Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law

FOR IMMEDIATE RELEASE, October 3, 2024

Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]

AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.

The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites.  These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.

As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.

Continue reading

High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up

FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.

On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.

Continue reading

NEW Pit Production Fact Sheet – July 2024

Nuclear Weapons and Waste Issues in NM – July 14 Presentation

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production

FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email

Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.

In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:

“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]

Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.

Continue reading

NNSA’s Nuclear Weapons Budget Takes Huge Jump

Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut

FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.

The Biden Administration states that the $19.8 billion will be used to:

“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.

The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:

“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)

Continue reading

NNSA Suppresses How Taxpayers Money Is Spent

FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.

NNSA Suppresses How Taxpayers Money Is SpentA current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.

Continue reading

2023

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT FACT SHEETS

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT PRESS RELEASES

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT NUCLEAR BUDGET GRAPHS

It seems we can’t find what you’re looking for. Perhaps searching can help.

Past Work Product (2020-2021)

It seems we can’t find what you’re looking for. Perhaps searching can help.

75TH ANNIVERSARY HIROSHIMA DAY ONLINE COMMEMORATION CALLING FOR THE ABOLITION OF NUCLEAR WEAPONS
August 6, 2020

"Jay Coghlan of Nukewatch.org on the history of the Los Alamos labs, where the bomb was designed and fabricated, and how it continues to play the leading role in the creation of most U.S. nuclear weapons since then."

[embeddoc url="https://nukewatch.org/wp-content/uploads/2020/05/plutonium-pit-production-fact-sheet.pdf" download="all" viewer="browser"]

PLUTONIUM PIT PRODUCTION WORKSHOP – NOVEMBER 19, 2019

RADIO INTERVIEW – SCOTT KOVAC & JON LIPSKY

Scott Kovac of Nuclear Watch New Mexico and Jon Lipsky, the FBI agent who led the 1989 raid investigating environmental crimes that shut down the Rocky Flats Nuclear Bomb Plant join Xubi to talk about Nuclear weapons, Nuclear clean up and Pit production plans at LANL.

livingontheedge.libsyn.com

RADIO INTERVIEW – JAY COGHLAN & JON LIPSKY

PIT Production at LANL with Nuclear Watch New Mexico’s Jay Coghlan and Workshop Speaker, Jon Lipsky

The Richard Eeds Show 11/18

RADIO INTERVIEW – MARYLIA KELLEY, EXECUTIVE DIRECTOR, TRI-VALLEY CARES

Nuclear Watch NM’s Workshop on LANL & PIT Production with Marylia Kelley of Tri-Valley CARES

The Richard Eeds Show 11/19


Pit Production Workshop: View the Presentations

Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant

Introduction by Jay Coghlan

Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL

Marylia Kelly, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race

https://www.facebook.com/NukeWatch.NM/videos/825812604488302/

Scott Kovac Nuclear Watch New Mexico, on LANL cleanup issues

Blog Posts

DOE Ignores COVID-19 Threat, Diverts Resources to Planning for Nuclear War by Releasing Draft Environmental Study on SRS Plutonium Bomb Plant

Today, in the middle of the growing coronavirus pandemic, the U.S. Department of Energy ignored the real national crisis and irresponsibly shifted its focus to planning for nuclear war, revealing plans to construct a Plutonium Bomb Plant (PBP) at the Savannah River Site (SRS) in South Carolina.

DOE’s semi-autonomous National Nuclear Security Administration (NNSA) today formally released the Draft Environmental Impact Statement for Plutonium Pit Production at the Savannah River Site in South Carolina, whose proposed action is to establish the production of plutonium “pits” (nuclear warhead cores) at SRS at a rate of up to 125 pits per year, with at least 50 pits per year by 2030 as the stated objective for now.

LANL Plans to Release Up To ~100,000 Curies of Radioactive Gas

Santa Fe, NM – On March 11, the Los Alamos National Laboratory (LANL) sent the federal Environmental Protection Agency a formal notice that the Lab will intentionally release up to some 100,000 curies of tritium, a radioactive isotope of hydrogen gas, beginning April 17, 2020. 

An internal Lab document states that actual “anticipated emissions” could be half that because of tritium remaining behind in equipment but offers no documentation to substantiate it. During the 1980’s LANL arbitrarily used a self-declared “building shielding factor” not approved by the EPA that reduced its legally required annual calculated radioactive air dose to the public by a third. When that reduction was disallowed LANL was in fact in legal violation of the Clean Air Act. With that as an example, undocumented reductions in radioactive doses claimed by LANL should be viewed with suspicion.

Energy Dept. Nearly Triples Funding for Plutonium Pit Production, Cuts Cleanup in Half – But Refuses to Complete New Env. Impact Statement for Los Alamos Lab

The 2011 Las Conchas fire threatened the Los Alamos National Laboratory. CREDIT: Brian Klieson.

Santa Fe, NM – Today the Department of Energy’s semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA), announced that it will not complete a new site-wide environmental impact statement for the Los Alamos National Laboratory (LANL). The last site-wide environmental impact statement was in 2008.

Since that time a catastrophic wildfire burned to the western boundary of the Lab (likely to occur more frequently with climate change); an exploding radioactive waste drum improperly prepared by LANL shut down the Waste Isolation Pilot Plant for three years, costing taxpayers ~$3 billion to reopen; the full extent and depth of a hexavalent chromium plume contaminating the regional groundwater is still not fully determined; and LANL’s long track record of chronic nuclear safety incidences remain unresolved.

LANL Budget Increased by Nearly $1 Billion to Accelerate Work As Production Site for Nuclear Weapons Designs by Livermore Lab Cleanup Cut by 46%

LANL Budget Increased by Nearly $1 Billion to Accelerate Work As Production Site for Nuclear Weapons Designs by Livermore Lab Cleanup Cut by 46%
Soil and groundwater contamination was discovered at the LLNL Livermore Site and Site 300 in the 1980s. This contamination resulted from early research activities

Santa Fe, NM – The Trump Administration has released more budget details for its proposed Fiscal Year 2021 federal budget for the Department of Energy and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). The Los Alamos National Laboratory (LANL) is slated to receive nearly a one billion dollar increase for its nuclear weapons programs (up 48%), overwhelmingly for new production. At the same time cleanup, whose need is caused by nuclear weapons production, is cut by 46%.

Significantly, LANL’s FY 2021 budget for design work of nuclear weapons stayed flat after falling by 28% from FY 2018 to FY 2019. Meanwhile, funding for nuclear weapons design work at the Lawrence Livermore National Laboratory more than doubled from FY 2019 to FY 2021.

As the NonProliferation Treaty’s 50th Anniversary Approaches U.S. to Soon Fund New Nuclear Warhead at $1 Billion Per Year

As the NonProliferation Treaty’s 50th Anniversary Approaches U.S. to Soon Fund New Nuclear Warhead at $1 Billion Per Year

Santa Fe, NM – This March 5, 2020, marks the 50th anniversary of the NonProliferation Treaty, whose central bargain was that non-nuclear weapons states forswore acquiring them in exchange for which nuclear weapons states promised to enter into serious negotiations leading to their elimination. Those negotiations have never happened.

The Trump Administration has marked the occasion by finally releasing the detailed fiscal year 2021 Congressional Budget Request for the Department of Energy’s semi- autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). The NNSA’s program for new and upgraded nuclear weapons gets a 3 billion dollar-plus mark up to $15.6 billion, slated to jump to $17 billion annually by 2025. This includes a new nuclear warhead, the submarine launched W93, initially funded at $53 million in FY 2021, but slated to climb to $1.1 billion annually by 2025. New warhead design and production typically take around 15 years or more.

Los Alamos Lab Cleanup Cut By 46%, Nuclear Weapons “Production Modernization” Jumps 57%

FOR IMMEDIATE RELEASE, February 12, 2020

Contact:   Jay Coghlan, Nuclear Watch NM, 505.989.7342, jay[at]nukewatch.org

Santa Fe, NM – The Trump Administration has released more budget information for fiscal year 2021 for the Department of Energy (DOE). * It states that proposed cleanup at the Los Alamos Lab is “Consistent with the priorities established with the New Mexico Environment Department in the 2016 Consent Order…” It then goes on to cut LANL cleanup by $100 million from $220 million in FY 2020 to $120 million requested for FY 2021. (Pages 52 and 55)

Trump’s FY 2021 DOE Nuclear Weapons Budget Sets Post-Cold War High – New Nuclear Warhead Is Planned

Donald Trump Photo illustration by Slate. Photos by CUTWORLD/iStock/Getty Images Plus and Jack Hill—WPA Pool/Getty Images.

Today the Trump Administration released topline budget numbers for fiscal year 2021 for the Department of Energy (DOE). This includes DOE’s semi-autonomous National Nuclear Security Administration (NNSA), whose nuclear weapons programs are slated to receive the highest amount of taxpayer dollars since the Cold War ended nearly 30 years ago.

This year 2020 marks the 75th anniversaries of the atomic bombings of Hiroshima and Nagasaki and the 50th anniversary of the Non-proliferation Treaty (NPT), which is commonly regarded as the cornerstone of international nuclear weapons nonproliferation. The NPT required the established nuclear powers to enter into serious negotiations leading to global nuclear disarmament, which they ignored. 2020 also marks the third anniversary of a nuclear weapons ban treaty that needs only 16 more nations to ratify before it goes into effect. The U.S. and other nuclear weapons powers vigorously oppose that ban treaty even as their “modernization” programs are fueling a new nuclear arms race and international arms control is collapsing.

Watchdog Groups Claim Nuclear Agency is Moving Forward to Manufacture New Plutonium Bomb Cores in Violation of National Environmental Law and an Existing Court Order

Natural Resources Defense Council
Nuclear Watch New Mexico
Savannah River Site Watch
Tri-Valley CAREs
The Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) has formally announced that it is proceeding with aggressive plans to expand the production of plutonium pits without required nation-wide “programmatic” public review. The Natural Resources Defense Council, Nuclear Watch New Mexico, Savannah River Site Watch and Tri-Valley CAREs assert this is in direct violation of the legal requirements of both the National Environmental Policy Act and a 1998 court order that stipulates that DOE must prepare a “programmatic environmental impact statement” (PEIS) when it plans to produce more than 80 pits per year. Plutonium pits are the radioactive cores or “triggers” of nuclear weapons.

Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection

 America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning.

Two recently released government reports make clear the stark inequality between the so-called modernization program to upgrade and indefinitely preserve U.S. nuclear forces (in large part for a new Cold War with Russia), and the nation-wide program to clean up the radioactive and toxic contamination from the first Cold War. The Obama Administration launched a trillion dollar nuclear weapons “modernization” program, which President Trump may expand. In contrast, cleanup of the first Cold War mess has been cut from a high of $8.5 billion in 2003 to $5.25 billion in 2016, even though comprehensive cleanup would produce far more jobs than nuclear weapons programs.

With respect to cleanup, last week the Congressional Government Accountability Office (GAO) released its bi-annual High-Risk Series, which added “Environmental Liabilities” to its list of federal programs and operations that are particularly susceptible to fraud, waste, abuse, and mismanagement. Environmental liabilities are expressed as the estimated taxpayers’ cost of necessary future cleanup.

The Department of Energy is running the world’s largest cleanup program addressing the massive contamination caused by Cold War nuclear weapons research and production. But that national program is plagued by inefficiencies, mismanagement, cost overruns and excessive contractor profits.

According to GAO, since 1989 DOE’s Office of Environmental Management has spent over $164 billion on cleanup. Nevertheless, “Despite billions spent on environmental cleanup, DOE’s environmental liability has roughly doubled from a low of $176 billion in fiscal year 1997 to the fiscal year 2016 estimate of $372 billion.”

Therefore, from a cost perspective, cleanup is going backwards fast. Moreover, that $372 billion won’t be anywhere near the total cost of comprehensive, genuine cleanup because not all contamination is yet known. Furthermore, DOE explicitly plans to “cap and cover” much of its existing buried radioactive and toxic wastes, creating de facto permanent nuclear waste dumps while declaring them cleaned up according to regulations.

In contrast, funding is rapidly rising for revamped nuclear weapons and the missiles, submarines and bombers to deliver these most formidable weapons of mass destruction. Underpinning this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of “deterrence,” thousands of warheads are being refurbished and kept to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government. As a top-level 2013 Defense Department policy document put it, “The new guidance [in Obama’s 2010 Nuclear Posture Review] requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a “counter-value’ or “minimum deterrence” strategy.”

President Reagan said long ago that nobody can win a nuclear war. Thousands of nuclear weapons are certainly not needed to deter emerging nuclear threats such as North Korea or potential nuclear terrorism. In addition, there are increasing hints (for example, by the Defense Department’s Defense Science Board) that the U.S. may develop and produce more precise low-yield nuclear weapons that are arguably more usable, and even possibly return to full-scale testing.

Expanded U.S. nuclear capabilities under the rubric of “modernization” involves the wholesale rebuilding of DOE’s nuclear weapons production complex; a perpetual cycle of Life Extension Programs that refurbish existing nuclear weapons while giving them new military capabilities; and completely new ballistic missiles, cruise missiles, heavy bombers and submarines to deliver the rebuilt nuclear weapons.

Not surprisingly, that’s going to cost American taxpayers more than previously thought. Last week the nonpartisan Congressional Budget Office (CBO) released its updated study Projected Costs of U.S. Nuclear Forces, 2017 to 2026. It estimated that “modernization” of the U.S. nuclear forces will cost $400 billion during 2017 to 2026. This is 15% higher than a CBO estimate two years ago of $348 billion for the 10-year period of 2015 to 2024.

Moreover, in its earlier report CBO asserted that the next two decades will cost even more. Therefore, modernization will exceed the one trillion dollars over 30 years that is often cited now. And that figure could go much higher yet should Trump accelerate modernization, which he implied when he tweeted the U.S. “must greatly strengthen and expand its nuclear capability…”

Common to both its nuclear weapons and cleanup programs, DOE has the singular distinction of having its contract management designated as high risk by GAO for 26 consecutive years. This is because the Department’s track record of inadequate management and oversight of contractors, who comprise 95% of all nuclear weapons complex employees, has left DOE vulnerable to fraud, waste and abuse. The list of busted projects is overwhelming, while the usual nuclear weapons contractors are typically not held accountable (for example, Bechtel’s Waste Treatment Plant at Hanford or Babcock and Wilcox’s half-billion dollar design mistake for Y-12’s proposed Uranium Processing Facility).

To illustrate this nation-wide problem locally, the Los Alamos National Laboratory (LANL), run by Bechtel and the University of California, recently signed a new 2016 Consent Order governing cleanup with the New Mexico Environment Department (NMED), which has coddled the nuclear weapons industry under Gov. Martinez. This new agreement pushes completion of Lab cleanup out to 2040, while creating loopholes where DOE can get out of cleanup by simply claiming that it is too difficult or costly. As a result, DOE has cut the Lab cleanup budget to around $188M per year, in contrast to a high of $225 million in 2014, or the $250 million per year that NMED has said in the past is necessary.

To add insult to injury, LANL’s estimated 3-4 billion dollar environmental liability assumes that nearly 200,000 cubic meters of radioactive and hazardous wastes are left behind forever in unlined dumps, protected only by “cap and cover” and thereby “cleaned up” according to regulations. But this, of course, is false cleanup. As a 2005 LANL hydrogeological report put it, “Future contamination at additional locations [in regional groundwater] is expected over a period of decades to centuries as more of the contaminant inventory reaches the water table.”

But nuclear weapon research and production at LANL, which threatens precious water resources, is not only thriving, but is expanding. Currently, up to $6 billion is planned to be spent on upgrading existing plutonium facilities and building new ones so that production can be expanded to 50-80 plutonium pits per year by 2028 (pits are the fissile cores of nuclear weapons). Ironically, expanded pit production is for exorbitant “Interoperable Warheads” for both intercontinental ballistic missiles and sub-launched missiles that the nuclear weapons labs are pushing but the Navy doesn’t want. Moreover, the planned changes to the existing, extensively tested nuclear stockpile are so radical that they could undermine confidence in performance reliability, possibly prompting a return to full scale testing.

Scott Kovac, Research Director at Nuclear Watch NM, commented, “Ten years from now, after taxpayers spend another $50 billion on cleanup, DOE’s environmental liability estimate will probably still be more than $400 billion. Meanwhile the US will have spent the same amount on expanded nuclear weapons production that will cause yet more contamination. That money should instead be used to get cleanup done once and for all, giving American taxpayers the real national security of a clean environment and safe drinking water.”

Jay Coghlan, Nuclear Watch New Mexico Executive Director, observed, “Over the next few decades the window will close for comprehensive, genuine cleanup. Unfortunately, our children and grandchildren will instead be saddled with the ongoing financial and environmental debts of never-ending improvements to nuclear weapons that keep a privileged elite rich. As citizens we need deep and meaningful contractor reform and stronger federal oversight. The directors of the nuclear weapons labs should be stripped of their two-hatted role as the presidents of the for-profit limited liability corporations that run the labs, which are built-in conflicts-of-interest. Then perhaps we would begin to see jobs-creating cleanup programs taking precedence over unneeded, exorbitant nuclear weapons programs that threaten global security and local environments.”

###

GAO High-Risk Series 2017 is available at http://www.gao.gov/products/GAO-17-317

Specific DOE cleanup cost numbers are at http://gao.gov/highrisk/us_government_environmental_liability/why_did_study#t=1

Projected Costs Of U.S. Nuclear Forces, 2017 To 2026 February 2017 is available at https://www.cbo.gov/sites/default/files/115th-congress-2017-2018/reports/52401-nuclearcosts.pdf

The quote on top-level counterforce nuclear weapons doctrine is from:

Report on Nuclear Implementation Strategy of the United States Specified in Section 491 of 10. U.S.C., Department of Defense, June 2013, page 4 (quotation marks in the original) http://www.globalsecurity.org/wmd/library/policy/dod/us-nuclear-employment-strategy.pdf

For possible more usable nuclear weapons and a return to full-scale testing, see Seven Defense Priorities for the New Administration, Defense Science Board, December 2016, http://www.acq.osd.mil/dsb/reports/Seven_Defense_Priorities.pdf
The quote on more expected groundwater contamination is from LANL’s Hydrogeologic Studies of the Pajarito Plateau: A Synthesis of Hydrogeologic Workplan Activities (1998–2004), ER2005-0679 December 2005, Page 5-15, http://www.worldcat.org/title/los-alamos-national-laboratorys-hydrogeologic-studies-of-the-pajarito-plateau-a-synthesis-of-hydrogeologic-workplan-activities-1998-2004/oclc/316318363

As Trump Seeks to Expand U.S. Nuclear Weapons Capabilities New Sandia Labs Director Argued for Expanded Use of Nuclear Weapons

On December 22, 2016 president-elect Donald Trump upended four decades of U.S. policy to reduce nuclear weapons by tweeting “the United States must greatly strengthen and expand its nuclear capability until such time as the world comes to its senses regarding nukes.” The next morning he doubled down by declaring, “Let it be an arms race. We will outmatch them at every pass and outlast them all.”

That same day Russian President Vladimir Putin claimed that his country’s nuclear weapons are fully capable of penetrating any American missile defense system, and observed “It’s not us who have been speeding up the arms race.” Earlier Trump had suggested that Japan, South Korea and Saudi Arabia should perhaps obtain nuclear weapons, and reportedly asked a foreign policy advisor why the U.S. couldn’t use nuclear weapons if it already had them. Further, Trump refused to rule out using nuclear weapons in Europe or against the Islamic State in Iraq and Syria. Underlying all this is a trillion dollar effort begun under the Obama Administration to upgrade U.S. nuclear forces, including new nuclear weapons production plants, and new missiles, submarines and bombers, all expected to be operational until around the year 2080.

One of the most important players in the trillion dollar nuclear weapons upgrade is the Sandia National Laboratories, with its newly appointed director Stephen Younger. Long before Trump, Younger argued for the expanded use of nuclear weapons, writing in his June 2000 paper Nuclear Weapons in the 21st Century “[i]t is often, but not universally, thought that nuclear weapons would only be used in extremis, when the nation is in the gravest danger…..This may not be true in the future.” (P. 2)

Although generally the least publicly recognized of the three American nuclear weapons labs, Sandia is the largest by both budget and number of personnel (the other two nuclear weapons labs are the Los Alamos and the Lawrence Livermore National Laboratories). Sandia has multiple sites (hence is called “Labs” in the plural), but its main facility is on Kirtland Air Force Base in Albuquerque, NM. Nearby is the Kirtland Underground Munitions Maintenance and Storage Complex, likely the largest storage facility for nuclear weapons in the nation, with up to 2,500 warheads. Kirtland AFB also sites the Air Force’s national Nuclear Weapons Center, which describes itself as the “The Nucleus of America’s Deterrent”, whose stated mission is to “Deliver nuclear capabilities Warfighters use every day to deter and assure.”

Although “deterrence” has been sold to the American taxpayer for decades as the rationale for nuclear weapons, in reality the U.S. (and Russian) arsenal is for nuclear warfighting, as a 2013 top-level Pentagon document explicitly states:

The new guidance requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a “counter-value’ or “minimum deterrence” strategy.

As one source explains

Counterforce doctrine, in nuclear strategy, [is] the targeting of an opponent’s military infrastructure with a nuclear strike. The counterforce doctrine is differentiated from the countervalue doctrine, which targets the enemy’s cities, destroying its civilian population and economic base. The counterforce doctrine asserts that a nuclear war can be limited and that it can be fought and won. https://www.britannica.com/topic/counterforce-doctrine

In turn, counterforce requires thousands of nuclear weapons for nuclear warfighting, instead of the few hundred needed for only deterrence. But as President Ronald Reagan famously put it in his 1984 State of the Union address:

A nuclear war cannot be won and must never be fought. The only value in our two nations possessing nuclear weapons is to make sure they will never be used. But then would it not be better to do away with them entirely?

In 1988 Reagan nearly reached agreement with Soviet Union leader Mikhail Gorbachev to ban nuclear weapons. Unfortunately, relying on false promises made by then-Livermore Lab Director Edward Teller, Reagan insisted on pursuing ballistic missile defenses (or “Star Wars”), which killed any possible deal. Thus, sadly, counterforce and the capability to wage a nuclear war remain the operative national security policy as we face today’s very real risk of entering into a new nuclear arms race with Russia.

Stephen Younger already foreshadowed this in his 2000 paper when he wrote, “The United States employs a counterforce strategy that targets military assets that could inflict damage to our national interests.” (P. 9) He is now in a prime position to implement that counterforce policy as Sandia Labs Director.

Sandia’s main mission is design of the thousands of nonnuclear components (such as fuzes, radars, etc.) that weaponize the nuclear designs of the Los Alamos and Lawrence Livermore National Laboratories into deliverable weapons of mass destruction. However, Sandia’s secondary mission is studying nuclear weapons “effects,” which are not the horrific effects of nuclear weapons on humans and the environment. Instead, this concerns the effects of nuclear weapons on nuclear weapons, to make sure that they are radiation hardened so that they will operate in the severe environments of a nuclear war. This is aimed at mostly the fratricidal effects of our own weapons, since any single target might be hit with multiple warheads. This has every thing to do with nuclear warfighting and first strike capabilities, rather than mere “deterrence.”

Younger’s appointment as director is also indicative of Sandia’s growing focus on nuclear weapons, principally due to Life Extension Programs (LEPs) that not only seek to indefinitely preserve existing nuclear weapons, but to also give them new military capabilities (Sandia is currently the lead lab for the B61-12 LEP, which is transforming a “dumb” bomb into the world’s first nuclear smart bomb). A decade ago Sandia Labs fell below 50% funded by nuclear weapons programs, which was publicly touted by the New Mexican congressional delegation as successful mission diversification leading to possible greater regional economic development. However, that trend is now reversed. In the FY 2017 federal budget request Sandia is 56% funded by nuclear weapons programs. In terms of gross funding for nuclear weapons programs Sandia is tied with the Los Alamos Lab at $1.58 billion for FY 2017, while Lawrence Livermore Lab’s nuclear weapons program is $1.07 billion. Sandia’s total annual budget is around $2.8 billion, the largest of the three nuclear weapons labs.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “Americans can’t allow an unpredictable president and a greedy nuclear weapons complex to fool us into a new nuclear arms race. Reagan said it best that “a nuclear war cannot be won and must never be fought.” We need to make sure that Trump gets that message as well. He says he wants to both rebuild the nation’s infrastructure and expand nuclear weapons capabilities. But it’s one or the other – Trump will find out the hard way that the country can’t afford to have it both ways.”

# # #

Stephen Younger’s June 2000 paper “Nuclear Weapons in the 21st Century” is available at https://nukewatch.org/importantdocs/resources/NuclearWeaponsIn21stCentury.pdf

For more on the Kirtland Air Force Base, the nuclear weapons complex within the nuclear weapons complex, please see https://nukewatch.org/Kirtland.html

The quote on U.S. nuclear weapons counterforce policy is from: Report on Nuclear Implementation Strategy of the United States Specified in Section 491 of 10. U.S.C. Department of Defense, June 2013, page 4 (quotation marks in the original) http://www.globalsecurity.org/wmd/library/policy/dod/us-nuclear-employment-strategy.pdf

Watchdogs Assail Revolving Door Between New Mexico Environment Department and Polluters

Nuclear Watch NM Press Release

For immediate release: January 17, 2017

Contact: Jay Coghlan, 505.989.7342, c. 505.470.3154, jay[at]nukewatch.org

 

Watchdogs Assail Revolving Door

Between New Mexico Environment Department and Polluters;

Gov. Martinez Fails to Protect State Budget and Environment

Santa Fe, NM – As the annual state legislative session begins, New Mexico is faced with a ~$70 million budget deficit, which must be balanced as per the state’s constitution, while revenues are projected to continue falling. To remedy this, Gov. Martinez plans to divert $120 million from public school reserves, take ~$12.5 million out of state employee retirement accounts, make teachers and state workers pay more into their retirement accounts (they are already among the lowest paid in the country), and extend 5.5% cuts for most state agencies while cutting yet more from the legislature and higher education. Instead, the state’s budget deficit could have been prevented had the New Mexico Environment Department aggressively fined polluters. But unfortunately there is a strong revolving door between NMED and the polluters it is suppose to regulate.

In her 2012 State of the State speech Gov. Martinez said, “My appointees are barred from lobbying state government for 2 years after serving in my administration.” Yet in August 2016 the Secretary of the New Mexico Environment Department (NMED), Mr. Ryan Flynn, resigned to become the Executive Director of the New Mexico Oil and Gas Association, whose main purpose is to lobby on behalf of the oil and gas industry against environmental regulations. Before joining NMED, Mr. Flynn worked for a law firm that advertises that “Our representation of oil and gas producers, mid-stream entities, and natural gas pipelines has been a mainstay of Modrall Sperling’s natural resources practice since the early days of the firm.” Modrall Sperling lawyers were very active in the NM Oil and Gas Association’s opposition to the so-called “pit rule” that sought to prevent oil and gas drilling mud waste from leaching into and contaminating groundwater. In June 2013 the New Mexico Oil Conservation Commission, appointed by Gov. Martinez, eviscerated the pit rule.

Similarly, Martinez and Flynn promulgated new groundwater protection rules that for the first time in the country actually allows groundwater contamination if it doesn’t migrate past the footprint of the operating site. This is the so-called Copper Rule, drafted by the copper mining giant Freeport-McMoRan (which is also a Modrell Sperling law firm client).

On January 13, 2017 Kathryn Roberts, the head of NMED’s Resource Protection Division, announced that she was leaving the Environment Department to accept an unnamed job in Alamogordo. Before NMED she worked at the Los Alamos National Laboratory (LANL) for four years as Group Leader for Regulatory Support and Performance (of “cleanup”). Upon information and belief, she will work as a public communications specialist for Longenecker and Associates, a Department of Energy (DOE) contractor that proposes to drill deep boreholes to test the disposal of high-level nuclear waste near Alamogordo.

This is part of the continuing targeting of New Mexico as the nation’s nuclear waste dump. Longenecker and Associates have participated in Sandia Labs studies of deep borehole high-level waste disposal. Of interest are some relatively recent new hires by Longenecker, including Don Cook, a longtime Sandia Labs scientist, past manager of the Atomic Weapons Establishment in the United Kingdom, and most recently the Deputy Administrator for Defense Programs (i.e., nuclear weapons) at the National Nuclear Security Administration. As such, he was essentially the head of the U.S. nuclear weapons complex, including the Los Alamos and Sandia Labs.

Also new to Longenecker and Associates as Corporate Vice President and Chief Strategy Officer is Christine Gelles, former interim manager of the new DOE Environmental Management field office at Los Alamos. A Longenecker resume´ notes that Gelles “Led planning and initial regulatory interactions with New Mexico Environment Department negotiation of Los Alamos Consent Order.” Ms. Roberts would have been one of Gelles’ counterparts on the other side of the table as head of NMED’s Resource Protection Division.

An original 2005 Consent Order negotiated between NMED and DOE was meant to compel comprehensive cleanup at LANL and force the Energy Department to increase cleanup funding. The new Consent Order, likely negotiated at least in part between Gelles and Roberts, contains giant loopholes whereby DOE can get out of cleanup by simply claiming that is too difficult or too costly. In fact, since the new Consent Order went into effect in June 2016, DOE has announced that the cost of “Remaining Legacy Cleanup” of radioactive and toxic wastes from more than 70 years of nuclear weapons research and production at LANL will cost $2.9 to $3.8 billion through fiscal year 2035, averaging $153 million per year, which is ridiculously low. That cost estimate clearly assumes that the Lab’s major radioactive and toxic wastes dumps will not be cleaned up. Instead they will be “capped and covered,” leaving some 200,000 cubic yards of radioactive and toxic wastes at Area G, its largest waste dump, posing a permanent threat to groundwater. DOE’s cost estimate for future LANL cleanup assumes flat funding out to FY 2035, and notes how that cost is “Aligned to [the] 2016 Consent Order.” This is a distinct and very unfortunate break from the 2005 Consent Order.

Particularly galling is the fact that under Gov. Martinez and ex-Secretary Ryan Flynn the New Mexico Environment Department granted more than 150 milestone extensions to the 2005 Consent Order, and then turned around and said that the Consent Order wasn’t working. From a budget perspective, New Mexico could have collected more than $300 million in stipulated penalties, more than four times the state’s projected budget deficit, had NMED vigorously enforced the 2005 Consent Order.

[For more, see here]

All of this is part of a pattern where the Martinez Administration has coddled the nuclear weapons industry even as that industry is cutting cleanup funding and ramping up nuclear weapons production that caused the mess to begin with. Gov. Martinez and ex-NMED Secretary Ryan Flynn have touted what they call an historic $74 million settlement that New Mexico and DOE reached after a radioactive waste barrel that LANL improperly treated ruptured at the Waste Isolation Pilot Plant (WIPP), contaminating 21 workers and closing down that multi-billion dollar facility for nearly three years. What was left unsaid is that DOE was already responsible for the supermajority of “Special Environmental Projects” that were agreed to in lieu of penalties and fines that could helped solved New Mexico’s budgets woes, even though state and federal policy on those projects both require that the regulatory agency collect a significant monetary penalty.

Not one penny went to New Mexico, while DOE was “obliged” to, for example, repave roads at WIPP and LANL that it uses to transport the radioactive bomb waste that it produces. To add insult to injury, NMED agreed to waive penalties for all future, unknown violations – no matter the severity or length – as long as there is corrective action of any sort at some undefined time. Also included in this give-away was an obligation by NMED to negotiate modifications to the 2005 Consent Order (now completed to New Mexico’s disadvantage), and to forego penalties that could have been assessed against DOE under it.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “It seems that the Environment Department under Gov. Martinez is in the business of protecting business against environmentalists. The legislature should hold their feet to the fire so that New Mexicans have a real environment department that protects our precious water resources and creates jobs doing so.”

# # #

 

Energy Dept Misrepresents Cost and Scope of Los Alamos Cleanup

New Mexican Politicians Should Not Be Misled

Energy Dept Misrepresents Cost and Scope of Los Alamos Cleanup

Santa Fe, NM – The Department of Energy (DOE) has released a 2016 Lifecycle Cost Estimate Summary of proposed future cleanup at the Los Alamos National Laboratory (LANL).  At the beginning of that document DOE declares that “An estimated 5,000 cubic meters of legacy waste remains, of which approximately 2,400 cm [cubic meters] is retrievably stored below ground”, a claim which was widely reported in New Mexican media.  From there DOE estimates that it will cost $2.9 to $3.8 billion to complete so-called cleanup around 2040.

The public was notified of the 2016 Lifecycle Cost Estimate in a September 15 Santa Fe City press release, with the subtitle “Study Lays Out Timeline, Costs, and More, Answers Critical Questions with Honest Assessment.” Santa Fe Mayor Javier Gonzales is quoted, “This report represents the first and most comprehensive release of specific plans to complete the cleanup of legacy waste at LANL, and is a big step forward for the people in these communities who want to see a concrete commitment to making progress.” Mayor Gonzales went on to thank Senators Udall and Heinrich and Rep. Ben Ray Lujan for their help in obtaining the report.

However, the DOE report is far from honest. It intentionally omits any mention of approximately 150,000 cubic meters of poorly characterized radioactive and toxic wastes just at Area G (LANL’s largest waste dump) alone, an amount of wastes 30 times larger than DOE acknowledges in the 2016 Lifecycle Cost Estimate. In reality, DOE and LANL plan to not clean up Area G, instead installing an “engineered cover” and leaving the wastes permanently buried. This will create a permanent nuclear waste dump above the regional groundwater aquifer, three miles uphill from the Rio Grande. Radioactive and toxic wastes are buried directly in the ground without liners, and migration of plutonium has been detected 200 feet below Area G’s surface.

Santa Fe Mayor Gonzales is the Vice-Chair of the Regional Coalition of LANL Communities. The Coalition is comprised of elected official from eight cities, counties and pueblos surrounding LANL, and is overwhelmingly funded by DOE and Los Alamos County. The same Santa Fe City press release quotes the RCLC Executive Director, “The Lifecycle Baseline documentation provides our communities the necessary foundation to properly advocate on behalf of the best possible scenarios for cleaning up legacy nuclear waste at the Laboratory in the most time and cost-efficient manner. After years of requests for this document, we now have the tool that can get us to additional cleanup dollars to get the job done.”

However, the 2016 Lifecycle Cost Estimate Summary itself states that it is “based on realistic expectations of annual funding for the remaining work” (last page, unnumbered) and “annual funding is expected to remain constant throughout the duration of the cleanup mission” (p. 5). While annual funding for the Lab’s nuclear weapons programs has climbed to $1.5 billion, cleanup has fallen from a high of $225 million in FY 2014 to $189 million requested for FY 2017. Moreover, this trend of declining cleanup funding may be exacerbated by the planned trillion dollar “modernization” of U.S. nuclear forces, including research and production sites like LANL (which is slated to quadruple production of the plutonium pit triggers for nuclear weapons). Instead of being a tool for additional dollars for genuine, comprehensive cleanup, the 2016 Lifecycle Cost Estimate Summary is a DOE ploy to avoid cleaning up more than 90% of all wastes at LANL.

Jay Coghlan, Nuclear Watch New Mexico Executive Director, commented, “Mayor Gonzales and the Regional Coalition are to be commended for getting any Lab cleanup plan at all out of the Department of Energy. But now they should take the next step and get the Department of Energy to quit being so chintzy with cleanup. Our elected officials should demand that DOE retract its false claim that there is only 5,000 cubic meters of waste left at LANL to clean up. Then our politicians should push hard for a genuine, comprehensive cleanup plan that permanently protects the environment and our precious water resources while creating hundreds of high paying jobs.”

# # #

The Department of Energy’s 2016 Lifecycle Cost Estimate Summary is available at https://nukewatch.org/importantdocs/resources/LBC-Summary-Aug-2016.pdf

Estimated quantities of waste at Area G (in cubic yards) are from Table G3.41, MDA G Corrective Measures Evaluation, 2011, LANS, p. G-13. See excerpts at https://nukewatch.org/importantdocs/resources/Area_G_Pit_Totals_from_CME_rev3_Sept-2011.pdf

The full MDA G Corrective Measures Evaluation (159 MB) is available at  http://permalink.lanl.gov/object/tr?what=info:lanl-repo/eprr/ERID-206324

Documentation of the plutonium detection 200 feet below the surface of Area G is at https://nukewatch.org/importantdocs/resources/AGCME Plate_B-3_radionuclides_subsurface.pdf

 

Radioactive waste disposal practices at Los Alamos National Laboratory

DOE Secretly Funding Front Group to Help it Evade Nuclear Cleanup

FOR IMMEDIATE RELEASE: August 31, 2016
Contact: Denise Duffield, 213-689-9170 <tel:213-689-9170>  office
Cindi Gortner 818-489-1226
Bonnie Klea 818-854-4825
Marie Mason  805-279-0356 

 

U.S. Department of Energy Secretly Funding Front Group to Help it Evade Nuclear Cleanup at Santa Susana Field Laboratory

Controversial grant made at the same time department reneged on financial commitment to national independently administered community fund


Community members living near the contaminated Santa Susana Field Laboratory were outraged to learn that the U.S. Department of Energy (DOE) has secretly been funding a front group that is lobbying for the breach of DOE’s cleanup agreement for the Santa Susana Field Laboratory (SSFL) – and that the agency’s request for secrecy may have been made to avoid attention from Senator Barbara Boxer, a longtime supporter of full cleanup.

SSFL is heavily contaminated with nuclear and chemical contamination resulting from decades of nuclear activities and rocket engine testing, In 2010, agreements (Administrative Orders on Consent or AOCs) were signed between the state Department of Toxic Substances Control (DTSC) and DOE and NASA to cleanup all detectable contamination at their respective portions of the property. The AOC was first proposed by former DOE Secretary Dr. Steven Chu and Assistant Secretary for Environmental Management (DOE-EM) Dr. Inez Triay. Boeing, which owns most of the site, refused to sign the agreement and is pushing for a much weaker cleanup.

In 2011, under the Brown Administration, the DTSC’s commitment to full cleanup began to erode, and along with it, those of NASA and DOE. Over objections from community members   and elected officials , the DTSC replaced the longstanding public participation vehicle, the SSFL Work Group, with the SSFL Community Advisory Group (SSFL CAG). The CAG’s leadership is composed of individuals with ties to the parties responsible for the contamination at SSFL, and the group actively lobbies against the AOCs. One CAG flyer reads, “Why the AOC Cleanup at SSFL is Bad for Our Community” (here .) and states that the AOC will harm the environment and Native American artifacts, which are in fact protected by the AOC. The CAG also denies SSFL’s health impacts. One CAG member, a former SSFL official and current DOE contractor, maligned previous health studies so badly that their authors felt compelled to write an op-ed in the Ventura County Star in defense.

The public has been demanding to know for a long time how the CAG was funded, and neither the CAG nor  DTSC have disclosed that information. In December 2015   and in May 2016 , cleanup advocates complained to the DTSC Independent Review Panel (IRP), established by the California legislature to investigate DTSC’s many failings, about the CAG’s anonymous funding and conduct. No action was taken on the matter.

The complaints were instigated by the CAG’s announcement, at it’s August 19, 2015 meeting, that it would be receiving a $32,000 – $35,000 donation from a donor who wished to be anonymous. A video from the meeting shows CAG member Alec Uzemeck claiming the donation had “no strings,” and that it was anonymous “Because everything we do is politically charged. We have people out there who make phone calls. And if you’re the executive of a corporation and you get a call from Barbara Boxer, I’m quite sure that that’s going to have an impact on it. But, we don’t want that. We wanna have the money in hand when we announce who the donors are.” (See video here .) The CAG’s August 2015 minutes (here ) make it clear that the anonymity was at the donor’s request, and so secret that the CAG leadership would not reveal the donor to the full CAG membership, causing one CAG member to resign.

At it’s August 17, 2016 meeting, a full year after having announced its anonymous gift, the CAG revealed that the donor was the Department of Energy. Uzemeck said, “DOE will be coming out with a quarterly report, probably in two or three weeks. And it will have a list of grants on the last page. And DOE is the one that made the grant for us. They are the one who supplied the funding. So, the question’s been answered.” Uzemeck’s statement can be viewed here. The CAG’s tax returns   show that the organization received $38,600 in 2015.

The DOE refuses to answer questions about the arrangement, what the grant funds are expended on, explain why the funding was kept secret for a full year, or provide a copy of the grant application and contract. “For one of the Responsible Parties, DOE, to be funding a group that is trying to help DOE avoid its cleanup obligations, and asking for DOE’s identity as the source of the funds to be long kept secret, would be nothing short of scandalous.” said Denise Duffield, Associate Director of Physicians for Social Responsibiiity-Los Angeles in an August 30 email to Dr. Monica Regalbuto, Assistant Secretary for the DOE’s Office of Environmental Management.

Community members are also deeply troubled that DOE funded the CAG during the same month that it broke its commitment and revoked funding for the final year of a five-year commitment to the New Mexico Community Foundation (NMCF)-administered Community Involvement Fund (CIF), which funds independent groups in impacted communities near contaminated DOE sites throughout the country. Reneging on its contract and failing to disperse a final $300,000 payment to NMCF caused over a dozen community groups to lose key funding.

“DOE broke its commitment to provide its funding for community groups near contaminated sites through an independent mechanism and hands-off procedures that assured DOE would not do precisely what it has now done—fund a front group to lobby on DOE’s behalf to get out of its cleanup obligations.” said Duffield in the email to Regalbuto.

Community members are dismayed and angered by the revelations. Simi Valley resident Marie Mason, who has led community cleanup efforts for 28 years, said, “I find it more than shocking that the DOE would fund this group and ask to conceal they are the funding source and especially to not have Senator Boxer find out. I am more than disgusted and filled with sadness. DOE and DTSC are part of the problem with too many close ties to the polluters and total disregard for the communities they are supposed to protect.”

Bonnie Klea, a former worker at SSFL and cancer survivor, said, “I am appalled that DOE funded the CAG so that members can go out and lobby against the AOC and deny the cancer risks from the past, present and future exposure from the site. This is disgusting. ” Klea and others note that the CAG does not represent the views of the community, which overwhelming supports the AOCs. All but 14 of the 3,700 comments submitted on the AOC were in favor of the agreement, and over 1,600 signed a petition last year urging that the cleanup agreements be upheld. (See petition here .)

Duffield’s email to DOE, sent also to local and state officials, implored the agency for answers and noted that no local elected officials had been consulted with or informed of the funding. “The community has the right to know about the intent, character, and tactics of the agency that holds their potential health and well being in its hands. And elected officials, many of whom have been lobbied by the CAG to weaken the cleanup, must be informed about financial contributions that DOE is making to this group to influence them and help it break out the cleanup agreements.”

# # #

The Rocketdyne Cleanup Coalition, or RCC, is a community-based alliance dedicated to the cleanup of the Santa Susana Field Laboratory (SSFL), commonly known as Rocketdyne.



From: Denise Duffield <dduffield(at)psr-la.org
Date: Mon, Aug 29, 2016 at 12:57 PM
Subject: Time-Sensitive Request re: DOE CAG funding and the SSFL AOC cleanup agreement
To:
[email protected]

Dear Assistant Energy Secretary for Environmental Management Regalbuto:

I was shocked to learn recently that DOE has been funding a front group that is lobbying for the breach of DOE’s cleanup agreement for the Santa Susana Field Laboratory (SSFL) – and that DOE had apparently requested that the funding be kept secret so that Senator Barbara Boxer wouldn’t learn of it. I write today to both apprise you of this troubling situation and to request further information and documents related to DOE’s decision to fund the SSFL CAG.

The SSFL CAG is a small but highly controversial group that is lobbying against the cleanup agreement (Administrative Order on Consent, or AOC) for SSFL signed by both DOE and the state regulatory agency overseeing the cleanup, the Department of Toxic Substances Control (DTSC). For example, one CAG flyer reads, “Why the AOC Cleanup at SSFL is Bad for Our Community” (here.) “The AOC Cleanup: More Harm Than Good?” reads another (here.) The CAG routinely propagates false information about SSFL’s contamination, health impacts, and cleanup. A CAG – Community Advisory Group – should represent the community. However, the SSFL CAG does not even remotely represent the community, which understands that SSFL is contaminated with dangerous radionuclides and chemicals and needs to be fully remediated per the current DOE cleanup agreement. The CAG is a classic “astroturf” (i.e., fake grassroots) group dominated by people with ties to the parties responsible for the contamination at SSFL.

The public has been demanding to know for a long time how the CAG was funded and how it spends those funds. The CAG has refused to disclose that information, which is troubling for an entity that claims to be public. The community has suspected that the money comes from one or more of the entities that polluted the site and that is trying to get out of its cleanup obligations, and that that is why the CAG wouldn’t disclose the funding source or sources. Now it appears that that is indeed the case. For one of the Responsible Parties, DOE, to be funding a group that is trying to help DOE avoid its cleanup obligations, and asking for DOE’s identity as the source of the funds to be long kept secret, would be nothing short of scandalous.

The DOE SSFL cleanup agreement (AOC) was proposed by former DOE Secretary Dr. Steven Chu and Assistant Secretary for Environmental Management (DOE-EM), Dr. Inez Triay. It was signed by DOE and DTSC in December 2010. The AOC stipulates that Area IV and the Northern Buffer Zone at SSFL are to be cleaned up to background. In February 2014, at a meeting of the SSFL Work Group, DOE SSFL Project Director John Jones told the audience of community members, elected officials, and media that the DOE was committed to upholding the AOC agreement (see video here.)

Since then, the community has seen an erosion of DOE’s stated commitment, including a Public Scoping plan which included numerous options that would violate the AOC (such as keeping waste on site), accompanied by a report grossly exaggerating soil removal estimates (see statement by the Southern California Federation of Scientists here.) In addition, the AOC explicitly defines soils as including structures (see page five of AOC here), which are to be cleaned up to background and all wastes to go to licensed low level radioactive waste disposal sites, yet DOE is now taking the position that it can demolish nuclear structures at SSFL at will, using far less protective standards, and dispose of their radioactive wastes anywhere. The DOE has also apparently told the CAG that it is contemplating trying to modify the AOC to be required to perform much less cleanup than it had promised in order to save money (see CAG July 20, 2016 minutes here.)

And now, we have learned that the DOE has been funding the CAG. The DOE is abundantly aware that the CAG openly, actively, and vigorously works to break the AOC cleanup agreement that DOE signed. DOE’s funding of the SSFL CAG is therefore an alarming and direct assault on the AOC itself. It also makes clear that the CAG is an agent of one of the parties responsible for the pollution at the site and which is trying desperately to get out of its obligation to clean up all the radioactive and toxic mess that it made. The CAG regularly lobbies elected officials to try to persuade them to push to weaken the cleanup —an activity outside the scope of a regular community advisory group. It is very troubling for DOE, responsible for the contamination and sworn to uphold a cleanup agreement to clean it all up, to be secretly funding a group that lobbies elected officials to support DOE breaking its agreement.

We are also deeply disturbed by the secrecy surrounding DOE’s grant to the SSFL CAG. The CAG first announced that it was to receive $32,000 in funding at an August 2015 meeting, in which it stated that the donor wished to remain anonymous in order to avoid Senator Barbara Boxer, a longtime SSFL cleanup supporter, learning of the funding and taking action thereon. (See video of CAG meeting here.) Only now, a year later, near the end of Senator Boxer’s esteemed Senate career, has the CAG apparently been given permission to reveal that the identity of its funder is the DOE. It is outrageous and unconscionable for a government agency to make a financial contribution to any organization and request that the funding be kept secret, for any reason, let alone for the purpose of evading the attention of a United States Senator who would likely object to what it was doing. The CAG’s August 2015 minutes (here) make it clear that the anonymity, which lasted a full year, was at the donor’s request.

Further, the DOE funded the CAG during the same year that it broke its commitment and revoked funding for the final year of a five-year commitment to the New Mexico Community Foundation (NMCF)-administered Community Involvement Fund (CIF), which funds independent groups in impacted communities near contaminated DOE sites throughout the country. The DOE’s agreement with NMCF states, “By utilizing a cooperative agreement with an independent entity to distribute grant funds to qualified organizations representing the interests of the public, DOE-EM will ensure that the program is not viewed as a surrogate for DOE’s own preferences, and that long-term DOE-EM decisions are based on input from individuals and/or groups who are most likely to be affected by those decisions.”

In other words, DOE was supposed to stay out of the grant selection process to assure that groups funded were independent of DOE. However, the DOE weighed in heavily against a re-application submitted by Physicians for Social Responsibility-Los Angeles (PSR-LA) for the SSFL Work Group, the longstanding advisory group established a quarter of a century ago by the electeds and which represents the main mechanism for the community to learn about and provide feedback on the cleanup and hold the agencies accountable. In August 2013 we applied for and received a $23,000 CIF grant. We re-applied in August 2014, but learned that DOE was pressuring CIF to deny the grant, which violated its commitment to keep hands-off the selection process. To its credit, in November 2014, the NMCF awarded the second grant of $20,000 (and did not fund the SSFL CAG, which had also applied for the funding.)

Very shortly thereafter, the DOE reneged on the final $300,000 it had pledged to NMCF, impacting not just PSR-LA and the SSFL Work Group but over a dozen communities nationwide. NMCF sent a message to its grantees on March 16, 2015 stating, “Earlier this year, representatives of the Department of Energy (DOE) advised New Mexico Community Foundation (NMCF) that the foundation would receive only partial funding for the CIF grant program in 2015.  Last month, we were informed that NMCF would only be funded a small portion of the overall budget request solely for administrative oversight of the current 2014-15 grant cycle, and no funding would be allocated to go towards new grant-making. Adding to our confusion and concern, the decision-making process associated with the 2015 CIF appropriation has not been clearly communicated, nor have we been given a clear indication of the reasons for the reduction in funding.”

We cannot say with certainty that DOE revoked funding to the NMCF due to its decision to fund the SSFL Work Group despite the inappropriate pressure by DOE. But, we must point this out as a strong possibility in light of the timing and DOE actions described herein. The CIF grant enabled the return of the trusted public participation vehicle, the SSFL Work Group, which attracted capacity crowds who were able to learn about the contamination that would be left on site if the cleanup agreements were not upheld. DOE had participated in the SSFL Work Group since its inception, but has now stopped attending virtually any public meeting where it could be held to account for its actions. Regardless of DOE’s motivation to abrogate its agreement with NMCF, it is very troubling that the DOE made this decision while simultaneously funding an organization that opposes a cleanup agreement that the DOE has been strongly signaling it wants to break. DOE broke its commitment to provide its funding for community groups near contaminated sites through an independent mechanism and hands-off procedures that assured DOE would not do precisely what it has now done—fund a front group to lobby on DOE’s behalf to get out of its cleanup obligations.

It is difficult to overstate just what is at stake for communities near SSFL right now. Decades of nuclear and aerospace activities at SSFL have left a legacy of dangerous nuclear and chemical contamination that continues to migrate from the site to offsite populations. Federal studies have shown an increase in cancers associated with proximity to the site. In 2010, after decades of attempts to achieve full cleanup, the historic AOCs were signed. As a result, $41.5 million dollars were spent for a US EPA survey that identified background radiation and found nearly 500 samples, in just one area of SSFL, that were above background, in some cases dramatically so. The community eagerly anticipated full cleanup, which the AOC stipulated would be complete by 2017.

We are now just months away from 2017, but cleanup has yet to begin. Indeed, DOE’s draft EIS – which a court ordered a decade ago and was due to be published years ago – is not yet released. Community members have feared that DOE’s EIS would be a full-bodied attack on the very cleanup agreement DOE had sworn to carry out, and wondered if the EIS was being delayed so as to not come out until after Senator Boxer leaves office and can no longer take action to insist DOE live up to the promises made. This suspicion has only increased given the timing of the announcement that DOE is the CAG’s secret benefactor, and that the reason for the secrecy was to avoid attention from Boxer. The community is appalled and angry, and deserves to know the full details of DOE’s arrangement with the SSFL CAG.

Below please find background information and documentation on these matters, followed by a series of pressing questions. I request that DOE provide answers to the questions, as well as a copy of the SSFL CAG Foundation’s grant application/proposal to the DOE and its DOE grant/contract, as well as any grant report, immediately. If there has been more than one grant to the CAG, provide information about each. The community has the right to know about the intent, character, and tactics of the agency that holds their potential health and well being in its hands. And elected officials, many of whom have been lobbied by the CAG to weaken the cleanup, must be informed about financial contributions that DOE is making to this group to influence them and help it break out the cleanup agreements. DOE funding a front group to lobby elected officials to push them to support DOE breaking its cleanup agreements would be an outrage.

Background and Documentation

The SSFL CAG was formed in 2012 over the objections of longtime community members and local elected officials. (See community petition here and letter from elected officials Julia Brownley, Fran Pavley, Shelia Kuehl, Linda Parks, and Greig Smith opposing formation of the CAG and supporting instead the longstanding SSFL Work Group here.) The CAG is widely perceived as a front group for the polluters that does not represent the interests of the community, because it is opposes the cleanup agreements that are overwhelming supported by the community. All but a handful of the 3,700 comments submitted on the AOC were in favor of the agreement. Last year over 1,600 signed a petition urging that the cleanup agreements be upheld. (See petition here.) Yet every member of the CAG opposes the AOCs, despite the requirements that a CAG represent the range of community perspectives.

The CAG’s leadership is composed of individuals who are former employees or contractors of the parties responsible for cleaning up the site (Boeing, DOE, and NASA.). Alec Uzemeck worked for Boeing’s predecessor, North American Aviation, at its then-headquarters in Downey for which the Santa Susana site was the field lab. Brian Sujata was Boeing’s project manager for SSFL cleanup, while Boeing was DOE’s contractor for the cleanup. Ross Berman worked for both Tetra Tech and CH2M Hill, contractors for the responsible parties. And Abe Weizberg was an official at SSFL, in charge of safety for the SNAP reactors, one of which experienced 80% fuel damage in an accident. Weitzberg remains a consultant for the DOE.

Since its founding, the SSFL CAG has undertaken a multi-faceted campaign aimed at undoing the SSFL cleanup agreements. This includes exaggerating cleanup soil volumes and truck traffic and claiming that the cleanup will harm the site’s natural environment and Native American artifacts (which are in fact protected by the AOC.) The CAG also attempts to minimize the contamination at SSFL and health impacts. Last year,  CAG member and former SSFL official Weitzberg launched an effort to have the Agency for Toxic Substances and Disease Registry (ATSDR) refute prior health studies and weigh in against the cleanup. In the process, he maligned the authors of those studies, who expressed their objections in an article published in the Ventura County Star here. The CAG has also made a habit of regularly and publicly disparaging longtime community members and cleanup advocates. Whereas meetings of the longstanding SSFL Work Group are packed with concerned members of the public and representatives of elected officials, very few attend CAG meetings. The last meeting had only half a dozen CAG members and a roughly equal number of the public, most of whom were critics of the CAG’s biases and actions.

On August 19, 2015, CAG member Alec Uzemeck announced at an SSFL CAG meeting that the CAG would be receiving a $32,000 – $35,000 donation from a donor who wished to be anonymous. The minutes from the meeting (which can be viewed here) state that the CAG established a non-profit foundation, “…in response to the gift from a donor who wishes to remain anonymous.” The CAG leadership was so secretive about the donor’s identify that it refused to inform the full CAG membership, causing one CAG member to resign, as reflected in the minutes, ” As a result of the fact that the donor is anonymous, Elizabeth Harris has resigned from the CAG…”  At the meeting, Uzemeck repeatedly said that the donation had “no strings,” and of the gift said, “Why is it anonymous at this point? Because everything we do is politically charged. We have people out there who make phone calls. And if you’re the executive of a corporation and you get a call from Barbara Boxer, I’m quite sure that that’s going to have an impact on it. But, we don’t want that.” (See video here.)

In December 2015 and in May 2016, cleanup advocates and community members complained to the DTSC Independent Review Panel (IRP), established by the California legislature to investigate DTSC’s many failings, about the CAG’s anonymous funding and conduct (see paragraphs 4 -6 on page 2 of the IRP’s May 12, 2016 minutes here.)

Finally, at an SSFL CAG meeting on August 17, 2016, nearly a year after announcing the funding and the donor’s request that its identity be kept secret so as to keep Senator Boxer in the dark, Uzemeck announced, “DOE will be coming out with a quarterly report, probably in two or three weeks. And it will have a list of grants on the last page. And DOE is the one that made the grant for us. They are the one who supplied the funding. So, the question’s been answered.” A recording of Uzemeck’s statement can be viewed here.

The SSFL CAG’s tax returns, which can be viewed here, show that the organization received $38,600 in 2015.

Questions for the Department of Energy

1. Did DOE, as reflected in the CAG’s minutes, suggest to the SSFL CAG to form a non-profit foundation so that it could provide funding to the CAG?

2. When did DOE begin discussing funding the CAG? When did it actually make the contribution, and what was the amount of the gift?  Has there been more than one?

3. What is the stated purpose of the grant? What will/have grant funds be expended on?

4. Under what category of funding was this grant made? Was it made from the DOE Office of Environmental Management, the same office that reneged on its commitment to NMCF?

5. CAG member Alec Uzemeck repeatedly stated that the grant had “no strings.” Does the DOE grant have any restrictions? Is lobbying prohibited? Is the CAG required to submit a report on its activities? Will it be invited to reapply for funding again this year?

6. Why did DOE request that its gift to the CAG be anonymous? Did the DOE tell the CAG, as expressed by Alec Uzemeck, verbally or in writing, that it wanted its gift secret, at least for a time, because it wanted to avoid repercussions from Senator Barbara Boxer?

7. How does the DOE reconcile public statements that it will uphold the AOC at the same time that it is funding a group that overtly works to destroy the AOC?

8. Did DOE’s animosity toward the Santa Susana cleanup agreement, and its displeasure at CIF funding PSR-LA and the SSFL Work Group, cause it to cancel the last year of its funding to NMCF, and thus cost over a dozen community groups throughout the United States to lose funding?

9.  Did DOE consult with elected officials historically concerned about SSFL cleanup as to whether the grant should be given to the CAG and whether it was a legitimate group representing the community?  Why did DOE ignore the opposition to the CAG expressed, in writing, by the electeds?

10.  Why did DOE not publicly solicit grant applications instead of secretly arranging to give the money to the CAG?  Why did DOE not solicit a grant application from the longstanding SSFL Work Group established by the electeds, which supports the cleanup agreements DOE is supposedly sworn to uphold?  Given that very few people attend CAG meetings, and the Work Group meetings are often standing-room only, why did DOE secretly fund the CAG, without a competitive grant application process, and not solicit an application from SSFL the Work Group?

Again, in addition, I request that DOE provide a copy of the SSFL CAG Foundation’s grant application or proposal to DOE, as well as the DOE-SSFL CAG grant contract or agreement, immediately.

Sincerely,

Denise Duffield
Coordinator, SSFL Work Group
and
Associate Director, Physicians for Social Responsibility-Los Angeles

cc:  Senator Barbara Boxer
Congresswoman Julia Brownley
California Senator Fran Pavley
LA County Supervisor Sheila Kuehl
Ventura County Supervisor Linda Parks
LA City Councilmember Mitch Englander
DTSC Director Barbara Lee
DTSC IRP Chair Gideon Kracov

 

DOE Inspector General report on the B61-12 nuclear smart bomb

The Department of Energy Inspector General has issued its audit report National Nuclear Security Administration’s Management of the B61-12 Life Extension Program. The B61-12 will literally cost twice its weight in gold. It is slated for production beginning 2020 and will blur the line between battlefield and strategic nuclear weapons by combining one strategic and three tactical variants. It will also be the world’s first “smart” nuclear bomb with a steerable tailfin kit giving it vastly improved accuracy. Nevertheless the U.S. government denies that the B61-12 will have any new military capabilities.

In its audit report, the DOE IG notes:

We believe without further improvement to its project management tools, it will be difficult for the program to proactively manage the costs, schedule, and risks of the B61-12 LEP to ensure it can deliver the First Production Unit within cost and meet its critical national security schedule.  In addition, there is uncertainty whether the original cost estimate for the B61-12 LEP contains sufficient management reserve to allow the program to respond to the numerous risks identified in the program.  Finally, not having documented assurance that unresolved significant finding investigations are a part of weapons design input significantly reduces management’s ability to ensure that redesigned nuclear weapon components have addressed prior safety and reliability concerns.

Regarding the last sentence “… reduces management’s ability to ensure that redesigned nuclear weapon components have addressed prior safety and reliability concerns”:

There was a problem with the new-design arming, firing and fuzing set for the W76-1, which is being produced now in its current Life Extension Program. It wasn’t a showstopper, but nevertheless a problem where new individual AF&F components had to be screened to determine whether their performance was affected.

The graph below from the 1993 Sandia Stockpile Life Study shows how the supermajority of nuclear weapons defects are discovered within the first few years of production. The point I’m reaching for is that as Life Extension Programs become more aggressive and more new-design components are used, design and production defects will be inevitable. It would be far better to maintain the stockpile through a conservative curatorship approach.

Circa 1995 I met with DOE Asst. Sec. for Defense Programs Victor Reis, the so-called father of the Stockpile Stewardship Program. Reis explicitly told me that the exorbitant Stockpile Stewardship Program was all about “the other side of the bathtub curve,” meaning it’s all about accelerated defects showing up at some time due to aging. Guess what? It hasn’t happened, not with ongoing surveillance and maintenance and exchange of limited life components that have been almost routine for decades. As the 1993 Sandia Stockpile Life Study concluded,

“It is clear that, although nuclear weapons ages, they do not wear out; they last as long as the nuclear weapons community (DOE and DOD) desire. In fact, we can find no example of a nuclear weapon retirement where age was ever a major factor in the retirement decision.”

Since then, the 1993 Sandia Stockpile Life Study’s conclusion has been buttressed by the JASON’s 2006 Pit Life Study and 2009 Life Extension Programs Study. In short, Life Extension Programs are not necessary for maintaining the nuclear stockpile, and may in fact undermine reliability by intentionally introducing major changes to an extensively tested stockpile. Life Extension Programs are, however, essential for creating new military capabilities for existing nuclear weapons, which is pretty clearly demonstrated by the B61-12 about to go into production, and arguably the W76-1 as well.

Nuclear Weapons defects graph from 1993 Sandia Stockpile Life Study

NNSA Set to Approve New Facilities for Expanded Plutonium Pit Production Without Credible Plans and Required Public Review

August 10, 2016

Santa Fe, NM – Yesterday, on the 71st anniversary of the destruction of Nagasaki by a plutonium bomb, the Government Accountability Office (GAO) submitted a report to the Senate Armed Services Committee on the National Nuclear Security Administration’s (NNSA’s) plans to expand plutonium pit production at the Los Alamos National Laboratory. NNSA has scheduled a formal “Critical Decision 2” at the end of this coming September to proceed with preliminary design of the upgraded and new facilities necessary to expand plutonium pit production.

The NNSA is a semi-autonomous nuclear weapons agency within the Department of Energy, which has the singular distinction of being the only federal department on the GAO’s High Risk List for wasting taxpayer’s dollars for 25 consecutive years. LANL is NNSA’s so-called “Plutonium Center of Excellence” and the nation’s only site for pit production, but major operations at PF-4, its main plutonium facility, have been stopped since June 2013 because of nuclear criticality safety concerns. In addition, there is no place for LANL to send its radioactive transuranic wastes from plutonium pit production since one of its waste drums ruptured at the Waste Isolation Pilot Plant in February 2014 and indefinitely closed that multi-billion facility.

Despite all this, funding for NNSA’s nuclear weapons research and production programs is being increased to nearly double the Cold War’s historic average, while nonproliferation, warhead dismantlement and cleanup programs are being cut or held flat. This is in part due to plans to spend at least a trillion dollars over the next 30 years on completely rebuilding U.S. nuclear weapons and producing new missiles, subs and bombers to deliver them. The “modernized” U.S. nuclear force is expected to be operational until at least until 2080, more than a century after the 1970 NonProliferation Treaty’s mandate for global nuclear disarmament.

The GAO’s report found that NNSA’s plans for upgraded and new facilities to expand plutonium pit production to 50-80 pits per year “did not include key performance parameters” and lacked analysis of a full range of alternatives. LANL’s currently approved production level is up to 20 pits per year, sanctioned in a 1996 Stockpile Stewardship and Management Programmatic Environmental Impact Statement that was required under the National Environmental Policy Act (NEPA). Subsequent NEPA efforts by NNSA to formally approve expanded plutonium pit production at LANL failed, and new efforts to expand plutonium pit production without adequate NEPA coverage could be vulnerable to legal challenge. Additionally, there is no public explanation or justification for the need to expand to 50-80 pits per year other than the nuclear weaponeers saying so. In contrast, independent expert studies have shown that pits have reliable lifetimes of at least a century (the average age of pits in the stockpile is now around 31 years), and up to 20,000 plutonium pits are already stored at the Pantex Plant near Amarillo, TX.

In 2012, in the face of exploding costs and rising citizen opposition, NNSA cancelled an earlier proposal to build a Walmart-sized “Chemistry and Metallurgy Research Replacement (CMRR) Project-Nuclear Facility” for expanded plutonium pit production. Now, as an alternative, NNSA and LANL seek to raise the administrative limit on plutonium in the CMRR Project’s first phase, the newly constructed Radiological Lab, from an original 8.4 grams to 400 grams; upgrade PF-4, the Lab’s main plutonium facility; and proceed with a “Plutonium Modular Approach project.”

Raising the amount of plutonium in the Rad Lab to 400 grams allows for dramatically increased “materials characterization” and “analytical chemistry” in direct support of expanded plutonium pit production. But it also raises the Rad Lab from a “radiological facility” to a “Hazard Category 3” nuclear facility, which has never been done before. Planned gloveboxes and the existing ventilation system may have to change and the facility’s seismic safety rating re-examined. The Rad Lab was originally constructed and equipped for a total cost of $400 million, but now up to another $675 million in equipment is being added. On top of that, re-categorizing the Rad Lab to a Hazard Category 3 facility could cost another $365 million. In all, the Rad Lab can cost up to $1.5 billion, while upgrades to PF-4 will cost another billion.

The Plutonium Modular Approach involves building at least two and perhaps three underground “modules” at one billion dollars each or more. The GAO report notes how since NNSA narrowly defined the program requirement as building the modules themselves instead of examining the need for the modules, “there is effectively no project alternative other than the modular approach,” despite DOE’s own orders to complete an analysis of a full range of alternatives.

In all, according to the GAO report, the full CMRR alternative of upgrading the Rad Lab and PF-4 and building at least two modules would cost at least 4 billion dollars, compared to the CMRR”s previous price tag of $5.8 billion (which was up from $975 million in 2005), and this is before the usual cost overruns. The GAO report also notes how the CMRR alternative appears cheaper because non-nuclear weapons operations, such as preparing plutonium for NASA’s spacecraft battery packs, have been eliminated. NNSA’s pattern when faced with its own cost overruns is to cut out all but nuclear weapons production, as it did with the Uranium Processing Facility (UPF) near Oak Ridge, TN. When a Defense Department estimate put UPF construction at $19 billion (up from $6.5 billion), NNSA eliminated dismantlements and downblending of highly enriched uranium so that it could keep production of thermonuclear components that can kill millions.

Jay Coghlan, Nuclear Watch Director, commented, “Expanded plutonium pit production at LANL is not needed to maintain stockpile safety and reliability, but instead is a must for nuclear weaponeers who want to give existing weapons new military capabilities through so-called Life Extension Programs. This GAO report is more evidence of how taxpayers’ money could be far better spent than on poorly planned, unnecessary and very expensive expanded plutonium pit production.”

# # #

The GAO report NNSA Needs to Clarify Requirements for Its Plutonium Analysis Project at Los Alamos is available at

http://www.gao.gov/products/GAO-16-585?utm_medium=email&utm_source=govdelivery

 

DOE’s 25 year status on GAO’s High Risk list is documented at

http://www.gao.gov/highrisk/doe_contract_management/why_did_study

 

For an extensive history of successful citizen activism against plutonium pit production see

https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

LANL Estimate of $2.9 Billion for “Remaining” Cleanup Leaves Nuclear & Toxic Wastes Behind and Kills Needed Jobs

 

For immediate release July 28, 2016

 

LANL Estimate of $2.9 Billion for “Remaining” Cleanup

Leaves Nuclear & Toxic Wastes Behind and Kills Needed Jobs

 

Santa Fe, NM – The Department of Energy (DOE) has announced that the cost of “Remaining Legacy Cleanup” of radioactive and toxic wastes from more than 70 years of nuclear weapons research and production at the Los Alamos National Laboratory (LANL) will cost $2.9 billion through fiscal year 2035, averaging $153 million per year.

That cost estimate clearly assumes that the Lab’s major radioactive and toxic wastes dumps will not be cleaned up. Instead they will be “capped and covered,” leaving some 200,000 cubic yards of radioactive and toxic wastes at Area G, its largest waste dump. Those wastes sit in unlined pits and trenches, 800 feet above groundwater and three miles uphill from the Rio Grande (plutonium contaminants have been detected 200 feet below Area G). During this same period of time the Lab’s nuclear weapons programs that caused the mess to begin with will cost ten times as much, even before expected funding increases for expanded production of plutonium bomb core “pits” and increasingly aggressive “Life Extension Programs” that give existing nuclear weapons new military capabilities.

DOE’s announcement also pegs the cost of past cleanup at LANL at $3.2 billion to date, raising the question of what has been and will be accomplished with precious taxpayer dollars. The answer is not much for the money. According to DOE’s own data, for the next couple of years only around a sixth of LANL’s “cleanup” funding will actually go to cleanup. Approximately one-third will be used to catch up on worker pensions and another third to babysit improperly treated radioactive waste barrels, one of which ruptured and closed the multi-billion dollar Waste Isolation Pilot Plant. More than half of the remaining one-third for real cleanup goes to LANL’s notoriously high overhead.

DOE’s cost estimate for future LANL cleanup assumes flat funding out to FY 2035, and notes how that cost is “Aligned to [the] 2016 Consent Order.” Despite repeated requests, DOE refused to estimate cleanup costs at LANL until a new Consent Order was finalized with the New Mexico Environment Department (NMED).  Both agencies recently signed it, creating a giant loophole in which the Lab can claim that cleanup is too expensive or impractical to achieve. This is the exact opposite of the original 2005 Consent Order, whose underlying intent was to make DOE and LANL ask Congress for additional cleanup funding. Subsequently, funding for LANL cleanup has fallen from $224 million in FY 2014 to $189 million requested for FY 2017.

Under the Gov. Martinez Administration, NMED Secretary Ryan Flynn granted more than 150 milestone extensions to the 2005 Consent Order at the Lab’s request and then claimed that the old Consent Order did not work. Nuclear Watch New Mexico has filed suit against DOE and LANL for missing compliance milestones under the original Consent Order, with potential fines of more than $300 million. NMED explicitly absolves those violations and fines through the new Consent Order and has intervened in the lawsuit against NukeWatch. This raises the question of whose side the Environment Department is on, the environment or the polluter (in this case, a $2.3 billion per year nuclear weapons facility)?

DOE and NMED kill the chance for serious job creation at the Los Alamos Lab with a deceptive plan for so-called cleanup that leaves tons of radioactive and toxic wastes in the ground that will permanently threaten northern New Mexico’s precious water resources. In addition to the environmental and safety threats and contamination, nuclear weapons programs are not big producers of new jobs. For example, the environmental impact statement for a planned $6.5 billion plutonium facility for expanded nuclear weapons production explicitly stated that not one new Lab job would be created because it would merely relocate existing jobs. In contrast, a LANL study of full cleanup of Area G assumed that around 40% of the total cost would go to labor. Thus, as a rough approximation, for every additional billion dollars put into cleanup, another 3,000 years of cleanup work could be created for one hypothetical worker (in other words, hundreds of high paying jobs for the regional economy).

Jay Coghlan, NukeWatch Director, commented, “The Department of Energy and the New Mexico Environment Department deal New Mexicans a bad hand by pushing a plan that blocks genuine cleanup at the Los Alamos Lab. We need real cleanup that protects our precious water resources for future generations, not more nuclear bombs that cause the mess to begin with.”

#  #  #

DOE’s presentation on its cost estimate for future LANL cleanup is available at

https://nukewatch.org/importantdocs/resources/EMLA_Los_ALamos_LCB_Estimate_NNMCAB_Presentation_07272016.pdf

Nuclear Watch NM Amends LANL Cleanup Lawsuit – Claims New Consent Order To Be Invalid

Nuclear Watch NM Amends LANL Cleanup Lawsuit – Claims New Consent Order To Be Invalid

Nuclear Watch New Mexico has amended its federal lawsuit against the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) that alleges twelve violations of a 2005 Consent Order governing cleanup at the Los Alamos National Laboratory (LANL). Those violations could result in potential penalties of more than $300 million dollars that would go to the state, if only the New Mexico Environment Department (NMED) were to enforce them.

Nuclear Watch now asks the court to declare the new 2016 Consent Order to be invalid because the requirement for the opportunity of a public hearing was not met.

NMED intervened in the case on June 23, 2016. The next day, NMED and DOE signed the 2016 Consent Order after a 60-day comment period, during which over 40 citizens, nonprofit organizations, public officials, and two Pueblos provided comments. Lack of enforceability and lack of concrete long-term schedules were common major foci of the comments. Despite that, “No change” without any further explanation was NMED’s overwhelming response to specific public comments as the two agencies moved from the draft to final Consent Order.

The finalized new Consent Order surrenders enforceability by creating a giant loophole where DOE and LANL can avoid cleanup by claiming that it is either too expensive or impractical. This is clearly the opposite of what is needed, when nuclear weapons research and production programs that caused the mess to begin with are receiving increased taxpayer funding, while cleanup programs are being cut.

In addition, NMED’s new Consent Order explicitly absolves DOE and LANS of past violations. In response, Nuclear Watch has added to its lawsuit this request for declaratory judgment by the court that DOE and NMED violated the public’s right for the opportunity of a formal hearing, explicitly required by the 2005 Consent Order.

Scott Kovac, NukeWatch Research Director, noted, “We will not let the public’s right for cleanup at the Los Alamos Lab be papered over by DOE and NMED. Both agencies agreed to all parts of the 2005 Consent Order, which included rigorous public participation requirements and a detailed the cleanup schedule, including a final compliance date. We will continue to push for the public to have a true voice in these important matters. ”

The New Mexico Environmental Law Center and Attorney John E. Stroud are representing NukeWatch in this legal action to enforce timely cleanup at LANL.

###

 

Nuclear Watch New Mexico’s 1st amended complaint is available here

NMED’s Final Consent Order and the “response” to comments matrix are available here

Nuclear Watch New Mexico’s original lawsuit complaint is available here

Our May 5, 2016 second notice of intent to sue (which is a good summary of our complaint) is available here

Our January 20, 2016 notice of intent to sue is available here

 

 

 

NM Environment Dept Finalizes Consent Order on Los Alamos Lab Cleanup Surrenders Enforcement to Nuclear Weaponeers

NM Environment Dept Finalizes Consent Order

on Los Alamos Lab Cleanup

Surrenders Enforcement to Nuclear Weaponeers

 

Santa Fe, NM – In a classic move to avoid publicity, the New Mexico Environment Department (NMED) announced late Friday afternoon June 24 that it had finalized a new “Consent Order” to replace a 2005 Order governing cleanup at the Los Alamos National Laboratory (LANL). The Environment Department’s brief press release headlined “Agreement Focuses on Cleanup & Supporting Stronger Federal Funding Requests.” This is doublespeak, as the new Consent Order is a giveaway to the Department of Energy and the Lab, surrendering the strong enforceability of the old Consent Order. The new Order is also clearly the opposite of the old Consent Order, whose underlying intent was to make DOE and LANL get more money from Congress for accelerated cleanup. In contrast, the new Consent Order allows them to get out of future cleanup by simply claiming that it’s too expensive or impractical to clean up.

The nuclear weaponeers are now openly talking about the “The Second Nuclear Age” before cleaning up form the first nuclear age. They are actively seeking to expand nuclear weapons production that caused the widespread contamination to begin with, particularly plutonium pit production at LANL.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers plan to spend a trillion dollars over the next 30 years completely rebuilding U.S. nuclear forces. Meanwhile, cleanup at the Los Alamos Lab, the birthplace of nuclear weapons, continues to be delayed, delayed, delayed. Real cleanup would be a win-win for New Mexicans, permanently protecting our water and environment while creating hundreds of high paying jobs. But yet the Environment Department fails New Mexicans by failing to enforce cleanup at Los Alamos.”

When NMED Secretary Ryan Flynn announced a draft new Consent Order on March 30, he claimed that the old Consent Order did not work. Nuclear Watch agrees, but that’s because Secretary Flynn granted more than 150 compliance milestone extensions at the Lab’s request, effectively eviscerating the old Consent Order. While finalizing the new Consent Order NMED ignored the explicit public participation requirements of the old Order, which among other things requires a public hearing on major modifications. Instead, NMED rammed through the final Consent Order, largely brushing aside the formal comments of some 40 concerned citizens and the Santa Clara Pueblo.

LANL is key to the trillion dollar rebuilding of nuclear forces as the premier nuclear weapons design lab and the nation’s sole production site for plutonium pit triggers, the most critical nuclear weapons components. Funding for Department of Energy (DOE) nuclear weapons programs is nearly double historic Cold War averages, with around $1.5 billion spent annually at LANL alone. In contrast, funding for Lab cleanup has been cut to $189 million for FY 2017 (down from $225 million in FY 2014), with only approximately a third going to actual cleanup (one-third goes to pensions and another third to safeguard improperly treated radioactive waste barrels, one of which ruptured and closed the multi-billion dollar Waste Isolation Pilot Plant).

The original 2005 Consent Order required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It also stipulated a detailed compliance schedule that the Lab was required to meet. Ironically, the last milestone, due December 6, 2015, required a report from LANL on how it successfully cleaned up Area G, its largest waste dump. However, real cleanup remains decades away, if ever. Instead, the Lab plans to “cap and cover” Area G, thereby creating a permanent nuclear waste dump in unlined pits and shafts, with an estimated 200,000 cubic yards of toxic and radioactive wastes buried above the regional groundwater aquifer, four miles uphill from the Rio Grande.

 

A few of the serious deficiencies of the new Consent Order are:

[Quotes are from the new Consent Order followed by page numbers]

• “The Parties agree that DOE’s project’s plans and tools will be used to identify proposed milestones and targets.” P. 28. “DOE shall define the use of screening levels and cleanup levels at a site…”  P. 32. This puts the Department of Energy in the driver’s seat, not the New Mexico Environment Department.

• “DOE shall update the milestones and targets in Appendix B on an annual basis, accounting for such factors as… changes in anticipated funding levels.” P. 29. Therefore the new Consent Order will be held hostage to DOE’s budget, which recently cut LANL’s cleanup funding.

• “… [DOE and NMED] shall meet to discuss the appropriation and any necessary revision to the forecast, e.g. DOE did not receive adequate appropriations from Congress…” P. 30. Again, the new Consent Order and therefore cleanup at LANL will be held hostage to DOE funding, when DOE’s own track record makes clear that its priority is expanded nuclear weapons production paid for in part by cutting cleanup and nonproliferation programs.

• “If attainment of established cleanup objectives is demonstrated to be technically infeasible, DOE may perform risk-based alternative cleanup objectives…” P. 34. DOE can opt out because of “impracticability” or cost of cleanup. P. 35. This creates giant loopholes that threaten comprehensive cleanup at LANL.

• The new draft Consent Order explicitly states that public participation requirements do NOT apply to future modifications of the Order. P. 25. This is the opposite of what the original Consent Order required, which made a point of incorporating the public process requirements of federal environmental law. Nuclear Watch New Mexico maintains that full public participation requirements apply to the new Consent Order as well, including its very formulation as a major modification of the old Consent Order. That full public participation process requires a public hearing if there are unresolved issues, which NMED has rejected, a position that may be of questionable legality.

 

On May 12, 2016, Nuclear Watch New Mexico filed a lawsuit against LANL and DOE for failing to meet compliance milestones in the old Consent Order. These violations incur around $300 million dollars in potential penalties, which NMED shows no sign of enforcing. To the contrary, NMED has filed a motion to intervene against Nuclear Watch New Mexico in its lawsuit, raising the question of whose side the Environment Department is on, the environment or the polluter (in this case a for-profit nuclear weapons lab)?

Moreover, when Nuclear Watch NM filed a notice of intent to sue on January 21, NMED Secretary Flynn sought to intimidate our lawyers by declaring “If a suit is filed, and the Environment Department becomes involved, we would insist on collecting any and all labor and legal costs from the (New Mexico Environmental Law Center) to reimburse New Mexico’s taxpayers for the costs resulting from this groundless and frivolous action.”

Far from being a frivolous action, Nuclear Watch and the New Mexico Environmental Law Center seek to compel full and genuine environmental restoration at the Los Alamos Lab, which the new Consent Order blocks by giving the nuclear weaponeers giant loopholes to avoid cleanup.

 

#  #  #

NMED’s June 24 press release and the new Consent Order are available here

Public comment on the draft Consent Order (including Nuclear Watch NM and Santa Clara Pueblo) is available here

Nuclear Watch New Mexico’s lawsuit complaint, filed May 12, 2016, is available here

  • Our complaint alleged twelve counts of milestone compliance violations where NMED did not grant extensions. At that time we calculated 7,853 total days of noncompliance at $37,500.00 per day, equal to $294,487,500, with the clock still ticking.

Our May 5, 2016 second notice of intent to sue (which is a good summary of our complaint) is available here

Our January 20, 2016 notice of intent to sue is available here

NMED Secretary Flynn’s quote is from “Nuclear Watch to sue over LANL cleanup problems”, Mark Oswald, Albuquerque Journal, January 21, 2016, is here.

 

Underground Pits and shafts at Area G
LANL Area G Underground Disposal Pits and Shafts

Past NukeWatch Events

It seems we can’t find what you’re looking for. Perhaps searching can help.

Past Work Product (2019-)

It seems we can’t find what you’re looking for. Perhaps searching can help.

2019


Proposed LANL Campus in Santa Fe

Read/Download the Full Press Release HERE


Pope Frances Calls for Nuclear Weapons Abolition

Read/Download the Full Press Release HERE


VIEW LIVE RECORDING & WORKSHOP RESOURCES

Presenters:

  • Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
  • Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
  • Marylia Kelley, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
  • Scott Kovac, Nuclear Watch New Mexico, on LANL cleanup issues

NukeWatch’s 22-page formal comments on expanded plutonium pit production

Until NNSA fully complies with the National Environmental Policy Act through the preparation of a programmatic environmental impact statement on expanded plutonium pit production, Nuclear Watch believes that any irreversible or irretrievable commitment of resources to either the expansion of pit production at the Los Alamos Lab or to the repurposing of the MOX Facility at the Savannah River Site is unlawful.

Read/Download the Full Document HERE


Scoping comments on NNSA draft EIS for plutonium pit production at the Savannah River Site

THE NEED FOR A PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT: This is our first and primary concern, that NNSA must first complete a programmatic environmental impact statement (PEIS) on its nation-wide plans for plutonium pit production, in advance of the Savannah River Site-specific environmental impact statement. To get right to the point, we argue that the SRS EIS process should go no further than this scoping period and should resume only after a completed formal Record of Decision for a new or supplemental PEIS.

Read/Download the Full Document HERE


Expanding Nuclear Pit Production: The Facts and What You Can Do

The Facts
• The Trump administration wants the United States to produce 80 plutonium pits per year
by 2030 without offering any concrete justification for the additional nuclear bomb cores.
• Multiple studies by government agencies have found that pits last for at least 100 years.
The average pit in the US stockpile is around 36 years old.
• More than 15,000 existing pits are already stored at the Pantex Plant near Amarillo, TX.
• Independent experts find it nearly impossible that the Los Alamos National Laboratory
and the Savannah River Site will be able to meet the 80 pit per year by 2030 requirement,
and billions of taxpayer dollars will be thrown down the drain in the meantime.

Read/Download the Full Document HERE


Federal Government Meets Watchdogs’ Demand for Environmental Review of Expanded Plutonium Pit Production

In a victory for transparency and legal compliance by the government, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) today published a “Notice of Intent” in the Federal Register to complete environmental reviews on its controversial proposal to expand plutonium “pit” production for new and refurbished nuclear weapons.

[embeddoc url="https://nukewatch.org/wp-content/uploads/2019/06/SRS-plutonium-bomb-plant6-14-19.pptx" download="all" viewer="google"]

Read/Download the Full News Release HERE


Noted Environmental Lawyers Warn Government Not to Expand Production of Plutonium Bomb Cores in Violation of National Environmental Policy Act and Public Review

On behalf of three public interest organizations - Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch – attorneys for the law firm of Meyer Glitzenstein & Eubanks and the Natural Resources Defense Council recently sent a 16-page letter to Lisa Gordon-Hagerty, head of the National Nuclear Security Administration (NNSA). The detailed letter warns the nuclear agency to not proceed with aggressive plans to expand plutonium pit production without first meeting its legal requirements for timely public review and comment under the National Environmental Policy Act.

Read/Download the Full Press Release HERE


Faulty Radioactive Liquid Waste Valves Raise Crucial Plutonium Pit Production and Safety Board Issues

Last Wednesday, facility operations personnel entered a service room and noticed a leak emanating from a valve on the radioactive liquid waste (RLW) system. Upon subsequent visual inspection by a radiological control technician, RLUOB engineers believe that this valve, and 6 similar valves, may be constructed of carbon steel. The RLW system handles radioactive liquid waste streams from chemistry operations that include nitric and hydrochloric acids—carbon steel valves would be incompatible with these solutions. The suspect valves are also in contact with stainless steel piping, which would create another corrosion mechanism. RLUOB management plans to drain the affected piping sections and develop a work package to replace all of the suspect valves. They will also confirm the valve materials and if shown to be incorrect, investigate the cause of this failure in the design, procurement, and installation processes. The valves were installed in 2013 as part of a modification to add straining and sampling capabilities that were not in the included in the original design. [Please note that DNFSB reports are posted a few weeks later than dated.]

This immediately raises two crucial issues: 1) the National Nuclear Security Administration’s (NNSA’s) plans for expanded plutonium pit production; and 2) the current attempt by the Department of Energy to restrict Safety Board access to its nuclear weapons facilities.

Read/Download the Full Press Release HERE


A Tale of Two Consent Orders and What Is Needed

On March 1, 2005, after arduous negotiations and threats of litigation, the New Mexico Environment Department (NMED), Department of Energy (DOE), and Los Alamos National Laboratory (LANL) entered into a Consent Order specifying the schedule for investigation and cleanup of the Lab’s hundreds of contaminated sites. This Consent Order (CO) was LANL’s agreement to fence-to-fence cleanup of Cold War legacy wastes, which NMED began to enforce.

Read/Download the Full Comparison HERE


Global Nuclear Weapons Threats Are Rising

More than 25 years after the end of the Cold War, all eight established nuclear weapons powers are “modernizing” their stockpiles. Talks have broken down with North Korea, the new nuclear weapons power. Nuclear-armed India and Pakistan narrowly averted war last month. Russian President Vladmir Putin made new nuclear threats in response to Trump’s announced withdrawal from the Intermediate-Range Nuclear Forces Treaty. This could lead to hair-trigger missile emplacements in the heart of Europe and block extension of the New Strategic Arms Reduction Treaty with Russia. If so, the world will be without any nuclear arms control at all for the first time since 1972. Meanwhile, the U.S. criticizes non-weapons states for signing a nuclear weapons ban treaty, despite the fact there have long been treaties completely banning chemical and biological weapons of mass destruction that the U.S. seeks to enforce. The pending international NonProliferation Treaty (NPT) Preparatory Committee conference at the United Nations is widely expected to collapse in failure because of the nuclear weapons powers’ failure to enter into serious negotiations leading to nuclear disarmament. The NPT’s Article VI mandate for those negotiations has been in effect since 1970, when the Treaty was signed by 189 countries (more than any other treaty).

Read/Download the Full Press Release HERE



Nuclear Watch New Mexico — Department of Energy FY 2020 Nuclear Weapons Budget Request

Read/Download the Full Budget Compilation HERE


2018


Expanded Plutonium Pit Production for U.S. Nuclear Weapons

Plutonium pits are the radioactive cores or “triggers” of nuclear weapons. Their production has always been a chokepoint of resumed industrial-scale U.S. nuclear weapons production ever since a 1989 FBI raid investigating environmental crimes shut down the Rocky Flats Plant near Denver. In 1997 the mission of plutonium pit production was officially transferred to its birthplace, the Los Alamos National Laboratory (LANL) in northern New Mexico, but officially capped at not more than 20 pits per year. However, in 2015 Congress required expanded pit production by 2030 whether or not the existing nuclear weapons stockpile actually needs it. This will support new military capabilities for nuclear weapons and their potential use.

Read/Download the full fact sheet pdf HERE


Watchdog Groups Claim Nuclear Agency is Moving Forward to Manufacture New Plutonium Bomb Cores in Violation of National Environmental Law and Public Review

Nuclear Watch New Mexico, Savannah River Site Watch, and Tri-Valley CAREs sent a letter of demand to the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to inform the government that its plan to quadruple the production rate of plutonium bomb cores is out of compliance with the National Environmental Policy Act (NEPA).

NNSA’s premature plan to quadruple the production rate of plutonium bomb cores (“pits”), the heart of all US nuclear weapons, is out of compliance with requisite environmental law, the groups argue, as NNSA has failed to undertake a legally-mandated programmatic review and hold required public hearings.

View/Download the entire press release HERE


DNFSB Hearing - Formal Comments

Nuclear Watch New Mexico is submitted formal comments to express in the strongest possible terms our opposition to DOE Order 140.1 Interface with the Defense Nuclear Facilities Safety Board. We find that the Department of Energy’s (DOE’s) attempt to restrict and suppress DNFSB access is very misguided, arrogant, and likely illegal in that it acts contrary to the Board’s enabling legislation.

Read the comments here


New Contractors Selected For Expanded Nuclear Weapons Production at Los Alamos

Santa Fe, NM. Today the Department of Energy's National Nuclear Security Administration (NNSA) announced its choice for the new management and operating contract for the Los Alamos National Laboratory (LANL).The new contractor, Triad National Security, LLC, is a limited liability company consisting of the Battelle Memorial Institute, the University of California and Texas A&M University. All three are non-profits, and it is unclear how this will affect New Mexico gross receipts taxes.

Battelle claims to be the world's largest non-profit technology research and development organization, and manages a number of labs including the Lawrence Livermore and Idaho National Laboratories. Texas A&M was founded in 1876 as the state's first public institution of higher learning and has the largest nuclear engineering program in the country. DOE Secretary Rick Perry is an avid A&M alumnus.

View/download full press release


Groups Release Key DOE Documents on Expanded Plutonium Pit Production, DOE Nuclear Weapons Plan Not Supported by Recent Congressional Actions

Santa Fe, NM & Columbia, SC - "Two key U.S. Department of Energy documents on future production of plutonium "pits" for nuclear weapons, not previously released to the public, fail to justify new and upgraded production facilities at both the Los Alamos National Laboratory (LANL) in New Mexico and the Savannah River Site (SRS) in South Carolina."

View/download press release


Los Alamos Cleanup

View/download Fact sheet


What's Not in NNSA's Plutonium Pit Production Decision

 

- NNSA did not mention that up to 15,000 "excess" pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in "strategic reserve." The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits. (In 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old.)
- NNSA did not explain how to dispose of all of that plutonium, given that the MOX program is an abysmal failure. Nor is it made clear where future plutonium wastes from expanded pit production will go since operations at the troubled Waste Isolation Pilot Plant are already constrained from a ruptured radioactive waste barrel, and its capacity is already overcommitted to existing radioactive wastes. View/download Press Release


NNSA Proposal to Raise Plutonium Limit Ten-Fold in Los Alamos' Rad Lab Is First Step in Expanded Plutonium Pit Production: Environmental Assessment Is Premature and Deceptive By Omission

"NNSA should begin nation-wide review of plutonium pit production, why it's needed, and what it will cost the American taxpayer in financial, safety and environmental risks. These are all things that the public should know." -Jay Coghlan, Director, Nuclear Watch New Mexico.

View/download Press Release


LANL Rad Lab: Formal Comments Under Nat'l Environmental Policy Act

Against raising plutonium limit at LANL Rad Lab

View/download Nuclear Watch comments as submitted

Excerpt:
"This Draft Rad Lab EA is deficient. There are major omissions, for example the lack of analyses of potential beryllium hazards and Intentional Destructive Acts. Moreover, safety, occupational and seismic risks are explained away in "preliminary analyses." All this should be corrected in a more complete environmental impact statement, including final and transparent analyses of safety and seismic risks...

"NNSA should proceed with a broader environmental impact statement after its May 11 decision on the future of expanded plutonium pit production."

- NNSA is planning a 10-fold increase in plutonium at the LANL Rad Lab with a view to ramping up the production of plutonium pits for new nuclear weapons.
- NNSA wants to re-categorize the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.
- (See details in our press release)
- National Environmental Policy Act


United States To Begin Construction Of New Nuclear Bomb Plant

The National Nuclear Security Administration (NNSA) announced on Friday, March 23, that it was authorizing the start of construction of the Uranium Processing Facility (UPF) and two sub-projects at the Y-12 National Security Complex in Oak Ridge, Tennessee. The UPF is a facility dedicated solely to the manufacture of thermonuclear cores for US nuclear bombs and warheads.
Citizen watchdog groups are responding by filing an expedited Freedom of Information Act request demanding a full fiscal accounting of the UPF bomb plant- something the NNSA has refused to provide for the last five years, including to Congress, despite repeated assurances that the project is "on budget."

"This project is already a classic boondoggle, and they are just getting started," said Ralph Hutchison, coordinator of the Oak Ridge Environmental Peace Alliance (OREPA) in Knoxville, Tennessee. "Worse, it undermines US efforts to discourage nuclear proliferation around the world. How can we oppose the nuclear ambitions of other countries when we are building a bomb plant here to manufacture 80 thermonuclear cores for warheads every year?"

Jay Coghlan of NukeWatch points out that "This project already has a long history, and it is instructive. In 2013, DOE announced it was 85% finished with the UPF design when it ran into the 'space/fit' issue- and more than a half-billion taxpayer dollars were just written off. In private business, that kind of thing gets you fired. In DOE's world of contractors running amok, they not only didn't get fired, not one Congressional hearing was held and the UPF budget went up the next year!"

- See full press release for all the details (PDF)
- View/download the OREPA/NukeWatch FOIA request (pdf)


The Regional Coalition of LANL Communities: Benefits for the Select Few

Santa Fe, NM- According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County's 46th district in the state House of Representatives.
Perhaps more serious is the fact that Romero was awarded an undisclosed amount of money by the Venture Acceleration Fund (VAF) for her private business Tall Foods, Tall Goods, a commercial ostrich farm in Ribera, NM. According to a May 8, 2017 Los Alamos Lab news release announcing the award to Tall Foods, Tall Goods, "The VAF was established in 2006 by Los Alamos National Security [LANS], LLC to stimulate the economy by supporting growth-oriented companies."[1] LANS, primarily composed of the Bechtel Corporation and the University of California, has held the annual ~$2.4 billion Los Alamos National Laboratory (LANL) management contract since June 2006.

For all the details, see full press release PDF


Major LANL Cleanup Subcontractor Implicated in Fraud - Entire Los Alamos Cleanup Should Be Re-evaluated

Santa Fe, NM. On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as "N3B"). This award followed a DOE decision to pull cleanup from LANL's prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen.
Tetra Tech Inc is a major subcontractor for N3B in the LANL cleanup contract... Serious allegations of fraud by Tetra Tech were raised long before the LANL cleanup contract was awarded. The US Navy found that the company had committed wide spread radiological data falsification, doctored records and supporting documentation, and covered-up fraud at the Hunters Point Naval Shipyard cleanup project in San Francisco, CA. See media links and excerpts below..."

(See all the details in the full press release)


Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race

Santa Fe, NM. Late Friday February 23, the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] "Weapons Activities", 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office's High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990...

(See all the details in the full press release)


NNSA Releases Draft Environmental Assessment for LANL Rad Lab; Raises Plutonium Limit 10 Times for Expanded Pit Production

Santa Fe, NM. Today the National Nuclear Security Administration announced an Environmental Assessment to increase the amount of plutonium used in the Radiological Laboratory Utility and Office Building (aka the "Rad Lab") at the Los Alamos National Laboratory from 38.6 grams of plutonium-239 equivalent to 400 grams. This 10-fold increase is significant because it will dramatically expand materials characterization and analytical chemistry capabilities in the Rad Lab in support of expanded plutonium pit production for future nuclear weapons designs. It also re-categorizes the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.

View/Download full press release


Trump's Budget Dramatically Increases Nuclear Weapons Work

Santa Fe, NM In keeping with the Trump Administration's recent controversial Nuclear Posture Review, today's just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production.
The National Nuclear Security Administration (NNSA), the Department of Energy's semi-autonomous nuclear weapons agency, is receiving a $2.2 billion overall boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category (Nuclear) "Weapons Activities", 18% above the FY 2018 level.
Digging deeper under Weapons Activities, "Directed Stockpile Work" is increased from $3.3 billion to $4.7 billion, or 41%...

(read the full press release)


Draft Nuclear Posture Review Degrades National Security

Yesterday evening the Huffington Post posted a leaked draft of the Trump Administration's Nuclear Posture Review (NPR). This review is the federal government's highest unclassified nuclear weapons policy document, and the first since the Obama Administration's April 2010 NPR.
This Review begins with "Many hoped conditions had been set for deep reductions in global nuclear arsenals, and, perhaps, for their elimination. These aspirations have not been realized. America's strategic competitors have not followed our example. The world is more dangerous, not less." The NPR then points to Russia and China's ongoing nuclear weapons modernization programs and North Korea's "nuclear provocations." It concludes, "We must look reality in the eye and see the world as it is, not as we wish it be."
If the United States government were to really "look reality in the eye and see the world as it is", it would recognize that it is failing miserably to lead the world toward the abolition of the only class of weapons that is a true existential threat to our country. As an obvious historic matter, the U.S. is the first and only country to use nuclear weapons. Since WWII the U.S. has threatened to use nuclear weapons in the Korean and Viet Nam wars, and on many other occasions.
Further, it is hypocritical to point to Russia and China's "modernization" programs as if they are taking place in a vacuum. The U.S. has been upgrading its nuclear arsenal all along. In the last few years our country has embarked on a $1.7 trillion modernization program to completely rebuild its nuclear weapons production complex and all three legs of its nuclear triad.
Moreover, Russia and China's modernization programs are driven in large part by their perceived need to preserve strategic stability and deterrence..
(read the full press release)

2017


2017


New Mexico Environment Department Surrendered to DOE Extortion

Santa Fe, NM. The New Mexico State Auditor Office recently questioned whether two settlements between the New Mexico Environment Department and the Department of Energy were in the best interests of New Mexico. That Office noted:
"The New Mexico Environment Department unnecessarily forgave tens of millions of dollars in civil penalties related to various waste management issues and missed cleanup deadlines by the Department of Energy (DOE) and its contractors. Considering the seriousness of the violations, and the clarity regarding responsibility for the violations, it appears highly unusual that the Department would not collect any civil penalties under these circumstances."
NMED completed an assessment of $54 million in penalties that would have gone to New Mexico, but did not enforce them before making the settlements with DOE. This was at a time when the state was beginning to face a serious budget crisis. As State Senator John Arthur Smith (Chair of the Senate Finance Committee) put it, NMED's failure to levy penalties when New Mexico was facing a budget crisis is "taking it out of the pockets of our kids and young people when they do something like that."
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This is inexcusable that NMED preemptively surrendered to Department of Energy extortion. In effect DOE is saying if you, the regulator, fine us, we will cut the money the taxpayer has paid to clean up our mess that threatens the citizens you are suppose to protect."

(View/download full press release)


Los Alamos Hires New Contractor - Starts Cleanup On the Cheap

Santa Fe, NM- Today the Department of Energy (DOE) announced the award of the new Los Alamos National Laboratory legacy cleanup contract to Newport News Nuclear BWXT-Los Alamos, LLC. The $1.39 billion contract is for ten years, which works out to $139 million per year...
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This dooms the Lab to cleanup on the cheap. This 140 million dollars per year to the cleanup contractor is based on a revised Consent Order by the New Mexico Environment Department that was a give away to the Los Alamos Lab. The original 2005 Consent Order held the Department of Energy's feet to the fire to complete real cleanup or pay stipulated penalties. In contrast, the Martinez administration gave the biggest polluter in northern New Mexico a free pass, forgiving a hundred million dollars in possible fines that should have gone to our kids' schools. New Mexicans deserve an Environment Department under a new governor that aggressively protects the environment and creates new high-paying jobs thorough enforcing comprehensive cleanup."

View/download the full press release


"Nuclear Weapons Development, Testing, Stockpile & UN Treaty" - Presentation by Nukewatch Director Jay Coghlan at the Albuquerque symposium "Dismantling the Nuclear Beast" Dec. 1-3, 2017.

View/download Power Point doc


Congressional Budget Office: Cost of Nuclear Weapons Upgrades and Improvements Increases to $1.2 Trillion

Today, in Washington, DC, the Congressional Budget Office released its new report, "Approaches for Managing the Costs of U.S. Nuclear Forces, 2017 to 2046". The Congressional Budget Office estimates that the most recent detailed plans for nuclear forces, which were incorporated in the Obama Administration's 2017 budget request, would cost $1.2 trillion in 2017 dollars over the 2017-2046 period: more than $800 billion to operate and sustain (that is, incrementally upgrade) nuclear forces and about $400 billion to modernize them.... Driving this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of "deterrence," thousands of warheads are being refurbished and improved to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government!

(read full press release)


Santa Fe City Council: LANL Cleanup Order Must Be Strengthened & Expanded and Plutonium Pit Production Suspended Until Safety Issues Are Resolved

Santa Fe, NM. On the evening of Wednesday October 25, the Santa Fe City Council passed a resolution requesting that the New Mexico Environment Department strengthen the revised Los Alamos National Labs cleanup order to call for additional characterization of legacy nuclear wastes, increased cleanup funding, and significant additional safety training. The resolution also called for the suspension of any planned expanded plutonium pit production until safety issues are resolved.

(view/download full press release)


International Campaign to Abolish Nuclear Weapons Wins Nobel Peace Prize, NukeWatch Calls on New Mexico Politicians and Santa Fe Archbishop To Support Drive Toward Abolition

Santa Fe, NM. Nuclear Watch New Mexico strongly applauds the awarding of the Nobel Peace Prize to the International Campaign to Abolish Nuclear Weapons (disclosure: NukeWatch is one of ICAN's ~400 member groups around the world). This award is especially apt because the peoples of the world are now living at the highest risk for nuclear war since the middle 1980's, when during President Reagan's military buildup the Soviet Union became convinced that the United States might launch a pre-emptive nuclear first strike. Today, we not only have Trump's threats to "totally destroy" North Korea and Kim Jong-un's counter threats, but also renewed Russian fears of a US preemptive nuclear attack... Generally unknown to the American taxpayer, our government has quietly tripled the lethality of the US nuclear weapons stockpile..."

(view/download complete press release)


Expanded Plutonium Pit Production at LANL Will Not Result in Significant Positive Effect On Job Creation and the Regional Economy

The National Nuclear Security Administration's own documents have explicitly stated that expanded pit production would have no significant positive effect on job creation and the regional economy of northern New Mexico. Nuclear Watch argues that expanded plutonium pit production could actually have negative effect if it blocks other economic alternatives such as comprehensive cleanup, which could be the real job producer. Moreover, given LANL's poor safety and environmental record, expanded plutonium pit production could have a seriously negative economic impact on northern New Mexico in the event of any major accidents.

- view/download fact sheet


Chromium Groundwater Contamination at Los Alamos Lab Far Greater Than Previously Expected; LANL's Treatment Plan Must Be Drastically Changed

Santa Fe, NM. The Los Alamos National Laboratory (LANL) has detected far more hexavalent chromium (Cr) contamination than previously estimated in the "sole source" regional groundwater aquifer that serves Los Alamos, Santa Fe and the Espanola Basin. Sampling in July from a new well meant to inject treated groundwater back into the aquifer detected chromium contamination five times greater than the New Mexico groundwater standard of 50 micrograms per liter (ug/L).

View/download the full press release


Talking Points: The 2016 LANL Cleanup Consent Order Should Be Rescinded

The 2005 LANL Cleanup Consent Order was all about the enforceable schedules. It required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It stipulated a detailed compliance schedule that the Lab was required to meet. Under Gov. Martinez, NMED Secretary Ryan Flynn granted more than 150 compliance milestone extensions at the Lab's request, effectively eviscerating it.
In June 2016 the New Mexico Environment Department (NMED), the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) signed a revised Consent Order governing cleanup at the Los Alamos National Laboratory (LANL). The new Consent Order is a big step backward in achieving comprehensive, genuine cleanup at the Lab. The revised 2016 CO was a giveaway by NMED to DOE and the Lab, negotiated to allow DOE's budget to drive cleanup, not what is needed to permanently protect our water.
NMED should have kept the original, enforceable 2005 Consent Order that it fought so hard for under the Richardson Administration, modified as needed for the cleanup schedule and final compliance date.

View/download the complete talking points


Oak Ridge Environmental and Peace Alliance, Nuclear Watch New Mexico, and The Natural Resources Defense Council File Lawsuit Against New Nuclear Bomb Plant

Washington, DC Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration's (NNSA's) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.'s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants.
"The story of this new bomb plant is a long tale of outrageous waste and mismanagement, false starts and re-dos, a federal agency that refuses to meet its legal obligation to engage the public, and a Senator that is bent on protecting this piece of prime nuclear pork for his home state," said Ralph Hutchison, coordinator of OREPA. "But the short version is this: when the NNSA made dramatic changes to the UPF, and admitted that it intends to continue to operate dangerous, already contaminated facilities for another twenty or thirty years, they ran afoul of the National Environmental Policy Act. Our complaint demands that the NNSA complete a supplemental environmental impact statement on the latest iteration of its flawed plans."

View/download the full press release


Some Background on Plutonium Pit Production at the Los Alamos Lab

Santa Fe, NM -The Washington Post has published the first in a series of articles on nuclear safety lapses in plutonium pit production at the Los Alamos Lab. Plutonium pits are the fissile cores of nuclear weapons that when imploded initiate the thermonuclear detonation of modern weapons. By the way, did you know? Plutonium facilities at LANL are- in principle- designed to withstand a serious earthquake of a degree expected to occur only once every 10,000 years. The last serious earthquake near the Lab is believed to have occurred 11,500 years ago.

View/download the full press release


This year's report examines the extraordinary spending at Department of Energy nuclear facilities and examines ways to reduce risks and save billions of dollars across the U.S. nuclear weapons complex.

(View/download PDF)


SA Preview of Trump's Budget: More Nuclear Bombs and Plutonium Pit Production

Santa Fe, NM. "The proposed level of funding for the National Nuclear Security Administration's (NNSA)'s Total Weapons Activities is $10.2 billion, a full billion above what was requested for FY 2017. In March, Trump's "skinny budget" stated NNSA's funding priorities as 'moving toward a responsive nuclear infrastructure', and 'advancing the existing warhead life extension programs'.
"Concerning Life Extension Programs, rather than merely maintaining and extending the lives of existing nuclear weapons as advertised, they are being given new military capabilities, despite denials at the highest levels of government. A current example is the B61-12 Life Extension Program, which is transforming a "dumb" nuclear bomb into the world's first highly accurate "smart" nuclear bomb.
"With respect to the Los Alamos National Laboratory (LANL), "responsive infrastructure" no doubt means accelerating upgrades to existing plutonium facilities and likely building two or three new underground "modules", all for the purpose of quadrupling plutonium pit production from 20 to 80 pits per year. (Plutonium pits are the fissile cores of nuclear weapons.)”

Read the full press release for all the details.


Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion

March 28, 2017, UN, NYC:
Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion
See video clips of some of the speakers:


Plutonium Pit Production at LANL (Updated March 2017)

(view/download PDF)


Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection

Santa Fe, NM. America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning.
Two recently released government reports make clear the stark inequality between the so-called modernization program to upgrade and indefinitely preserve U.S. nuclear forces (in large part for a new Cold War with Russia), and the nation-wide program to clean up the radioactive and toxic contamination from the first Cold War. The Obama Administration launched a trillion dollar nuclear weapons "modernization" program, which President Trump may expand. In contrast, cleanup of the first Cold War mess has been cut from a high of $8.5 billion in 2003 to $5.25 billion in 2016, even though comprehensive cleanup would produce far more jobs than nuclear weapons programs.

Read the full press release for all the details.


NNSA Releases Los Alamos Lab Performance Evaluation Report,Nuclear Criticality Safety Issues Still Not Fully Resolved

The National Nuclear Security Administration (NNSA) has publicly released its fiscal year 2016 Performance Evaluation Report (PER) for Los Alamos National Security, LLC (LANS), the for-profit contractor that runs the Los Alamos Lab. The Performance Evaluation Report is NNSA's annual report card on contractor performance, and overall the agency awarded LANS $59 million in profit out of a possible $65 million. The grade was 85% for the incentive part of the award. In 2012 Nuclear Watch New Mexico successfully sued NNSA to ensure that the Performance Evaluation Reports detailing taxpayers funds paid to nuclear weapons contractors are publicly available. In 2016 the NNSA decided to put the LANL management contract out for competitive bid, but granted LANS a contract extension until the end of September 2018.
Despite the passing grade that NNSA gave LANS, there is still ample reason for public concern. First, it bears repeating that in February 2014 a radioactive waste drum improperly prepared by the Los Alamos National Laboratory (LANL) burst underground at the Waste Isolation Pilot Plant (WIPP), contaminating 21 workers and closing that multi-billion dollar facility (a limited restart of operations at WIPP may occur this month).
Less widely known is the fact that LANL's main plutonium facility that produces WIPP wastes has only recently restarted operations after being shut down since June 2013 because of nuclear criticality safety concerns... (more: read full press release)

Media appearances including radio interviews are listed on the internal Media page

See the NukeWatch Channel at YouTube for our extensive playlists of key videos.

See the Nukewatch Twitter feed

See the Nukewatch Tumblr site


WatchBlog Posts:

Over 200 posts published since 2009. See archives at the WatchBlog

Earlier Work Product items are archived here