Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law
FOR IMMEDIATE RELEASE, October 3, 2024
Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]
AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.
The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites. These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.
As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.
High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up
FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.
On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.
NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production
FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email
Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.
In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:
“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]
Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.
NNSA’s Nuclear Weapons Budget Takes Huge Jump
Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut
FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.
The Biden Administration states that the $19.8 billion will be used to:
“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.
The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:
“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)
NNSA Suppresses How Taxpayers Money Is Spent
FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email
Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.
A current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.
2023
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
RECENT FACT SHEETS
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
RECENT PRESS RELEASES
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
RECENT NUCLEAR BUDGET GRAPHS
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
Past Work Product (2020-2021)
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
75TH ANNIVERSARY HIROSHIMA DAY ONLINE COMMEMORATION CALLING FOR THE ABOLITION OF NUCLEAR WEAPONS
August 6, 2020
"Jay Coghlan of Nukewatch.org on the history of the Los Alamos labs, where the bomb was designed and fabricated, and how it continues to play the leading role in the creation of most U.S. nuclear weapons since then."
[embeddoc url="https://nukewatch.org/wp-content/uploads/2020/05/plutonium-pit-production-fact-sheet.pdf" download="all" viewer="browser"]
PLUTONIUM PIT PRODUCTION WORKSHOP – NOVEMBER 19, 2019
RADIO INTERVIEW – SCOTT KOVAC & JON LIPSKY
Scott Kovac of Nuclear Watch New Mexico and Jon Lipsky, the FBI agent who led the 1989 raid investigating environmental crimes that shut down the Rocky Flats Nuclear Bomb Plant join Xubi to talk about Nuclear weapons, Nuclear clean up and Pit production plans at LANL.
RADIO INTERVIEW – JAY COGHLAN & JON LIPSKY
PIT Production at LANL with Nuclear Watch New Mexico’s Jay Coghlan and Workshop Speaker, Jon Lipsky
RADIO INTERVIEW – MARYLIA KELLEY, EXECUTIVE DIRECTOR, TRI-VALLEY CARES
Nuclear Watch NM’s Workshop on LANL & PIT Production with Marylia Kelley of Tri-Valley CARES
Pit Production Workshop: View the Presentations
Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
Introduction by Jay Coghlan
Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
Marylia Kelly, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
https://www.facebook.com/NukeWatch.NM/videos/825812604488302/
Scott Kovac Nuclear Watch New Mexico, on LANL cleanup issues
Blog Posts
Biden Releases Record NNSA Nuclear Weapons Budget
President Biden has released his proposed FY 2024 budget for the Department of Energy’s semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). The budget for NNSA’s “Total Weapons Activities” for nuclear weapons research and production programs is slated to increase by 10% to $18.8 billion.
Of that $18.8 billion requested for FY 2024, over $3 billion is devoted to “Life Extension Programs” or “Alterations” that extend the service lives of existing nuclear weapons by decades while giving them new military capabilities. It also includes two new-design nuclear weapons, the W87-1 ICBM warhead (increased 50% to $1 billion) and the sub-launched W93 warhead (increased 62% to $390 million). Meanwhile, funding for dismantlements that provide a good nonproliferation example and save taxpayers’ money by eliminating long-term security costs is decreased by 4% to $53.7 million. That is a small fraction of one percent of NNSA’s Total Weapons Activities.
Two bright spots, yet still small relative to the U.S.’ planned $2 trillion nuclear weapons “modernization” program, are the zeroing out of funding for the Sea-Launched Cruise Missile (SLCM) warhead and stronger language on the retirement of the 1.2 megaton B83 bomb. Trump proposed to bring back nuclear-armed sea-launched cruise missiles, which were retired by President George H. Bush after the end of the Cold War. Biden’s 2022 Nuclear Posture Review canceled the SLCM, but Congress insisted on funding it, which will only grow stronger with Republican control the House.
In Response to Lawsuit, NNSA Releases FY 2022 Performance Evaluation Reports as “Frequently Requested Documents” as Required by FOIA; Reveals Pit Production Schedule is Likely Increasingly Delayed
Today, the National Nuclear Security Administration[1] (NNSA) finally posted its FY 2022 Performance Evaluation Reports to its electronic “FOIA Reading Room.” These reports are “Frequently Requested Documents” as defined by the Freedom of Information Act (meaning three or more requests) and are therefore required to be posted under the law. The catalyst for this was a lawsuit filed by Nuclear Watch New Mexico in September 2022.
NNSA’s Performance Evaluation Reports for its eight nuclear weapons research and production sites[2] grade annual contractor performance and award performance fees accordingly. Approximately 57,000 people are employed by the NNSA nuclear weapons complex, 95% of them contractor personnel. The Department of Energy and NNSA (or its predecessor DOE Defense Programs) have been on the independent Government Accountability Office’s “High Risk List” for project mismanagement and waste of taxpayers’ dollars since 1992.
Nuclear Watch New Mexico’s Follow-up to News about the Chromium Plume: Santa Fe New Mexican article, “San Ildefonso governor says halt of plume cleanup will lead to spread onto pueblo”
“Nuclear Watch New Mexico believes that it is past time that this dangerous contaminant is cleaned up at the source.
Extracted treated groundwater should be pumped or trucked uphill to flush out the remaining 90% of the chromium so that it can be decisively dealt with instead of with only marginally effective “pump and treat” for a few centuries…”
By Jay Coghlan
The real shame is how ineffective Lab cleanup of the hexavalent chromium plume is. First, even after 18 years, LANL and DOE still don’t know the boundaries of the plume, all the while claiming it’s not on San Ildefonso Pueblo Land (maybe LANL should deprioritize expanded nuclear weapons production and focus on that). Second, this is our common “sole source” (EPA special designation) aquifer that is one of the primary sources of drinking water for the cities of Santa Fe, Española, and Los Alamos, eleven Pueblos and all of the Española Basin’s rural areas. Third, hex chromium is the carcinogen made notorious in the popular movie Erin Brockovich. Fourth, it is estimated that 160,000 pounds of chromium were released up until 1972, but only 10% (i.e. ~16,000 pounds) has been recovered through extraction and treatment. When the head of DOE Environmental Management Los Alamos Office was asked where’s the rest of the chromium, Michael Mikolanis demurred and said that he would have to get back on that question.
San Ildefonso governor says halt of plume cleanup will lead to spread onto pueblo
THE FUTURE OF WIPP: PLUTONIUM BOMB WASTE
NNSA’s mission is plutonium pit production…for the next 30 years and beyond.
NNSA HAS STATED CLEARLY: “WIPP IS ESSENTIAL FOR PIT PRODUCTION UNTIL 2080.”
As you can see clearly in the National Nuclear Security Administration’s chart above, NNSA is getting ready to dump radioactive wastes from plutonium pit production at WIPP for the next 30 years.
Waste from expanded pit production will soon far outweigh cleanup wastes.
Despite being located in New Mexico, out-of-state sites have been given priority over radioactive wastes from Los Alamos Lab.
ALL FUTURE PIT PRODUCTION is for speculative new designs that can’t be tested because of the international testing moratorium, thereby perhaps eroding confifidence in the stockpile. Or, alternatively, these new designs could push the U.S. into resuming testing, which would have severe proliferation consequences.
Pit production will add an estimated 57,550 cubic meters of radioactive plutonium wastes over 50 years, more than half of WIPP’s projected future capacity. The National Academy of Sciences has already concluded that WIPP doesn’t have sufficient capacity for all of DOE’s planned radioactive wastes.
State Environment Department Begins to Rein in Work On LANL’s Chromium Plume Given Major Differences With DOE
At a February 9, 2023 public community forum hosted by the Department of Energy’s Environmental Management Los Alamos Office, there were strong indications that the New Mexico Environment Department (NMED) is convinced that DOE’s plans to remediate the chromium groundwater contamination plume under Los Alamos National Laboratory (LANL) is not working. Kimberly Lebak, program manager for N3B, the LANL cleanup contractor, described how it is finalizing the 2023 milestones under the Consent Order that governs cleanup, despite the fact that the NMED Groundwater Bureau has requested that DOE stop injecting treated water by April 1, 2023. DOE and NMED are not seeing eye-to-eye concerning the “Interim Measure” that N3B is using to contain the chromium plume.
The two agencies disagree on the Interim Measure, originally designed to prevent chromium from migrating across the San Ildefonso Pueblo border while DOE tries to figure out a final remedy.
Top Environment Official Takes Inside Info to Nuclear Weapons Agency, Gets Puny Slap-on-Wrist for Ethical Violation; Governor Should Enforce State Code of Conduct
Santa Fe, NM – The Department of Energy (DOE) will spend $9.4 billion dollars in New Mexico during this fiscal year 2023, 10% more than the State’s entire operating budget of $8.5 billion. To help enable its agenda of expanding nuclear weapons production that will cause more radioactive wastes and contamination, the DOE’s semi-autonomous National Nuclear Security Administration (NNSA) or its contractors often go head hunting for top State officials.
The New Mexico Environment Department (NMED) has sued DOE over the slow pace of cleanup at the Los Alamos National Laboratory (LANL). Stephanie Stringer, former Deputy Cabinet Director (the number two position at NMED), applied to work for NNSA in August 2022, and resigned to take that job in November. During that time, she was privy to NMED litigation strategy against DOE and chaired the New Mexico Water Quality Control Commission that denied a citizens’ motion against one of LANL’s most crucial facilities for expanding plutonium pit production, the Radioactive Liquid Waste Treatment Facility. As a result, the New Mexico Ethics commission fined Stringer a paltry $250. Assuming that Stringer is earning at least $100,000 base salary in her new position, that fine would have cost her approximately five hours of her time.
Independent Government Accountability Office Releases Scathing Report on Expanding Plutonium Pit Production; Pressure Mounts on Los Alamos Lab to Increase Production
Santa Fe, NM – Today, the independent Government Accountability Office (GAO) released a scathing report entitled NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Pit Production Capability. The National Nuclear Security Administration (NNSA) and its parent Department of Energy have been on the GAO’s High Risk List for project mismanagement since 1991.
Plutonium pits are the essential radioactive cores of nuclear weapons. There has been only limited production at the Los Alamos National Laboratory (LANL) since 1989 when a FBI raid investigating environmental crimes abruptly shut down production at the Rocky Flats Plant near Denver. NNSA now plans to spend $2.9 billion in FY 2023 alone to establish production of at least 30 pits per year at LANL and 50 pits per year at the Savannah River Site (SRS) in South Carolina.
The two main findings of GAO’s report are:
- NNSA’s Plutonium Pit Production Scope of Work Includes Dozens of Programs, Projects, and Other Activities Managed by Multiple NNSA Offices at Multiple Sites (p 19)
RE: The Santa Fe New Mexican “GAO: Cost, time estimates for making nuclear bomb cores flawed” – Underneath it All is the Nuclear Elephant in the Room: Future Pit Production is Actually Unnecessary.
BY JAY COGHLAN
Good article indeed. Kudos to Scott Wyland.
But to add to it:
The National Nuclear Security Administration (NNSA) cannot do, or rather will not do, good governance 101 for its largest program ever (i.e., expanded plutonium pit production), which is credible cost estimates and schedules. Why won’t NNSA do that? Because of PR and political concerns when their flaky cost estimates (such as they are) get blown up by inevitable escalating costs. NNSA knows that if it gave accurate projected costs Congress and the public would balk. Thus, the agency goes in lowballing costs, which always inevitably rise. I could rattle off a dozen NNSA projects over the last 15 years in which costs have exploded, wasting tens of billions of taxpayers’ dollars.
But get this, future pit production is also unnecessary and may actually degrade national security. To begin with, independent experts have found that pits have serviceable lifetimes of at least a century (their average age is now around 40). And we already have at least 15,000 existing pits stored at the Pantex Plant near Amarillo, TX.
QUESTIONS FOR DOE FY 2015 BUDGET
ALLIANCE FOR NUCLEAR ACCOUNTABILITY
A national network of organizations working to address issues of
nuclear weapons production and waste cleanup
Ashish Sinha: (301) 910-9405 [email protected]
Bob Schaeffer: (239) 395-6773 [email protected]
for use with March 4, 2014 Obama Administration Budget Request
QUESTIONS FOR THE U.S. DEPARTMENT OF ENERGY (DOE)
FY 2015 NUCLEAR WEAPONS, REACTOR AND CLEANUP BUDGET
The U.S. nuclear budget is out of control. Huge cost overruns for unnecessary production facilities are common. At the same time, cleanup of radioactive and toxic pollution from weapons research, testing, production and waste disposal is falling behind. The Department of Energy (DOE) budget for FY 2015 will reveal the Obama Administration’s nuclear priorities.
The Alliance for Nuclear Accountability (ANA), a 25-year-old network of groups from communities downwind and downstream of U.S. nuclear sites, will be looking at the following issues. For details, contact the ANA leaders listed at the end of this Media Advisory.
— Does the budget reflect the Administration’s commitment to curtail unnecessary spending on the $19 billion Uranium Processing Facility at Oak Ridge by downsizing it to the capacity needed to support stockpile surveillance, maintenance and limited life extension?
— Does the budget address the looming deficit in nuclear weapons dismantlement capacity so the United States can meet its international arms reduction commitments?
— Will the Obama Administration articulate its alternative plutonium strategy to the $6 billion “CMRR Nuclear Facility,” which was effectively cancelled in 2012? Is any expanded production needed when expert studies have found that existing plutonium pits are durable?
— Will NNSA reduce funding or impose meaningful milestones at the National Ignition Facility (NIF), which performed less than half of its planned Stockpile Stewardship experiments in FY2013 and still has not achieved ignition.
— Is the budget a de facto cancellation of plans to pursue “interoperable warhead designs” by imposing a delay of five years or more on the program? How much money will taxpayers save?
— Does the FY 2015 budget seek more than the $537 million requested for the B61 Life Extension Program last year? Will the “First Production Unit” from this $10 billion program continue to slip to 2020 or later delaying needed routine replacement of critical components?
— How much of the additional $26 billion in Defense Sec. Chuck Hagel’s “Opportunity, Growth and Security Initiative” will go to DOE nuclear weapons programs?
— Will the Administration support increased funding for the Defense Nuclear Facilities Safety Board (DNFSB) to provide independent oversight of DOE projects given the many cost over-runs, schedule delays, safety issues and technical problems?
— What is the projected life-cycle cost of the plutonium fuel (MOX) program at Savannah River? Is DOE’s internal cost assessment consistent with ANA’s estimate of $27 billion? When will it be released? Have any nuclear reactor operators committed to using MOX fuel?
— Does the Request include continued funding for design and licensing of Small Modular Reactors (SMRs), which private investors have been unwilling to finance fully because of concerns about viability and risks? Does DOE have plans to finance SMR construction?
—How much additional Environmental Management (EM) funding would be necessary in FY 2015 to meet all legally mandated cleanup milestones? States say cleanup agreements at a dozen major sites are underfunded by hundreds of million dollars.
— In which states does DOE face fines and lawsuits for missing milestones due to budget shortfalls? Which states are enforcing their binding clean-up agreements by imposing fines and taking further legal action?
— What is the high range for total life-cycle clean-up costs (LCC) for EM sites Because of funding shortfalls, are LCC costs continuing to increase? In the FY 2013 Budget Request High Range LCC was $308.5 billion, and in the FY 2014 Request LCC was $330.9 billion.
— Does the FY 2015 Request include funds to cleanup contamination from the recent radiation release at the Waste Isolation Pilot Plant (WIPP)? How much will this incident delay shipments from the Idaho National Lab, Los Alamos, Savannah River, and Oak Ridge?
— How much money is included for construction of new double-shell tanks to replace those leaking radioactive waste at the Hanford site? Are funds included for emergency pumping of tanks found to be leaking?
— Is DOE allocating sufficient funds to monitor and address ignitable hydrogen gas buildup in Hanford’s nuclear waste tanks as recommended by the Defense Nuclear Facilities Safety Board to protect workers, the public and the environment from possible explosions?
— Is an independent review of the Hanford Waste Treatment Plant included in the budget request to address concerns about the reliability of many of the parts and materials?
–– How much money is DOE allocating for building and development of the Hanford Waste Treatment Plant based on the current, flawed design and how much on redesign?
— For information about specific DOE nuclear weapons sites and programs, contact:
Meredith Crafton – Hanford: (206) 292-2850 x26 [email protected]
Tom Clements – Savannah River and MOX Plant: (803) 240-7268 [email protected]
Jay Coghlan – Los Alamos Lab and Life Extension: (505) 989-7342 [email protected]
Don Hancock – Environmental Management Program: (505) 262-1862 [email protected]
Ralph Hutchison – Oak Ridge Site and Dismantlement: (865) 776-5050 [email protected]
Marylia Kelley – Livermore Lab and Life Extension: (925)-443-7148 [email protected]
WIPP Update Feb 27 2014 – 13 Employees Contaminated
WIPP Update Feb 27 2014 – 13 Employees Contaminated
I’ll remind us all that the Waste Isolation Pilot Plant (WIPP) site is NOT a National Security site. It is a fancy landfill. There are really no secret programs there to protect. Maybe there are some secret parts buried there, but they have long-since been crushed. There is no reason to withhold news. The waste streams are well known and exactly where they are emplaced in WIPP is also well known. When the public gets news from WIPP officials, we deserve to have our questions answered clearly with all the important facts included.
Our best wishes go out to the employees.
Here’s the February 26, 2014 letter from the U.S. Department of Energy – Carlsbad Field Office, which provides oversight of the private contractor, Nuclear Waste Partnership, LLC, that currently manages and operates WIPP. Unfortunately, this letter raises many questions. Below are each of the paragraphs of the letter, followed by my questions and comments.
First Paragraph –
This morning (February 26), the 13 Waste Isolation Pilot Plant (WIPP) employees that were on site the evening of February 14 were notified that they have tested positive for radiological contamination. Employees were notified within about 12 hours of the receipt of preliminary sample results.
Ok, “the 13 Waste Isolation Pilot Plant (WIPP) employees that were on site the evening of February 14,” sounds like there were only 13 employees at WIPP on Feb 14. But the February 15, 2014, 9:17 PM WIPP press release states, “All non-essential employees were off-site by 5:30 PM MST.” The February 15, 2014, 9:17 PM WIPP press release also states, “No contamination has been found on any equipment, personnel, or facilities.” I guess we are to read this as, “No contamination has been found ON any personnel.”
Questions raised –
How many employees were onsite when?
Were the 13 contaminated employees essential or non-essential?
Were the non-essential employees (how many?) that left by 5:30 bioassayed?
How does an employee inhale rads and not have any on them?
Second Paragraph –
At the time of the event, these employees were performing above ground operations, and federal oversight duties at the WIPP facility. Nuclear Waste Partnership, LLC, the site contractor, requested that all workers on site the night of the event submit follow-up bioassay samples as they were considered more likely to have indications of potential exposure. Additional samples will be collected from these employees in the weeks ahead in order to perform complete analyses.
Questions raised –
When did Nuclear Waste Partnership, LLC request the bioassay samples from the night workers?
What made them “more-likely” to be exposed? What exactly were they doing?
Were the non-essential employees (how many?) that left by 5:30 bioassayed? When was this request made?
Third Paragraph –
It is premature to speculate on the health effects of these preliminary results, or any treatment that may be needed. However, on-site sampling and surveys and environmental monitoring, to date, continue to support National Atmospheric Release Advisory Center (NARAC) modeling, which indicates that airborne contamination was likely at very low levels.
Questions raised –
Where is the National Atmospheric Release Advisory Center (NARAC) modeling? The public must be allowed to read any and all reference documents. And by the way, NARAC is located at the Lawrence Livermore National Laboratory, which is a Department of Energy site.
Fourth Paragraph –
The material for this release event is transuranic radionuclides. The release material was predominantly americium-241, material which is consistent with the waste disposed of at the WIPP. This is a radionuclide used in consumer smoke detectors and a contaminant in nuclear weapons manufacturing.
Questions raised –
Really? Smoke detectors? Here’s from the EPA
As long as the radiation source stays in the detector, exposures would be negligible (less than about 1/100 of a millirem per year), since alpha particles cannot travel very far or penetrate even a single sheet of paper, and the gamma rays emitted by americium are relatively weak. If the source were removed, it would be very easy for a small child to swallow, but even then exposures would be very low because the source would pass through the body fairly rapidly (by contrast, the same amount of americium in a loose powdered form would give a significant dose if swallowed or inhaled). Still, its not a good idea to separate the source from the detector apparatus.
All the americium at WIPP is the byproduct of Cold War nuclear weapons production. The Center for Disease Control (CDC) explains the health effects of americium.
The radiation from americium is the primary cause of adverse health effects from absorbed americium. Upon entering the body by any route of exposure, americium moves relatively rapidly through the body and is deposited on the surfaces of the bones where it remains for a long time. As americium undergoes radioactive decay in the bone, alpha particles collide with nearby cell matter and give all of their energy to this cell matter. The gamma rays released by decaying americium can travel much farther before hitting cellular material, and many of these gamma rays leave the body without hitting or damaging any cell matter. The dose from this alpha and gamma radiation can cause changes in the genetic material of these cells that could result in health effects such as bone cancers.
Fifth Paragraph – Here it states that inhalation did employees did occur.
Determining employee dose typically involves multiple sample analyses to determine employee’s radionuclide excretion rate over time. This allows the lab to estimate the employee’s accumulated internal dose. The time this process takes depends largely on the solubility of the inhaled particulate, with less water-soluble radioactive materials requiring more samples and time to accurately estimate the dose. Follow-up urine samples may require about three or more weeks to accurately predict dose.
Sixth Paragraph –
We are now focusing our sampling program on employees with work assignments that may have placed them at greater risk, including those on shift February 15. We are still reviewing staff assignments to determine if additional employees will need to be tested. However, employees who feel they were assigned positions or functions that placed them at risk will be included in follow-up bioassay monitoring at their request.
Questions raised –
How many employees were working on the 15th? Were they wearing safety protection?
What is the criterion “to determine if additional employees will need to be tested”?
Seventh Paragraph –
There is no risk to family or friends of these employees. As we learn more information, we will continue to share. If you have any questions or concerns, please contact 1-800-336-9477. Thank you.
Questions raised –
What is the current status at the site?
Are employees working there now?
Are they wearing protective gear?
There apparently is a Press Conference today (Feb27 2014) at 3pm MST.
WIPP update Feb 26 2014
The New York Times ran a WIPP story today, NUCLEAR WASTE REPOSITORY SET TO REOPEN AFTER LEAK, New York Times — February 26, 2014, By Matthew L. Wald
This is a good example of what is known, what is being said, and what is not being said.
1. One shaft has a filter with a monitor and three don’t. The article, and many others, quotes a WIPP press release,
But late on Feb. 14, at an hour when no one was in the mine, an air monitor indicated the presence of radioactive contamination. An automated system cut off most of the ventilation and routed the exhaust through filters that are supposed to capture 99.97 percent of all contamination, turning off fans and changing the air flow, in less than one minute.
At WIPP, there are 4 ways for air to get to the surface – the Exhaust Shaft, the Salt Shaft, the Air Intake Shaft, and the Waste Handling Shaft. When radioactive contamination is detected, airflow is directed to the Exhaust Shaft as its filter is put into place. This shaft has the only filter and monitors on any of the shafts. WIPP officials claim that it was a monitor in Panel 7 that detected radiation and set into action the sending of all the air to the Exhaust Shaft. The Panel 7 monitor is around 2000 feet from the shafts. This means that the WIPP officials were relying on any contamination to set off the monitor before any contamination went up a shaft. We need a layout of the monitors, and if they were working, in the underground.
2. “Safe levels” of radioactivity? The article quotes a WIPP monitor,
“For someone living in town, I would say the dose was probably zero,” Russell Hardy, director of the Carlsbad Environmental Monitoring and Research Center, an independent monitoring organization that is part of New Mexico State University, said in a telephone interview Tuesday. He said that the event would not add to background levels of radiation — including bomb fallout — any more than an eyedropper full of water would contribute to the rise in the level of the Pacific Ocean.
Seriously, an eyedropper in the Pacific? I had to look it up –
There are over 70 cubic million miles in the Pacific Ocean. Meaning there are 188,000,000,000,000,000,000 gallons in the pacific ocean. That is 187 quintillion gallons.
No problem, unless you eat the fish that drank that drop. Anyway, I don’t believe anyone knows how much radiation was released. The preliminary results are based on a ridiculously small number of air samples. The official projections are based on the implication that the samples represent the maximum contamination, which is unlikely.
3. Then, it was explained how to get dosed –
Even in the desert, the danger to humans was small, the mine’s operators said. The highest reading from the monitors indicated that a person could have inhaled radioactive material that would emit a dose, over the person’s lifetime, of 3.4 millirem, an amount roughly equal to three days of natural background radiation. But to get the dose, the person would have had to stand for hours in the desert, on the downwind side of the plant.
Again, the official projections are based on the implication that the samples represent the maximum contamination, which is unlikely. We await the many soil samples that will shed light on the actual amounts.
WIPP Update Feb 25 2014
Let’s start with what we know.
The Waste Isolation Pilot Plant (WIPP) is the Nation’s only operating geologic repository for nuclear waste. WIPP can legally only accept a very specific type of waste – transuranic (TRU) waste generated at defense-related nuclear facilities. “Transuranic” refers to atoms of man-made elements that are heavier (higher in atomic number) than uranium. The most prominent element in most TRU waste is plutonium. Some TRU waste consists of items such as soil, rags, tools, and laboratory equipment contaminated with radioactive materials. Other forms of TRU waste include organic and inorganic residues or even entire enclosed contaminated cases in which radioactive materials were handled.
The WIPP underground is 2150 feet below the surface. And will consist of 8 separate panels with 7 football field-sized rooms per panel. (Two additional panels, 9 & 10, are to be placed in the existing tunnels that lead to Panels 1 – 8.) WIPP has a legal maximum capacity of 175,564 m3 and is currently starting to fill Panel 7.
Timeline –
At 12:25 p.m. February 5, 2014, – Shortly after 11 a.m., an underground vehicle used to transport salt is on fire in the underground.
At 11:30 PM Friday February 14, 2014, a continuous air monitor detected airborne radiation in the underground.
Sometime on Saturday February 15, 2014, a filter aboveground at the fence line of the WIPP facility (Location A) was sampled. The field preliminary analysis showed .87 Bq. (EPA’s action level for the isotopes of concern is 37 Bq.)
Sometime on February 17 & 18, 2014, more samples were taken from other monitors and also from Location A, which showed a much lower reading (.04 Bq) than it did three days earlier. http://www.wipp.energy.gov/Special/WIPP%20Environmental%20Sampling%20Results.pdf
Are the fire and the release related?
On the surface I would have to say yes. The first large fire in the underground was followed by first release 9 days later. But the 9 days is a problem. Apparently nothing happened for 9 days after the fire then something happened to cause the release of radionuclides aboveground. Did the fire somehow loosen the ceiling 2000’ away? Maybe, but right now, I have to think that it is a freak coincidence, because we don’t know the cause of the release.
Is the release serious?
Yes, WIPP is not supposed to leak for 10,000 years.
Is the release a threat?
Elevated levels of radionuclides can always pose a threat. The primary threat of alpha-emitters like plutonium is inhalation. Inhalation of very small amounts of plutonium can cause cancer.
The Location A monitor was some 6750 feet from the assumed source of the release, Panel 7. (2000’ from Panel 7 to the bottom of the exhaust shafts + 2150’ to the surface + ½ mile (2600’) to the monitor) Did Location A pick up a representative sample of the release? Unlikely. There are too many variables to know if the Feb 15 sample from Location A was higher or lower than the main part of the release. But the results do show that any higher risk is more than likely localized.
The map shows the seven monitoring locations. I have always thought that this was not enough monitoring locations.
What about the plume maps floating around the internet?
One in particular is getting some attention.
Please remember that these maps represent one possible outcome of a group of inputs entered into a NOAA computer program. We don’t know the input parameters that were used, therefore we do not know what this map is based on. This is not an actual map of where any actual plutonium actually went.
Also please notice the units.
The yellow is “1.0E-13 mass/m3”.
That would be .000,000,000,000,1 of something per cubic meter.
The blue is “1.0E-16 mass/m3”
That would be .000,000,000,000,000,1 of something per cubic meter.
It’s not nothing, but it’s not much. I would like to see what this map is based upon. This does show how well computers can crunch numbers.
What about claims of nuclear salt water rocket explosions in the WIPP underground?
There is a website in Hungary. That has an alert –
A grim “Of Special Importance” (highest classification level) report prepared by the Russian State Atomic Energy Corporation (ROSATOM) circulating in the Kremlin warned that the “potentially catastrophic nuclear event” currently unfolding at the US atomic Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico has prompted the White House to begin pre-staging government forces and equipment in the event a large-scale evacuation is needed, Whatdoesitmean.com reported.
I’m sorry, but I don’t have time to respond to Whatdoesitmean.com. There was no Rosatom/WIPP report. There are no nuclear salt-water rockets in the underground at WIPP, exploded or otherwise.
What to do?
In the short term let’s keep a critical ear open to the DOE story and separate out the spin. I’m waiting for the next batch of samples to be released to the public. WIPP has several proposals modify its permit in the works. Clearly, at this time, those all need to be put on hold until details of the exact cause of this accident are released to the public. The health and environmental impacts must be fully known and cleanup must be completed to everyone’s satisfaction.
Budget Deal Mixed Bag for Nuclear Weapons Programs
Budget Deal Mixed Bag for Nuclear Weapons Programs
Planned Long-Term Trend Not Sustainable
Following December’s budget deal Congressional appropriators have completed a one trillion dollar omnibus appropriations bill for this fiscal year, expected to pass given that neither political party wants another shutdown. The federal government has been running on a Continuing Resolution since October 1, and the omnibus bill now provides funding levels for the entire fiscal year 2014. Concerning the National Nuclear Security Administration’s nuclear weapons programs, the appropriators made a slight cut to Obama’s requested $7.87 billion, funding “Total Weapons Activities” at $7.78 billion.
All of this, of course, takes place within a larger context. The nonpartisan Congressional Budget Office (CBO) recently released a study entitled Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will cost $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.
As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars. This is simply not sustainable, given the nation’s continuing budget constraints.
The new omnibus appropriations bill has fully funded the most controversial program, the B61 nuclear bomb Life Extension Program (LEP), at the president’s request of $537 million. This overrode a proposed cut by Senate Energy and Water Development Appropriations, a key subcommittee that Senator Tom Udall sits on. Udall vigorously opposed that cut, saying that he wanted to save a few hundred jobs in New Mexico.
The B61 LEP has exploded in costs from an original $4 billion dollars to $12 billion, including a program synchronized with the Pentagon to give the bomb a new tail fin guidance kit that would transform it into the world’s first nuclear “smart” bomb. Its main mission is forward deployment in NATO countries, a relic of the Cold War, contradicting Obama’s rhetoric of lowering the presence of battlefield nuclear weapons in Europe.
But this is not a clear-cut victory for NNSA and the nuclear weapons labs. The appropriators cut funding for the B83 nuclear bomb that NNSA claims the B61 LEP will enable it to retire (leaving aside the fact that it was already planned for retirement). The appropriators made clear that they wanted to hold NNSA to its word. Moreover, the appropriators demanded detailed reporting on major warhead refurbishments, which they applied retroactively to the B61 LEP, and cut the requested amount for the tail fin guidance kit in half. Finally, the fight over the B61 LEP will soon start all over again with the release of the proposed FY 2015 federal budget, expected in late February or early March.
So whereas the NNSA and the labs have won an ambiguous victory in the B61 LEP, the rest of the omnibus appropriations bill demonstrates how deeply troubled their nuclear weapons programs are. Foremost amongst these is a planned Life Extension Program for the W78 ICBM warhead, proposed to be “interoperable” with the W88 sub-launched warhead. This is the first of three proposed interoperable warheads, which the NNSA and labs want to use to transform both the nuclear weapons stockpile and the research and production complex that supports it, with requisite exorbitant appropriations to fund them. In a serious blow to this scheme, the appropriators funded only $38 million out of $72.69 million requested for paper studies. Although not yet officially reported, conventional wisdom in Washington, DC is that the Nuclear Weapons Council (composed of senior officials from both NNSA and the Pentagon) has already canceled the interoperable warhead.
The appropriators also require NNSA to submit a report by May 1 explaining the costs and benefits of stress testing plutonium pits at the Lawrence Livermore National Laboratory in California. These radioactive nuclear weapons cores would have to be transported back and forth from the Los Alamos Lab. This is significant because Livermore’s continuing future in nuclear weapons programs is becoming increasingly questionable, given the failure of its flagship National Ignition Facility to initiate fusion, its loss of security status to handle large amounts of plutonium, and now the doubtful future of interoperable warheads, which it was banking on.
Concerning the proposed Uranium Processing Facility (UPF) near Oak Ridge, TN, the appropriators provided $309 out of $325.8 million requested, but noted that it is an adjustment caused by the necessity to consider additional alternatives. The UPF has been under increasing fire after a half-billion dollar design mistake and a recent Pentagon estimate that it would cost $12 to $19 billion, up from $6 billion. Conspicuous in its absence is any mention of follow-on to the deferred plutonium facility at LANL (the “CMRR-Nuclear Facility”) whose mission is to expand plutonium pit production, or NNSA’s “alternative plutonium strategy.”
The appropriators also provided $343.5 million for the Mixed Oxide (MOX) Fuel Fabrication Facility, adding to the $320 million requested. However, they directed NNSA to identify the root causes of cost increases and prioritize recommended solutions and corrective measures, showing that this program too is in serious jeopardy.
The appropriators funded $224.79 million for “cleanup” at the Los Alamos National Laboratory, which primarily consists of removing radioactive transuranic wastes that were suppose to be shipped to the Waste Isolation Pilot Plant a decade ago. In contrast, LANL is planning to “cap and cover” around one million cubic meters of radioactive and toxic wastes and backfill, creating a de facto permanent, unlined nuclear waste dump above groundwater and the Rio Grande.
Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers have won for now the battle over funding for the gold-plated B61 bomb Life Extension Program, but we look forward to the coming fight over next year’s budget. The rest of their plans are falling apart because they are so often their own worst enemy with constant cost overruns and lack of clear need. We are confident that given the trillion dollar cost for future nuclear weapons, subs, bombers, and missiles, the public will increasingly demand cleanup and related jobs, not more nuclear bombs.”
# # #
The omnibus appropriations bill can be viewed at http://docs.house.gov/billsthisweek/20140113/113-HR3547-JSOM-D-F.pdf
The NNSA section begins at p. 34 or PDF p. 70.
Nukes Will Cost One Trillion over 30 Years; Cleanup, Job Creation Imperiled
Nuclear Weapons “Modernization” Will Cost One Trillion Dollars Over Thirty Years;
Locally, Los Alamos Lab Cleanup and Job Creation Are Imperiled
The nonpartisan Congressional Budget Office (CBO) has just released its study Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that estimated costs for maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will total $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.
As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars.
Approximately two-thirds of the modernization costs will be for new submarines, bombers and missiles that could be operational for the rest of this century, contrary to the Obama Administration’s rhetoric of a future world free of nuclear weapons. The remaining third will be for the Department of Energy’s research and production complex, which includes the Los Alamos, Lawrence Livermore and Sandia nuclear weapons labs.
While the American public at large is experiencing growing income inequality and limited economic opportunity, nuclear weapons contractors are experiencing increasing profits and decreasing federal oversight. The for-profit corporations running the labs, comprised of Lockheed Martin (the world’s biggest defense contractor), Bechtel, and the University of California, plan a never-ending cycle of exorbitantly expensive “Life Extension Programs.” These programs will not only extend the service lives of existing nuclear weapons for decades, but also give them new military capabilities, contrary to declared U.S. international policy. Ironically, the contractors’ drive for profits may undermine national security, as confidence in our nuclear weapons could be eroded by planned massive changes to an extensively tested stockpile that has been proven to be reliable.
The Los Alamos National Laboratory (LANL) had planned to “modernize” with a new facility to support expanded production of plutonium pit cores (or “primaries”) for nuclear weapons. Because of budget constraints, the Obama Administration decided to defer it in favor of the Uranium Processing Facility near Oak Ridge, TN, for production of nuclear weapons “secondaries.” The LANL plutonium project, known as the Chemistry and Metallurgy Research Replacement (CMRR)-Nuclear Facility, had grown from an original estimate of $600 million to around $6 billion, for which it would not have created a single new permanent job (it would have merely relocating existing Lab jobs). But the Uranium Processing Facility has now grown from a similarly estimated $600 million to an astounding worse case $19 billion, in part due to a simple design error that cost a half-billion dollars just to correct on paper.
So-called nuclear weapons modernization at these costs is clearly not sustainable, especially when they create few if any new permanent jobs. Moreover, they exist for a product that must never be used (i.e. nuclear weapons). Therefore, they are of little economic benefit to society outside of the privileged enclaves that benefit from nuclear weapons research and production (for example, Los Alamos County is the second richest county out of 3,077 counties in the USA).
Funding for nuclear weapons modernization programs will rob taxpayers’ dollars for programs that local citizens really need. For example, the Los Alamos Lab plans to “cap and cover” its largest waste dump (called “Area G”), leaving up to one million cubic meters of poorly characterized radioactive and toxic wastes and backfill permanently buried in unlined pits and shafts. This will create a de facto permanent nuclear waste dump above the Rio Grande, and most importantly above a sole source groundwater aquifer that supplies 270,000 people in the arid Southwest.
The Cities of Santa Fe and Taos, New Mexico, oppose LANL’s plans to create a permanent nuclear waste dump, passing resolutions demanding full characterization of the wastes and offsite disposal. The resolutions note that, “full cleanup of Area G would be a win-win for New Mexicans, permanently protecting our precious groundwater and the Rio Grande while creating 100’s of high paying jobs for twenty years or more.” The costs for full cleanup of Area G would be about the same as four to five years’ worth of the Lab’s nuclear weapons programs that caused the mess to begin with.
Jay Coghlan, Nuclear Watch NM Director, commented, “We simply can’t afford to squander precious taxpayers’ money on programs that enrich contractors while introducing radical changes to fully tested nuclear weapons. This may harm national security by undermining confidence in stockpile reliability. Instead, New Mexicans should demand that their elected officials invest taxpayers’ money in programs that create real security for citizens, such as creating jobs that protect diminishing water resources, rather than their habitual support for unneeded, mismanaged and exorbitantly expensive nuclear weapons programs.”
# # #
The Congressional Budget Office report Projected Costs of Nuclear Forces 2014 -2023 is available at http://www.cbo.gov/sites/default/files/cbofiles/attachments/12-19-2013-NuclearForces.pdf
The Santa Fe City press release announcing passage of its resolution opposing “cap and cover’ of Los Alamos Lab’s largest radioactive and toxic waste dump is available at https://web.archive.org/web/20220819151417/https://www.santafenm.gov/news/detail/santa_fe_city_council_unanimously_passed_resolution
For a comparative estimate of cleaning up LANL’s Area G radioactive and toxic waste dump see https://nukewatch.org/facts/nwd/Area_G_Comparison_Costs-11-14-12.pdf
For a history of successful citizen activism against expanded plutonium pit production see https://nukewatch.org/facts/nwd/Pit-Production-History.pdf
Op ed on Area G resolution had outdated info
The first iteration of the draft City resolution on Area G cleanup called for reburial of low-level wastes in a modern landfill, while specifically calling for any high level and transuranic wastes to be disposed offsite. Most low-level wastes are mixed with hazardous wastes, which legally would have to be disposed offsite. Unfortunately DOE has sole regulatory authority over “purely” radioactive low-level wastes.
The resolution has now gone through several iterations, and the final draft that will presented to the Council does not have reburial. See
and scroll down.
Rather than being fast tracked this resolution has gone through 2 City committees and a 3rd today, before being presented to the full council on Wednesday.
FYI, two back-to-back events:
Wednesday, Dec. 11, 6:00-6:45 pm, Santa FePublic info session presented by Nuclear Watch NM and others (TBD) on Santa Fe City resolution calling for comprehensive cleanup of LANL’s largest radioactive waste dump (see below). First Presbyterian Church, 208 Grant Ave. From there we’ll walk two blocks to City Hall.
Wednesday, Dec. 11, 7:00 pm.
Santa Fe Santa Fe City Council hearing and public comment on a resolution introduced by Mayor Coss calling on LANL to examine alternatives to planned “cap and cover” of radioactive wastes at TA-54 Area G. This will be followed by the City Council’s yes or no vote to adopt. We are encouraging citizens to come and show their support for comprehensive cleanup of the Lab’s largest radioactive waste dump! Council Chambers, Santa Fe City Hall, 200 Lincoln Ave.
Reader View: City resolution on waste doesn’t do enough
ShannYn Sollitt
By ShannYn Sollitt | 0 comments
On Dec. 2, the Finance Committee of the Santa Fe City Council considered a resolution requesting a consideration of the alternatives to Los Alamos National Laboratory’s current plan to deal with their highly radioactive legacy nuclear waste by leaving it buried in illegal landfills.
The laboratory’s only plan is to leave it in place and cover it. The highly toxic waste dumps in Los Alamos at the top of the watershed are leaking deadly contaminants into the Rio Grande, directly upstream from the city’s new water source — posing serious health threats to Santa Feans.
Thank you, Mayor David Coss, for your awareness, concern and willingness to bring this issue to the forefront, and for your foresight and compassion for the future generations of our community. However, if the intent is to assure a secure and potable water supply for the coming generations, the resolution falls short.
It relies on a cleanup proposal to rebury the low-level, yet still highly radioactive, waste in lined landfills. This approach postpones the problem for the coming generations while solutions to remediate it are available and being utilized now. American scientists are currently effectively remediating the nuclear devastation of land around the Fukushima nuclear plant in Japan.
For 55 years, Los Alamos National Laboratory has known of the serious health threats presented by the seepage of radionuclides into the groundwater and has done nothing more than “study” the problem — costing taxpayers billions. Clearly, the laboratory scientists have neither the environmental intelligence nor the will to cope with this problem. Sadly, the resolution is being fast-tracked through the council before the members of the community with considered solutions have been given the opportunity to present their ideas.
The resolution will come before the full City Council on Wednesday. Please help us broaden the discourse by contacting the mayor. Concerned citizens are asking for a seat at the table to share views of the viable alternatives to protect our bioregion from the scourge of the nuclear industry.
ShannYn Sollitt is founder and director of NetWorks Productions, a nonprofit communication arts production company dedicated to creating and disseminating media designed to inspire a peaceful and sustainable world.
Mayor’s Resolution Makes Sense
Mayor’s Resolution Makes Sense
The article in today’s Santa Fe New Mexican(11/13/13) criticizing the proposed City of Santa Fe resolution is long on rhetoric and short on solutions. I appreciate that it may be a slow news day, but this article belongs in the Opinion Section, in my humble opinion…
The resolution calls on Los Alamos Lab to complete a thorough clean up of its wastes left over from the Cold War. How can that be a bad thing? The resolution is just one of Mayor Coss’ efforts to address the economic and environmental issues facing Santa Fe. It works in conjunction with economic development because the waste must be dealt with and it will provide jobs into the future. The Mayor’s efforts for increasing spending at the Lab have been focused on obtaining much-needed cleanup dollars, not expanding the nuclear weapons production budgets.
The article claims that “other non-lethal waste that has been used since the mid 1940s has been buried and capped on LANL property.” It sounds like there is no problem. The term ‘non-lethal’ is misleading, and not really a term used to describe the millions of cubic meters of radiological and hazardous wastes in the ground around Los Alamos. Granted, much of the low-level radioactive wastes and solvents are in less dangerous concentrations, but there are buried radioactive wastes that will have to be remotely handled by robots when they are removed.
The resolution uses an example of the recent cleanup of Materials Disposal Area B that was accomplished using Stimulus Dollars. MDA B at LANL was excavated, characterized and the wastes were shipped to different sites. During cleanup at the Fernald site in Ohio, higher-level wastes were shipped off-site and the low-level waste was replaced on-site in modern landfills with monitoring wells. The resolution shares elements of these real-life completed cleanups. It is easy to criticize while not having one’s own plan. The criticism seems to imply that no action is needed.
Not every resolution can address every issue at LANL. But a resolution that proposes a better cleanup plan that will protect our drinking water and land, protect New Mexicans, and provide jobs is neither “hypocritical” nor “propaganda.”
I invite alternative clean up proposals to be put on the table for discussion.
Santa Fe Mayor Calls to Not Allow the Creation of a Permanent Nuclear Waste Dump at Los Alamos
Santa Fe Mayor Calls to Not Allow the Creation of a Permanent Nuclear Waste Dump at Los Alamos
Santa Fe, NM – Nuclear Watch New Mexico applauds the demand by the Mayor of Santa Fe that the Los Alamos National Laboratory (LANL) not rule out alternatives to their so-called “cleanup” plan for Area G, the Lab’s largest radioactive waste dump. LANL plans to “cap and cover” and permanently leave one million cubic meters of radioactive and hazardous wastes buried forever.
Mayor David Coss will ask the Santa Fe City Council to approve his resolution to seek real cleanup alternatives at their December 11th meeting. Mayor Coss is also chairman of the Regional Coalition of LANL Communities that lobbies Congress for increased Lab funding. Yesterday he introduced his resolution to the Regional Coalition as well.
LANL is relying on their own outrageous estimate of $29 billion for removal of the waste at Area G as a rationale to leave the waste in place. Nuclear Watch has performed a cost comparison that compares the Lab’s estimate on a recent cleanup actually performed by the Lab and also to another Laboratory estimate. Our cost comparison shows that removal of the waste could actually cost less than $6 billion. The Lab’s preference is to cap and cover and leave the waste in place at Area G.
Scott Kovac, NukeWatch Program Director, commented, “LANL should quit playing games that cap and cover somehow represents genuine cleanup. For the same price as 5 years’ worth of nuclear weapons work that caused this mess to begin with, Area G could be fully cleaned up. I echo the Mayor’s words that this could be a real win-win for New Mexicans, permanently protecting groundwater and the Rio Grande while creating hundreds of long-term high-paying jobs. I call on other local governments and everyone to pick up the Santa Fe Mayor’s challenge.”
# # #
Read the Santa Fe Mayor’s press release
Read the Santa Fe City Resolution
Read Nuclear Watch’s cost comparison here and Area G fact sheet
Ex-Congresswoman Heather Wilson paid by nuclear weapons labs the day after she leaves office
Heather Wilson Finalized Contract with Sandia Labs While in Congress;
Payments Started the First Day She Left Congress;
Wilson Should Resign from Council Determining Labs’ Futures
Santa Fe, NM – Today, The Albuquerque Journal reported that former Congresswoman Heather Wilson (R. – New Mexico) finalized her first contract with the Sandia National Laboratories on December 19, 2008, while she was still representing the district that includes that nuclear weapons facility. Moreover, her first invoice documents that she began to be paid $10,000 a month for “Consultant/Advisory Services” that had no written work requirements on January 4, 2009, her very first day out of office. A few months later she was also being paid $10,000 a month by the Los Alamos National Laboratory (LANL) for a similar contract.
The Albuquerque Journal article builds upon a Department of Energy (DOE) Inspector General investigation, which determined that the Sandia and Los Alamos Labs had made approximately $450,000 in improper payments to Wilson up until March 2011, when she began to campaign for the Senate. The DOE IG report said that the facts indicate that federal funds were used for prohibited lobbying activities, which that office is still investigating. The Labs were forced to return that money to the government, but not Wilson.
The Albuquerque Journal received the new information concerning the dates of Wilson’s contract with Sandia from Nuclear Watch New Mexico. The watchdog organization obtained the documents by appealing an initially rejected federal Freedom of Information Act (FOIA) request.
During her unsuccessful 2012 Senate campaign Wilson repeatedly attacked her opponent Martin Heinrich for not supporting the labs strongly enough. In particular, while invoking a jobs argument, she repeatedly criticized the Obama Administration for delaying a controversial facility at LANL for expanded production of plutonium pit cores for nuclear weapons. However, despite its estimated $6 billion cost to the taxpayer, the government’s own documents clearly disclosed that the facility would not create a single new permanent job because it would merely relocate existing Lab jobs. In contrast, during her entire Senate campaign, Wilson did not disclose the full extent of her financial ties to the nuclear weapons labs.
In February 2013, House Speaker John Boehner appointed Wilson to a congressional advisory council that will recommend how the nuclear weapons laboratories should be managed and operated in the future. Jay Coghlan, Director of Nuclear Watch New Mexico, commented, “Heather Wilson should resign from this advisory council immediately because of her clear conflict-of interest. If she does not step down voluntarily, congressional leaders must replace her.”
“Other Members of Congress should take heed of Heather Wilson’s highly questionable ethical behavior,” Coghlan continued. “They should remember that they were elected to represent their constituents, not the for-profit corporations running the labs. Our politicians should avoid even the appearance of favoring the interests of the nuclear weapons labs above the public’s best interests, which Wilson so clearly failed to do.”
# # #
Ex-Congresswoman Wilson’s contract with Sandia and invoices obtained through Nuclear Watch New Mexico’s Freedom of Information Act request are available at
https://nukewatch.org/facts/nwd/HeatherWilson-Sandia contract-invoices.pdf
The Nov. 3, 2013 Albuquerque Journal article From Congress to contract: Heather Wilson says 10K per month Sandia Labs deal met ethics rules is available at
http://www.abqjournal.com/293472/news/from-congress-to-contract.html
(a paid subscription is necessary for the full article).
The June 2013 DOE IG Report Concerns with Consulting Contract Administration at Various Department Sites (DOE/IG-0889) that focuses on Heather Wilson’s contracts with the Los Alamos and Sandia National Laboratories is available at http://energy.gov/ig/downloads/inspection-report-doeig-0889
903 W. Alameda #325, Santa Fe, NM 87501 • Voice and fax: 505.989.7342
[email protected] • www.nukewatch.org • https://nukewatch.org/watchblog/
http://www.facebook.com/NukeWatch.NM
RECENT FACT SHEETS
Past NukeWatch Events
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
Past Work Product (2019-)
Nothing Found
It seems we can’t find what you’re looking for. Perhaps searching can help.
2019
November 26, 2019 Press Release November 24, 2019 Press Release November 19, 2019 Plutonium Pit Production Workshop Presenters:
August 12, 2019 NEPA Comments NukeWatch’s 22-page formal comments on expanded plutonium pit production Until NNSA fully complies with the National Environmental Policy Act through the preparation of a programmatic environmental impact statement on expanded plutonium pit production, Nuclear Watch believes that any irreversible or irretrievable commitment of resources to either the expansion of pit production at the Los Alamos Lab or to the repurposing of the MOX Facility at the Savannah River Site is unlawful. Read/Download the Full Document HERE July 25, 2019 NEPA Comments Scoping comments on NNSA draft EIS for plutonium pit production at the Savannah River Site THE NEED FOR A PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT: This is our first and primary concern, that NNSA must first complete a programmatic environmental impact statement (PEIS) on its nation-wide plans for plutonium pit production, in advance of the Savannah River Site-specific environmental impact statement. To get right to the point, we argue that the SRS EIS process should go no further than this scoping period and should resume only after a completed formal Record of Decision for a new or supplemental PEIS. Read/Download the Full Document HERE July 9, 2019 Plutonium Pit Production Fact Sheet Expanding Nuclear Pit Production: The Facts and What You Can Do The Facts Read/Download the Full Document HERE June 10, 2019 News Release In a victory for transparency and legal compliance by the government, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) today published a “Notice of Intent” in the Federal Register to complete environmental reviews on its controversial proposal to expand plutonium “pit” production for new and refurbished nuclear weapons. [embeddoc url="https://nukewatch.org/wp-content/uploads/2019/06/SRS-plutonium-bomb-plant6-14-19.pptx" download="all" viewer="google"] Read/Download the Full News Release HERE June 4, 2019 Press Release On behalf of three public interest organizations - Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch – attorneys for the law firm of Meyer Glitzenstein & Eubanks and the Natural Resources Defense Council recently sent a 16-page letter to Lisa Gordon-Hagerty, head of the National Nuclear Security Administration (NNSA). The detailed letter warns the nuclear agency to not proceed with aggressive plans to expand plutonium pit production without first meeting its legal requirements for timely public review and comment under the National Environmental Policy Act. Read/Download the Full Press Release HERE May 31, 2019 Press Release Last Wednesday, facility operations personnel entered a service room and noticed a leak emanating from a valve on the radioactive liquid waste (RLW) system. Upon subsequent visual inspection by a radiological control technician, RLUOB engineers believe that this valve, and 6 similar valves, may be constructed of carbon steel. The RLW system handles radioactive liquid waste streams from chemistry operations that include nitric and hydrochloric acids—carbon steel valves would be incompatible with these solutions. The suspect valves are also in contact with stainless steel piping, which would create another corrosion mechanism. RLUOB management plans to drain the affected piping sections and develop a work package to replace all of the suspect valves. They will also confirm the valve materials and if shown to be incorrect, investigate the cause of this failure in the design, procurement, and installation processes. The valves were installed in 2013 as part of a modification to add straining and sampling capabilities that were not in the included in the original design. [Please note that DNFSB reports are posted a few weeks later than dated.] This immediately raises two crucial issues: 1) the National Nuclear Security Administration’s (NNSA’s) plans for expanded plutonium pit production; and 2) the current attempt by the Department of Energy to restrict Safety Board access to its nuclear weapons facilities. Read/Download the Full Press Release HERE April 26, 2019 Consent Orders Comparison On March 1, 2005, after arduous negotiations and threats of litigation, the New Mexico Environment Department (NMED), Department of Energy (DOE), and Los Alamos National Laboratory (LANL) entered into a Consent Order specifying the schedule for investigation and cleanup of the Lab’s hundreds of contaminated sites. This Consent Order (CO) was LANL’s agreement to fence-to-fence cleanup of Cold War legacy wastes, which NMED began to enforce. Read/Download the Full Comparison HERE March 25, 2019 Press Release More than 25 years after the end of the Cold War, all eight established nuclear weapons powers are “modernizing” their stockpiles. Talks have broken down with North Korea, the new nuclear weapons power. Nuclear-armed India and Pakistan narrowly averted war last month. Russian President Vladmir Putin made new nuclear threats in response to Trump’s announced withdrawal from the Intermediate-Range Nuclear Forces Treaty. This could lead to hair-trigger missile emplacements in the heart of Europe and block extension of the New Strategic Arms Reduction Treaty with Russia. If so, the world will be without any nuclear arms control at all for the first time since 1972. Meanwhile, the U.S. criticizes non-weapons states for signing a nuclear weapons ban treaty, despite the fact there have long been treaties completely banning chemical and biological weapons of mass destruction that the U.S. seeks to enforce. The pending international NonProliferation Treaty (NPT) Preparatory Committee conference at the United Nations is widely expected to collapse in failure because of the nuclear weapons powers’ failure to enter into serious negotiations leading to nuclear disarmament. The NPT’s Article VI mandate for those negotiations has been in effect since 1970, when the Treaty was signed by 189 countries (more than any other treaty). Read/Download the Full Press Release HERE March 26, 2019 NukeWatch Budget Compilation Nuclear Watch New Mexico — Department of Energy FY 2020 Nuclear Weapons Budget Request |
2018
November 16, 2018 Plutonium Pit Production Fact Sheet Plutonium pits are the radioactive cores or “triggers” of nuclear weapons. Their production has always been a chokepoint of resumed industrial-scale U.S. nuclear weapons production ever since a 1989 FBI raid investigating environmental crimes shut down the Rocky Flats Plant near Denver. In 1997 the mission of plutonium pit production was officially transferred to its birthplace, the Los Alamos National Laboratory (LANL) in northern New Mexico, but officially capped at not more than 20 pits per year. However, in 2015 Congress required expanded pit production by 2030 whether or not the existing nuclear weapons stockpile actually needs it. This will support new military capabilities for nuclear weapons and their potential use. Read/Download the full fact sheet pdf HERE October 31, 2018 Nuclear Watch New Mexico, Savannah River Site Watch, and Tri-Valley CAREs sent a letter of demand to the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to inform the government that its plan to quadruple the production rate of plutonium bomb cores is out of compliance with the National Environmental Policy Act (NEPA). NNSA’s premature plan to quadruple the production rate of plutonium bomb cores (“pits”), the heart of all US nuclear weapons, is out of compliance with requisite environmental law, the groups argue, as NNSA has failed to undertake a legally-mandated programmatic review and hold required public hearings. View/Download the entire press release HERE NukeWatch Comments, September 27, 2018 Nuclear Watch New Mexico is submitted formal comments to express in the strongest possible terms our opposition to DOE Order 140.1 Interface with the Defense Nuclear Facilities Safety Board. We find that the Department of Energy’s (DOE’s) attempt to restrict and suppress DNFSB access is very misguided, arrogant, and likely illegal in that it acts contrary to the Board’s enabling legislation. June 8, 2018 Press Release New Contractors Selected For Expanded Nuclear Weapons Production at Los Alamos Santa Fe, NM. Today the Department of Energy's National Nuclear Security Administration (NNSA) announced its choice for the new management and operating contract for the Los Alamos National Laboratory (LANL).The new contractor, Triad National Security, LLC, is a limited liability company consisting of the Battelle Memorial Institute, the University of California and Texas A&M University. All three are non-profits, and it is unclear how this will affect New Mexico gross receipts taxes. Battelle claims to be the world's largest non-profit technology research and development organization, and manages a number of labs including the Lawrence Livermore and Idaho National Laboratories. Texas A&M was founded in 1876 as the state's first public institution of higher learning and has the largest nuclear engineering program in the country. DOE Secretary Rick Perry is an avid A&M alumnus. May 31, 2018 Press Release Santa Fe, NM & Columbia, SC - "Two key U.S. Department of Energy documents on future production of plutonium "pits" for nuclear weapons, not previously released to the public, fail to justify new and upgraded production facilities at both the Los Alamos National Laboratory (LANL) in New Mexico and the Savannah River Site (SRS) in South Carolina." May 15, 2018 Fact Sheet May 10, 2018 Press Release What's Not in NNSA's Plutonium Pit Production Decision
- NNSA did not mention that up to 15,000 "excess" pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in "strategic reserve." The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits. (In 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old.) May 2, 2018 Press Release "NNSA should begin nation-wide review of plutonium pit production, why it's needed, and what it will cost the American taxpayer in financial, safety and environmental risks. These are all things that the public should know." -Jay Coghlan, Director, Nuclear Watch New Mexico. April 26, 2018 NukeWatch Comments LANL Rad Lab: Formal Comments Under Nat'l Environmental Policy Act Against raising plutonium limit at LANL Rad Lab View/download Nuclear Watch comments as submitted Excerpt:
- NNSA is planning a 10-fold increase in plutonium at the LANL Rad Lab with a view to ramping up the production of plutonium pits for new nuclear weapons. March 26, 2018 Press Release United States To Begin Construction Of New Nuclear Bomb Plant The National Nuclear Security Administration (NNSA) announced on Friday, March 23, that it was authorizing the start of construction of the Uranium Processing Facility (UPF) and two sub-projects at the Y-12 National Security Complex in Oak Ridge, Tennessee. The UPF is a facility dedicated solely to the manufacture of thermonuclear cores for US nuclear bombs and warheads.
Jay Coghlan of NukeWatch points out that "This project already has a long history, and it is instructive. In 2013, DOE announced it was 85% finished with the UPF design when it ran into the 'space/fit' issue- and more than a half-billion taxpayer dollars were just written off. In private business, that kind of thing gets you fired. In DOE's world of contractors running amok, they not only didn't get fired, not one Congressional hearing was held and the UPF budget went up the next year!" - See full press release for all the details (PDF) March 1, 2018 Press Release The Regional Coalition of LANL Communities: Benefits for the Select Few Santa Fe, NM- According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County's 46th district in the state House of Representatives. For all the details, see full press release PDF February 28, 2018 Press Release Santa Fe, NM. On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as "N3B"). This award followed a DOE decision to pull cleanup from LANL's prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen. (See all the details in the full press release) February 26, 2018 Press Release Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race Santa Fe, NM. Late Friday February 23, the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] "Weapons Activities", 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office's High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990... (See all the details in the full press release) February 22, 2018 Press Release Santa Fe, NM. Today the National Nuclear Security Administration announced an Environmental Assessment to increase the amount of plutonium used in the Radiological Laboratory Utility and Office Building (aka the "Rad Lab") at the Los Alamos National Laboratory from 38.6 grams of plutonium-239 equivalent to 400 grams. This 10-fold increase is significant because it will dramatically expand materials characterization and analytical chemistry capabilities in the Rad Lab in support of expanded plutonium pit production for future nuclear weapons designs. It also re-categorizes the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility. View/Download full press release February 12, 2018 Press Release Trump's Budget Dramatically Increases Nuclear Weapons Work Santa Fe, NM In keeping with the Trump Administration's recent controversial Nuclear Posture Review, today's just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production. January 12, 2018 Press Release Draft Nuclear Posture Review Degrades National Security Yesterday evening the Huffington Post posted a leaked draft of the Trump Administration's Nuclear Posture Review (NPR). This review is the federal government's highest unclassified nuclear weapons policy document, and the first since the Obama Administration's April 2010 NPR. 2017 |
2017
December 22, 2017 Press Release New Mexico Environment Department Surrendered to DOE Extortion Santa Fe, NM. The New Mexico State Auditor Office recently questioned whether two settlements between the New Mexico Environment Department and the Department of Energy were in the best interests of New Mexico. That Office noted: (View/download full press release) December 20, 2017 Press Release Los Alamos Hires New Contractor - Starts Cleanup On the Cheap Santa Fe, NM- Today the Department of Energy (DOE) announced the award of the new Los Alamos National Laboratory legacy cleanup contract to Newport News Nuclear BWXT-Los Alamos, LLC. The $1.39 billion contract is for ten years, which works out to $139 million per year... View/download the full press release Public Presentation, December 2, 2017 October 31, 2017 Press Release Today, in Washington, DC, the Congressional Budget Office released its new report, "Approaches for Managing the Costs of U.S. Nuclear Forces, 2017 to 2046". The Congressional Budget Office estimates that the most recent detailed plans for nuclear forces, which were incorporated in the Obama Administration's 2017 budget request, would cost $1.2 trillion in 2017 dollars over the 2017-2046 period: more than $800 billion to operate and sustain (that is, incrementally upgrade) nuclear forces and about $400 billion to modernize them.... Driving this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of "deterrence," thousands of warheads are being refurbished and improved to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government! October 27, 2017 Press Release Santa Fe, NM. On the evening of Wednesday October 25, the Santa Fe City Council passed a resolution requesting that the New Mexico Environment Department strengthen the revised Los Alamos National Labs cleanup order to call for additional characterization of legacy nuclear wastes, increased cleanup funding, and significant additional safety training. The resolution also called for the suspension of any planned expanded plutonium pit production until safety issues are resolved. (view/download full press release) October 6, 2017 Press Release Santa Fe, NM. Nuclear Watch New Mexico strongly applauds the awarding of the Nobel Peace Prize to the International Campaign to Abolish Nuclear Weapons (disclosure: NukeWatch is one of ICAN's ~400 member groups around the world). This award is especially apt because the peoples of the world are now living at the highest risk for nuclear war since the middle 1980's, when during President Reagan's military buildup the Soviet Union became convinced that the United States might launch a pre-emptive nuclear first strike. Today, we not only have Trump's threats to "totally destroy" North Korea and Kim Jong-un's counter threats, but also renewed Russian fears of a US preemptive nuclear attack... Generally unknown to the American taxpayer, our government has quietly tripled the lethality of the US nuclear weapons stockpile..." (view/download complete press release) NukeWatch fact sheet, September 26, 2017 The National Nuclear Security Administration's own documents have explicitly stated that expanded pit production would have no significant positive effect on job creation and the regional economy of northern New Mexico. Nuclear Watch argues that expanded plutonium pit production could actually have negative effect if it blocks other economic alternatives such as comprehensive cleanup, which could be the real job producer. Moreover, given LANL's poor safety and environmental record, expanded plutonium pit production could have a seriously negative economic impact on northern New Mexico in the event of any major accidents. September 15, 2017 Press Release Santa Fe, NM. The Los Alamos National Laboratory (LANL) has detected far more hexavalent chromium (Cr) contamination than previously estimated in the "sole source" regional groundwater aquifer that serves Los Alamos, Santa Fe and the Espanola Basin. Sampling in July from a new well meant to inject treated groundwater back into the aquifer detected chromium contamination five times greater than the New Mexico groundwater standard of 50 micrograms per liter (ug/L). View/download the full press release September 11, 2017 Press Release Talking Points: The 2016 LANL Cleanup Consent Order Should Be Rescinded The 2005 LANL Cleanup Consent Order was all about the enforceable schedules. It required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It stipulated a detailed compliance schedule that the Lab was required to meet. Under Gov. Martinez, NMED Secretary Ryan Flynn granted more than 150 compliance milestone extensions at the Lab's request, effectively eviscerating it. View/download the complete talking points July 20, 2017 Press Release Washington, DC Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration's (NNSA's) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.'s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants. View/download the full press release June 19, 2017 Press Release Some Background on Plutonium Pit Production at the Los Alamos Lab Santa Fe, NM -The Washington Post has published the first in a series of articles on nuclear safety lapses in plutonium pit production at the Los Alamos Lab. Plutonium pits are the fissile cores of nuclear weapons that when imploded initiate the thermonuclear detonation of modern weapons. By the way, did you know? Plutonium facilities at LANL are- in principle- designed to withstand a serious earthquake of a degree expected to occur only once every 10,000 years. The last serious earthquake near the Lab is believed to have occurred 11,500 years ago. View/download the full press release ANA Report 2017: Accountability Audit May 19, 2017 Press Release SA Preview of Trump's Budget: More Nuclear Bombs and Plutonium Pit Production Santa Fe, NM. "The proposed level of funding for the National Nuclear Security Administration's (NNSA)'s Total Weapons Activities is $10.2 billion, a full billion above what was requested for FY 2017. In March, Trump's "skinny budget" stated NNSA's funding priorities as 'moving toward a responsive nuclear infrastructure', and 'advancing the existing warhead life extension programs'. Read the full press release for all the details. March 28, 2017 ANA workshop at UN Ban Treaty Conference Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion March 28, 2017, UN, NYC:
March 2017 Fact Sheet Plutonium Pit Production at LANL (Updated March 2017) February 23, 2017 Press Release Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection Santa Fe, NM. America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning. Read the full press release for all the details. January 5, 2017 Press Release The National Nuclear Security Administration (NNSA) has publicly released its fiscal year 2016 Performance Evaluation Report (PER) for Los Alamos National Security, LLC (LANS), the for-profit contractor that runs the Los Alamos Lab. The Performance Evaluation Report is NNSA's annual report card on contractor performance, and overall the agency awarded LANS $59 million in profit out of a possible $65 million. The grade was 85% for the incentive part of the award. In 2012 Nuclear Watch New Mexico successfully sued NNSA to ensure that the Performance Evaluation Reports detailing taxpayers funds paid to nuclear weapons contractors are publicly available. In 2016 the NNSA decided to put the LANL management contract out for competitive bid, but granted LANS a contract extension until the end of September 2018. |
Media appearances including radio interviews are listed on the internal Media page
See the NukeWatch Channel at YouTube for our extensive playlists of key videos.
See the Nukewatch Twitter feed
See the Nukewatch Tumblr site
WatchBlog Posts:
Over 200 posts published since 2009. See archives at the WatchBlog
Earlier Work Product items are archived here