Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law
FOR IMMEDIATE RELEASE, October 3, 2024
Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]
AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.
The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites. These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.
As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.
High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up
FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.
On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.
NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production
FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email
Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.
In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:
“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]
Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.
NNSA’s Nuclear Weapons Budget Takes Huge Jump
Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut
FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.
The Biden Administration states that the $19.8 billion will be used to:
“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.
The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:
“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)
NNSA Suppresses How Taxpayers Money Is Spent
FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.
A current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.
2023
NukeWatch DNFSB 2022 Hearing Comments 1-20-23
Nuclear Watch New Mexico January 20, 2023 | Email
Defense Nuclear Facilities Safety Board
625 Indiana Avenue NW, Suite 700
Washington, DC 20004
Via email at <[email protected]>
Re: Comments concerning the November 16, 2022 public hearing regarding legacy cleanup activities, nuclear safety, and increased production activities at the Los Alamos National Laboratory
Dear Safety Board:
Nuclear Watch New Mexico (NukeWatch) appreciates the opportunity to provide follow up written comments for the November 16, 2022 public hearing in Santa Fe, NM. We want to thank the Board for its continuing concern over Los Alamos National Laboratory (LANL) safety issues and for having a public hearing to begin with. Further, we are grateful for the DNFSB’s perseverance in the face of the Department of Energy’s arguably illegal attempts to restrict its access. We look forward to many more years of the Safety Board’s insights and recommendations on nuclear facilities at DOE and NNSA sites, for which the DNFSB is uniquely positioned. Your service is invaluable and irreplaceable. Thank you!
Our mission statement: Nuclear Watch New Mexico seeks to promote safety and environmental protection at nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.
PLUTONIUM PIT PRODUCTION BRIEFING
Jay Coghlan, Nuclear Watch New Mexico January 17, 2023 | Email
GAO report: NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Pit Production Capability, January 12, 2023, gao.gov/products/gao-23-104661
- “NNSA’s Plutonium Pit Production Scope of Work Includes Dozens of Programs, Projects, and Other Activities Managed by Multiple NNSA Offices at Multiple Sites.” p. 19
- “NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Establishing its Pit Production Capability.” p. 40
- They [NNSA officials] said they did not want to introduce uncertainty about dates and wanted to avoid releasing preliminary or unpalatable information that was subject to change.” pp. 40-41
- “NNSA will have spent billions of dollars without having an overall idea of total program costs, or when program objectives, to include the capability to produce 80 pits per year, will be reached.” pp. 55-56
Independent Government Accountability Office Releases Scathing Report on Expanding Plutonium Pit Production; Pressure Mounts on Los Alamos Lab to Increase Production
FOR IMMEDIATE RELEASE, January 12, 2023 | Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – Today, the independent Government Accountability Office (GAO) released a scathing report entitled NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Pit Production Capability. The National Nuclear Security Administration (NNSA) and its parent Department of Energy have been on the GAO’s High Risk List for project mismanagement since 1991.
Plutonium pits are the essential radioactive cores of nuclear weapons. There has been only limited production at the Los Alamos National Laboratory (LANL) since 1989 when a FBI raid investigating environmental crimes abruptly shut down production at the Rocky Flats Plant near Denver. NNSA now plans to spend $2.9 billion in FY 2023 alone to establish production of at least 30 pits per year at LANL and 50 pits per year at the Savannah River Site (SRS) in South Carolina.
The two main findings of GAO’s report are:
- NNSA’s Plutonium Pit Production Scope of Work Includes Dozens of Programs, Projects, and Other Activities Managed by Multiple NNSA Offices at Multiple Sites (p 19)
RECENT FACT SHEETS
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
RECENT PRESS RELEASES
Los Alamos Lab: More Plutonium, More Nuclear Weapons
FOR IMMEDIATE RELEASE, April 18, 2022 | Contact: Jay Coghlan, 505.989.7342, [email protected], Scott Kovac, 505.989.7342, [email protected],
Santa Fe, NM – On Good Friday afternoon, just before the Easter weekend, the Department of Energy (DOE) posted its “Laboratory Tables”, the best source for site specific budget information. DOE boosts funding for the Los Alamos National Laboratory (LANL) to $4.6 billion in FY 2023 (+21%), which begins October 1. With another typical $300 million in “Work for Others” (the Defense Department, FBI, CIA, etc.), LANL’s total institutional funding for FY 2023 will be approximately $4.9 billion.
Out of that, $3.6 billion is slated for core nuclear weapons research and production programs. The percentage of nuclear weapons funding at LANL has steadily grown as the Lab increasingly banks its future on plutonium “pit” bomb core production. A decade ago, nuclear weapons programs were 59% of LANL’s total institutional budget. Today it is 73%. Moreover, the remainder of Lab programs (including nonproliferation and cleanup) either directly or indirectly support nuclear weapons programs, for example through a 6% internal tax for “laboratory-directed research and development” that has historically tilted towards nuclear weapons.
LANL’s largest funding increase is for “Plutonium Modernization”, jumping 61% to $1.6 billion in FY 2023. Within that, funding to expand the production of plutonium “pit” bomb cores at LANL’s aging plutonium pit production facility is increased 68% to $588 million.
Biden’s FY 2023 Budget Fuels New Nuclear Arms Race
FOR IMMEDIATE RELEASE, April 12, 2022 | Contact: Jay Coghlan, 505.989.7342, [email protected], Scott Kovac, 505.989.7342, [email protected],
Santa Fe, NM – The Biden Administration is slow rolling its nuclear weapons budget for the federal fiscal year 2023, which will begin October 1, 2022. Top line budget numbers released on March 24 showed that Biden is increasing the National Nuclear Security Administration’s (NNSA’s) budget category for “Total Weapons Activities” by 7.4% to $16.5 billion. That may seem like a relatively modest increase, especially given accelerating inflation.
However, huge increases in specific programs have now been disclosed in an obscure budget chart entitled “Comparative Appropriation by Congressional Control FY 2023.” These NNSA programs are the tip of the spear in the United States’ $1.7 trillion nuclear weapons “modernization” program. It will rebuild every nuclear warhead in the planned stockpile with new military capabilities; design and manufacture new-design nuclear weapons as well; construct new production plants expected to be operational until the 2080’s; and procure at enormous taxpayers’ expense new missiles, subs and bombers to deliver these weapons of mass destruction. It is, in short, a program of nuclear weapons forever.
NukeWatch Lawsuit Settlement Speeds Up Cleanup at Los Alamos Lab
FOR IMMEDIATE RELEASE, March 23, 2022 | Contact: Jay Coghlan, 505.989.7342, [email protected], Scott Kovac, 505.989.7342, [email protected],
Santa Fe, NM – Today, Nuclear Watch New Mexico is announcing successful settlement of a lawsuit it brought against the Department of Energy (DOE) over its slow cleanup of the Los Alamos National Laboratory (LANL). The watchdogs’ lawsuit alleged violations of a 2005 Consent Order, which was a site-wide cleanup agreement between the New Mexico Environment Department (NMED) and DOE to address radioactive and toxic wastes at the Lab. NMED has since sued DOE to terminate a revised 2016 Consent Order issued under the Martinez Administration that is far weaker than the original 2005 Order.
After a six-year court battle, NukeWatch’s settlement agreement requires DOE to:
- Reestablish a surface water flow monitoring station near where the Los Alamos Canyon meets the Rio Grande. This is critical because the Canyon has long been a known pathway for plutonium contaminants to migrate as far as 20 miles south to Cochiti Lake, a popular recreational area. The Buckman Direct Diversion Project (BDDP), three miles south of the Canyon, supplies drinking water directly out of the river to the City and County of Santa Fe. The original monitoring station warned the BDDP to close its intake gates as a precaution during stormwater events and allowed characterization of the radioactive contaminants in the stormwater flows.” However, it was destroyed during a 2013 flood and DOE had refused to reinstall it ever since, despite repeated BDDP requests. Meanwhile, during that same period of time, funding doubled for LANL’s nuclear weapons research and production programs that caused the radioactive and toxic pollution to begin with.
NNSA Whitewashes LANL Performance, Hides Information from Taxpayers
FOR IMMEDIATE RELEASE, February 10, 2022 | Contact: Jay Coghlan, 505.989.7342, [email protected]
Santa Fe, NM – Today the National Nuclear Security Administration (NNSA) released cursory three-page summaries of its FY 2021 Performance Evaluation Reports (PERs) which grade contractor performance at its eight nuclear weapons sites. Out of six missions goals the NNSA gave the Los Alamos National Laboratory (LANL) two “Excellent” and four “Very Good,” thereby awarding 87% of the at-risk award fee of $26 million to Triad National Security, LLC, the Management and Operating Contractor. In all, including the fixed fee of $20.5 million, Triad will receive $46.7 million for its FY 2021 contractor performance.[1]
The NNSA is releasing only summaries of the Performance Evaluation Reports (“Performance Evaluation Summaries”), which provide scant information and essentially whitewash contractor performance. For context, the Department of Energy’s nuclear weapons and cleanup programs have been on the Government Accountability Office’s High Risk List for project and contractor mismanagement for 27 consecutive years. In 2012 Nuclear Watch New Mexico sued to obtain the full and complete Performance Evaluation Reports, after which NNSA caved in and immediately provided them. However, that unfortunately resulted in no legal settlement requiring annual releases of the full and complete PERs, and now the agency is back to suppressing information of contractor performance paid for by the American taxpayer.
Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit
Federal agencies continue to reject a full review of the public safety and environmental risks of producing nuclear bomb cores at multiple DOE sites.
Jay Coghlan, director of Nuclear Watch New Mexico, commented, “The government has yet to explain to American taxpayers why it will spend more than $50 billion to build new plutonium pit bomb cores for new-design nuclear weapons when we already have thousands of existing pits proven to be reliable for a century or more. This has nothing to do with maintaining the safety and reliability of the existing stockpile and everything to do with building up a new nuclear arms race that will threaten the entire world.”
SRS WATCH / EIN PRESSWIRE October 26, 2021
AIKEN, SOUTH CAROLINA — Public interest groups shot back at the U.S. Department of Energy and the National Nuclear Security Administration’s attempt to suppress a lawsuit seeking a comprehensive environmental review of the agencies’ plans to produce large quantities of nuclear bomb cores, or plutonium pits, at DOE sites in New Mexico and South Carolina.
Expanded Plutonium “Pit” Bomb Production Rules Over Genuine Cleanup Los Alamos Lab Plans to Make Existing Nuclear Waste Dumps Permanent Without Eliminating Threat to Groundwater
The Department of Energy (DOE) has submitted a report to the New Mexico Environment Department (NMED) declaring its preferred plan to “cap and cover” radioactive and toxic wastes at one of the Los Alamos National Laboratory’s (LANL’s) oldest dumps. DOE’s $12 million cleanup-on-the-cheap plan for Material Disposal Area C will create a permanent nuclear waste dump above our regional groundwater. In contrast, DOE has asked Congress for one billion dollars for expanded plutonium “pit” bomb core production at LANL for fiscal year 2022 alone.
LANL used to falsely claim that groundwater contamination was impossible and even asked NMED for a waiver from even having to monitor for it. We now know that there is extensive groundwater contamination from hexavalent chromium (the carcinogen in the Erin Brockovich movie) and high explosives. Traces of plutonium have been detected 1,300 feet under Area C in regional groundwater monitoring wells. The dump also has a large toxic gaseous plume of industrial solvents known as volatile organic compounds (VOCs) which threatens nearby facilities.
New Mexico: Number One in Nuclear Weapons and Radioactive Wastes Near Last in Citizen and Child Well-Being
The goal of NNSA programs in New Mexico is to indefinitely extend the service lives of existing nuclear weapons while giving them new military capabilities. This will be followed by completely new nuclear weapons that cannot be tested given the global testing moratorium. Alternatively, it could prompt the U.S. back into nuclear weapons testing, which would have serious international proliferation implications. NNSA’s claimed rationale is “deterrence” which requires only a few hundred nuclear weapons. In reality the U.S. and Russia each have thousands of ready-to-launch weapons for nuclear war-fighting.
Lawsuit Filed Against Biden Administration Over Nuclear Bomb Core Production Plans
Federal agencies’ refusal to review cross-country expansion of plutonium pit production violates the National Environmental Policy Act and the Administrative Procedures Act, groups say.
AIKEN, S.C. – Today, a coalition of community and public interest groups filed a lawsuit against the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA). This legal action is prompted by the agencies’ failure to take the “hard look” required by the National Environmental Policy Act at their plans to more than quadruple the production of plutonium pits and split their production between the Los Alamos National Laboratory in New Mexico and the Savannah River Site in South Carolina.
Following New Mexico Environment Department Lawsuit DOE Dramatically Increases Funding for Los Alamos Lab Cleanup
Santa Fe, NM – The Biden Administration has finally released budget details for Department of Energy (DOE) programs that clean up Cold War contamination and radioactive and toxic wastes. In January the New Mexico Environment Department sued DOE in order to terminate a 2016 “Consent Order” that subordinated cleanup at the Los Alamos National Laboratory (LANL) to the budget that DOE wants, which is increased nuclear weapons production. The Biden Administration has responded by increasing proposed cleanup funding at the Lab by 33% from $226 million in FY 2021 to $333.5 million proposed for FY 2022 (which begins October 1, 2021).
Biden Continues Trump’s Bloated Nuclear Weapons Budget
Will That Change in Future Years?
Santa Fe, NM – In a classic move that discouraged media coverage, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) released its long delayed FY 2022 Congressional Budget Request around 7:30 pm EST Friday, May 28, at the very beginning of the long Memorial Day weekend.
Nuclear Watch New Mexico strongly opposed the 25% FY 2021 increase that the Trump Administration bequeathed to NNSA’s nuclear weapons programs. That massive increase was originally sold in testimony to Congress as essential to maintaining the nuclear deterrence but later revealed as necessary to cover NNSA cost overruns and blown schedules.[i]
RECENT NUCLEAR BUDGET GRAPHS
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
Past Work Product (2020-2021)
Non-Governmental Organizations Demand Resumption of Los Alamos Nuclear Bomb Plant Public Information Meetings
The NGOs request that the semi-annual public meetings resume by early fall 2020, and the CMRR Project website be updated and maintained until the RLUOB reconfiguration and PF-4 upgrades are completed. All documents and presentations from the previous 13 public meetings must be reposted. The NGOs are also asking that the unilateral decision by the DOE/National Nuclear Security Administration (NNSA) to increase the amount of plutonium equivalent allowed in the RLUOB from 8.4 grams to 400 grams be reviewed by NMED.
Los Alamos Lab Suppresses Data on Negative Economic Impact on Surrounding Counties; Wealthy White Los Alamos County Asks for 3,000 Acres Seized from Hispanics and Native Americans
“This is yet another example of the racial disparity that exists in the wake of communities like Los Alamos, established under the protective umbrella of government sanctioned white privilege. When you take something by force and don’t pay for it, that’s called stealing. So why is land stolen by the US government from the original Hispanic and Native American owners not being given back to them?…As the national reckoning over racial injustice unfolds, let us not forget how Los Alamos Lab came to be and the insult to injury that giving away land stolen from others represents.”
— Chuck Montaño, Nuclear Watch NM Steering Committee member. Mr. Montaño, born and raised in Santa Fe, NM, worked at the Los Alamos National Laboratory for 32 years where he investigated allegations of fraud, waste and abuse.
WATCHDOG GROUPS FILE LEGAL PETITION WITH ENERGY DEPT: Allege Agency is Slow Walking “Record of Decision” Re: Plutonium Bomb Core Production to Prevent Judicial Review; Stage Set for Litigation on Expanded Production
“DOE and NNSA appear to be deliberately slow-walking the issuance of a formal Record of Decision on expanded plutonium pit production in an apparent effort to prevent the federal courts from reviewing the agencies’ failure to comply with the National Environmental Policy Act.”
COLLECTIVE COMMENTS: on the National Nuclear Security Administration’s (NNSA’s) Draft Supplement Analysis of the 2008 Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (LANL) for Plutonium Operations
These comments were signed onto by over 100 individuals and organizations.
THANK YOU to all those who participated!
75TH ANNIVERSARY HIROSHIMA DAY ONLINE COMMEMORATION CALLING FOR THE ABOLITION OF NUCLEAR WEAPONS
August 6, 2020
"Jay Coghlan of Nukewatch.org on the history of the Los Alamos labs, where the bomb was designed and fabricated, and how it continues to play the leading role in the creation of most U.S. nuclear weapons since then."
[embeddoc url="https://nukewatch.org/wp-content/uploads/2020/05/plutonium-pit-production-fact-sheet.pdf" download="all" viewer="browser"]
PLUTONIUM PIT PRODUCTION WORKSHOP – NOVEMBER 19, 2019
RADIO INTERVIEW – SCOTT KOVAC & JON LIPSKY
Scott Kovac of Nuclear Watch New Mexico and Jon Lipsky, the FBI agent who led the 1989 raid investigating environmental crimes that shut down the Rocky Flats Nuclear Bomb Plant join Xubi to talk about Nuclear weapons, Nuclear clean up and Pit production plans at LANL.
RADIO INTERVIEW – JAY COGHLAN & JON LIPSKY
PIT Production at LANL with Nuclear Watch New Mexico’s Jay Coghlan and Workshop Speaker, Jon Lipsky
RADIO INTERVIEW – MARYLIA KELLEY, EXECUTIVE DIRECTOR, TRI-VALLEY CARES
Nuclear Watch NM’s Workshop on LANL & PIT Production with Marylia Kelley of Tri-Valley CARES
Pit Production Workshop: View the Presentations
Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
Introduction by Jay Coghlan
Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
Marylia Kelly, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
https://www.facebook.com/NukeWatch.NM/videos/825812604488302/
Scott Kovac Nuclear Watch New Mexico, on LANL cleanup issues
Blog Posts
Nuclear Weapons Issues & The Accelerating Arms Race: December 2023
Nuclear weapons issues
Final conference by Senate and House Armed Services Committee deleted expansion of the Radiation Exposure Compensation Act that would have covered Trinity Test Downwinders, among others. In contrast, it authorized tens of billions for expanding nuclear weapons programs. So, it’s nothing for those harmed by nuclear weapons testing and production in New Mexico, but radical expansion of those programs that did harm them.
The FY 2024 Defense Authorization Act added money above Biden’s request for pit production at the Savannah River Site and the Sea-Launched Cruise Missile and its new nuclear warhead. The Biden Administration opposed the SLCM, but Congress authorized it anyway.
LANL SWEIS
The 2020 Supplement Analysis that we had robustly critiqued with comprehensive formal comments, which DOE/NNSA have ignored, contains analysis of pit production based solely off the 2008 SWEIS pit analysis. Our single biggest point in the 2020 SA comments was the need for a programmatic environmental impact statement on expanded plutonium pit production.
Homily and Statement by Archbishop Wester to the Parties to the Treaty on the Prohibition of Nuclear Weapons
On November 29, 2023, the 34th anniversary of the death of Dorothy Day, and in conjunction with the Second Meeting of the State Parties to the Treaty on the Prohibition of Nuclear Weapons, the Archbishop of Santa Fe John C. Wester gave a homily on nuclear disarmament at Our Church of the Savior near the United Nations. Dorothy Day was a life-long anti-nuclear weapons activist and is now being considered for canonization by the Catholic Church.
The Second Meeting of States Parties on the Prohibition of Nuclear Weapons
Since the invasion of Ukraine nearly two years ago, to the recent situation in Israel/Gaza, the risk of impending nuclear war has been a reality considered by many for the first time. As stated at a side event during the weeklong meeting of States Parties on the Prohibition of Nuclear Weapons (TPNW) held last week from November 27 to Decmber 1st, Hirotsugu Terasaki, Director General of Peace and Global Issues, Soka Gakkai International (SGI), warned that the wide-scale violence brought by these two events “continue to heighten the risk that nuclear weapons could actually be used.” This fear is made all the more tangible when considering also that earlier this month, the Putin announced Russia would be revoking its ratification of the Comprehensive Test Ban Treaty (CTBT), which Terasaki pointed out is a “serious setback for the cause of nuclear disarmament.”
As stated in the article, The Voices of Victims of Nuclear Weapons Testing, “these realities make convening the current Second Meeting of States Parties of the TPNW, which concludes December 1, all the more important and a crucial opportunity to revive momentum for nuclear disarmament and abolition.”
Nuclear Weapons Issues & The Accelerating Arms Race: November 2023
Nuclear weapons issues
New bomb: The Pentagon has announced a new nuclear bomb, the B61-13. The B61-12 is now in production and will be forward deployed in Europe. But it has a dial-a-yield that maxes out at 50 kilotons. The new B61-13 will max out at 360 kt to get at hardened deeply buried targets (both have limited earth-penetrating capabilities). At one time, production of the B61-12 at least potentially signified retirement of the 1.2 megaton surface burst B83 strategic bomb, but now production of the B61-13 will probably be relatively quick at the tail end of already scheduled B61-12 production.
See: https://www.defense.gov/News/Releases/Release/Article/3571660/department-of-defense-announces-pursuit-of-b61-gravity-bomb-variant/ and https://media.defense.gov/2023/Oct/27/2003329624/-1/-1/1/B61-13-FACT-SHEET.PDF
See excellent analysis by the Federation of American Scientists:
https://fas.org/publication/biden-administration-to-build-a-new-nuclear-bomb/
Strategic Posture Review: Commissioned by Congress,
“The Commission recommends that a strategy to address the two-nuclear-peer threat [Russia and China] environment be a prerequisite for developing U.S. nuclear arms control limits for the 2027-2035 timeframe. The Commission recommends that once a strategy and its related force requirements are established, the U.S. government determine whether and how nuclear arms control limits continue to enhance U.S. security…”
→
U.S. Strategic Posture Commission Ratchets Up Nuclear Arms Race
Today, America’s Strategic Posture, The Final Report was released by the Congressional Commission on the Strategic Posture of the United States. In its own words:
“The Congressional Commission on the Strategic Posture of the United States was established by the Fiscal Year (FY) 2022 National Defense Authorization Act (NDAA), and concludes that America’s defense strategy and strategic posture must change in order to properly defend its vital interests and improve strategic stability with China and Russia. Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.”
The United States has already embarked upon a $2 trillion “modernization” program that is a complete makeover of its nuclear forces. This program will rebuild every warhead in the planned future stockpile while giving them new military capabilities. It will also build new-design nuclear weapons and new missiles, subs and bombers to deliver them, plus new nuclear weapons production plants expected to be operational until the 2080’s.
Los Alamos Lab’s Future at a Crossroads: Cleanup or More Nuclear Weapons? NukeWatch Applauds NM State Rejection of Fake Cleanup
Santa Fe, NM – In an important win for genuine cleanup at the Los Alamos National Laboratory (LANL), the New Mexico Environment Department (NMED) has rejected the Lab’s plans for so-called cleanup through “cap and cover.” LANL’s plan would leave existing radioactive and toxic wastes uncharacterized and forever buried in unlined pits and trenches as a permanent threat to groundwater. At issue is remediation of the Lab’s “Material Disposal Area C” waste dump that has 7 pits and 108 shafts of radioactive and toxic wastes. Area C is located in the heart of nuclear weapons production at LANL, contiguous to the Lab’s main plutonium facility which is expanding production of plutonium “pit” bomb cores.
In a September 7, 2023 “Public Notice of Statement of Basis,” the Environment Department ruled:
“For maximum protection of human health and the environment and to ensure that the drinking water resource can be conservatively protected, NMED has determined that the selected [cleanup] remedy for MDA C must consist of waste excavation, characterization, and appropriate disposal of the buried waste… Excavation will ensure that the source of contamination at MDA C is removed…”
National Nuclear Security Administration: New Assessments of Major Projects from the Government Accountability Office
National Nuclear Security Administration: Assessments of Major Projects
The National Nuclear Security Administration plans to invest over $30 billion in its major projects to modernize the research and production infrastructure supporting the nation’s nuclear weapons stockpile. This is our first biennial assessment of NNSA’s major projects.
As of March 2023, NNSA’s major projects collectively exceeded their cost estimates by over $2 billion. They also surpassed their collective schedules by almost 10 years. Cost growth and schedule delays had multiple causes, such as lower levels of worker productivity than planned.
The Department of Energy has been on the Government Accountability Office’s “High Risk List” for project mismanagement since 1991. A January 2023 GAO report says it all: NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Pit Production Capability. Congress has made its ongoing concern over the lack of pit aging studies explicit in legislation. The FY 2021 Consolidated Appropriations Act enacted the following provision:
“Pit and Plutonium Aging.-There is concern with the apparent lack of focus on advancing knowledge regarding pit and plutonium aging since the JASONs conducted its first study in 2006. Given the future needs of the nation’s nuclear deterrent, a robust program of research and experimentation is needed. Therefore, NNSA is directed to develop a comprehensive, integrated ten-year research program for pit and plutonium aging that represents a consensus program among the national laboratories and federal sponsors. Such a plan shall include estimated cost of ongoing research, new or upgraded capability needs, and key near-, mid-, and long-range milestones. The plan shall be submitted to the Committees on Appropriations of both Houses of Congress not later than 180 days after enactment of this Act.”
As far as is publicly known no such plan has been submitted to Congress despite its statutory requirement. That said, a ten year plan to have plutonium pit aging studies is not sufficient to begin with when uncertainty over pit aging is being used as the rationale for an aggressive plutonium pit production program costing at least $60 billion over the next thirty years. The recent GAO report states, “…Six projects in the design phase are implementing significant changes that may increase their cost and schedule beyond NNSA’s preliminary estimates. These include a project to modify existing plutonium processing facilities at Los Alamos National Laboratory in New Mexico.”
Furthermore, the entire U.S. $2 Trillion “Modernization” plan includes new intercontinental ballistic missiles, new cruise missiles, heavy stealth bombers and
submarines, which entails rebuilding warheads with new military capabilities plus completely new-design nuclear weapons. This is not just for “deterrence” but instead for nuclear warfighting capabilities. No production of plutonium pits is scheduled to maintain the safety and reliability of the existing nuclear stockpile; instead it is for new-design nuclear weapons. The US is inspiring a new arms race with nuclear weapons forever.
→
Photos from Japan Pilgrimage of Peace
Image Credit: The Archdiocese of Seattle Website (Daily Digests), Leslie M. Radigan & Archdiocese of Santa Fe Official Facebook Page, and Jay Coghlan of NukeWatch New Mexico.
“We are here to see what we can do to advocate for peace and share the gospel,” said AB Etienne. We are here “to invite people to realize that we can have peace by growing relationships with our neighbors and communities. We need to do that as people before we can do so as nations.”
Watchdogs Urge Reduced Contractor Fees at the Los Alamos Lab
Watchdogs Urge Reduced Contractor Fees at the Los Alamos Lab
Washington, DC and Santa Fe, NM – Today, the Project On Government Oversight and Nuclear Watch New Mexico sent the Secretary of the Department of Energy a letter urging that the contractor award fee for the Los Alamos National Laboratory (LANL) be slashed. The total possible fee that can be earned for FY 2014, which ended September 30, is $17.1 million in fixed fee and up to $40 million in incentive fee. The watchdog organizations argue that the incentive fee award should be cut at least in half because of grossly substandard contractor performance.
The Los Alamos Lab is run by Los Alamos National Security, LLC (LANS), whose two main partners are the University of California (UC) and the privately held Bechtel Corporation. UC ran the Lab as a nonprofit until June 2006, and received approximately $8 million in annual compensation. In contrast, the for-profit LANS was awarded $51.9 million in FY 2013, or more than six times the old nonprofit fee, for no apparent improvement in contract management. As recently reported by The Albuquerque Journal, LANL Director Charlie McMillan makes $1.5 million annually while also acting as president of LANS, which is a possible conflict of interest.
LANS’ contract performance in FY 2014 was demonstrably worse than other years. The best, well-publicized evidence is that the Lab used unapproved waste handling methods to prepare plutonium-contaminated radioactive wastes for disposal at the Waste Isolation Pilot Plant (WIPP). A waste drum subsequently ruptured, contaminating 21 workers and closing WIPP, with estimated reopening costs of a half-billion dollars (which will no doubt increase). Moreover, the New Mexico Environment Department now threatens to levy substantial fines against LANL because of its missed deadline to send transuranic wastes to WIPP.
Less well known, the Lab is the nation’s only so-called “Plutonium Center of Excellence,” but has been unable to conduct major operations at its plutonium facility since the end of June 2013 because of nuclear criticality safety issues. The two watchdog organizations do not support plutonium operations at LANL, much of which is geared towards the unnecessary production of plutonium pits, the fissile cores of nuclear weapons. However, at the same time, contractors should not be paid for work they don’t do.
Peter Stockton, POGO’s senior investigator, commented, “It’s time for some tough love! LANS screws up the WIPP facility, costing the government at least $500 million, and had to stop operations at its plutonium facility for over a year because of nuclear safety concerns. In the face of these debacles, DOE should be seeking restitution, not providing a performance bonus.”
Bechtel has had a particularly troubling contracting history with DOE. Under its management estimated costs for the Waste Treatment Plant at the Hanford nuclear reservation soared from $3.5 billion to $13 billion, with numerous whistleblower complaints. Similarly, under LANS’ management of the Los Alamos Lab, estimated costs for the Chemistry and Metallurgy Research Replacement Project mushroomed from around $600 million to $6.5 billion, leading to cancellation of the proposed “Nuclear Facility.” Now, in effect, Bechtel has awarded itself the construction contract to build the Uranium Processing Facility at the Y-12 production plant in Oak Ridge, TN. Under a previous contractor estimated costs for the UPF exploded from around $600 million to as high as $19 billion. To help fix that, the UPF’s mission has been recently narrowed to nuclear weapons components production only (eliminating dismantlements) in order to hold to a budget cap of $6.5 billion. That means the American taxpayer is paying more for less, and arguably for the wrong priorities. Lockheed Martin and Bechtel run the new Y-12 management contract.
Jay Coghlan, Nuclear Watch Director, commented, “The Department of Energy’s cozy relationships with its contractors must end, given their repeated failures and massive cost overruns. Substandard performance by the Los Alamos Lab contractor is costing the taxpayer dearly, and therefore DOE should slash its incentive performance fee award at least in half. From there, DOE should consider booting Los Alamos National Security, LLC for another contractor entirely.”
# # #
The POGO/Nuclear Watch NM letter to DOE Secretary Ernest Moniz urging reduced award fees for the Los Alamos Lab contractor is available at
https://nukewatch.org/importantdocs/resources/POGO-NukeWatch-Moniz-LANS-performance-12-3-14.pdf
Highlights of National Nuclear Security Administration Issues in the House FY 2015 National Defense Authorization Act
Highlights of National Nuclear Security Administration Issues
In the House FY 2015 National Defense Authorization Act
Sources: House FY 2015 NDAA, pages 1516 – 1555 and budget tables beginning page 1643.
http://docs.house.gov/billsthisweek/20141201/CPRT-113-HPRT-RU00-S1847.pdf
Compiled by Jay Coghlan, Nuclear Watch New Mexico. Any comments by me are italicized.
The House FY 2015 National Defense Authorization Act authorizes $8.2 billion for the National Nuclear Security Administration’s (NNSA’s) nuclear weapons programs, in contrast to the Obama Administration’s request of $8.3 billion.
It meets the Administration’s $643 million request for the B61 Life Extension Program, and raises the $9.4 million request for the Long-Range Stand-Off (AKA air-launched cruise missile) nuclear warhead to $17 million.
It raises the $30 million request for dismantlements to $40 million.
It meets the $335 million request for the Uranium Capabilities Replacement Project (AKA the Uranium Processing Facility).
It raises the $196 million request for construction of the MOX Fuel Fabrication Facility to $341 million.
It cuts the $410.8 million request for the NNSA Office of the Administrator to $386.9 million.
SEC. 3111. DESIGN AND USE OF PROTOTYPES OF NUCLEAR WEAPONS FOR INTELLIGENCE PURPOSES requires the lab directors to “develop a multiyear plan to design and build prototypes of nuclear weapons to further intelligence estimates with respect to foreign nuclear weapons activities and capabilities.” This effort “emphasizes the competencies of the national security laboratories with respect to designing and building prototypes of nuclear weapons.”
This could possibly be abused by U.S. designers to design new nuclear weapons under the rubric of gathering foreign intelligence.
SEC. 3112. PLUTONIUM PIT PRODUCTION CAPACITY declares that the “production of plutonium pits and other nuclear weapons components must be driven by the requirement to hedge against technical and geopolitical risk and not solely by the needs of life extension programs.” It goes on to require the actual production of not less than 10 plutonium war reserve pits during 2024, 20 during 2025, 30 during 2026, and demonstration of the capability to produce 80 pits per year by 2027.
How convenient to delink plutonium pit production from the actual needs of Life Extension Programs, since the only LEP that required new pit production has been indefinitely delayed. This was for the so-called Interoperable Warhead, which faced exorbitant costs and lack of support by the Navy. Nevertheless, the House Armed Services Committee now mandates expensive and provocative expanded plutonium pit production for which there is no clear need. Ironically, the Los Alamos National Laboratory has been unable to conduct plutonium operations at its pit production facility since June 2013 because of nuclear criticality safety issues.
SEC. 3118. COST CONTAINMENT FOR URANIUM CAPABILITIES REPLACEMENT PROJECT limits Phase 1 of construction of the Uranium Processing Facility to $4.2 billion. That cap could be adjusted if the DOE Secretary submits a detailed justification, including “a detailed description of the actions taken to hold appropriate contractors, employees of contractors, and employees of the Federal Government accountable for the repeated failures within the project.” It also requires that uranium operations in Building 9212 cease by 2025.
Notably, the House NDAA does NOT contain a definitional change that NNSA shopped to key congressional committees that would have narrowed the Uranium Processing Facility’s mission, thereby helping to contain its costs (which was previously capped at $6.5 billion). Thus the Uranium Processing Facility could soon be headed for another budget crisis.
SEC. 3119. PRODUCTION OF NUCLEAR WARHEAD FOR LONG-RANGE STANDOFF WEAPON requires that “The Secretary of Energy shall deliver a first production unit for a nuclear warhead for the long-range standoff weapon by not later than September 30, 2025.”
This is meant to block the Administration’s proposed two year delay. Rushing into the LRSO nuclear warhead makes no sense because it puts the cart before the horse when work on the new air-launched cruise missile has yet to start.
SEC. 3120. DISPOSITION OF WEAPONS-USABLE PLUTONIUM requires another report on possible alternatives to the MOX Program for plutonium disposition, including their life cycle costs.
Nevertheless, as previously stated, the Act increases funding for construction of the MOX Fuel Fabrication Facility to $341 million.
SEC. 3132. ANALYSIS OF EXISTING FACILITIES AND SENSE OF CONGRESS WITH RESPECT TO PLUTONIUM STRATEGY requires “analysis of using or modifying existing facilities of the nuclear security enterprise… to support [NNSA’s plutonium] strategy, as part of critical decision 1 in the acquisition process for the design and construction of modular structures associated with operations of the PF–4 facility at Los Alamos National Laboratory, Los Alamos, New Mexico.” This is to include “plans to construct two modular structures that will achieve full operating capability not later than 2027,” all for the purpose of “meet[ing] the requirements for implementation of a responsive infrastructure, including meeting plutonium pit production requirements.”
But there are no actual pit production requirements. Recall that the Act delinks plutonium pit production from the actual needs of the nuclear weapons stockpile to become a hedge against undefined and indefinite “technical and geopolitical risk.” The Act also requires major expansion of production at LANL, when significant budget, environmental and safety issues for existing plutonium pit production remain unresolved (witness the use of unauthorized waste treatment processes by the Lab that led to the contamination of 21 workers and the closure of the Waste Isolation Pilot Plant, with initial estimates of $.5 billion dollars to reopen). The House Armed Services Committee’s mandate of expanded plutonium pit production is an ideological statement of nuclear weapons forever, rather than being driven by the technical needs of the stockpile. This is an unnecessary and provocative waste of taxpayer’s money that if enacted is doomed for failure.
NNSA Considers Stuffing More Plutonium Into New Facility
Despite the fact that no one has come up with a good reason to increase plutonium pit production for the nation’s nuclear weapons stockpile, officials want to study the possibility of radically increasing the amount of plutonium allowed in a recently completed laboratory at the Los Alamos National Laboratory.
The Deputy Administrator for National Nuclear Security Administration (NNSA) Defense Programs, Don Cook, has requested an analysis to increase the radioactive materials inventory in the recently completed Radiological Laboratory Utility Office Building (RLUOB) to up to 400 grams of plutonium-239, the isotope used in nuclear weapons. The RLUOB, which originally was limited to 8.4 grams of Pu 239, was built as Phase 1 of the Chemistry and Metallurgy Research Replacement Project at LANL that would have expanded plutonium pit production to 50 – 80 pits per year (pits are the radioactive cores of nuclear weapons). LANL’s current capacity is 20 pits per year. Phase 2 of the CMRR project, the “Nuclear Facility,” was canceled because of lack of clear need and a bulging ten-fold increase in costs.
This RLUOB, along with some floor space in the existing Plutonium Facility (PF-4), will replace the old Chemistry and Metallurgy Research Building, which is slated for closure in 2019. The Laboratory was working on a plutonium strategy to move out of CMR and maintain the current plutonium capability.
But NNSA recently increased the maximum amount of radiological materials allowed in the RLOUB, and all “radiological” facilities, from 8.4 grams to 38.6 grams. Internal Lab documents floated plans that could have increased the limit again by two or three times by treating each little laboratory in the RLUOB as its own radiological facility. This could have increased the limit to 115.8 grams of Pu239.
But NNSA apparently wants to go big. The new analysis is to consider the RLUOB as a Hazard Category 3 nuclear facility, which is a huge step up from its current designation as a radiological facility.
Scott Kovac, Research and Operations Director for Nuclear Watch New Mexico, said, “This turkey of a plan is stuffed with bad ideas – The RLUOB is not seismically qualified for that amount of plutonium. A new supplemental environmental impact statement will be needed. There is no need for more plutonium pits, except for new nuclear weapons, because they last for around 100 years and nuclear weapons stockpiles are decreasing. And apparently LANL can’t safely handle plutonium anyway, as major operations with plutonium have been paused since June 2013 because of nuclear criticality safety issues. Finally, it was LANL’s improper handling of plutonium waste that contaminated 21 workers at the Waste Isolation Pilot Plant, causing it to close with at least a half billion dollars in costs to reopen. We say no to more plutonium at Los Alamos!”
# # #
Read the Defense Nuclear Facilities Safety Board report here.
Comment on NYT article “Which President Cut the Most Nukes?”
Today’s New York Times article “Which President Cut the Most Nukes?” does a public service by pointing out that contrary to his rhetoric, Obama has the lowest nuclear weapons dismantlement rate of any president. In fact, he proposes to cut funding for dismantlements by 45% in FY 2015, along with cutting nonproliferation programs designed to keep nuclear materials safe from terrorists by 20%. This is to help pay for increasing nuclear weapons production.
The U.S. government under Obama is completely rebuilding the nuclear weapons production complex. This includes multi-billion dollar facilities for plutonium components at Los Alamos, NM, and highly enriched uranium at Oak Ridge, TN, both of which have massive cost overruns. It also includes a new Kansas City Plant, built by private investors in a sweetheart deal, for the thousand of nonnuclear components (fuzes, radars, etc.) needed to make nuclear weapons deliverable.
In all, “modernization” of nuclear weapons and their delivery systems is expected to cost more than a trillion dollars over the next 30 years. This will inevitably rob American taxpayers of what they truly need (upgraded public infrastructure, environmental and health protection, public education, etc.), while enriching the usual, unaccountable defense contractors. All of these new production plants are expected to manufacture nuclear weapons until 2075, a far cry from the aspirational future world free of nuclear weapons that President Obama claims to profess.
See “Which President Cut the Most Nukes?” at http://www.nytimes.com/2014/11/02/sunday-review/which-president-cut-the-most-nukes.html?emc=edit_tnt_20141101&nlid=59407362&tntemail0=y&_r=0
Scottish Independence and U.K. “Modernizing for the Second Nuclear Age”
Scots will vote on independence from the United Kingdom on Sept. 18, with polls showing the lead of anti-independence forces narrowing. If independence wins one declared goal of the Scottish National Party is to kick out the only British base for nuclear-armed strategic submarines at Faslane, effectively putting the future of U.K. nuclear forces in grave doubt. Polls show that the majority of Scots favor getting rid of Faslane.
In addition, a Review Conference of the NonProliferation Treaty (NPT) will be held at the United Nations in May 2015. Non-weapons state are growing increasingly impatient with the weapons states’ failure to abide by the NPT Article VI mandate “… to pursue negotiations in good faith on effective measures relating to cessation of the nuclear arms race at an early date and to nuclear disarmament…” In fact, the Republic of the Marshall Islands has sued the UK and others in the World Court over that failure.
NPT Article I also requires that “Each nuclear-weapon State Party to the Treaty undertakes not to transfer to any recipient whatsoever nuclear weapons or other explosive devices directly, or indirectly…” Given the interdependence of their nuclear weapons programs, the U.S. and U.K. violate this as well, as explained below.
The late Martin White, former head of Strategic Technologies for the Ministry of Defence (MOD) of the United Kingdom, made clear that the UK will not be honoring NPT Articles I and VI for the foreseeable future. The Los Alamos National Laboratory’s (LANL’s) July issue of National Security Science features an article by White entitled “Modernizing for the Second Nuclear Age.” http://www.lanl.gov/discover/publications/national-security-science/2014-july/UK-is-modernizing-for-the-second-nuclear-age.php
Some excerpts:
• You may know that we are in a period of major investment at AWE [Atomic Weapons Establishment] in terms of workforce, facilities, and programs. In the past decade, the workforce has grown from a low of 3,000to the current 4,500.
• By the end of this decade, we will have new uranium, high explosives, and assembly facilities. Just as crucial, we will have a state-of-the-art high-power laser, supercomputing, and new hydrodynamic experimental capabilities.
• In all this, our interactions with the United States have been and remain pivotal in shaping the U.K. deterrent program. And our continuing collaborations with Los Alamos National Laboratory touch the very core of our technical capability.
But the title itself contains my main point, “Modernizing for the Second Nuclear Age.” Indeed, the cover page page of the article has a dramatic picture of a U.K. strategic submarine, whose home port can only be Faslane.
This “Second Nuclear Age” is already a common theme with American nuclear weaponeers, See, for example, “The challenges facing stockpile stewardship in the Second Nuclear Age”, LANL Director Charlie McMillan, http://www.lanl.gov/discover/publications/national-security-science/2014-february/challenges-facing-stockpile-stewardship
Or “The Second Nuclear Age”, http://www.lanl.gov/discover/publications/national-security-science/2014-february/the-second-nuclear-age.php
The U.S. and UK nuclear weapons programs are very close and always have been. For example, the now head of the National Nuclear Security Administration’s (NNSA) nuclear weapons programs, NNSA Dep. Administrator for Defense Programs Don Cook, is an American from the Sandia Labs. Until a few years ago he was the manager of the UK’s Atomic Weapons Establishment as well. Also, the biggest U.S. defense contractor, Lockheed Martin, is one part of a three-part consortium running AWE.
Contrary to NPT Article I the U.S. is manufacturing neutron generators for the U.K. Neutron generators are crucial nuclear weapons components that introduce neutrons at the instant of detonation to begin the cascading chain reaction of a nuclear weapons explosion. For example, “…we noted that SNL had not established a costing methodology that consistently included a fair share of infrastructure costs to ensure full cost recovery for NG units to be built for the United Kingdom (UK). Reference: “The National Nuclear Security Administration’s Neutron Generator Activities, DOE Inspector General Audit report, page 2, http://energy.gov/ig/downloads/audit-report-oas-l-14-11
I conclude by asking questions: If they knew about it, how would the Scots feel about a “Second Nuclear Age”? Would that have any effect in their vote for independence? And how will the increasingly impatient non-weapons states feel about a “Second Nuclear Age” at the May 2015 NPT Review Conference?
Why Do DOE And LANL Refuse To Do A Pit Production Study?
Why Do DOE And LANL Refuse To Do A Pit Production Study?
A recent Congressional Research Service (CRS) Report Manufacturing Nuclear Weapon “Pits”: A Decisionmaking Approach for Congress, August 15, 2014 attempts to present the amount of space needed at Los Alamos National Laboratory for the Lab to produce 80 plutonium pits per year. CRS has to do this estimating task because the Lab has never done this calculation.
It is unclear to us why the Lab has yet to do this calculation. The Lab claims to be the “Plutonium Center of Excellence for the Nation” yet the CRS report explains that no one knows whether existing buildings, without modifications, could manufacture 80 plutonium pits per year (ppy); or if modest upgrades would suffice; or if major construction would be needed to augment the current capacity of about 10 ppy.
A plutonium pit is a nuclear weapon component that is a hollow plutonium shell that is imploded with conventional explosives to create a nuclear explosion that triggers the rest of the weapon. Some argue that the capacity to manufacture new pits may be needed to extend the service life of unneeded weapons, to replace broken pits (which never happens), and to hedge against possible unnamed geopolitical surprises where only more nukes will solve the problem. How many pits that the country actually needs to produce annually is beyond the scope of the CRS report. We believe it is zero.
Along with the unknown space requirements, the Lab also does not know how much Material At Risk (MAR a.k.a. plutonium) would be needed in the building to produce 80 ppy. “…these data have never been calculated rigorously.”
CRS created some charts for this report to show what they believe to be current usage of the Lab’s Plutonium Facility (PF-4). But what this looks like for 80 ppy is still a guess.
We at NukeWatch have been demanding that LANL produce this information — most recently in our 2011 comments on the Draft CMRR-NF Supplemental Environmental Impact Statement
We think two things a probably happening. There is still not a need for 80 pits per year (or any). And if the Lab were to finally do a pit production study, Congress would find out that LANL has enough space now.
The money should be used to clean up the Lab’s legacy Cold War waste.
Doyle Entangled in Anti-Nuclear Classification
On July 23, 2014, Los Alamos National Laboratory approved for public release an article titled Rethinking the Unthinkable, written by retired U.S. Air Force Colonel Houston T. Hawkins, with the intention of being used for public presentations.
This article argues for an increase in nuclear weapons production and expanding stockpiles. Hawkins stresses the importance nuclear weapons has for the stability of U.S. foreign policy, arguing “the march toward disarmament would take us backwards into an even more unstable and dangerous world.” This stability, therefore, is generated by nuclear stockpiles.
In addition, nuclear deterrence according to the article is an important cornerstone of national security in that it serves as “strategic parity” between states. It also yields confidence not only in the functioning of domestic stockpiles, but in the intelligence capability of U.S. decision makers in assessing foreign nuclear advancements and curtailing surprises.
DOE Sec. Moniz Calls To Speed Up WIPP Reopening While LANL Digs Up More Problems
US Department of Energy Secretary Ernest Moniz visited the Waste Isolation Pilot Plant (WIPP) recently and announced future recovery plans for WIPP and they include a target date to start some operations 18 months from now reported KRQE.
That date is extremely optimistic. Here’s a few reasons why –
- The exact cause of the February 14 release that shut WIPP down is still unknown. The cause must be determined before much else can happen.
- There are 360+ drums in Panel 6 that are suspected to have similar waste characteristics to the drum that leaked radiation. These have also now been re-characterized as “ignitable” by Los Alamos officials. Do these need to be removed and retreated? A decision is needed.
- Panel 6 must be sealed off to protect mine workers from releases.
- There are 50+ suspect drums in Panel 7 where the original release happen.
- Parts of Panel 7 must be sealed off to protect workers.
- A new exhaust shaft is in the planning stages.
- The mine should be decontaminated.
- Funding for the recovery work will be needed.
- Fines will probably have to be paid.
- If the WIPP Hazardous Waste Permit with the State is changed substantially, public comments and possible hearings will be required.
- Hopefully, a truly independent review will be approved.
In addition to these, Los Alamos officials have retroactively re-characterized many waste drums as “ignitable”. See previous post. Today it was revealed that Los Alamos has re-characterized some waste drums as “corrosive”. Ignitable (EPA waste code D001) and corrosive (EPA waste code D002) wastes are prohibited from WIPP.
The NM Environment Department, and its Secretary Ryan Flynn, has the final say about the final disposition of the now illegal waste drums and many of the other issues. We trust he will take the health of present workers and future generations into account in his decision-making. DOE’s imagined schedule should not be a consideration.
We appreciate that Los Alamos Laboratory officials have stepped up and re-characterized the drums. But we don’t think DOE officials should be making statements about the timing of WIPP’s reopening (or even that WIPP will reopen at all) until all the facts are in.
To make matters even worse, the Current Argus reported that “Moniz told the town hall meeting [that the Department of] Energy is considering the facility [WIPP] to store spent fuel from commercial nuclear power plants, but provided no time line.”
To even consider expanding WIPP when it is not even open shows the lack of focus on the current problems and shows the lessons have not been learned.
LANL Heading Down Slippery Slope With Proposed Biosafety Lab
The DOE Inspector General released Audit Report on “Management of the National Nuclear Security Administration’s Biosafety Laboratories” that calls for a re-evaluation of the proposed needs for Biolabs at nuclear weapons facilities such as Los Alamos.
The report stated that Los Alamos National Laboratory was considering a $9.5 million expansion of bio-laboratory capabilities even though the Lab could not assess current usage or future needs. Apparently the Lab based facility-planning decisions on perceptions about future demand.
From the report –
[DOE] identified the development of a BSL-3 facility at LANL as its preferred alternative for meeting biosafety laboratory needs even though it had not fully considered the need for and cost effectiveness of additional capacity. Nor, had it developed a sound basis for measuring the utilization of existing facilities – a critical factor in determining the need for additional capacity.
Biological containment levels range from BSL-1, which handles only agents not known to cause illness in humans, to BSL-4, which houses agents for which there are no known cures, such as Ebola. A BSL-3 designation permits work with virulent pathogens used in both defensive and offensive biological warfare research.
Although the BSL-3 building has been constructed, the need is very questionable. From the report –
Specifically, we contacted two of the three Federal agencies that LANL told us were prospective [Work For Other] WFO customers and officials representing those potential customers stated that they did not have any specific plans to contract for BSL-3 research at LANL. Further, officials at both agencies indicated that other existing BSL-3 facilities could satisfactorily meet their needs. In fact, one official told us that generally other existing BSL-3 laboratories were less expensive than expected at the new LANL facility and that several had comparable security.
While the BSL-3 building has been constructed, there is no compliance with the National Environmental Policy Act (NEPA). The draft Environmental Impact Statement (EIS) currently being prepared for BSL-3 facility operations pursuant to NEPA has not even been released, much less a final EIS or Record of Decision (ROD). The current schedule calls for the EIS to be released in August 2014, but if past schedule changes are indications, it is not going to happen.
The draft EIS has been in process for nine years and counting. We at NukeWatch demand that DOE start over and re-scope both the alternatives and need for the BSL-3 at LANL. LANL is working on a Biological Research Capability Assessment to assess bioscience needs, which must be completed before the BSL-3 is re-scoped.
We hope the current Assessment is more empirical than the 2011 Review, which proposed that the BSL-3 facility was essential to LANL’s mission without considering data such as available capacity at other locations and estimates of projected use from outside customers.
The LANL BSL-3 EIS was the result of a lawsuit. During 2001 and 2002 NukeWatch contested the arbitrary and capricious public process DOE was using to justify its decision to build the proposed BSL-3 facilities at LANL and Lawrence Livermore National Laboratory (LLNL). DOE failed to adequately address the many concerns raised by the public and proceeded to release final Environmental Assessments (EAs) for both laboratories, along with so-called Findings of No Significant Impact, which gives the Department the green light to begin the first steps leading to operations. Because DOE left so many legitimate questions and concerns unanswered, NukeWatch felt that a legal challenge was necessary.
In August 2003 NukeWatch and Tri-Valley CAREs, a citizens group based in Livermore, CA, jointly filed a lawsuit in the federal district court of northern California claiming that DOE had failed to fully analyze the environmental and health risks associated with the proposed operation of its BSL-3 facilities at LANL and LLNL. In effect, DOE wrote itself a blank check for a wide range of infectious disease research at the two labs. NukeWatch and Tri-Valley CAREs argued that DOE failed to consider the grave risks of introducing pathogens whose behavior may not be known or understood, and for which a cure may not exist.
In January 2004, DOE announced that it had revoked approval for its newly constructed, advanced bio-warfare agent research facility at Los Alamos. DOE went back to square one, and reviewed whether the agency needed to undertake a full Environmental Impact Statement – a key demand in the lawsuit. The BSL-3 at LLNL was built and is operating.
DOE released a notice for the LANL EIS on November 29, 2005. The Notice of Intent to prepare an EIS for the BSL-3 stated that one reason requiring preparation of an EIS was that “it was necessary to conduct additional seismic analysis of the location of the building on fill material on the sloping side of a canyon.” This calls into question not just whether BSL-3 activities can be safely conducted before these issues are resolved through the EIS, but whether any operations can be safely conducted at all.
The drawing below shows the LANL BSL-3 built in a seismic zone, on fill, and on a steep slope.
The DOE-IG report stated that LANL would need to spend about $437,000 in upgrades to attempt to mitigate this seismic concern. DOE also is spending about $478,000 to complete the now required Environmental Impact Statement
Another $595,000 is needed to open the facility, which includes $368,000 of operating costs for maintenance, utilities, etc.
Can the Laboratory be the best place for bioscience? If the Lab is looking for more funding streams, shouldn’t it be directing its attention to non-proliferation programs and cleanup?
DOE Retroactively Classifies Suspect WIPP Drums As Ignitable
DOE Retroactively Classifies Suspect WIPP Drums As Ignitable
In two letters posted to the NMED website, Los Alamos contractor and DOE Field Office officials informed NMED that 86 drums currently stored at LANL and 368 drums underground in Panel 6 at WIPP are now considered to contain ignitable wastes. These drums are part of the same waste stream as the drum in Panel 7 that is suspected to have caused the Feb. 14 radiation release and the subsequent closure of the Waste Isolation Pilot Plant (WIPP).
The letters state that DOE applied EPA Hazardous Waste Number D001 for the characteristic of ignitability.
The WIPP Permit specifically prohibits D001 Wastes at WIPP –
2.3.3.7. Ignitable, Corrosive, and Reactive Wastes
Wastes exhibiting the characteristic of ignitability, corrosivity, or reactivity (EPA Hazardous Waste Numbers of D001, D002, or D003) are not acceptable at WIPP.
DOE stated that it had “reason to believe that the nitrate salt bearing waste in the containers described above is an oxidizer and therefore the D001 code should be applied to the respective containers”, but did not explain exactly what that reason was. What did LANL or the Accident Investigation Board (AIB) discover that lead them to apply the D001 classification? The AIB report investigating the Feb. 14 release is not due until September.
Now there are 368 illegal drums buried at WIPP. DOE can’t seal up Panel 6 until the exact cause of the Feb 14 release is known, even though there is a plan to expedite closure of Panel 6. NMED Secretary Ryan Flynn has stated on several occasions that that we must know the exact cause before sealing up Panel 6. We agree. Otherwise we might be burying drums that should be retrieved and repackaged, as onerous of a task that that would be.
DOE stated, “Because the investigations are ongoing, the application of the D001 is considered provisional and may change to include and/or remove containers/waste streams in the future.” But the WIPP permit has no provision for allowance for “provisional” classification wastes.
Either they are or they are not.
RECENT FORMAL COMMENTS
Past NukeWatch Events
March 10, 2020 – Deadline for Comments on Protecting NEPA
The Council on Environmental Quality (CEQ) is proposing to update its regulations for implementing the procedural provisions of the National Environmental Policy Act (NEPA). Sumbit comments HERE by March 10 on how and why the National Environmental Policy Act is our country’s most fundamental environmental law. It is important for the public, Congress and federal agencies to understand that NEPA has provided benefits to government decision-making processes.
Public Event – Rocky Flats Disaster: Red Light for SRS Plutonium Bomb Plant
Speakers: Dr. LeRoy Moore and Patricia Mellen, Esq, who is trying to get grand jury documents about the FBI raid released on behalf of the Rocky Mountain Peace and Justice Center and other groups.
Read LeRoy’s new book: “Plutonium & People Don’t Mix: Rocky Flats: Colorado’s Defunct Nuclear Bomb Factory.”
View article by LeRoy: Rocky Flats refuge opening disregards evidence of risk
Come meet NukeWatch staff.
Ask questions!
6:00 – 8:00 pm
Tuesday Nov. 19
City of Mud Gallery
1114 A Hickox St, Santa Fe,
New Mexico 87505
(straight across from Tune-Up Cafe)
How to Avoid a Nuclear Apocalypse
Join Women’s Action for New Directions (WAND) for a panel with leading experts in nuclear nonproliferation & disarmament
https://schedule.sxsw.com/
→
January 24, 2019
Watch the announcement HERE
Read the 2019 Doomsday Clock Statement.
Past Work Product (2019-)
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
2019
November 26, 2019 Press Release November 24, 2019 Press Release November 19, 2019 Plutonium Pit Production Workshop Presenters:
August 12, 2019 NEPA Comments NukeWatch’s 22-page formal comments on expanded plutonium pit production Until NNSA fully complies with the National Environmental Policy Act through the preparation of a programmatic environmental impact statement on expanded plutonium pit production, Nuclear Watch believes that any irreversible or irretrievable commitment of resources to either the expansion of pit production at the Los Alamos Lab or to the repurposing of the MOX Facility at the Savannah River Site is unlawful. Read/Download the Full Document HERE July 25, 2019 NEPA Comments Scoping comments on NNSA draft EIS for plutonium pit production at the Savannah River Site THE NEED FOR A PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT: This is our first and primary concern, that NNSA must first complete a programmatic environmental impact statement (PEIS) on its nation-wide plans for plutonium pit production, in advance of the Savannah River Site-specific environmental impact statement. To get right to the point, we argue that the SRS EIS process should go no further than this scoping period and should resume only after a completed formal Record of Decision for a new or supplemental PEIS. Read/Download the Full Document HERE July 9, 2019 Plutonium Pit Production Fact Sheet Expanding Nuclear Pit Production: The Facts and What You Can Do The Facts Read/Download the Full Document HERE June 10, 2019 News Release In a victory for transparency and legal compliance by the government, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) today published a “Notice of Intent” in the Federal Register to complete environmental reviews on its controversial proposal to expand plutonium “pit” production for new and refurbished nuclear weapons. [embeddoc url="https://nukewatch.org/wp-content/uploads/2019/06/SRS-plutonium-bomb-plant6-14-19.pptx" download="all" viewer="google"] Read/Download the Full News Release HERE June 4, 2019 Press Release On behalf of three public interest organizations - Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch – attorneys for the law firm of Meyer Glitzenstein & Eubanks and the Natural Resources Defense Council recently sent a 16-page letter to Lisa Gordon-Hagerty, head of the National Nuclear Security Administration (NNSA). The detailed letter warns the nuclear agency to not proceed with aggressive plans to expand plutonium pit production without first meeting its legal requirements for timely public review and comment under the National Environmental Policy Act. Read/Download the Full Press Release HERE May 31, 2019 Press Release Last Wednesday, facility operations personnel entered a service room and noticed a leak emanating from a valve on the radioactive liquid waste (RLW) system. Upon subsequent visual inspection by a radiological control technician, RLUOB engineers believe that this valve, and 6 similar valves, may be constructed of carbon steel. The RLW system handles radioactive liquid waste streams from chemistry operations that include nitric and hydrochloric acids—carbon steel valves would be incompatible with these solutions. The suspect valves are also in contact with stainless steel piping, which would create another corrosion mechanism. RLUOB management plans to drain the affected piping sections and develop a work package to replace all of the suspect valves. They will also confirm the valve materials and if shown to be incorrect, investigate the cause of this failure in the design, procurement, and installation processes. The valves were installed in 2013 as part of a modification to add straining and sampling capabilities that were not in the included in the original design. [Please note that DNFSB reports are posted a few weeks later than dated.] This immediately raises two crucial issues: 1) the National Nuclear Security Administration’s (NNSA’s) plans for expanded plutonium pit production; and 2) the current attempt by the Department of Energy to restrict Safety Board access to its nuclear weapons facilities. Read/Download the Full Press Release HERE April 26, 2019 Consent Orders Comparison On March 1, 2005, after arduous negotiations and threats of litigation, the New Mexico Environment Department (NMED), Department of Energy (DOE), and Los Alamos National Laboratory (LANL) entered into a Consent Order specifying the schedule for investigation and cleanup of the Lab’s hundreds of contaminated sites. This Consent Order (CO) was LANL’s agreement to fence-to-fence cleanup of Cold War legacy wastes, which NMED began to enforce. Read/Download the Full Comparison HERE March 25, 2019 Press Release More than 25 years after the end of the Cold War, all eight established nuclear weapons powers are “modernizing” their stockpiles. Talks have broken down with North Korea, the new nuclear weapons power. Nuclear-armed India and Pakistan narrowly averted war last month. Russian President Vladmir Putin made new nuclear threats in response to Trump’s announced withdrawal from the Intermediate-Range Nuclear Forces Treaty. This could lead to hair-trigger missile emplacements in the heart of Europe and block extension of the New Strategic Arms Reduction Treaty with Russia. If so, the world will be without any nuclear arms control at all for the first time since 1972. Meanwhile, the U.S. criticizes non-weapons states for signing a nuclear weapons ban treaty, despite the fact there have long been treaties completely banning chemical and biological weapons of mass destruction that the U.S. seeks to enforce. The pending international NonProliferation Treaty (NPT) Preparatory Committee conference at the United Nations is widely expected to collapse in failure because of the nuclear weapons powers’ failure to enter into serious negotiations leading to nuclear disarmament. The NPT’s Article VI mandate for those negotiations has been in effect since 1970, when the Treaty was signed by 189 countries (more than any other treaty). Read/Download the Full Press Release HERE March 26, 2019 NukeWatch Budget Compilation Nuclear Watch New Mexico — Department of Energy FY 2020 Nuclear Weapons Budget Request |
2018
November 16, 2018 Plutonium Pit Production Fact Sheet Plutonium pits are the radioactive cores or “triggers” of nuclear weapons. Their production has always been a chokepoint of resumed industrial-scale U.S. nuclear weapons production ever since a 1989 FBI raid investigating environmental crimes shut down the Rocky Flats Plant near Denver. In 1997 the mission of plutonium pit production was officially transferred to its birthplace, the Los Alamos National Laboratory (LANL) in northern New Mexico, but officially capped at not more than 20 pits per year. However, in 2015 Congress required expanded pit production by 2030 whether or not the existing nuclear weapons stockpile actually needs it. This will support new military capabilities for nuclear weapons and their potential use. Read/Download the full fact sheet pdf HERE October 31, 2018 Nuclear Watch New Mexico, Savannah River Site Watch, and Tri-Valley CAREs sent a letter of demand to the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to inform the government that its plan to quadruple the production rate of plutonium bomb cores is out of compliance with the National Environmental Policy Act (NEPA). NNSA’s premature plan to quadruple the production rate of plutonium bomb cores (“pits”), the heart of all US nuclear weapons, is out of compliance with requisite environmental law, the groups argue, as NNSA has failed to undertake a legally-mandated programmatic review and hold required public hearings. View/Download the entire press release HERE NukeWatch Comments, September 27, 2018 Nuclear Watch New Mexico is submitted formal comments to express in the strongest possible terms our opposition to DOE Order 140.1 Interface with the Defense Nuclear Facilities Safety Board. We find that the Department of Energy’s (DOE’s) attempt to restrict and suppress DNFSB access is very misguided, arrogant, and likely illegal in that it acts contrary to the Board’s enabling legislation. June 8, 2018 Press Release New Contractors Selected For Expanded Nuclear Weapons Production at Los Alamos Santa Fe, NM. Today the Department of Energy's National Nuclear Security Administration (NNSA) announced its choice for the new management and operating contract for the Los Alamos National Laboratory (LANL).The new contractor, Triad National Security, LLC, is a limited liability company consisting of the Battelle Memorial Institute, the University of California and Texas A&M University. All three are non-profits, and it is unclear how this will affect New Mexico gross receipts taxes. Battelle claims to be the world's largest non-profit technology research and development organization, and manages a number of labs including the Lawrence Livermore and Idaho National Laboratories. Texas A&M was founded in 1876 as the state's first public institution of higher learning and has the largest nuclear engineering program in the country. DOE Secretary Rick Perry is an avid A&M alumnus. May 31, 2018 Press Release Santa Fe, NM & Columbia, SC - "Two key U.S. Department of Energy documents on future production of plutonium "pits" for nuclear weapons, not previously released to the public, fail to justify new and upgraded production facilities at both the Los Alamos National Laboratory (LANL) in New Mexico and the Savannah River Site (SRS) in South Carolina." May 15, 2018 Fact Sheet May 10, 2018 Press Release What's Not in NNSA's Plutonium Pit Production Decision
- NNSA did not mention that up to 15,000 "excess" pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in "strategic reserve." The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits. (In 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old.) May 2, 2018 Press Release "NNSA should begin nation-wide review of plutonium pit production, why it's needed, and what it will cost the American taxpayer in financial, safety and environmental risks. These are all things that the public should know." -Jay Coghlan, Director, Nuclear Watch New Mexico. April 26, 2018 NukeWatch Comments LANL Rad Lab: Formal Comments Under Nat'l Environmental Policy Act Against raising plutonium limit at LANL Rad Lab View/download Nuclear Watch comments as submitted Excerpt:
- NNSA is planning a 10-fold increase in plutonium at the LANL Rad Lab with a view to ramping up the production of plutonium pits for new nuclear weapons. March 26, 2018 Press Release United States To Begin Construction Of New Nuclear Bomb Plant The National Nuclear Security Administration (NNSA) announced on Friday, March 23, that it was authorizing the start of construction of the Uranium Processing Facility (UPF) and two sub-projects at the Y-12 National Security Complex in Oak Ridge, Tennessee. The UPF is a facility dedicated solely to the manufacture of thermonuclear cores for US nuclear bombs and warheads.
Jay Coghlan of NukeWatch points out that "This project already has a long history, and it is instructive. In 2013, DOE announced it was 85% finished with the UPF design when it ran into the 'space/fit' issue- and more than a half-billion taxpayer dollars were just written off. In private business, that kind of thing gets you fired. In DOE's world of contractors running amok, they not only didn't get fired, not one Congressional hearing was held and the UPF budget went up the next year!" - See full press release for all the details (PDF) March 1, 2018 Press Release The Regional Coalition of LANL Communities: Benefits for the Select Few Santa Fe, NM- According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County's 46th district in the state House of Representatives. For all the details, see full press release PDF February 28, 2018 Press Release Santa Fe, NM. On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as "N3B"). This award followed a DOE decision to pull cleanup from LANL's prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen. (See all the details in the full press release) February 26, 2018 Press Release Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race Santa Fe, NM. Late Friday February 23, the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] "Weapons Activities", 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office's High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990... (See all the details in the full press release) February 22, 2018 Press Release Santa Fe, NM. Today the National Nuclear Security Administration announced an Environmental Assessment to increase the amount of plutonium used in the Radiological Laboratory Utility and Office Building (aka the "Rad Lab") at the Los Alamos National Laboratory from 38.6 grams of plutonium-239 equivalent to 400 grams. This 10-fold increase is significant because it will dramatically expand materials characterization and analytical chemistry capabilities in the Rad Lab in support of expanded plutonium pit production for future nuclear weapons designs. It also re-categorizes the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility. View/Download full press release February 12, 2018 Press Release Trump's Budget Dramatically Increases Nuclear Weapons Work Santa Fe, NM In keeping with the Trump Administration's recent controversial Nuclear Posture Review, today's just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production. January 12, 2018 Press Release Draft Nuclear Posture Review Degrades National Security Yesterday evening the Huffington Post posted a leaked draft of the Trump Administration's Nuclear Posture Review (NPR). This review is the federal government's highest unclassified nuclear weapons policy document, and the first since the Obama Administration's April 2010 NPR. 2017 |
2017
December 22, 2017 Press Release New Mexico Environment Department Surrendered to DOE Extortion Santa Fe, NM. The New Mexico State Auditor Office recently questioned whether two settlements between the New Mexico Environment Department and the Department of Energy were in the best interests of New Mexico. That Office noted: (View/download full press release) December 20, 2017 Press Release Los Alamos Hires New Contractor - Starts Cleanup On the Cheap Santa Fe, NM- Today the Department of Energy (DOE) announced the award of the new Los Alamos National Laboratory legacy cleanup contract to Newport News Nuclear BWXT-Los Alamos, LLC. The $1.39 billion contract is for ten years, which works out to $139 million per year... View/download the full press release Public Presentation, December 2, 2017 October 31, 2017 Press Release Today, in Washington, DC, the Congressional Budget Office released its new report, "Approaches for Managing the Costs of U.S. Nuclear Forces, 2017 to 2046". The Congressional Budget Office estimates that the most recent detailed plans for nuclear forces, which were incorporated in the Obama Administration's 2017 budget request, would cost $1.2 trillion in 2017 dollars over the 2017-2046 period: more than $800 billion to operate and sustain (that is, incrementally upgrade) nuclear forces and about $400 billion to modernize them.... Driving this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of "deterrence," thousands of warheads are being refurbished and improved to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government! October 27, 2017 Press Release Santa Fe, NM. On the evening of Wednesday October 25, the Santa Fe City Council passed a resolution requesting that the New Mexico Environment Department strengthen the revised Los Alamos National Labs cleanup order to call for additional characterization of legacy nuclear wastes, increased cleanup funding, and significant additional safety training. The resolution also called for the suspension of any planned expanded plutonium pit production until safety issues are resolved. (view/download full press release) October 6, 2017 Press Release Santa Fe, NM. Nuclear Watch New Mexico strongly applauds the awarding of the Nobel Peace Prize to the International Campaign to Abolish Nuclear Weapons (disclosure: NukeWatch is one of ICAN's ~400 member groups around the world). This award is especially apt because the peoples of the world are now living at the highest risk for nuclear war since the middle 1980's, when during President Reagan's military buildup the Soviet Union became convinced that the United States might launch a pre-emptive nuclear first strike. Today, we not only have Trump's threats to "totally destroy" North Korea and Kim Jong-un's counter threats, but also renewed Russian fears of a US preemptive nuclear attack... Generally unknown to the American taxpayer, our government has quietly tripled the lethality of the US nuclear weapons stockpile..." (view/download complete press release) NukeWatch fact sheet, September 26, 2017 The National Nuclear Security Administration's own documents have explicitly stated that expanded pit production would have no significant positive effect on job creation and the regional economy of northern New Mexico. Nuclear Watch argues that expanded plutonium pit production could actually have negative effect if it blocks other economic alternatives such as comprehensive cleanup, which could be the real job producer. Moreover, given LANL's poor safety and environmental record, expanded plutonium pit production could have a seriously negative economic impact on northern New Mexico in the event of any major accidents. September 15, 2017 Press Release Santa Fe, NM. The Los Alamos National Laboratory (LANL) has detected far more hexavalent chromium (Cr) contamination than previously estimated in the "sole source" regional groundwater aquifer that serves Los Alamos, Santa Fe and the Espanola Basin. Sampling in July from a new well meant to inject treated groundwater back into the aquifer detected chromium contamination five times greater than the New Mexico groundwater standard of 50 micrograms per liter (ug/L). View/download the full press release September 11, 2017 Press Release Talking Points: The 2016 LANL Cleanup Consent Order Should Be Rescinded The 2005 LANL Cleanup Consent Order was all about the enforceable schedules. It required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It stipulated a detailed compliance schedule that the Lab was required to meet. Under Gov. Martinez, NMED Secretary Ryan Flynn granted more than 150 compliance milestone extensions at the Lab's request, effectively eviscerating it. View/download the complete talking points July 20, 2017 Press Release Washington, DC Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration's (NNSA's) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.'s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants. View/download the full press release June 19, 2017 Press Release Some Background on Plutonium Pit Production at the Los Alamos Lab Santa Fe, NM -The Washington Post has published the first in a series of articles on nuclear safety lapses in plutonium pit production at the Los Alamos Lab. Plutonium pits are the fissile cores of nuclear weapons that when imploded initiate the thermonuclear detonation of modern weapons. By the way, did you know? Plutonium facilities at LANL are- in principle- designed to withstand a serious earthquake of a degree expected to occur only once every 10,000 years. The last serious earthquake near the Lab is believed to have occurred 11,500 years ago. View/download the full press release ANA Report 2017: Accountability Audit May 19, 2017 Press Release SA Preview of Trump's Budget: More Nuclear Bombs and Plutonium Pit Production Santa Fe, NM. "The proposed level of funding for the National Nuclear Security Administration's (NNSA)'s Total Weapons Activities is $10.2 billion, a full billion above what was requested for FY 2017. In March, Trump's "skinny budget" stated NNSA's funding priorities as 'moving toward a responsive nuclear infrastructure', and 'advancing the existing warhead life extension programs'. Read the full press release for all the details. March 28, 2017 ANA workshop at UN Ban Treaty Conference Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion March 28, 2017, UN, NYC:
March 2017 Fact Sheet Plutonium Pit Production at LANL (Updated March 2017) February 23, 2017 Press Release Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection Santa Fe, NM. America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning. Read the full press release for all the details. January 5, 2017 Press Release The National Nuclear Security Administration (NNSA) has publicly released its fiscal year 2016 Performance Evaluation Report (PER) for Los Alamos National Security, LLC (LANS), the for-profit contractor that runs the Los Alamos Lab. The Performance Evaluation Report is NNSA's annual report card on contractor performance, and overall the agency awarded LANS $59 million in profit out of a possible $65 million. The grade was 85% for the incentive part of the award. In 2012 Nuclear Watch New Mexico successfully sued NNSA to ensure that the Performance Evaluation Reports detailing taxpayers funds paid to nuclear weapons contractors are publicly available. In 2016 the NNSA decided to put the LANL management contract out for competitive bid, but granted LANS a contract extension until the end of September 2018. |
Media appearances including radio interviews are listed on the internal Media page
See the NukeWatch Channel at YouTube for our extensive playlists of key videos.
See the Nukewatch Twitter feed
See the Nukewatch Tumblr site
WatchBlog Posts:
Over 200 posts published since 2009. See archives at the WatchBlog
Earlier Work Product items are archived here