duh!). I recall circa 2009 that it had an article concerning the fact that the MC 4700 “super fuze” that was being installed in the then-ramping up W76 Life Extension Program had initial design and production problems. As the article boasted, those defects were detected and swiftly corrected.

However, the principle remains that introducing intentional changes can undermine confidence in stockpile reliability. The grand irony is that the Stockpile Stewardship Program has been lavishly funded because of the official rationale of preserving stockpile reliability, but I believe it has been a Trojan horse all along for using Life Extension Programs to create new military capabilities (and which the excellent analysis above reinforces).

[I have tried a few times to again find that Pantexan article, unfortunately without success.]

Below is a graph (pending) from the 1993 Sandia Stockpile Life Study which shows that the supermajority of nuclear weapons defects occur within the first 5 years from the First Production Unit. Marylia Kelley (Executive Director of TriValley CAREs that watchdogs Livermore Lab ) and I met with Vic Reis, commonly regarded as the “father” of the Stockpile Stewardship Program, in 2004 or 2005. He explicitly said to us that the whole purpose of the Stockpile Stewardship Program was for the “other side of the bathtub curve”, i.e. when defects were going to multiply because of aging.

Guess what? That hasn’t happened, given long-established stockpile surveillance, rigorous maintenance and well-understood replacement of “limited life components” (e.g., batteries, neutron generators, tritium).

Indeed, the 1993 Sandia Stockpile Life Study itself said

We undertook this study to understand how long nuclear weapons last. We quickly learned that this is the wrong question. It is clear that, although nuclear weapons age, they do not wear out; they last as long as the nuclear weapons community (DOE and DOD) desire. In fact, we can find no example of a nuclear weapon retirement where age was ever a major factor in the retirement decision.

The more significant question is “what does it take to sustain a weapon while it is in the stockpile?”… Failures, defects, and aging problems have been rare…

[Available at https://nukewatch.org/facts/nwd/Sandia_93_StockpileLife.pdf]

So again, I think the Stockpile Stewardship Program has been a ruse to indefinitely preserve U.S. nuclear weapons while giving them new military capabilities. And now we have the trillion dollar-plus “modernization” to vastly expand U.S. nuclear warfighting capabilities.

Nuclear Weapons defects graph from 1993 Sandia Stockpile Life Study

Russia Violates Important Arms Control Treaty, While US Presses Ahead With Destabilizing Strategic Advantages

There is this important article today:

US General Says Russia Has Deployed Banned Missile

WASHINGTON — A senior U.S. general on Wednesday accused Russia of deploying a land-based cruise missile in violation of “the spirit and intent” of a nuclear arms treaty and charged that Moscow’s intention is to threaten U.S. facilities in Europe and the NATO alliance.

“We believe that the Russians have deliberately deployed it in order to pose a threat to NATO and to facilities within the NATO area of responsibility,” Gen. Paul Selva, vice chairman of the Joint Chiefs of Staff, told a House Armed Services Committee hearing….

continued at <http://www.defensenews.com/articles/us-general-says-russia-has-deployed-banned-missile>

 

Nuclear Watch New Mexico definitely takes treaty violations seriously. But left unsaid is the fact that the US is acquiring 1,000 new nuclear-armed cruise missiles permitted under New START, which because of that, despite what Trump says, is a better deal for the US than Russia.

Then there is the pending forward deployment in Europe of new B61-12s with new military capabilities (the world’s first “smart” nuclear bomb), plus the ongoing increase in hard target kill capability “boosting the overall killing power of existing US ballistic missile forces by a factor of roughly three…”, as so well recently explained by Kristensen, McKinzie and Postal. See https://web.archive.org/web/20180623204508/https://thebulletin.org/how-us-nuclear-force-modernization-undermining-strategic-stability-burst-height-compensating-super10578

Then there is American chest thumping about new threats to NATO, but left unsaid is NATO expansionism to the borders of Russia; and American abrogation of the ABM Treaty, leading to ballistic missile defenses in Europe that could destabilize “deterrence.”

Yes, treaties are essential, but as usual hard nosed military capabilities unfortunately rule the day.  It’s a wonder that Russia’s nuclear posture isn’t actually more aggressive than it is in the face of new American threats.

Of course the nuclear weapons states are pretty hopeless, as the United States and Russia spiral into a new nuclear arms race. Something new is needed.

We are curious as to where the pending nuclear weapons ban treaty negotiations might go and what impact they might have. More to come, as NukeWatch director Jay Coghlan observes the first week of negotiations March 27-31 at the United Nations in New York City.

As Trump Seeks to Expand U.S. Nuclear Weapons Capabilities New Sandia Labs Director Argued for Expanded Use of Nuclear Weapons

On December 22, 2016 president-elect Donald Trump upended four decades of U.S. policy to reduce nuclear weapons by tweeting “the United States must greatly strengthen and expand its nuclear capability until such time as the world comes to its senses regarding nukes.” The next morning he doubled down by declaring, “Let it be an arms race. We will outmatch them at every pass and outlast them all.”

That same day Russian President Vladimir Putin claimed that his country’s nuclear weapons are fully capable of penetrating any American missile defense system, and observed “It’s not us who have been speeding up the arms race.” Earlier Trump had suggested that Japan, South Korea and Saudi Arabia should perhaps obtain nuclear weapons, and reportedly asked a foreign policy advisor why the U.S. couldn’t use nuclear weapons if it already had them. Further, Trump refused to rule out using nuclear weapons in Europe or against the Islamic State in Iraq and Syria. Underlying all this is a trillion dollar effort begun under the Obama Administration to upgrade U.S. nuclear forces, including new nuclear weapons production plants, and new missiles, submarines and bombers, all expected to be operational until around the year 2080.

One of the most important players in the trillion dollar nuclear weapons upgrade is the Sandia National Laboratories, with its newly appointed director Stephen Younger. Long before Trump, Younger argued for the expanded use of nuclear weapons, writing in his June 2000 paper Nuclear Weapons in the 21st Century “[i]t is often, but not universally, thought that nuclear weapons would only be used in extremis, when the nation is in the gravest danger…..This may not be true in the future.” (P. 2)

Although generally the least publicly recognized of the three American nuclear weapons labs, Sandia is the largest by both budget and number of personnel (the other two nuclear weapons labs are the Los Alamos and the Lawrence Livermore National Laboratories). Sandia has multiple sites (hence is called “Labs” in the plural), but its main facility is on Kirtland Air Force Base in Albuquerque, NM. Nearby is the Kirtland Underground Munitions Maintenance and Storage Complex, likely the largest storage facility for nuclear weapons in the nation, with up to 2,500 warheads. Kirtland AFB also sites the Air Force’s national Nuclear Weapons Center, which describes itself as the “The Nucleus of America’s Deterrent”, whose stated mission is to “Deliver nuclear capabilities Warfighters use every day to deter and assure.”

Although “deterrence” has been sold to the American taxpayer for decades as the rationale for nuclear weapons, in reality the U.S. (and Russian) arsenal is for nuclear warfighting, as a 2013 top-level Pentagon document explicitly states:

The new guidance requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a “counter-value’ or “minimum deterrence” strategy.

As one source explains

Counterforce doctrine, in nuclear strategy, [is] the targeting of an opponent’s military infrastructure with a nuclear strike. The counterforce doctrine is differentiated from the countervalue doctrine, which targets the enemy’s cities, destroying its civilian population and economic base. The counterforce doctrine asserts that a nuclear war can be limited and that it can be fought and won. https://www.britannica.com/topic/counterforce-doctrine

In turn, counterforce requires thousands of nuclear weapons for nuclear warfighting, instead of the few hundred needed for only deterrence. But as President Ronald Reagan famously put it in his 1984 State of the Union address:

A nuclear war cannot be won and must never be fought. The only value in our two nations possessing nuclear weapons is to make sure they will never be used. But then would it not be better to do away with them entirely?

In 1988 Reagan nearly reached agreement with Soviet Union leader Mikhail Gorbachev to ban nuclear weapons. Unfortunately, relying on false promises made by then-Livermore Lab Director Edward Teller, Reagan insisted on pursuing ballistic missile defenses (or “Star Wars”), which killed any possible deal. Thus, sadly, counterforce and the capability to wage a nuclear war remain the operative national security policy as we face today’s very real risk of entering into a new nuclear arms race with Russia.

Stephen Younger already foreshadowed this in his 2000 paper when he wrote, “The United States employs a counterforce strategy that targets military assets that could inflict damage to our national interests.” (P. 9) He is now in a prime position to implement that counterforce policy as Sandia Labs Director.

Sandia’s main mission is design of the thousands of nonnuclear components (such as fuzes, radars, etc.) that weaponize the nuclear designs of the Los Alamos and Lawrence Livermore National Laboratories into deliverable weapons of mass destruction. However, Sandia’s secondary mission is studying nuclear weapons “effects,” which are not the horrific effects of nuclear weapons on humans and the environment. Instead, this concerns the effects of nuclear weapons on nuclear weapons, to make sure that they are radiation hardened so that they will operate in the severe environments of a nuclear war. This is aimed at mostly the fratricidal effects of our own weapons, since any single target might be hit with multiple warheads. This has every thing to do with nuclear warfighting and first strike capabilities, rather than mere “deterrence.”

Younger’s appointment as director is also indicative of Sandia’s growing focus on nuclear weapons, principally due to Life Extension Programs (LEPs) that not only seek to indefinitely preserve existing nuclear weapons, but to also give them new military capabilities (Sandia is currently the lead lab for the B61-12 LEP, which is transforming a “dumb” bomb into the world’s first nuclear smart bomb). A decade ago Sandia Labs fell below 50% funded by nuclear weapons programs, which was publicly touted by the New Mexican congressional delegation as successful mission diversification leading to possible greater regional economic development. However, that trend is now reversed. In the FY 2017 federal budget request Sandia is 56% funded by nuclear weapons programs. In terms of gross funding for nuclear weapons programs Sandia is tied with the Los Alamos Lab at $1.58 billion for FY 2017, while Lawrence Livermore Lab’s nuclear weapons program is $1.07 billion. Sandia’s total annual budget is around $2.8 billion, the largest of the three nuclear weapons labs.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “Americans can’t allow an unpredictable president and a greedy nuclear weapons complex to fool us into a new nuclear arms race. Reagan said it best that “a nuclear war cannot be won and must never be fought.” We need to make sure that Trump gets that message as well. He says he wants to both rebuild the nation’s infrastructure and expand nuclear weapons capabilities. But it’s one or the other – Trump will find out the hard way that the country can’t afford to have it both ways.”

# # #

Stephen Younger’s June 2000 paper “Nuclear Weapons in the 21st Century” is available at https://nukewatch.org/importantdocs/resources/NuclearWeaponsIn21stCentury.pdf

For more on the Kirtland Air Force Base, the nuclear weapons complex within the nuclear weapons complex, please see https://nukewatch.org/Kirtland.html

The quote on U.S. nuclear weapons counterforce policy is from: Report on Nuclear Implementation Strategy of the United States Specified in Section 491 of 10. U.S.C. Department of Defense, June 2013, page 4 (quotation marks in the original) http://www.globalsecurity.org/wmd/library/policy/dod/us-nuclear-employment-strategy.pdf

DOE Inspector General report on the B61-12 nuclear smart bomb

The Department of Energy Inspector General has issued its audit report National Nuclear Security Administration’s Management of the B61-12 Life Extension Program. The B61-12 will literally cost twice its weight in gold. It is slated for production beginning 2020 and will blur the line between battlefield and strategic nuclear weapons by combining one strategic and three tactical variants. It will also be the world’s first “smart” nuclear bomb with a steerable tailfin kit giving it vastly improved accuracy. Nevertheless the U.S. government denies that the B61-12 will have any new military capabilities.

In its audit report, the DOE IG notes:

We believe without further improvement to its project management tools, it will be difficult for the program to proactively manage the costs, schedule, and risks of the B61-12 LEP to ensure it can deliver the First Production Unit within cost and meet its critical national security schedule.  In addition, there is uncertainty whether the original cost estimate for the B61-12 LEP contains sufficient management reserve to allow the program to respond to the numerous risks identified in the program.  Finally, not having documented assurance that unresolved significant finding investigations are a part of weapons design input significantly reduces management’s ability to ensure that redesigned nuclear weapon components have addressed prior safety and reliability concerns.

Regarding the last sentence “… reduces management’s ability to ensure that redesigned nuclear weapon components have addressed prior safety and reliability concerns”:

There was a problem with the new-design arming, firing and fuzing set for the W76-1, which is being produced now in its current Life Extension Program. It wasn’t a showstopper, but nevertheless a problem where new individual AF&F components had to be screened to determine whether their performance was affected.

The graph below from the 1993 Sandia Stockpile Life Study shows how the supermajority of nuclear weapons defects are discovered within the first few years of production. The point I’m reaching for is that as Life Extension Programs become more aggressive and more new-design components are used, design and production defects will be inevitable. It would be far better to maintain the stockpile through a conservative curatorship approach.

Circa 1995 I met with DOE Asst. Sec. for Defense Programs Victor Reis, the so-called father of the Stockpile Stewardship Program. Reis explicitly told me that the exorbitant Stockpile Stewardship Program was all about “the other side of the bathtub curve,” meaning it’s all about accelerated defects showing up at some time due to aging. Guess what? It hasn’t happened, not with ongoing surveillance and maintenance and exchange of limited life components that have been almost routine for decades. As the 1993 Sandia Stockpile Life Study concluded,

“It is clear that, although nuclear weapons ages, they do not wear out; they last as long as the nuclear weapons community (DOE and DOD) desire. In fact, we can find no example of a nuclear weapon retirement where age was ever a major factor in the retirement decision.”

Since then, the 1993 Sandia Stockpile Life Study’s conclusion has been buttressed by the JASON’s 2006 Pit Life Study and 2009 Life Extension Programs Study. In short, Life Extension Programs are not necessary for maintaining the nuclear stockpile, and may in fact undermine reliability by intentionally introducing major changes to an extensively tested stockpile. Life Extension Programs are, however, essential for creating new military capabilities for existing nuclear weapons, which is pretty clearly demonstrated by the B61-12 about to go into production, and arguably the W76-1 as well.

Nuclear Weapons defects graph from 1993 Sandia Stockpile Life Study

NNSA Set to Approve New Facilities for Expanded Plutonium Pit Production Without Credible Plans and Required Public Review

August 10, 2016

Santa Fe, NM – Yesterday, on the 71st anniversary of the destruction of Nagasaki by a plutonium bomb, the Government Accountability Office (GAO) submitted a report to the Senate Armed Services Committee on the National Nuclear Security Administration’s (NNSA’s) plans to expand plutonium pit production at the Los Alamos National Laboratory. NNSA has scheduled a formal “Critical Decision 2” at the end of this coming September to proceed with preliminary design of the upgraded and new facilities necessary to expand plutonium pit production.

The NNSA is a semi-autonomous nuclear weapons agency within the Department of Energy, which has the singular distinction of being the only federal department on the GAO’s High Risk List for wasting taxpayer’s dollars for 25 consecutive years. LANL is NNSA’s so-called “Plutonium Center of Excellence” and the nation’s only site for pit production, but major operations at PF-4, its main plutonium facility, have been stopped since June 2013 because of nuclear criticality safety concerns. In addition, there is no place for LANL to send its radioactive transuranic wastes from plutonium pit production since one of its waste drums ruptured at the Waste Isolation Pilot Plant in February 2014 and indefinitely closed that multi-billion facility.

Despite all this, funding for NNSA’s nuclear weapons research and production programs is being increased to nearly double the Cold War’s historic average, while nonproliferation, warhead dismantlement and cleanup programs are being cut or held flat. This is in part due to plans to spend at least a trillion dollars over the next 30 years on completely rebuilding U.S. nuclear weapons and producing new missiles, subs and bombers to deliver them. The “modernized” U.S. nuclear force is expected to be operational until at least until 2080, more than a century after the 1970 NonProliferation Treaty’s mandate for global nuclear disarmament.

The GAO’s report found that NNSA’s plans for upgraded and new facilities to expand plutonium pit production to 50-80 pits per year “did not include key performance parameters” and lacked analysis of a full range of alternatives. LANL’s currently approved production level is up to 20 pits per year, sanctioned in a 1996 Stockpile Stewardship and Management Programmatic Environmental Impact Statement that was required under the National Environmental Policy Act (NEPA). Subsequent NEPA efforts by NNSA to formally approve expanded plutonium pit production at LANL failed, and new efforts to expand plutonium pit production without adequate NEPA coverage could be vulnerable to legal challenge. Additionally, there is no public explanation or justification for the need to expand to 50-80 pits per year other than the nuclear weaponeers saying so. In contrast, independent expert studies have shown that pits have reliable lifetimes of at least a century (the average age of pits in the stockpile is now around 31 years), and up to 20,000 plutonium pits are already stored at the Pantex Plant near Amarillo, TX.

In 2012, in the face of exploding costs and rising citizen opposition, NNSA cancelled an earlier proposal to build a Walmart-sized “Chemistry and Metallurgy Research Replacement (CMRR) Project-Nuclear Facility” for expanded plutonium pit production. Now, as an alternative, NNSA and LANL seek to raise the administrative limit on plutonium in the CMRR Project’s first phase, the newly constructed Radiological Lab, from an original 8.4 grams to 400 grams; upgrade PF-4, the Lab’s main plutonium facility; and proceed with a “Plutonium Modular Approach project.”

Raising the amount of plutonium in the Rad Lab to 400 grams allows for dramatically increased “materials characterization” and “analytical chemistry” in direct support of expanded plutonium pit production. But it also raises the Rad Lab from a “radiological facility” to a “Hazard Category 3” nuclear facility, which has never been done before. Planned gloveboxes and the existing ventilation system may have to change and the facility’s seismic safety rating re-examined. The Rad Lab was originally constructed and equipped for a total cost of $400 million, but now up to another $675 million in equipment is being added. On top of that, re-categorizing the Rad Lab to a Hazard Category 3 facility could cost another $365 million. In all, the Rad Lab can cost up to $1.5 billion, while upgrades to PF-4 will cost another billion.

The Plutonium Modular Approach involves building at least two and perhaps three underground “modules” at one billion dollars each or more. The GAO report notes how since NNSA narrowly defined the program requirement as building the modules themselves instead of examining the need for the modules, “there is effectively no project alternative other than the modular approach,” despite DOE’s own orders to complete an analysis of a full range of alternatives.

In all, according to the GAO report, the full CMRR alternative of upgrading the Rad Lab and PF-4 and building at least two modules would cost at least 4 billion dollars, compared to the CMRR”s previous price tag of $5.8 billion (which was up from $975 million in 2005), and this is before the usual cost overruns. The GAO report also notes how the CMRR alternative appears cheaper because non-nuclear weapons operations, such as preparing plutonium for NASA’s spacecraft battery packs, have been eliminated. NNSA’s pattern when faced with its own cost overruns is to cut out all but nuclear weapons production, as it did with the Uranium Processing Facility (UPF) near Oak Ridge, TN. When a Defense Department estimate put UPF construction at $19 billion (up from $6.5 billion), NNSA eliminated dismantlements and downblending of highly enriched uranium so that it could keep production of thermonuclear components that can kill millions.

Jay Coghlan, Nuclear Watch Director, commented, “Expanded plutonium pit production at LANL is not needed to maintain stockpile safety and reliability, but instead is a must for nuclear weaponeers who want to give existing weapons new military capabilities through so-called Life Extension Programs. This GAO report is more evidence of how taxpayers’ money could be far better spent than on poorly planned, unnecessary and very expensive expanded plutonium pit production.”

# # #

The GAO report NNSA Needs to Clarify Requirements for Its Plutonium Analysis Project at Los Alamos is available at

http://www.gao.gov/products/GAO-16-585?utm_medium=email&utm_source=govdelivery

 

DOE’s 25 year status on GAO’s High Risk list is documented at

http://www.gao.gov/highrisk/doe_contract_management/why_did_study

 

For an extensive history of successful citizen activism against plutonium pit production see

https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

LANL Estimate of $2.9 Billion for “Remaining” Cleanup Leaves Nuclear & Toxic Wastes Behind and Kills Needed Jobs

 

For immediate release July 28, 2016

 

LANL Estimate of $2.9 Billion for “Remaining” Cleanup

Leaves Nuclear & Toxic Wastes Behind and Kills Needed Jobs

 

Santa Fe, NM – The Department of Energy (DOE) has announced that the cost of “Remaining Legacy Cleanup” of radioactive and toxic wastes from more than 70 years of nuclear weapons research and production at the Los Alamos National Laboratory (LANL) will cost $2.9 billion through fiscal year 2035, averaging $153 million per year.

That cost estimate clearly assumes that the Lab’s major radioactive and toxic wastes dumps will not be cleaned up. Instead they will be “capped and covered,” leaving some 200,000 cubic yards of radioactive and toxic wastes at Area G, its largest waste dump. Those wastes sit in unlined pits and trenches, 800 feet above groundwater and three miles uphill from the Rio Grande (plutonium contaminants have been detected 200 feet below Area G). During this same period of time the Lab’s nuclear weapons programs that caused the mess to begin with will cost ten times as much, even before expected funding increases for expanded production of plutonium bomb core “pits” and increasingly aggressive “Life Extension Programs” that give existing nuclear weapons new military capabilities.

DOE’s announcement also pegs the cost of past cleanup at LANL at $3.2 billion to date, raising the question of what has been and will be accomplished with precious taxpayer dollars. The answer is not much for the money. According to DOE’s own data, for the next couple of years only around a sixth of LANL’s “cleanup” funding will actually go to cleanup. Approximately one-third will be used to catch up on worker pensions and another third to babysit improperly treated radioactive waste barrels, one of which ruptured and closed the multi-billion dollar Waste Isolation Pilot Plant. More than half of the remaining one-third for real cleanup goes to LANL’s notoriously high overhead.

DOE’s cost estimate for future LANL cleanup assumes flat funding out to FY 2035, and notes how that cost is “Aligned to [the] 2016 Consent Order.” Despite repeated requests, DOE refused to estimate cleanup costs at LANL until a new Consent Order was finalized with the New Mexico Environment Department (NMED).  Both agencies recently signed it, creating a giant loophole in which the Lab can claim that cleanup is too expensive or impractical to achieve. This is the exact opposite of the original 2005 Consent Order, whose underlying intent was to make DOE and LANL ask Congress for additional cleanup funding. Subsequently, funding for LANL cleanup has fallen from $224 million in FY 2014 to $189 million requested for FY 2017.

Under the Gov. Martinez Administration, NMED Secretary Ryan Flynn granted more than 150 milestone extensions to the 2005 Consent Order at the Lab’s request and then claimed that the old Consent Order did not work. Nuclear Watch New Mexico has filed suit against DOE and LANL for missing compliance milestones under the original Consent Order, with potential fines of more than $300 million. NMED explicitly absolves those violations and fines through the new Consent Order and has intervened in the lawsuit against NukeWatch. This raises the question of whose side the Environment Department is on, the environment or the polluter (in this case, a $2.3 billion per year nuclear weapons facility)?

DOE and NMED kill the chance for serious job creation at the Los Alamos Lab with a deceptive plan for so-called cleanup that leaves tons of radioactive and toxic wastes in the ground that will permanently threaten northern New Mexico’s precious water resources. In addition to the environmental and safety threats and contamination, nuclear weapons programs are not big producers of new jobs. For example, the environmental impact statement for a planned $6.5 billion plutonium facility for expanded nuclear weapons production explicitly stated that not one new Lab job would be created because it would merely relocate existing jobs. In contrast, a LANL study of full cleanup of Area G assumed that around 40% of the total cost would go to labor. Thus, as a rough approximation, for every additional billion dollars put into cleanup, another 3,000 years of cleanup work could be created for one hypothetical worker (in other words, hundreds of high paying jobs for the regional economy).

Jay Coghlan, NukeWatch Director, commented, “The Department of Energy and the New Mexico Environment Department deal New Mexicans a bad hand by pushing a plan that blocks genuine cleanup at the Los Alamos Lab. We need real cleanup that protects our precious water resources for future generations, not more nuclear bombs that cause the mess to begin with.”

#  #  #

DOE’s presentation on its cost estimate for future LANL cleanup is available at

https://nukewatch.org/importantdocs/resources/EMLA_Los_ALamos_LCB_Estimate_NNMCAB_Presentation_07272016.pdf

University of New Mexico’s growing involvement in nuclear weapons prograns

See Honeywell, UNM sign accord to pursue joint research

This is more evidence of the University of New Mexico’s deepening involvement in nuclear weapons programs. UNM recently announced that with Boeing, the U. of Texas and others that it was going to bid on the Sandia Labs management contract.

Honeywell runs the new Kansas City Plant, which is manufacturing and/or procuring ~100,000 nonnuclear nuclear weapons components every year for increasingly aggressive Life Extension Programs. These programs not only extend the service lives of nuclear weapons for up to 60 years, but also give them new military capabilities, despite denials at the highest levels of the U.S. government.

UNM is also the host site for the June 21 Strategic Deterrence Symposium featuring top military and Energy Dept. nuclear brass. Nuclear Watch NM will be there to see what they are to.

Consolidated Nuclear Security LLC Performance Evaluation Report – Wrong B61-12 tail case?

Buried in the just released NNSA FY 2015 Performance Evaluation Report (PER) for Consolidated Nuclear Security LLC (the combined contract for Pantex and Y-12 run by Lockheed Martin and Bechtel) is the remarkable note that Pantex sent to the Defense Department a Joint Test Assembly (JTA) of the B61-12 nuclear smart bomb with the wrong tail case. Generally, a  JTA is a full scale mock up of the nuclear weapon (just not nuclear armed), in this case for a real life drop test from an Air Force fighter at the Tonapah Test Range in Nevada (which is run by the Sandia Labs).

P. 5:  “CNS experienced several issues with the builds of the new B61 JTA Modernization configurations. CNS experienced quality issues on five of the six First Production Units. The most severe of which was the installation of an incorrect tail case on the JTA S/N 602 that was delivered to Department of Defense (DoD). The DoD chose not to proceed with the flight test and returned the unit to Pantex.” [S/N is the serial number of the particular unit.]   – End –

How do you put the wrong tail case on the mock bomb, especially given all the hoopla we’ve heard about the B61-12 and the rush to get it into production? Did this involve the now-well known tail fin kit that turns the “dumb” B61 bomb into the precision-guided B61-12?

A few other worthy items from the CNS PER:

•     p. 5: Pantex is falling behind in dismantlements, and this is before the announced planned 20% increase in dismantlements. “CNS achieved 101% of dismantlements related to secondaries and 66% of the revised Production Control Document (PCD) baseline schedule. The low performance against the revised PCD baseline schedule resulted in NNSA falling below the trajectory to achieve the 2022 dismantlement goal.”

Secondaries are dismantled at Y-12, with all of the rest of the nuclear weapon dismantled at Pantex. The 2022 dismantlement goal is to dismantle the ~2,500 nuclear weapons scheduled by 2009 for dismantlement. This does not include any weapons retired since then.

•     p. 7: “CNS did not meet the majority of the expectations for scheduled surveillance activities, deliverables, and requirements as documented within each applicable weapons system approved Integrated Weapon Evaluation Team (IWET) Plans and associated directive documents.”

Rigorous surveillance is the prerequisite for maintaining stockpile safety and reliability (the claimed rationale for the Stockpile Stewardship Program), but has chronically suffered lower prioritization.

• p. 10: “W76-1 LEP: CNS achieved 101% of the secondary production schedule, met the military shipment schedule, but only achieved 85% of the total FY15 delivery commitment to the Department of Defense.”

This doesn’t bode well for future Life Extension Programs that are growing only more complex and ambitious.

•     p. 11: “CNS is behind schedule on pit recertification projects and is working on recovery plans. The CNS delays have not adversely impacted the B61-12 schedule.  However, if delays continue the impacts to the B61-12 schedule are certain.”

•     p. 14: The future uranium casting process for the Uranium Processing Facility is still unproven.

“CNS did not fully meet expectations on the use of the production microwave caster in [Building] 9212 [at Y12]. This is partially due to equipment issues including the stack 11 filter issues and a failure in the microwave’s bottom lift assembly. Unfortunately, CNS was unable to recover the schedule. Running the microwave caster early and often is valuable since this technology represents the future Uranium Processing Facility (UPF) casting capability.”

•     p. 24: Pantex and Y-12 are beginning “additive manufacturing” (3-D printing) of nuclear weapons components. What are the future proliferation consequences of this?

“CNS began advancing manufacturing capabilities through additive manufacturing initiatives. CNS procured and received a Connex 500-UV Resin multi-color, large-scale plastic machine. This machine will be used for prototyping, proof of principle, displays and cutaways, and training aids. CNS also procured its first metal additive machine and installation will begin at Y-12 in July. Once R&D material testing is complete, the first area of focus will be tooling applications. A second, identical machine has been procured for Pantex and will be delivered late summer for similar applications.”

•     p. 35: CNS, composed of Lockheed Martin and Bechtel, gave the construction contract for the Uranium Processing Facility at Y-12 to Bechtel. There was no competition that I heard about.

Concerning Bechtel’s track record, it took the Chemistry and Metallurgy Research Replacement Project at LANL from an original $600 million to $6 billion, and the Waste Treatment Facility at Hanford from $3.5 billion to $13 billion, and it may still never work.

•     p. 42: “While NNSA has noted the CAS [Contractor Assurance System] reports have gotten more self-critical over FY15, the CNS end of year self-assessment was not self-critical. Given all the issues this year that impacted mission, it was unusual that the report was not more introspective.”

In fact, CNS gave itself a glowing self-assessment, which NNSA did not agree with. In all, NNSA awarded CNS $11.3 million out of a possible $20 million in incentive fees, along with a fixed fee of $31 million. For NNSA, that’s a pretty big slap on the wrist.

The Performance Evaluations Reports are available at https://nnsa.energy.gov/aboutus/ouroperations/apm/perfevals

NukeWatch successfully sued in 2012 to get the reports publicly released, but NNSA was misbehaving again and did not release the FY 2015 PERs until now. These reports are invaluable for insight into what NNSA sites actually do and related contractor performance. The reports are also becoming increasingly critical of contractor performance ever since the major security incident at Y-12 and the closure of the Waste Isolation Pilot Plant caused by an errant radioactive waste drum from Los Alamos.

NukeWatch NM Heads to DC To Stop U.S. Nuclear Weapons “Trillion Dollar Trainwreck”

NukeWatch NM Heads to Washington to Press Congress, Obama Officials

To Stop U.S. Nuclear Weapons “Trillion Dollar Trainwreck” —

LANL Whistleblower Chuck Montaño to Be Honored

 

Three members of Nuclear Watch New Mexico will visit Washington, DC from April 17 to April 20 to oppose U.S. Department of Energy (DOE) nuclear weapons projects, which they say will lead to a “trillion dollar trainwreck” through out-of control spending, more radioactive waste generation, and weapons proliferation. The group will meet with the New Mexican congressional delegation, committee staffers, and administration officials with responsibility for U. S. nuclear policies to press for new funding priorities.

The Nuclear Watch NM delegation will be working with more than 50 colleagues from two dozen other states who are participating in the 28th annual Alliance for Nuclear Accountability “DC Days.” They will distribute copies of the ANA’s new report “Trillion Dollar Trainwreck” a detailed analysis of the Obama Administration’s latest plans to spend more money on nuclear weapons without truly enhancing U.S. security.

Jay Coghlan, NukeWatch director and president of the ANA Board of Directors, said, “Massive spending on nuclear weapons ‘modernization’ creates potential catastrophic risks for U.S. taxpayers, the environment and world peace. We will press policy-makers to cut programs that fund dangerous DOE boondoggles. The money saved should be redirected to dismantling weapons and cleaning up the legacy of nuclear weapons research, testing and production.”

NukeWatch NM Steering Committee member Chuck Montaño will receive recognition during DC Days from the Alliance for Nuclear Accountability (ANA) at a reception on April 19, 2015, at the Hart Senate Office Building. He, along with California’s senior U.S. Senator Diane Feinstein and ranking member of the House Armed Services Committee Rep. Adam Smith (D.-WA), will be among those honored by ANA for their efforts to hold the nuclear weapons military-industrial complex accountable. Montaño is being recognized for his advocacy confronting whistleblower and employee abuse, managerial malfeasance and fraudulent activity, all of which he documents in his recently released book detailing the chain of events that led to him becoming a federally protected whistleblower.

Montaño commented that he wrote Los Alamos: Secret Colony, Hidden Truths, “so people can appreciate the Lab’s full impact and legacy, not just what institutional leaders want the public to remember. There are important events I document for posterity, which may otherwise be hidden or erased from memory, and I didn’t want that to happen.”

Jay Coghlan, NukeWatch director, said, “I am very proud of Chuck Montaño, especially since he’s a Nuke Watch Steering Committee member as well. We depend on people like him with the inside story to help keep the Lab safe for communities and workers alike. It’s gratifying to see that the Alliance for Nuclear Accountability and its many member organizations appreciate his efforts.”

Mr. Montaño, a lifelong Santa Fe area resident, was employed at the Los Alamos National Laboratory for 32 years, until his forced retirement from the lab in 2010. He is also the former Director of Fraud and Special Audits for the Office of the New Mexico State Auditor.

The Alliance for Nuclear Accountability (ANA) is a network of three-dozen local, regional and national organizations representing the concerns of communities downwind and downstream from U.S. nuclear weapons production and radioactive waste disposal sites.

 

# # #

 

Chuck Montaño’s book Los Alamos: Secret Colony, Hidden Truths

is available at www.losalamosdiary.com

 

 

 

Watchdogs Demand Expedited Release of Lab Evaluations to E-FOIA Reading Room

Watchdogs File Second FOIA Request for Los Alamos and Sandia Labs Evaluations,

Demand Expedited Release to E-FOIA Reading Room

 

Santa Fe, NM – Nuclear Watch New Mexico has filed a second request under the Freedom of Information Act (FOIA) for the National Nuclear Security Administration’s FY 2015 Performance Evaluation Reports for the Los Alamos and Sandia National Laboratories. Nuclear Watch filed its first request on December 22, 2015, which has still not been fulfilled despite the law’s statutory requirement that FOIA requests be honored within 20 working days. Because of that, Nuclear Watch is demanding expedited processing and posting of these reports to an electronic FOIA reading room, as required by the 1996 E-FOIA amendments.

In 2009 the National Nuclear Security Administration (NNSA) began to withhold Performance Evaluation Reports without explanation. Accordingly, Nuclear Watch filed a FOIA request for the FY 2009 Los Alamos Lab Performance Evaluation Report that NNSA denied. Nuclear Watch appealed that decision to the Department of Energy’s Office of Hearings and Appeals, which upheld the denial on the basis that the reports contained proprietary information, contrary to the openness and transparency of previous years.

Since that time, the NNSA’s nuclear weapons complex has been rocked by constant cost overruns, security scandals, illegal lobbying and the closure of the multi-billion dollar Waste Isolation Pilot Plant after a faulty radioactive waste drum from LANL ruptured and contaminated workers. It is Nuclear Watch’s belief that American taxpayers deserve to know how their money is being spent on substandard performance by nuclear weapons contractors such as Bechtel, the University of California and Lockheed Martin.

In January 2012 Nuclear Watch filed a FOIA request for the FY 2011 Performance Evaluation Reports of all eight NNSA sites, which the agency again denied. However, rather than fruitlessly appealing to the DOE Office of Hearings and Appeals, the organization filed a lawsuit on March 28, 2012, and began to receive the PERs six days later. Since then the NNSA has publicly released its FY 2012, 2013 and 2014 PERs without having to be compelled by FOIA requests or citizen lawsuits.

However, the National Nuclear Security Administration has not released its FY 2015 Performance Evaluation Reports, which we know have been completed at least for the Los Alamos Lab. On December 17, 2015, LANL Director Charlie McMillan reported to his employees that the Los Alamos National Security, LLC management and operations contract would be put out to bid because of substandard performance as documented by the Performance Evaluation Report.

These reports have been of keen media interest. After its FOIA request was not honored the Albuquerque Journal recently editorialized:

Money to run the labs comes from U.S. taxpayers, who deserve to know how it is being spent and if contractors are doing their jobs in a timely and efficient manner. Past shoddy attention to detail by NNSA contractors and lackadaisical oversight by the U.S. Department of Energy are some of the reasons why the evaluations are critical to protecting national security. The potential search for new contractors makes the evaluations especially critical. They should be made public post haste.

Similarly a respected journalist with the Knoxville News Sentinel reported that his FOIA request was left unfulfilled, and noted that, “The performance reports contain valuable information on how the NNSA contractors are carrying out their missions involving billions of taxpayer dollars annually.” In addition, at least two other nonprofit watchdog organizations, the Oak Ridge Environmental and Peace Alliance and SRS Watch, have FOIAed for NNSA’s Performance Evaluation Reports without success.

These multiple requests by different entities are particularly important because according to the Department of Justice the 1996 E-FOIA amendments

create a new category of records that will be required to receive “reading room” treatment — a category consisting of any records processed and disclosed in response to a FOIA request that “the agency determines have become or are likely to become the subject of subsequent requests for substantially the same records… Second, the amendments will require agencies to use electronic information technology to enhance the availability of their reading room records… To meet this new requirement through on-line access, agencies should have Internet or World Wide Web sites prepared to serve this “electronic reading room” function.

Jay Coghlan, Nuclear Watch New Mexico director, commented, “It is unconscionable that the National Nuclear Security Administration withholds information from the American taxpayer on how fat contractors who constantly bust budgets are paid, especially when these same contractors always have their hands out for yet more taxpayer money for nuclear weapons forever. The question is, what do NNSA and its contractors have to hide? To answer that, Nuclear Watch will not only demand that the Performance Evaluation Report be publicly released, but that from this point on the reports be automatically posted to an electronic FOIA reading room as the law requires. The American taxpayer should not have to fight this battle year after year just to keep greedy nuclear weapons contractors accountable.”

# # #

Nuclear Watch New Mexico’s second Freedom of Information Act request for the Los Alamos and Sandia Performance Evaluation Reports is available at

https://nukewatch.org/importantdocs/resources/NWNM-FOIA-FY15-PERs-4-6-16.pdf

 

The Albuquerque Journal March 24, 2016 editorial “Tardy posting of NNSA evaluations unacceptable” is available at

https://web.archive.org/web/20160407101502/http://www.abqjournal.com/745237/opinion/tardy-posting-of-nnsa-evaluations-unacceptable.html

 

Knoxville News Sentinel reporter Frank Munger’s blog post is available at

http://knoxblogs.com/atomiccity/2016/03/14/what-to-think/

 

The Department of Justice quote is from FOIA Update, Vol. XVII, No. 4 1996

https://www.justice.gov/oip/blog/foia-update-congress-enacts-foia-amendments

 

NNSA’s Performance Evaluation Reports from 2007 to 2014 are available at

https://nukewatch.org/PERs-PEPs.html

Los Alamos Cleanup At the Crossroads – New Cleanup Agreement Requires New Schedule and That Is About All

Los Alamos Cleanup At the Crossroads

New Cleanup Agreement Requires New Schedule and That Is About All

Following protracted negotiations, threatened litigation, and claims of imminent and substantial endangerment, the New Mexican Environment Department (NMED), the Department of Energy (DOE) and the Los Alamos National Laboratory (LANL) contractor agreed to sign the original Consent Order in March 2005. Its promise was fence-to-fence cleanup of Cold War legacy waste at Los Alamos. The 2005 Consent Order was designed as a plan-to-make-a-plan, with investigations followed by cleanup and with hundreds of specific milestones. The intent was to convince DOE to increase funding for LANL cleanup by making a complete cleanup schedule subject to enforcement. The original CO had a “final compliance date” scheduled for December 6, 2015.

However, in 2012, NMED signed a “Framework Agreement” with DOE that prioritized the transfer of 3,706 cubic meters of aboveground, “transuranic” (TRU) nuclear bomb production wastes from LANL to the Waste Isolation Pilot Plant (WIPP) in southern New Mexico. This put Consent Order cleanup on the back burner. Approximately 150 milestone extensions of the 2005 CO were granted to LANL by NMED. In February 2014, WIPP was shut down by improper packaging at LANL of a drum of this waste. Dealing with the remaining “suspect” drums (packaged at the same time) at LANL is a major priority lately instead of cleanup. This has kept the Consent Order cleanup on the back burner.

 

  • Just change the schedule

So NMED and LANL could pick a new final cleanup date, say 2030, and work backwards. Or start by adding 4 or 5 years to the old schedule for some reports and work it out from there. The point is to keep the original 2005 Consent Order language, which is very protective of the health and environment of Northern New Mexico, and just change the schedule dates. However the work is rescheduled, all the work items in the old Compliance Schedule Tables need to be addressed in new Compliance Schedule Tables with new dates given for all the work.

Recent public presentations by NMED implied that cleanup milestones in a revised CO would be assigned annually based on the anticipated budget. This would leave hundreds of cleanup items with no target date for completion and would leave cleanup at the mercy of Congressional budget winds. Any cleanup item not on the list for any given year could be outside the scope of enforcement. LANL could be in the position to not put items on the annual list and to delay cleanup forever.

If the schedule must be rearranged into some sort of “Campaign Mode” in an attempt to make cleanup more “efficient”, completion dates must be kept for every step. Every item in the Campaign must remain enforceable with concrete milestones including a final compliance date. All other items not in a Campaign must remain scheduled.

 

  • Lack of budget cannot be an excuse for lack of cleanup

Taking cleanup dollar crumbs and sprinkling them annually over some perceived priority cleanup items is the least efficient way to address the fence-to-fence cleanup of Cold War wastes at Los Alamos. Cleanup of the 70 years worth of contamination will never again be cheaper than it is this year. It is imperative that ambitious schedule be made and that it be kept.

Every day of delay means another day of Cold War radioactive and hazardous wastes leaking into the environment of Northern New Mexico.

  • Particular items to keep –  meaningful public comment and a final date

NMED Secretary Ryan Flynn stated publicly (starting at 8:00 min) that the need for a final cleanup date at Los Alamos is critical to Congress for funding. He presented a map that showed that Los Alamos National Laboratory was the only DOE weapons site without final cleanup date. (Slide 4) Instead, cleanup at LANL is listed as “TBD” (To Be Determined).

The final compliance date for the last work item must keep the Class 3 permit modification language. Please see our earlier blog for more information. This will ensure that the public can be heard at the end of the next CO and requires the opportunity for a public hearing.

There must be meaningful public input for the revised CO. NMED must give response to all comments.

A well-planned schedule with concrete milestones and final compliance dates would get the work done faster and cheaper. Course corrections with schedule adjustments will have to be made along the way. This would be expected for such a complex task. Having to adjust the schedule is no reason to throw it out. Any major rewrite of the 2005 Consent Order may only leave the future of NM less protected.

Not keeping up with changes in the 2005 Consent Order schedule is the main reason that the CO needs to be revised today. We currently find ourselves with cleanup of legacy wastes in such disarray that it seems that the only fix is to start over. But there is no reason not to just update the original 2005 schedule. Secretary Flynn has stated that the 2005 Consent Order is still in effect.

Today we could be looking at a known Consent Order with a new schedule. Instead we may end up with NMED and DOE renegotiating some untried document with unknown benefits and an unknown schedule.

Cleanup at Los Alamos National Laboratory is too important to leave as TBD.

 

DOE Cold War Sites Closure Dates map
Current Estimated Dates for Final Cleanup of Cold War Nuclear Weapons Sites

 

 

 

 

ABQ Journal Article: Los Alamos lab would get $2.1 billion in proposed budget; officials discuss plans for making plutonium `pits’

This article has some details on future expanded plutonium pit production and related facility upgrades and new construction at the Los Alamos Lab.

1) Brig. Gen. S.L. Davis, NNSA acting deputy administrator for defense programs, explicitly ties future underground “modules” to the 50 to 80 pits per year production rate. That is the most explicit statement I’ve seen so far on that.  The admission that they can do up to 30 pits per year without the modules is also useful.

2) NNSA and LANL all talk about the statutory requirement for expanded pit production (from the FY 2015 Defense Authorization Act). That came from the nuclear neocons in the House Armed Services Strategic Forces Subcommittee (one of the staff guys that wrote that legislation is originally from Sandia Labs). They required expanded production regardless of the technical needs of the stockpile.  It is worth noting that after LANL finished producing 29 W88 pits in 2011 for the stockpile, there has been no further pit production scheduled, essentially because the existing stockpile doesn’t need it.

3) Nevertheless, LANL is tooling up to produce W87 pits for the Interoperable Warhead, which has been delayed for at least 5 years and which the Navy doesn’t want.  So the whole thing is a house of cards.  The real question is whether the appropriators will fund expanded plutonium pit production, and specifically where Senator Tom Udall (D-NM) will stand on that. He’s on the Senate Energy and Water Development Appropriations Subcommittee.

Jay Coghlan

Nuclear Watch New Mexico

http://www.abqjournal.com/721642/news/los-alamos-lab-would-get-2-1-billion-in-obamas-proposed-budget.html
Los Alamos lab would get $2.1 billion in proposed budget; officials discuss plans for making plutonium `pits’
By Mark Oswald / Journal Staff Writer
Published: Wednesday, February 10th, 2016 at 10:57am
Updated: Wednesday, February 10th, 2016 at 5:40pm

SANTA FE, N.M. — The Obama adminstration’s proposed fiscal 2016 budget for the Department of Energy, released Tuesday, allocates $2.1 billion for Los Alamos National Laboratory.

That’s down from $2.2 billion that the new budget document says was “enacted” for the current fiscal year but up from $1.9 billion in Department of Energy funding that was included in the administration’s request for last year.

Jay Coghlan of Nuclear Watch New Mexico said the new documents show an additional $200 million was added to the lab’s nuclear weapons program during FY 2016.

The budget, released Tuesday, also calls for $189 million for clean up of decades-worth of radioactive and hazardous materials at LANL, about the same as in recent years.

LANL is under a directive to resume production of plutonium “pits,” the triggers for nuclear weapons, as part of changes and upgrades to the nation’s nuclear weapon stockpile.

Previous DOE documents have indicated that plans to add to new underground “modules” at Los Alamos for the plutonium work were planned, for a cost estimated at a whopping $2 billion or more.

The new budget request doesn’t advance the “module” idea, leaving the plans for pit production facilities open to interpretation. The budget request says that the “remaining mission need” can be met with other alternatives.

“A common interpretation from all this is that the administration has more time to think about it,” said Greg Mello of the anti-nuclear Los Alamos Study Group. “We think it’s great they should take the time to think more clearly… before plunking capital asset money on the table.”

LANL’s Radiological, Utility, and Office Building is now projected to be a $1.44 billion building. DOE recently endorsed plans to expand RLOUB’s plutonium handling capacity by more than 10 times to 400 grams, apparently as part of the pit production plan. Critics say the building was not built as a nuclear facility.

During a press briefing today (Wednesday, Feb. 10), a Journal reporter asked officials of the National Nuclear Security Administration about potential pit production facilities.

Brig. Gen. S.L. Davis, acting deputy administrator for defense programs, said, “Under the current capabilities we have in the projects we have going, we’re going to be able to do ten pits in 2024, 20 pits in 2025, and 30 pits in 2026.

“To get to the 50-80 pits dictated by statute we’d have to do additional construction. In the current budget, we have some money for design of a plutonium capability. We’re currently undergoing an analysis of alternatives to see if that would be, in fact, plutonium modules at Los Alamos or perhaps some other alternatives, but at this point there is no money for funding of the major construction item to do that in the current budget.”

NNSA administrator Frank Klotz, said that to make sure the agency has the capacity for plutonium operations, “we are undergoing several projects basically to move things out of the old chemical and metallurgy facility building by repurposing space” in the building known as Plutionium Facility-4 in and in RLUOB.

“We have some significant funding going to subprojects associated with that,” said Klotz. He said that in the fiscal year 2017 budget, there’s about $6 million “which will be used for the development of the conceptual design for an analysis alternatives for the additional capacity we need at Los Alamos to do pit manufacturing.”

“In the out years, we have put in $12 million per year for the plutonium modular approach,” Klotz said. “We recognize that is not nearly enough money to do that. However, until we go through the analysis alternatives and until we do our internal and external independent cost estimations and all of the environmental assessments and all the other things that needs to be done before we can come up with a realistic estimate in terms of what that we’ll be.

“We’ll be back in the FY 18 or 19 budget when we have done all that due diligence and have better figures for that.”

Nuke Watch’s Coghlan said of the overall DOE budget, with $9.3 billion for the weapons activities within the National Nuclear Security Administration: “Recall that President Obama received the 2009 Nobel Peace Prize for calling for the abolition of nuclear weapons. Instead, the last budget of his administrations sets an all time record for funding Department of Energy nuclear weapons programs. What this means at Los Alamos is that the Lab’s future is being increasingly tied to expanded production of plutonium pits, the radioactive cores of nuclear weapons.”

Watchdogs Call for Renewed Investigation of Corruption at Los Alamos Lab

For immediate release February 2, 2016

Watchdogs Call for Renewed Investigation of Corruption at Los Alamos Lab and Questionable Suicide of Former Deputy Director

Santa Fe, NM – Today three well-known whistleblowers sent a certified letter to Mr. Damon Martinez, the US Attorney for the District of New Mexico, asking him to reopen an investigation into fraud and corruption at the Los Alamos National Laboratory (LANL) and the questionable suicide in 2002 of the then-recently retired Lab Deputy Director. Mr. Damon is the top federal law enforcement official in New Mexico, and also serves as the Chair of the National Lab/Research University Working Group for US Attorneys. Therefore, he should be uniquely qualified to address the whistleblowers’ concerns.

Glenn Walp and Steve Doran were hired in 2002 by LANL to investigate fraud at the Lab after it had been repeatedly rocked by security and corruption scandals. However, senior Lab officials summarily fired them without cause before they could complete their investigations. During their long careers in law enforcement they were respectively, among other things, Commissioner of Pennsylvania State Police and police chief of Idaho City, Idaho. The third whistleblower, Chuck Montaño, is a multi-credentialed auditor and investigator who worked at LANL for 32 years. He became a federally protected whistleblower after reporting accounting malpractice and abuses that he had witnessed for years, and for which Lab management retaliated against him.

In their letter to Mr. Martinez, the three whistleblowers state that their main concern is the need for law enforcement to fully investigate the claimed suicide in 2002 of LANL’s second-in-command, former Deputy Director of Operations Richard Burick. Specifically at issue was the gun found at the scene of his death, and the improbability of this particular type of handgun being left in the state and condition that it was found in if truly used in a suicide. Steve Doran, who is a highly qualified investigator, and other weapon experts have concluded that it is impossible that the gun in question would have landed where it did, with an open, undamaged chamber, had it been truly used in a suicide.

In the same period of time as Burick’s claimed suicide, the criminal investigation of major procurement fraud at LANL was derailed by the Lab’s hasty firing of Walp and Doran. This, in turn, prevented a congressional committee from learning the full scope of potential criminal activity. Since then, new information has emerged that possibly links the corruption to Burick’s suicide, which the three whistleblowers assert deserves serious investigation by federal law enforcement.

The whistleblowers are coming forth now with their letter to the US Attorney for New Mexico prompted in part by a recent article by the Project on Government Oversight (POGO), a respected national organization that investigates and publicizes government waste, fraud and abuse. The POGO article concluded that if there were ever to be full accountability at LANL, “a new investigation into Richard Burick’s alleged suicide would be a good place to start.”

Walp, Doran and Montaño are also motivated by the recent announcement by the National Nuclear Security Administration that the LANL management contract will be competed in 2017. Their concern is that a full and complete investigation is needed in order to clean house and help ensure that one of the premier nuclear weapons labs, long plagued by scandal, is properly managed in the future, free of any possible reoccurrence of fraud and corruption. They believe that it is imperative that decision makers know the full extent of what transpired in order to know how best to proceed with the award of the new contract. Without a deeper understanding and accountability before the award is made, it is possible that the LANL management contract will end up in the hands of those largely responsible for the cover-up of past mismanagement at the Los Alamos Lab, or even worse the possible obstruction of justice that occurred.

Former Pennsylvania State Police Commissioner Glenn Walp commented, “Unless the consortium contractors for the Los Alamos National Laboratory consciously and aggressively resolve their perpetual management and operational failings, the lab will remain a haven for crime, corruption and cover-ups; perhaps it is time to shut it down.”

Former Police Chief Steve Doran asserted, “Corruption at Los Alamos must be taken out at the roots and those responsible brought to justice. This will build a strong national laboratory system that can be both trusted and productive.”

Federally protected whistleblower Chuck Montaño added, “The Los Alamos Lab is a cash cow for the military-industrial complex, and because politicians are so beholden to these corporations, there’s zero accountability for the fraud, waste and abuse that keeps occurring in Los Alamos. We are seeking to end that by asking the US Attorney for New Mexico to intervene and go wherever the facts may take him. ”

# # #

 The Walp/Doran/Montaño letter to Mr. Damon Martinez, US Attorney for New Mexico, is available at https://nukewatch.org/importantdocs/resources/Letter-NM-US-Attorney-LANL-fraud.pdf

The Project on Government Oversight’s article Once Upon a Time in Los Alamos is available at http://www.pogo.org/blog/2016/once-upon-a-time-los-alamos.html

Chuck Montaño’s book Los Alamos: Secret Colony, Hidden Truths chronicling his 32 years working at the Los Alamos Lab and becoming a federally protected whistleblower is available at http://losalamosdiary.com/index.html

Glenn Walp’s book Implosion at Los Alamos on his hiring and firing investigating corruption and fraud at the Los Alamos Lab is available at http://www.implosionatlosalamos.com/

Nuclear Watch NM Gives Notice of Intent to Sue Over Lack of Cleanup at the Los Alamos Lab

Nuclear Watch NM Gives Notice of Intent to Sue

Over Lack of Cleanup at the Los Alamos Lab

Nuclear Watch New Mexico has notified the Department of Energy (DOE) and the Los Alamos National Laboratory (LANL) that it will file a lawsuit over their failure to meet cleanup milestones under a “Consent Order” governed by the New Mexico Environment Department. Formal notice is required before a lawsuit can actually be filed, which NukeWatch intends to do within 60 days or less. The New Mexico Environmental Law Center is representing NukeWatch in this legal action to enforce cleanup at LANL.

Jay Coghlan, NukeWatch Executive Director, commented, “The nuclear weaponeers plan to spend a trillion dollars over the next 30 years completely rebuilding U.S. nuclear forces. Meanwhile, cleanup at the Los Alamos Lab, the birthplace of nuclear weapons, continues to be delayed, delayed, delayed. We are putting the weaponeers on notice that they have to cleanup their radioactive and toxic mess first before making another one for a nuclear weapons stockpile that is already bloated far beyond what we need. Real cleanup would be a win-win for New Mexicans, permanently protecting our water and environment while creating hundreds of high paying jobs.”

Last week Nuclear Watch NM broke a story  on how LANL and DOE have formally given the green light for new underground facilities to expand the production of plutonium pits (the fissile triggers of modern H-bombs) from the currently approved level of 20 pits per year to 80. In all, upgrades to existing plutonium facilities at LANL and the construction of two underground “modules” that can be added to later for yet more production will cost at least $4 billion. The environmental impact statement for a previously proposed Walmart-sized plutonium facility (canceled because of costs that exploded up to $6.5 billion dollars) documented that not a single new Lab job would be created because it would simply relocate existing jobs. Full cleanup, on the other hand, would be labor intensive and create hundreds of high paying jobs for several decades.

Every year the estimated cost of nation-wide “environmental liabilities” from past nuclear weapons research and production, currently $298 billion, outpaces the annual levels of environmental restoration funding actually spent, even though those estimated liabilities don’t include full cleanup to begin with. At the same time, one multi-billion dollar DOE cleanup project after the other fails, for example the $13.5 billion Waste Treatment Plant at the Hanford nuclear reservation, the multi-billion dollar Waste Isolation Pilot Plant in southern New Mexico (closed because of a ruptured radioactive waste barrel from LANL), and the estimated $2.6 billion spent to date for incomplete cleanup at LANL. As an example of local impacts, during major stormwater events the City of Santa Fe has to close water diversion on the Rio Grande that can supply up to 15 million gallons per day of drinking water because of plutonium contamination in Los Alamos Canyon. Meanwhile, nation-wide, thousands of sick Cold War workers and downwinders from nuclear weapons tests await long delayed health benefits and compensation.

LANL is key to the trillion dollar rebuilding of nuclear forces as the premier nuclear weapons design lab and the nation’s sole production site for plutonium pit triggers, the most critical nuclear weapons components. Funding for DOE nuclear weapons programs is nearly double historic Cold War averages, with around $1.5 billion spent annually at LANL alone. In contrast, funding for Lab cleanup remains flat at around $185 million per year, with only approximately a third going to actual cleanup (one-third goes to pensions and another third to safeguarding improperly prepared radioactive waste barrels destined for the now-closed WIPP). New Mexico Environment Department (NMED) officials have publicly stated that around $250 million per year is needed for effective cleanup at LANL.

The 2005 Consent Order required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It also stipulated a detailed compliance schedule that the Lab was required to meet. Ironically, the last milestone, due December 6, 2015, required a report from LANL on how it successfully cleaned up Area G, its largest waste dump. However, real cleanup remains decades away, if ever. The Lab plans to “cap and cover” Area G, thereby creating a permanent nuclear waste dump in unlined pits and shafts, with an estimated 200,000 cubic yards of toxic and radioactive wastes buried above the regional groundwater aquifer, four miles uphill from the Rio Grande.

In the past the New Mexico Environment Department had repeatedly stated that it would release a revised Consent Order with new compliance dates before the end of 2015. Last November NMED Secretary Ryan Flynn said that a draft revised Consent Order would not be released until settlements were finalized over LANL violations of waste handling procedures that led to the closure of WIPP. Those settlement negotiations are still ongoing, leaving the Consent Order governing cleanup at the Lab in legal limbo.

Under typical hazardous waste handling permits, federal regulations require that an extension of a final compliance date include “an opportunity for a public hearing at which all interested persons shall be given a reasonable chance to submit data, views or arguments orally or in writing and to examine witnesses testifying at the hearing.” While the 2005 Consent Order is not a permit per se, it nevertheless explicitly incorporated the public process requirements of a federal hazardous waste permit. Therefore, Nuclear Watch New Mexico believes that any revised Consent Order requires an opportunity for meaningful public participation during its negotiation, leading to a public hearing should there be any unresolved issues, a position which so far NMED has opposed.

Scott Kovac, Nuclear Watch NM Research Director, said, “DOE, LANL and NMED have had four years to involve the public in revising Consent Order cleanup decisions and comnpliance dates at the Lab, but yet they seem to have ignored the final deadline. Northern New Mexicans want meaningful input into cleanup decisions at LANL. NukeWatch believes that a rigorous cleanup schedule must be stipulated from the beginning in any revised Consent Order, and that the Lab must be held accountable every step along the way for getting the necessary funding and doing the work on time. We insist upon meaningful public participation and dates certain for compliance milestones. Cleanup at the Los Alamos Lab cannot be open-ended or it will never be accomplished.”

# # #

Nuclear Watch New Mexico’s Notice of Intent to Sue is available at https://nukewatch.org/importantdocs/resources/NukeWatch-NM-NOI-to-DOE-and-LANS-20160120.pdf

Budget data are from the Department of Energy’s annual Congressional Budget Requests.

The current estimate of $298 billion to cleanup past nuclear weapons research and production comes from the DOE Agency Financial Report for Fiscal Year 2014. Even that figure does not come anywhere close to full and complete cleanup, but instead often involves “cap and cover” and leaving nuclear wastes permanently in place.

The quote concerning the need for a public hearing was incorporated into New Mexico state law NMSA 1978, §74-4-4.2(H) (2006).

Federal Nuclear Safety Oversight at LANL Remains Drastically Understaffed

Federal Nuclear Safety Oversight at LANL Remains Drastically Understaffed

A recently released report, Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory (LANL), December 2015, explains nuclear safety oversight staffing shortages.

The Office of Enterprise Assessments (EA) is the Department of Energy’s (DOE) organization responsible for assessments of nuclear and industrial safety, and cyber and physical security. DOE has regulatory authority over the radiologic facilities, operations, and wastes of the nuclear weapons complex. (Whereas the State of New Mexico has regulatory authority over non-radiological, hazardous operations and wastes.)

LANL is managed and operated by Los Alamos National Security, LLC with oversight by DOE’s Los Alamos Field Office (NA-LA). On a good day, NA-LA, with around 100 total on staff, would have their hands full providing oversight for LANS’ 13,000 employees and contractors scattered over nearly 40 square miles.

Lack of Safety Oversight Staff, with No Help in Sight

But the recent report (which was investigated in June and July, 2015) explains that NA-LA has funding for only 6 out of the 12 (at the least) required Facility Representative (FR) positions. An FR is defined as an individual assigned responsibility by the local field office for monitoring the safe and efficient performance of a facility and its operations. This individual is the primary point of contact with the contractor for operational and safety oversight.

DOE has a process to determine adequate Facility Representative staffing. The NA-LA FR staffing analysis for 2015 indicated that 17 FRs are needed to cover 13 Hazard Category 2 nuclear facilities, 4 Hazard Category 3 nuclear facilities, 11 High Hazard facilities, 12 moderate hazard facilities, and 7 low hazard facilities. NA-LA figured that only 12 FRs were needed and that 10 were on board. However the current NA-LA organization chart shows 7 FRs, one of whom has been on detail as the acting chief of staff for over a year and has not maintained his FR qualifications. There are no current plans to fill the vacancies. Due to staffing shortages, FR oversight is limited to the nuclear facilities. The bottom line is that the current NA-LA staffing level is 6 FRs fewer than the requirement of 12 stated in the Work Force Analysis and Staffing Plan Report. (Pg. 25)

This staff shortage is exacerbated by the fact that NA-LA has not approved LANS’ contractor assurance system (CAS), which is required by DOE orders. DOE’s version of Contractor Assurance is a contractor-designed and utilized system to manage performance consistent with contract requirements. The system provides transparency between the contractor and DOE to accomplish mission needs, and for DOE to determine the necessary level of Federal oversight.

A rigorous and credible assessment program is the cornerstone of effective, efficient management of programs such as environment, safety, and health; safeguards and security; cyber security; and emergency management.

The NA-LA oversight processes include an evaluation of the CAS primarily through staff assessments. Also, NA-LA annually approves the annual performance evaluation plan, which is an element of the CAS system.

It is NA-LA’s oversight of the 2015 Performance Evaluation Report (which has not yet been publically released) that lead to DOE ending LANS’ contract at LANL in 2017. We give a tip of the hat to NA-LA for being so diligent about poor LANL performance while being so short-handed. It makes me wonder what other problems may be as yet undiscovered. Would the LANL waste drum packing mistake, which shut down the Waste Isolation Pilot Plant (WIPP), have been caught if NA-LA was fully staffed? The estimated cost of reopening WIPP is $.5 billion and climbing.

It is irresponsible for DOE not to provide its Los Alamos Field Office with its required staffing and resources. The lack of oversight is not only dangerous. It can be expensive.

NukeWatch insists that Federal safety oversight of DOE nuclear and hazardous activities be the first priority. Fully staffed oversight is essential for worker and public safety. This will be especially important as the new contractor takes over operations of LANL in 2017.

Taxpayers con not afford to have any less in place.

 

 

Four Strikes and You’re Out

Four Strikes and You’re Out

In stunning news on December 18, Justin Horwath of the SF New Mexican reported that the management and operating contractor of Los Alamos National Laboratory will not have its contract renewed after it ends Sept. 30, 2017. This is stunning because LANS LLC, the M&O contractor, could have potentially run the Lab until for 20 years until 2026, had it not had so many problems.

The annual contract for FY 2016 was over $2.2 billion. This means that Los Alamos National Security (LANS) left upwards of $20 billion (9 years of lost contract) on the table. It’s not often that a company gets the opportunity to make mistakes that costs them $20 billion worth of contracts. 

The management of the Lab was privatized when LANS was awarded the contract in 2005. LANS is a partnership between the University of California, Bechtel Corp., Babcock & Wilcox Co., and AECOM (formerly URS). Before 2005 the University of California exclusively managed LANL as a non-profit. The for-profit experiment for managing the Lab will hopefully be reconsidered. 

As a reminder, Nuclear Watch NM, along with our friends at Tri-Valley CARES, submitted a bid to manage the Lab back in 2005We thought the management should be non-profit and that nuclear weapons research should be phased out.

The overall direction of future missions at the Los Alamos National Laboratory (LANL) – We propose to downgrade the Lab’s nuclear weapons programs and subordinate them under a new Associate Directorship of Nuclear Nonproliferation so that it can be better assured that national and international obligations under the NonProliferation Treaty are met.

LANS lost the M&O contract because they failed to earn the “award term” 4 times. The award term is simply another year added to the contract. Section H-13(f) of the current contract states, ‘If the Contractor fails 4 times to earn award term, the operation of this Award Term clause will cease.” 

LANS lost award term in 2013.

Then, LANS lost award term in 2014 AND had one extra award term that was previously earned taken away because of improperly packing the radioactive waste drum that shut down WIPP.

And LANS lost this award term for 2015. LANL may be negotiating this, but they got a waiver in 2012 that granted them an award term when they didn’t actually earn it. They were told that was their last waiver.

That’s four.

These award terms are based on the Lab’s Performance Evaluation Reports (PERs), which thanks to a successful Freedom of Information Act lawsuit by NukeWatch, are available onlineWe wonder if having these available to the public could have helped the National Nuclear Security Administration (NNSA) in any way to not give the award terms. 

We do thank NNSA and the DOE LA Field Office for sticking to their guns by providing genuine oversight of the Lab this go-around. But the past few years serve as a reminder of the dangerous and difficult side of nuclear weapons work, the continuing health impacts to workers, and the impossibility of isolating the radioactive waste for hundreds of thousands of years. When will the US decide that it’s just not worth it?

The SF New Mexican also tells that NM Congressional delegation has weighed inWe agree with the joint statement issued by U.S. Sens. Tom Udall and Martin Heinrich and U.S. Rep. Ben Ray Luján that, “DOE must hold all of its contractors accountable and be responsible stewards of federal funds.”

But we have some questions about this statement:

“Los Alamos National Laboratory employs some of the best and brightest minds in the country whose contributions are indispensable to our national security. The lab also strengthens our economy by providing quality jobs, and we will always fight to protect its mission. As DOE prepares a new contract proposal, assuring continuity for the employees at LANL and the high-quality scientific, energy, and security contributions they make to our nation will be paramount. We are confident that Los Alamos will continue to have a critical role in national and international security, research and science. We expect to receive further details and regular briefings from NNSA as the process moves forward in the new year.”

The delegation’s joint letter seems to demonstrate how overly concerned they are with LANL’s “mission” of nuclear weapons production and with the institutional benefit of profit-making national security contractors. The Lab’s actual contributions to energy research and basic science are also a small proportion to the taxpayer dollars expended there.

A major rewrite of the Lab’s missions is needed where true national security is not based on nuclear weapons.

NukeWatch Calls for Public Seats at the Table in LANL Cleanup Negotiations

For immediate release December 7, 2015

Contacts: Jay Coghlan, jay[at]nukewatch.org

Deadline for Last Cleanup Milestone of LANL Consent Order Passes

NukeWatch Calls for Public Seats at the Table in Negotiations

Santa Fe, NM – Yesterday, December 6, was the deadline for the last compliance milestone in the Consent Order between the New Mexico Environment Department (NMED) and the Department of Energy (DOE) that governs cleanup at the Los Alamos National Laboratory (LANL). Ironically, that last milestone required the submittal of a report by the Lab on how it successfully completed cleanup of Area G, its largest waste dump. Real comprehensive cleanup is decades away at current funding levels. One of the purposes of the 2005 Consent Order was to prod Congress to increase funding for cleanup of 70 years of neglected Cold War contamination at the Lab.

NMED has the final decision on what form cleanup of hazardous wastes takes at LANL. But any revised Consent Order is still off in the future, and the degree of public participation in its formulation yet to be determined by NMED. Meanwhile, LANL plans to “cap and cover” Area G, thereby creating a permanent nuclear waste dump in unlined pits and shafts, with an estimated 200,000 cubic yards of toxic and radioactive wastes buried above the regional groundwater aquifer, 4 miles uphill from the Rio Grande.

Following protracted negotiations and threatened litigation by DOE against NMED, the Environment Department succeeded in getting DOE and the LANL contractor to sign the original Consent Order in March 2005. However, beginning in 2012, NMED signed a “Framework Agreement” with DOE that prioritized the transfer of 3,706 cubic meters of aboveground, monitored “transuranic” (TRU) wastes from nuclear bomb production at Area G to the Waste Isolation Pilot Plant (WIPP) in southern New Mexico.

The stated rationale of this so-called 3706 Campaign was to minimize the risk from wildfire following the 2010 Las Conchas Fire that burned within 3.5 miles of Area G. However, if those TRU wastes were really at risk from wildfire, they would have burned during the 2000 Cerro Grande Fire that came within a half-mile of Area G. The Framework Agreement allowed LANL to discontinue most legacy cleanup to concentrate on TRU shipments that should have already been completed.

Moreover, the 3706 Campaign itself ended in disaster in February 2014 when an improperly treated radioactive waste drum from LANL ruptured at WIPP, contaminating 21 workers and indefinitely closing down that multi-billion dollar facility. Dealing with the 59 similarly treated “suspect” drums still at LANL will use a substantial amount of scarce cleanup funding for at least the next two years. Combined with the need to address a large chromium groundwater plume discovered after the original Consent Order went into effect, cleanup of buried mixed radioactive wastes will remain on the back burner, if ever addressed.

Further, since 2011 LANL has requested and NMED perfunctorily granted more than 150 milestone extensions, thus effectively eviscerating the Consent Order without public comment and consent. Which brings us to today, after the last compliance milestone deadline has expired, with little cleanup actually accomplished since 2012. A new schedule of cleanup is on hold until a revised Consent Order is negotiated.

Previously NMED Secretary Ryan Flynn has said that a draft revised Consent Order would be released for a 60-day public comment period before the end of 2015. But as of mid-November negotiations had not started. More recently Secretary Flynn has said that a draft renewed Consent Order would be released only after the schedule of payments is finalized for a $73 million settlement over WIPP violations. WhileNuclear Watch New Mexico appreciates NMED’s firmness on the WIPP settlements, we would like to see the same amount of zeal applied to enforcing cleanup at LANL through the Consent Order.

NukeWatch strongly believes that much more vigorous public participation steps, including the opportunity for a public hearing, are legally required by the existing Consent Order. Specifically, the March 2005 Consent Order incorporated the full public participation requirements applicable to hazardous waste permits. Federal environmental regulations, which are incorporated into New Mexico state regulations, establish the public participation procedures for various types of permit modifications, including extending final compliance dates. These are deeper levels of public participation than the 60-day public comment period that NMED is currently contemplating. In our view, a 60-day public comment period on a draft Consent Order is tantamount to commenting on a done deal already negotiated between DOE and NMED.

Scott Kovac, Research and Operations Director for Nuclear Watch New Mexico, stated, “The requirements are clear for deep and meaningful public participation in LANL cleanup decisions, including the opportunity for the interested public to have a seat at the negotiating table and the possibility for a public hearing. NMED must make Cold War legacy cleanup a priority at LANL and should start by prioritizing full public participation while negotiating the revised Consent Order.”

Jay Coghlan, NukeWatch Executive Director, added, “Ultimately this is all about the future of cleanup at LANL, which is receiving less federal funding while the nuclear weapons programs that created the mess to begin with are getting more money. We want nothing short of comprehensive cleanup at the Los Alamos Lab. That would be a real win-win for New Mexicans, permanently protecting our water and the environment while creating hundreds of high-paying jobs.

# # #

Read much more background.

Nuclear Watch’s letter to Secretary Flynn – on Consent Order public participation requirements.

The existing Consent Order governing cleanup at LANL 

 

Area G at LANL

Op-ed: B61 bomb is fuel for new arms race

Op-ed: B61 bomb is fuel for new arms race

By Jay Coghlan / Nuclear Watch New Mexico

Albuquerque Journal
Sunday, October 25th, 2015 at 12:02am

http://www.abqjournal.com/665029/opinion/b61-bomb-is-fuel-for-new-arms-race.html

The article “‘New’ U.S. nukes are anything but” should be judged more by
its omissions than its contents.

While arguing that the soon-to-be rebuilt B61 bomb won’t be a “new”
nuclear weapon, the Heritage Foundation omits mentioning that it is
being retrofitted with a tail fin kit that will give it precision
guidance. In effect, once completed, the B61 bomb will be the world’s
first nuclear “smart” bomb, to be delivered by the new super-stealthy
(but problem-plagued) $1 trillion F-35.

If that’s not a new military capability – which the U.S. government
denies – then I don’t know what is.

The Heritage Foundation also bemoans Russia’s 2-to-1 advantage in
tactical nuclear weapons in Europe. It omits mentioning that the new B61
bomb modification will meld three tactical variants and one strategic
version of the same bomb, in effect wiping out the distinction between
tactical and strategic nuclear weapons.

The new B61 will be a precision-guided, selectable yield, multi-purpose
nuclear weapon with relatively less fallout and collateral damage. It
will lower the threshold for potential use of nuclear weapons because it
will be arguably more usable.

I am no Putin apologist – I personally know Russian activists persecuted
by his regime. But don’t be fooled by the Heritage Foundation’s
one-sided narrative that helps propel the new Cold War.

The Russians are paranoid, perhaps deservedly so, starting with Genghis
Khan and on through Napoleon and Hitler. Relentless expansion of NATO
fuels that paranoia.

While offering a laundry list of alleged treaty violations by Russia,
the Heritage Foundation fails to mention how George W. Bush unilaterally
tore up the Anti-Ballistic Missile Treaty for “Star Wars” defenses that
still don’t work after hundreds of billions of dollars, and if they did
would create enhanced nuclear war-fighting capabilities.

The Heritage Foundation warns of Moscow’s “time-honored technique of
denial and deception,” but we as Americans must guard against our own
government’s use of the same that got us into disastrous wars like
Vietnam and Iraq.

Cool heads are needed to avoid a new nuclear arms race, not the
cherry-picked narrative of the Heritage Foundation.

That narrative will profit the war contractors who in turn support the
Heritage Foundation. Among them is Lockheed Martin, who illegally
lobbied to extend its for-profit Sandia Laboratories management contract
and is profiting on both ends with the B61 bomb.

Lockheed runs the program through Sandia to transform the B61 into the
world’s first nuclear smart bomb, and is building the way-over-budget
F-35 to deliver them.

As Pope Francis recently warned us, “Many powerful people don’t want
peace, because they feed off war. It is the industry of death!”

Concerning the B61 smart nuclear bomb, Lockheed Martin and the Sandia
Labs are in the business of megadeath, which the Heritage Foundation
seeks to aid and abet.

Pope Francis Calls for the Complete Prohibition of Nuclear Weapons

September 25, 2015

Pope Francis Calls for the Complete Prohibition of Nuclear Weapons  

Santa Fe, NM – In his speech today at the United Nations Pope Francis stated:

The Preamble and the first Article of the Charter of the United Nations set forth the foundations of the international juridical framework: peace, the pacific solution of disputes and the development of friendly relations between the nations. Strongly opposed to such statements, and in practice denying them, is the constant tendency to the proliferation of arms, especially weapons of mass destruction, such as nuclear weapons. An ethics and a law based on the threat of mutual destruction – and possibly the destruction of all mankind – are self-contradictory and an affront to the entire framework of the United Nations, which would end up as “nations united by fear and distrust.” There is urgent need to work for a world free of nuclear weapons, in full application of the non-proliferation Treaty, in letter and spirit, with the goal of a complete prohibition of these weapons.

Separately, the United Nations’ Secretary-General Ban Ki-moon released a statement in advance of tomorrow’s (September 26) International Day for the Total Elimination of Nuclear Weapons tomorrow. He said:

The norm against the use of nuclear weapons – the most destructive weapons ever created, with potentially unparalleled human costs – has stood strong for seven decades. But the only absolute guarantee that they are never used again is through their total elimination.

The Pope’s words builds upon a December 2014 paper entitled “Nuclear Weapons: Time for Abolition” that the Vatican presented at an international conference on the “Humanitarian Impacts of Nuclear Weapons” held by the Austrian government in Vienna. In it, the Catholic Church declared that the provisional justification it once gave for possession of nuclear weapons for the sake of “deterrence” during the Cold War is no longer valid. The Vatican further stated in no uncertain terms, “Now is the time to affirm not only the immorality of the use of nuclear weapons, but the immorality of their possession, thereby clearing the road to nuclear abolition.”

Contrary to the Catholic Church’s growing push to ban nuclear weapons, the recent May 2015 NonProliferation Treaty (NPT) Review Conference ended in failure. The immediate reason was that the United States, United Kingdom and Canada blocked the adoption of a “Final Document” seeking to implement a previously agreed-to conference on a Middle East nuclear weapons free zone, at the behest of Israel, a non-signatory to the NPT and a non-declared nuclear weapons power. A broader, deeper reason is that the majority of non-weapons states are growing increasingly frustrated by the nuclear weapons powers’ failure to honor their NPT Article VI obligation “to pursue negotiations in good faith on effective measures relating to cessation of the nuclear arms race at an early date and to nuclear disarmament…”, first promised in 1970.  This is now exacerbated by accelerating nuclear weapons “modernization” programs, led by the United States which plans to spend a trillion dollars over thirty years completely rebuilding its nuclear weapons stockpile and infrastructure.

New Mexico plays a key role in these modernization programs, with two of the nation’s three nuclear weapons laboratories, Sandia and Los Alamos. Currently the labs’ main focus is “Life Extension Programs” that prolong the service lives of existing U.S. nuclear weapons for up to 60 years and give them new military capabilities despite U.S. government denials. These programs are clearly contrary to the Vatican’s push for nuclear weapons abolition.

New Mexico also has one of the highest percentages of Catholic citizens, at around 40% of the total population. The full name of its capitol Santa Fe (English: “Holy Faith”) is “The Royal City of the Holy Faith of Saint Francis of Assisi,” the saint from whom Pope Francis took his papal name. St. Francis and the Pope are both known for their focus on the poor. Ironically, Los Alamos County, next to Santa Fe, is the second richest county in the USA because of nuclear weapons programs, while some of the poorest communities in the country (the San Ildefonso and Santa Clara Pueblos) are contiguous to it.

One of New Mexico’s two Catholic Archbishops, Oscar Cantú of Las Cruces, is chair of the United States Conference of Catholic Bishop’s Committee on International Justice and Peace, and is playing a leading role in the Catholic Church’s accelerating push for nuclear weapons abolition. He delivered a homily at the Nagasaki Cathedral in Japan on August 9, 2015 commemorating the 70th anniversary of the city’s destruction by a plutonium bomb designed and produced in New Mexico. He described it as a life-changing experience, and declared:

The bishops of the United States join in solidarity with the Church in Japan in advocating for global nuclear non-proliferation and disarmament in the face of the tragedies that occurred here when atomic bombs struck… the U.S. bishops committed themselves to shaping “the climate of opinion which will make it possible for our country to express profound sorrow over the atomic bombing in 1945. Without that sorrow, there is no possibility of finding a way to repudiate future use of nuclear weapons….”

New Mexico’s other archbishop, Santa Fe’s newly installed John Wester, has not yet stated his position on nuclear weapons. His diocese includes the Los Alamos and Sandia National Labs.

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “Northern New Mexico has been a Catholic stronghold for centuries, and the birthplace of nuclear weapons seventy years ago. Catholics and non-Catholics alike must examine their consciences and the Pope’s calling for the prohibition of nuclear weapons, and how that squares with the nuclear weapons industry that is so deeply embedded in our culture and economy. The choice is not easy, but clearly we must follow faith and good will toward elimination of these worst of weapons of mass destruction. I hope that Santa Fe’s new Archbishop John Wester will help guide us in following Pope Francis’ call for the complete prohibition of nuclear weapons.”

# # #

Pope Francis’ quote is from http://time.com/4049905/pope-francis-us-visit-united-nations-speech-transcript/ Note: the original transcript erroneously said “weapons of mass distraction” instead of “weapons of mass destruction.”

The Vatican’s December 2014 paper  “Nuclear Weapons: Time for Abolition” is available at http://www.paxchristi.net/sites/default/files/nuclearweaponstimeforabolitionfinal.pdf

See Archbishop Oscar Cantú’s essays on the need to abolish nuclear weapons at http://www.usccb.org/issues-and-action/human-life-and-dignity/war-and-peace/nuclear-weapons/

In particular, see Homily on Peace and a World without Nuclear Weapons for a Mass at Urakami Cathedral in Nagasaki, Japan Bishop Oscar Cantú, August 9, 2015

New Mexico’s Archbishop Cantú Helps Lead Vatican Charge for Nuclear Weapons Abolition

On Thursday morning, 9:30 EST/7:30 MT, Sept. 24 Pope Francis will  address both houses of the U.S. Congress, viewable by webcast on C-SPAN. The next morning at 8:30 am EST/6:30 MT he addresses at the United Nations in New York City, viewable on the UN web site http://webtv.un.org/
There is good reason to think that the Pope might address the need for nuclear weapons abolition. In December 2014 the Vatican presented a paper entitled “Nuclear Weapons: Time for Abolition” at the conference on “Humanitarian Impacts of Nuclear Weapons” held by the Austrian government in Vienna. In it, the Vatican declared that while the possession of nuclear weapons could be justified for the sake of “deterrence” during the Cold War that is no longer true. It further stated, “Now is the time to affirm not only the immorality of the use of nuclear weapons, but the immorality of their possession, thereby clearing the road to nuclear abolition.”

See http://www.paxchristi.net/sites/default/files/nuclearweaponstimeforabolitionfinal.pdf

I met with the Holy See’s permanent delegation to the United Nations during the first week of the NonProliferation Treaty Review Conference this last May 2015. To my surprise I was told that Archbishop Oscar Cantú of Las Cruces, NM, chair of the Vatican’s Committee on International Justice and Peace, is playing a prominent role in the Catholic Church’s accelerating push for nuclear weapons abolition. You can see a number of papers that he has written on nuclear weapons at
https://web.archive.org/web/20200428225157/http://www.usccb.org/issues-and-action/human-life-and-dignity/war-and-peace/nuclear-weapons/

For example, in anticipation of the Pope’s speech to Congress, Archbishop Cantú wrote The Pope and the Bomb: New Nuclear Dangers and Moral Dilemmas
September 17, 2015 http://www.usccb.org/issues-and-action/human-life-and-dignity/war-and-peace/nuclear-weapons/presentation-the-pope-and-the-bomb-2015-09-17.cfm
In a background paper on nuclear weapons Pope Francis is quoted as saying:
“A world without nuclear weapons” is a goal shared by all nations and echoed by world leaders, as well as the aspiration of millions of men and women. The future and the survival of the human family hinges on moving beyond this ideal and ensuring that it becomes a reality.         — Pope Francis, December 7, 2014″

Archbishop Cantú was at a mass at the Nagasaki Cathedral in Japan this August, 9, 2015, the 70th anniversary of the atomic bombing. See his
Homily on Peace and a World without Nuclear Weapons for a Mass at Urakami Cathedral in Nagasaki, Japan
August 9, 2015
http://www.usccb.org/issues-and-action/human-life-and-dignity/war-and-peace/nuclear-weapons/homily-by-bishop-cantu-at-nagasaki-for-world-without-nuclear-weapons-2015-08-09.cfm

In his homily Archbishop Cantú declares:

“Pope Francis, when asked in November 2014 about what happened in Hiroshima and Nagasaki, said, “… humanity has not learnt its lesson … Humans did this and discovered nuclear energy which has many positive uses, but they also used it to destroy creation, humanity.”

The bishops of the United States join in solidarity with the Church in Japan in advocating for global nuclear non-proliferation and disarmament in the face of the tragedies that occurred here when atomic bombs struck.  In our 1983 pastoral letter on The Challenge of Peace, the U.S. bishops committed themselves to shaping “the climate of opinion which will make it possible for our country to express profound sorrow over the atomic bombing in 1945. Without that sorrow, there is no possibility of finding a way to repudiate future use of nuclear weapons….”  – End of quote –

Also, see Letter to Secretary of State Kerry on the Treaty on the Non-Proliferation of Nuclear Weapons
Bishop Oscar Cantú, May 12, 2015
In it he writes:
The United States and other nuclear weapons possessing states bear a particular responsibility for nuclear disarmament and despite the  success of the New START Treaty in further reducing the numbers of  weapons, there has not been enough progress.  We urge bold and concrete commitments to accelerate verifiable nuclear disarmament, including taking weapons off “launch on warning” status to prevent a catastrophic accident, deeper cuts in nuclear arsenals, ratification of the Comprehensive Test Ban Treaty to bring it into force, serious negotiations on a fissile material cut-off treaty and other prudent measures.

As the Holy See recently said:  “Lack of concrete and effective nuclear disarmament will lead sooner or later to real risks of nuclear proliferation.”  We share the view that ‘[t]he erosion of the credibility of the NPT could have catastrophic consequences for all countries and for the future of humanity as a whole.”  Please be assured of our prayers as you work for a world without nuclear weapons.

Sincerely yours,
Cantú
Most Reverend Oscar Cantú
Bishop of Las Cruces
Chair, Committee on International Justice and Peace

– End of quote –

Nuclear Watch New Mexico finds it very gratifying to see a New Mexico archbishop helping to lead the Vatican’s charge for nuclear weapons abolition. We will take an intense interest in seeing what position the other New Mexico archbishop, Santa Fe’s newly installed John Wester, might take on nuclear weapons. His diocese includes two of the nation’s three nuclear weapons laboratories, Los Alamos and Sandia. The labs’ main business nowadays is Life Extension Programs that prolong the lives of existing U.S. nuclear weapons for up to 60 years while giving them new military capabilities, despite denials at the highest levels of government. In keeping with New Mexico demographics, the work force at the labs is around  25% Catholic, some of whom may be receptive to the Pope’s call for nuclear weapons abolition.

Los Alamos National Laboratory Files Motion to Dismiss James Doyle Whistleblower Case

Los Alamos National Laboratory Files Motion to Dismiss

James Doyle Whistleblower Case

Santa Fe, NM – On August 25, 2015 the for-profit contractor that runs the Los Alamos National Laboratory filed a motion with the U.S. Department of Energy Office of Hearings and Appeals to dismiss Dr. James Doyle’s whistleblower complaint. Doyle’s case received widespread national and international media attention after Los Alamos National Security, LLC (LANS) terminated his employment in July 2014. In 2013 Doyle had published a study arguing that the global, verifiable abolition of nuclear weapons was in the best national security interests of the United States.

In September 2014, following his termination, DOE Secretary Ernest Moniz wrote to Doyle that Frank Klotz, the head of the National Nuclear Security Administration (NNSA), had asked the DOE Office of Inspector General (OIG) to investigate if “Dr. Doyle’s termination resulted in whole, or in part from the publication of his article in question or the views expressed in it.” NNSA Administrator Frank Klotz repeated this promise of an Inspector General investigation in a February 2015 letter to Senator Edward Markey, but it has yet to take place.

The promised Inspector General investigation is essential in determining whether LANS and NNSA acted properly in the Doyle case, and must be conducted before the DOE Office of Hearings and Appeals rules on LANS’ motion to dismiss. This is underscored by the fact that an earlier Inspector General report had determined that the LANS classification officer who retroactively classified Dr. Doyle’s study had a history of mishandling classified information and misrepresented himself to OIG investigators.

Dr. James Doyle remarked, “This attempt by LANS to have my case dismissed before the promised Inspector General investigation or an administrative hearing is a blatant attempt to deprive me of my rights and to cover up misconduct. I have written to President Obama and Energy Secretary Moniz asking that they deny LANS’ motion to dismiss and complete the promised Inspector General investigation.”

Doyle was among only 14 people within the laboratory workforce of over 10,000 employees to be laid off in 2014.

Doyle claimed in his whistleblower complaint that LANS’ Classification Officer abused his authority by improperly and retroactively classifying his article “Why Eliminate Nuclear Weapons,” which supported President Obama’s declared policy of a future world free of nuclear weapons. Although he wrote the study on his own time, Doyle took the precaution of successfully clearing his article with LANL in advance of publication. Various media articles have reported that his study was retroactively classified only after an inquiry by Republican staff on the House Armed Services Committee as to whether it contained sensitive information.

Because of classification rules Doyle cannot address allegations that his study contains secret information. However, Jay Coghlan, Director of Nuclear Watch New Mexico, observed, “Anyone can download Doyle’s study from the internet and see for themselves that it contains nothing sensitive about nuclear weapons deployments, designs or materials. There is only one word in his study that can possibly be classified, and that word is “Israel,” whose possession of nuclear weapons is commonly regarded as the worst kept secret in the world. Nevertheless, it is official US government policy to keep it classified. Many officials have crossed that line, but only Doyle has had to pay the price after it was misused in a biased manner to gag him after his article was published and he fought back.”

The DOE Office of Hearings and Appeals has not yet responded to the LANS motion to dismiss the Doyle case.

# # #

Los Alamos National Security, LLC’s motion to dismiss is available at

https://nukewatch.org/importantdocs/resources/LANS-motion-to-dismiss.pdf

Dr. James Doyle’s letter to Secretary Ernest Moniz is available at

https://nukewatch.org/importantdocs/resources/Doyle-Moniz-letter.pdf

Doyle’s January 2013 study “Why Eliminate Nuclear Weapon?” is available at:

https://www.iiss.org/en/publications/survival/sections/2013-94b0/survival–global-politics-and-strategy-february-march-2013-3db7/55-1-02-doyle-a88b.

The DOE Office of Hearings and Appeals’ docket on the Doyle case is available at https://cse.google.com/cse/publicurl?cx=011145866664225340457:yhreiv3focq

The February 2015 DOE Inspector General report is available at http://energy.gov/sites/prod/files/2015/02/f19/DOE-IG-0935.pdf.

Additional background on the Doyle case is available at:

http://www.publicintegrity.org/2014/07/31/15161/nuclear-weapons-lab-employee-fired-after-publishing-scathing-critique-arms-race

and

http://www.latimes.com/business/hiltzik/la-fi-mh-antinuclear-article-20140815-column.html

What does $4.79 million look like to Lockheed Martin?

What does $4.79 million look like to Lockheed Martin Inc, the world’s biggest defense contractor?

Recently, Lockheed Martin (LM) agreed to pay a $4.79 million settlement to the federal government to settle Justice Department allegations that LM illegally used taxpayer money to lobby for an extension of its Sandia Labs management contract.LM was trying to get its $2.5 billion annual management and operating contract extended without any pesky competition.

What may seem like a large amount to us is just a slap on the wrist to LM, which has scored almost $300 billion in 169,345 different contracts with the US federal government since 2008.

The website USA Spending tells us that LM did $32 billion in business with the federal government in 2014. Of that, $25 billion was contracted with the Department of Defense and almost $3 billion with the Department of Energy (DOE). It is for DOE that LM runs Sandia and co-manages Pantex and Y-12 with Bechtel. These 3 sites are a large part of the US nuclear weapons complex. We are all familiar with LM’s defense contracting, but Lockheed Martin is also contracting to help build the nuclear warheads for the missiles and aircraft that it also builds, for example with the world’s first nuclear “smart” bomb, the B61-12. It’s one-stop nuclear war machine shopping.

Lockheed Martin also has its tentacles in many diverse federal agencies, for instance the Internal Revenue Service where it provides computer-related services. The taxpayer ultimately pays for all contracts.

The settlement on clearly illegal lobbying behavior represents only .015% of LM’s annual total federal contracts and just .16% of the DOE contracts for 2014.

To LM, $4.79 million must look like the cost of doing business.

Here are some Lockheed Martin numbers for 2014:

US Agency Year(s) Amount Contracts Source
Total for LM

2008-2015

$293,176,103,660

169,345

More

Total for LM

2014

$32,496,127,143 20,156

More

Department Of Defense

2014

$25,319,041,531

17,869

 More

Department Of Energy

2014

$2,998,937,872

138

 More

IRS

2014

$27,824,450

83

 More

 

 

 

 

 

Watchdogs Denounce Slap on Wrist for Illegal Lobbying Activities

Watchdogs Denounce Slap on Wrist for Illegal Lobbying Activities
By the World’s Biggest Defense Contractor
Demand Real Accountability by Barring Lockheed Martin
From Future Sandia Labs Contract

 

Santa Fe, NM – In notice given late Friday the Department of Justice announced a settlement with Lockheed Martin over alleged violations of federal anti-lobbying laws to extend its management contract of the Sandia Labs without competition.

Jay Coghlan, Director of Nuclear Watch New Mexico, commented:

4.7 million dollars is a slap on the wrist for the world’s biggest defense contractor to pay. Lockheed Martin clearly broke the law by engaging in illegal lobbying activities to extend its Sandia contract without competition, and earned more than 100 million dollars while doing so. Moreover, it engaged in deep and systemic corruption, including paying Congresswoman Heather Wilson $10,000 a month starting the day after she left office for so-called consulting services that had no written work requirements. There should be criminal prosecutions for clear violations of federal anti-lobbying laws, and Lockheed Marin should be barred from future competition for the Sandia Labs contract, expected next year. Holding the revolving gang of greedy politicians and contractors strictly accountable is essential as they get ready to fleece the taxpayer during the planned one trillion dollar “modernization” for what the nuclear weapons labs are now calling “The Second Nuclear Age.”

Rep. Heather Wilson was the protégé of the powerful Senator Pete Domenici and was groomed to succeed him. Historically the New Mexican congressional delegation has always had deep ties to the Los Alamos and Sandia nuclear weapons labs, while the state remains among the poorest in the country. In 2013 Nuclear Watch New Mexico discovered through a Freedom of Information Act request that Wilson signed her contract with Sandia while still in office, and began receiving payment the day after she left Congress. She went on to secure a simultaneous contract with the Los Alamos National Laboratory, also for $10,000 a month for “consulting” services with no written work requirements.

# # #

The Department of Justice’s settlement agreement is available at

https://nukewatch.org/importantdocs/resources/Sandia-Settlement-Agreement.pdf

Rep. Heather Wilson’s contract and invoices pursuant to our FOIA request are available at

https://nukewatch.org/facts/nwd/HeatherWilson-Sandia contract-invoices.pdf

Federation of American Scientists

Nuclear Watch New Mexico

For immediate release August 12, 2015

Contacts:       Jay Coghlan, NWNM, 505.470.3154, jay[at]nukewatch.org

Hans Kristensen, FAS, 202.454.4695, hkristensen[at]fas.org

Robert Alvarez, IPS, 301.585.7672, kitbob[at]rcn.com

Dr. James Doyle, nonproliferation expert, 505.470.3154, jimdoyle6[at]msn.com

 

Nuclear Weapons Experts File Amicus Brief

To Support Marshall Islands Lawsuit

To Require Nuclear Disarmament Negotiations

Under U.S. NonProliferation Treaty Commitments

 

Washington, DC and Santa Fe, NM – Four nuclear weapons experts have filed an amicus (“friend of the court”) brief in support of a lawsuit filed by the Republic of the Marshall Islands to compel the United States to meet its requirements under the Nuclear NonProliferation Treaty (NPT). The basic bargain of the NPT is that non-weapons states agreed to never acquire nuclear weapons, in exchange for which nuclear weapons states promised to enter into good faith disarmament negotiations. Ratification of the treaty by the Senate in 1970 made its provisions the law of the land under the U.S. Constitution.

The experts filing the brief are: Hans Kristensen, Director of the Nuclear Information Project at the Federation of American Scientists; Dr. James Doyle, a nuclear nonproliferation expert fired by the Los Alamos national lab after publishing a study arguing for nuclear weapons abolition; Robert Alvarez, a former Senior Policy Advisor to the Secretary of Energy, now at the Institute for Policy Studies; and Jay Coghlan, director of Nuclear Watch New Mexico.

Hans Kristensen explained, “The United States, as one of the five original nuclear weapons states under the NPT, has a clear legal obligation to pursue negotiations toward nuclear disarmament. Yet despite progress on reducing overall nuclear arsenals, forty-five years later there are and have been no negotiations on their elimination. Instead, all nuclear weapon powers are pursuing broad and expensive modernization programs to retain and improve nuclear weapons indefinitely.”

The Marshall Islands’ lawsuit, which was filed in federal court in San Francisco, asserts that the U.S. has failed to fulfill its treaty duties. The case was initially dismissed in February 2015 by a federal judge after the U.S. government argued in part that enforcement of the NPT’s requirement for nuclear disarmament negotiations was not in the public interest. This is now being appealed. As the Marshall Islands’ original complaint notes, “While cessation of the nuclear arms race and nuclear disarmament are vitally important objectives to the entire international community, the Marshall Islands has a particular awareness of the dire consequences of nuclear weapons.” While still a U.S. protectorate after World War II, the American nuclear weapons complex used the Marshall Islands for more than a hundred atmospheric nuclear weapons tests that included newly developed H-bombs, and the displaced Marshallese have suffered severe health and contamination effects to this day. However, the Marshall Islands’ lawsuit is not asking for compensation, but instead seeks to hold the nuclear weapons powers accountable to the NPT’s requirement for good faith nuclear disarmament negotiations.

Andrea St. Julian, an attorney based in San Diego who specializes in federal appellate proceedings, filed the 94-page amicus brief. She observed, “The level of expertise and understanding the amici bring to this appeal is remarkable. Their arguments show how profoundly mistaken the district court was in its misapplication of the law. If the Court of Appeals takes adequate note of the briefing, it will have no alternative but to reverse the dismissal of the Marshall Islands’ suit. If not, we expect the Marshall Islands to take its case to the U.S. Supreme Court, and we will strongly support it there.”

Dr. James Doyle commented, “It’s not possible to eliminate the knowledge to build nuclear weapons, but it’s possible to make them illegal and remove them from all military arsenals, as existing treaties on chemical and biological weapons have already substantially done. The Marshall Islands’ case is an important step on the path to the elimination of nuclear weapons and deserves a ruling by the U.S. Supreme Court.”

Robert Alvarez added, “The Republic of the Marshall Islands has exposed the abuse of the good faith and trust of the non-weapons states that signed the NonProliferation Treaty on the understanding that the nuclear weapons states would begin disarmament negotiations. By seeking a binding legal requirement to actually begin negotiations, the Marshall Islands is simply trying to get the United States to honor the promises and commitments it made to the world 45 years ago.”

Jay Coghlan noted that the recently concluded 2015 NPT Review Conference ended in failure, in large part because nuclear weapons nations are modernizing their arsenals. He observed, “The U.S. government is getting ready to spend a trillion dollars on new production facilities for nuclear weapons and new bombers, missiles and submarines to deliver them. Because of that, we are keen to help the Marshall Islands hold the U.S. and other nuclear weapons powers accountable to their end of the NPT bargain, which is to enter into disarmament negotiations.”

# # #

The amicus brief is available at https://nukewatch.org/importantdocs/resources/Dkt-38-Amicus-Brief.pdf

Bios of the four amici are available in the amicus brief, beginning page 1.

Complete 9th circuit court proceedings in the Republic of Marshall Islands’ lawsuit are available at https://www.wagingpeace.org/nuclearzero/

 

 

Major Protests at U.S. Warhead Facilities Across the Nation Unite to Decry Trillion Dollar Plan for New U.S. Nuclear Weapons

For more information:
Ralph Hutchison, Oak Ridge Environmental Peace Alliance, [email protected]
<mailto:[email protected]> , 865-776-5050
Marylia Kelley, Tri-Valley CAREs, Livermore, mailto:[email protected]
<mailto:[email protected]> , 925-443-7148
Other key national and regional contacts are listed at the end of this release

For immediate release, August 4, 2015

HISTORIC 70TH ANNIVERSARY OF ATOMIC BOMBING OF HIROSHIMA, NAGASAKI:

Major Protests at U.S. Warhead Facilities Across the Nation Unite to Decry Trillion Dollar Plan for New U.S. Nuclear Weapons; Advocate Disarmament

A thousand or more peace advocates, Hibakusha (A-bomb survivors), religious leaders, scientists, economists, attorneys, doctors and nurses, nuclear analysts, former war planners and others across the country are coming together to commemorate the 70th Anniversary of the U.S. atomic bombings of Hiroshima and Nagasaki this August 6 through 9 at key sites in the U.S. nuclear weapons complex.

Major commemorations, rallies, protests and/or nonviolent direct actions will place at the Lawrence Livermore National Laboratory in CA, the Los Alamos National Laboratory in NM, the Kansas City Plant in MO, the Y-12 Plant in TN, the Rocky Flats Plant in CO, the Pantex Plant in TX, and in GA near the Savannah River Site. These events are united by their reflection on the past, and, uniquely, their focus on the present and future with a resolute determination to change U.S. nuclear weapons policy at the very locations that are linchpins in producing the new trillion dollar stockpile of nuclear weapons and their delivery vehicles.

“We stand on the brink of a new, global nuclear arms race,” noted Ralph Hutchison, the longstanding coordinator for the Oak Ridge Environmental Peace Alliance. “This is epitomized by government plans for a new Uranium Processing Facility to produce H-bomb components at Y-12, including for new-design weapons.”

“U.S. plans to ‘modernize’ the arsenal are also underway at Livermore Lab,” stated Marylia Kelley, Tri-Valley CAREs’ executive director. “A new Long-Range Stand Off warhead design and the start of plutonium shots in the Lab’s National Ignition Facility reveal two facets of this new arms race,” Kelley continued. “In contrast to the cold war, which was largely about sheer numbers, the new arms race and its dangers stem from novel military capabilities now being placed into nuclear weapons.”

Around the world, pressure for the U.S. to show leadership toward the abolition of nuclear weapons is growing. Pope Francis has repeatedly pressed the moral argument against nuclear weapons, inveighing not only against their use but also against their possession. In the wake of the successful Iran agreement, many are suggesting that since it has been settled that it would never be legitimate for Iran to obtain a nuclear weapon, shouldn’t we also agree that the 16,000 nuclear weapons in existence have no legitimacy either. Moreover, 113 governments recently signed the “Humanitarian Pledge,” circulated by Austria, to press the U.S. and other nuclear weapons states to fulfill their disarmament obligations.
Actions this week at U.S. nuclear weapons facilities will highlight the mounting international calls for nuclear abolition, with U.S. organizers lending their deep and often unique “on the ground” knowledge from the gates and fence lines of the facilities involved in creating new and modified U.S. nuclear weapons. “This 70th anniversary should be a time to reflect on the absolute horror of a nuclear detonation,” mused Ann Suellentrop of Physicians for Social Responsibility-Kansas City, “yet the new Kansas City Plant is churning out components to extend U.S. nuclear weapons 70 years into the future. The imperative to change that future is what motivates me to organize a peace fast at the gates of the Plant.”

Key events at U.S. nuclear weapons complex sites include:
• Y-12
– pastoral letter, remembrance, rally and nonviolent direct action, peace fast and lanterns. (More at http://orepa.org/action/hiroshimanagasaki-70/ <http://orepa.org/action/hiroshimanagasaki-70/> )
• Livermore Lab – peace camp, August 6 rally and nonviolent direct action, peace fast at the gates. (More info at www.trivalleycares.org <http://www.trivalleycares.org> )
• Los Alamos Lab – film screening, panels, rally and conference (More at www.nuclearwatch.org <http://www.nuclearwatch.org> )
• Kansas City Plant – atomic photographers exhibit, speakers, film screening, and peace fast at the gates. (More info at www.psr.org/chapters/kansas/ <http://www.psr.org/chapters/kansas/> )
• Savannah River Site – film screening, vigil, and circle of hope. (More: www.nonukesyall.org <http://www.nonukesyall.org> )
• Rocky Flats Plant – peace quilt, concert, film screening, labyrinth mourning walk. (More from [email protected] <mailto:[email protected]> )
• Pantex Plant – Hiroshima exhibit, panel discussion. (More at: www.peacefarm.us <http://www.peacefarm.us> )

These and other Hiroshima events and actions at sites in the U.S. nuclear weapons complex are being led by organizations that are members of the Alliance for Nuclear Accountability, which represents about three dozen groups. More about ANA can be found at www.ananuclear.org <http://www.ananuclear.org> .

ANA contacts available for interviews include:
Joni Arends
, Concerned Citizens for Nuclear Safety, [email protected] <mailto:[email protected]> ,  505 986-1973 (NM sites)
Jay Coghlan, Nuclear Watch New Mexico, [email protected] <mailto:[email protected]> , 505-989-7342 (NM sites)
Ann Suellentrop, Physicians for Social Responsibility-KC, [email protected] <mailto:[email protected]> , 913-271-7925 (MO site)
Kevin Kamps, Beyond Nuclear, [email protected] <mailto:[email protected]> , 240-462-3216 (Ohio sites)
Jerry Stein, Peace Farm, [email protected] <mailto:[email protected]> , 806-351-2744 (TX site)
Judith Mohling, Rocky Mountain Peace & Justice Center, [email protected] <mailto:[email protected]> , 303-447-9635 (CO sites)
Glenn Carroll, Nuclear Watch South, [email protected] <mailto:[email protected]> , 404-378-4263 (SC, GA sites)
Paul Kawika Martin, Peace Action, [email protected] <mailto:[email protected]> , 951-217-7285 (in Hiroshima)
Ralph Hutchison, Oak Ridge Environmental Peace Alliance, [email protected] <mailto:[email protected]> , 865-776-5050 (TN sites)
Marylia Kelley, Tri-Valley CAREs. [email protected] <mailto:[email protected]> , 925-443-7148 (CA sites)
Jackie Cabasso, Western States Legal Foundation, United for Peace & Justice, [email protected] <mailto:[email protected]> , 510-839-5877 (CA sites, calendar of national events)

Additional resources for media:
Physicians for Social Responsibility calendar and map of Hiroshima and Nagasaki actions at: www.psr.org/news-events/events/hiroshimadayevents-2015.html <http://www.psr.org/news-events/events/hiroshimadayevents-2015.html>
United for Peace and Justice, Nuclear Free Future Month calendar of events at: www.nuclearfreefuture.org <http://www.nuclearfreefuture.org>

###

 

Scroll to top