Nuclear Watch New Mexico – Work Product

ALL RECENT WORK

Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law

FOR IMMEDIATE RELEASE, October 3, 2024

Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]

AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.

The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites.  These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.

As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.

Continue reading

High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up

FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.

On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.

Continue reading

NEW Pit Production Fact Sheet – July 2024

Nuclear Weapons and Waste Issues in NM – July 14 Presentation

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production

FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email

Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.

In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:

“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]

Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.

Continue reading

NNSA’s Nuclear Weapons Budget Takes Huge Jump

Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut

FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.

The Biden Administration states that the $19.8 billion will be used to:

“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.

The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:

“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)

Continue reading

NNSA Suppresses How Taxpayers Money Is Spent

FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.

NNSA Suppresses How Taxpayers Money Is SpentA current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.

Continue reading

2023

U.S. Strategic Posture Commission Ratchets Up Nuclear Arms Race

FOR IMMEDIATE RELEASE, October 12, 2023
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Today, America’s Strategic Posture, The Final Report was released by the Congressional Commission on the Strategic Posture of the United States. In its own words:

“The Congressional Commission on the Strategic Posture of the United States was established by the Fiscal Year (FY) 2022 National Defense Authorization Act (NDAA), and concludes that America’s defense strategy and strategic posture must change in order to properly defend its vital interests and improve strategic stability with China and Russia. Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.”

Los Alamos Lab’s Future at a Crossroads: Cleanup or More Nuclear Weapons? NukeWatch Applauds NM State Rejection of Fake Cleanup

FOR IMMEDIATE RELEASE, September 18, 2023
Jay Coghlan – 505.989.7342, c 505.470.3154 | Email
Scott Kovac – c. 505.316.4148 | Email

Santa Fe, NM – In an important win for genuine cleanup at the Los Alamos National Laboratory (LANL), the New Mexico Environment Department (NMED) has rejected the Lab’s plans for so-called cleanup through “cap and cover.” LANL’s plan would leave existing radioactive and toxic wastes uncharacterized and forever buried in unlined pits and trenches as a permanent threat to groundwater. At issue is remediation of the Lab’s “Material Disposal Area C” waste dump that has 7 pits and 108 shafts of radioactive and toxic wastes. Area C is located in the heart of nuclear weapons production at LANL, contiguous to the Lab’s main plutonium facility which is expanding production of plutonium “pit” bomb cores.

In a September 7, 2023 “Public Notice of Statement of Basis,” the Environment Department ruled:

“For maximum protection of human health and the environment and to ensure that the drinking water resource can be conservatively protected, NMED has determined that the selected [cleanup] remedy for MDA C must consist of waste excavation, characterization, and appropriate disposal of the buried waste… Excavation will ensure that the source of contamination at MDA C is removed…”

Plutonium Detections From Trinity Test Discovered 78 years After Test – Confirm RECA Must Be Expanded

FOR IMMEDIATE RELEASE, July 31, 2023
Tina Cordova, Tularosa Basin Downwind Consortium – 505.897.6787 | Email
Dr. Michael E. Ketterer – 928.853.7188 | Email
Scott Kovac, Nuclear Watch New Mexico – 505.989.7342 | Email

Santa Fe, NM – New preliminary information strongly supports Radiation Exposure Compensation Act (RECA) status for New Mexicans downwind of the Trinity Test Site. In the past weeks, Michael E. Ketterer, (Professor Emeritus, Chemistry and Biochemistry, Northern Arizona University, Flagstaff, AZ) has completed a short “proof of principle” study that directly investigates where plutonium in soils originates by analyzing isotopic ratios, in a known portion of the Trinity Test plume.

Dr. Ketterer sampled soils along highways NM 42, US 54, NM 55, US 60, and US 380. The isotopes show that there is definitely plutonium from the Trinity Test in the northeast plume, and distinguishes it from global (stratospheric) background and New Mexico regional background from Nevada Test Site fallout. Soils along all five of these highways contain plutonium that reflects mixtures of Trinity Test debris and global/Nevada regional background fallout; in some cases, nearly 100% of the Pu originates from the Trinity Test.

While Dr. Ketterer has not encountered any activities (expressed as Bq/kg or pCi/g, Becquerels or picocuries respectively) of plutonium that cause alarm from the radio-toxicity standpoint, there’s very limited data.

RECENT FACT SHEETS

NEW Pit Production Fact Sheet – July 2024

Comment on the Lawrence Livermore National Laboratory Draft Site-Wide Environmental Impact Statement

Nuclear Watch New Mexico January 21, 2023 Email

Via email to: [email protected]
Ms. Fana Gebeyehu-Houston,
LLNL SWEIS Document Manager,
1000 Independence Ave., SW, Washington, DC 20585

Dear Ms. Fana Gebeyehu-Houston:

Thank you for the opportunity to comment on the National Nuclear Security Administration’s (NNSA) Draft Site-Wide Environmental Impact Statement (SWEIS) for the continued operation of the Lawrence Livermore National Laboratory Main Site in Livermore, CA and Site 300 high explosives testing range near Tracy, CA.

Nuclear Watch New Mexico takes particular interest in the Livermore Lab as the sister lab of the Los Alamos National Laboratory (LANL). We have long been involved in the issue of plutonium pit production at LANL. We see the two labs as inextricably linked given that LANL will be producing plutonium pits for the new W87-1 warhead, for which LLNL is the lead design agency.

Our mission statement: Nuclear Watch New Mexico seeks to promote safety and environmental protection at nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

NukeWatch DNFSB 2022 Hearing Comments 1-20-23

Nuclear Watch New Mexico January 20, 2023 Email

Defense Nuclear Facilities Safety Board
625 Indiana Avenue NW, Suite 700
Washington, DC 20004

Via email at <[email protected]>

Re: Comments concerning the November 16, 2022 public hearing regarding legacy cleanup activities, nuclear safety, and increased production activities at the Los Alamos National Laboratory

Dear Safety Board:

Nuclear Watch New Mexico (NukeWatch) appreciates the opportunity to provide follow up written comments for the November 16, 2022 public hearing in Santa Fe, NM. We want to thank the Board for its continuing concern over Los Alamos National Laboratory (LANL) safety issues and for having a public hearing to begin with. Further, we are grateful for the DNFSB’s perseverance in the face of the Department of Energy’s arguably illegal attempts to restrict its access. We look forward to many more years of the Safety Board’s insights and recommendations on nuclear facilities at DOE and NNSA sites, for which the DNFSB is uniquely positioned. Your service is invaluable and irreplaceable. Thank you!

Our mission statement: Nuclear Watch New Mexico seeks to promote safety and environmental protection at nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

PLUTONIUM PIT PRODUCTION BRIEFING

Jay Coghlan, Nuclear Watch New Mexico January 17, 2023 Email

GAO report: NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Pit Production Capability, January 12, 2023, gao.gov/products/gao-23-104661

  • “NNSA’s Plutonium Pit Production Scope of Work Includes Dozens of Programs, Projects, and Other Activities Managed by Multiple NNSA Offices at Multiple Sites.” p. 19
  • “NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Establishing its Pit Production Capability.” p. 40
  • They [NNSA officials] said they did not want to introduce uncertainty about dates and wanted to avoid releasing preliminary or unpalatable information that was subject to change.” pp. 40-41
  • “NNSA will have spent billions of dollars without having an overall idea of total program costs, or when program objectives, to include the capability to produce 80 pits per year, will be reached.” pp. 55-56

Presentation to the Radioactive and Hazardous Materials Committee on Discussion Topics Concerning LANL Jay Coghlan
Questionable Department of Energy benefits to New Mexico:

• DOE plans to spend $9.4 billion in New Mexico during this fiscal year 2023, 71% for nuclear weapons research and production while much of the rest is for related radioactive waste disposal. This is 10% more than the State’s entire operating budget of $8.5 billion. Forty-one percent of the National Nuclear Security Administration’s nation-wide FY 2023 nuclear weapons research and production budget will be spent in the Land of Enchantment alone(1).

• How does this really benefit New Mexicans when the Land of Enchantment:

  • Has the third highest rate of poverty (18.2%) after Mississippi and Louisiana(2);
  • Is fourth lowest in per capita income in 2022, 3 down from 37th in 1959; and
  • Is ranked 46th in best states to live in, according to five criteria (affordability, economy, education and health, quality of life, and safety),4 dead last in quality of education(5) and dead last in quality of life for children?(6)

At the same time, Los Alamos County is the 11th richest county in the USA(7), has the most millionaires per capita (11.6%)(8), and has been ranked the best county to live in(9). Clearly the economic benefits are for a privileged minority of the New Mexican population.

RECENT PRESS RELEASES

Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law

FOR IMMEDIATE RELEASE, October 3, 2024

Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]

AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.

The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites.  These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.

As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.

High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up

FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.

On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production

FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email

Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.

In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:

“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]

Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.

NNSA’s Nuclear Weapons Budget Takes Huge Jump

Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut

FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.

The Biden Administration states that the $19.8 billion will be used to:

“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.

The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:

“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)

NNSA Suppresses How Taxpayers Money Is Spent

FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.

NNSA Suppresses How Taxpayers Money Is SpentA current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.

U.S. Strategic Posture Commission Ratchets Up Nuclear Arms Race

FOR IMMEDIATE RELEASE, October 12, 2023
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Today, America’s Strategic Posture, The Final Report was released by the Congressional Commission on the Strategic Posture of the United States. In its own words:

“The Congressional Commission on the Strategic Posture of the United States was established by the Fiscal Year (FY) 2022 National Defense Authorization Act (NDAA), and concludes that America’s defense strategy and strategic posture must change in order to properly defend its vital interests and improve strategic stability with China and Russia. Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.”

Los Alamos Lab’s Future at a Crossroads: Cleanup or More Nuclear Weapons? NukeWatch Applauds NM State Rejection of Fake Cleanup

FOR IMMEDIATE RELEASE, September 18, 2023
Jay Coghlan – 505.989.7342, c 505.470.3154 | Email
Scott Kovac – c. 505.316.4148 | Email

Santa Fe, NM – In an important win for genuine cleanup at the Los Alamos National Laboratory (LANL), the New Mexico Environment Department (NMED) has rejected the Lab’s plans for so-called cleanup through “cap and cover.” LANL’s plan would leave existing radioactive and toxic wastes uncharacterized and forever buried in unlined pits and trenches as a permanent threat to groundwater. At issue is remediation of the Lab’s “Material Disposal Area C” waste dump that has 7 pits and 108 shafts of radioactive and toxic wastes. Area C is located in the heart of nuclear weapons production at LANL, contiguous to the Lab’s main plutonium facility which is expanding production of plutonium “pit” bomb cores.

In a September 7, 2023 “Public Notice of Statement of Basis,” the Environment Department ruled:

“For maximum protection of human health and the environment and to ensure that the drinking water resource can be conservatively protected, NMED has determined that the selected [cleanup] remedy for MDA C must consist of waste excavation, characterization, and appropriate disposal of the buried waste… Excavation will ensure that the source of contamination at MDA C is removed…”

Plutonium Detections From Trinity Test Discovered 78 years After Test – Confirm RECA Must Be Expanded

FOR IMMEDIATE RELEASE, July 31, 2023
Tina Cordova, Tularosa Basin Downwind Consortium – 505.897.6787 | Email
Dr. Michael E. Ketterer – 928.853.7188 | Email
Scott Kovac, Nuclear Watch New Mexico – 505.989.7342 | Email

Santa Fe, NM – New preliminary information strongly supports Radiation Exposure Compensation Act (RECA) status for New Mexicans downwind of the Trinity Test Site. In the past weeks, Michael E. Ketterer, (Professor Emeritus, Chemistry and Biochemistry, Northern Arizona University, Flagstaff, AZ) has completed a short “proof of principle” study that directly investigates where plutonium in soils originates by analyzing isotopic ratios, in a known portion of the Trinity Test plume.

Dr. Ketterer sampled soils along highways NM 42, US 54, NM 55, US 60, and US 380. The isotopes show that there is definitely plutonium from the Trinity Test in the northeast plume, and distinguishes it from global (stratospheric) background and New Mexico regional background from Nevada Test Site fallout. Soils along all five of these highways contain plutonium that reflects mixtures of Trinity Test debris and global/Nevada regional background fallout; in some cases, nearly 100% of the Pu originates from the Trinity Test.

While Dr. Ketterer has not encountered any activities (expressed as Bq/kg or pCi/g, Becquerels or picocuries respectively) of plutonium that cause alarm from the radio-toxicity standpoint, there’s very limited data.

Biden Releases Record NNSA Nuclear Weapons Budget

FOR IMMEDIATE RELEASE, March 14, 2023
Jay Coghlan – 505.989.7342 | Email | Scott Kovac – 505.989.7342 | Email

Santa Fe, NM – President Biden has released his proposed FY 2024 budget for the Department of Energy’s semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). The budget for NNSA’s “Total Weapons Activities” for nuclear weapons research and production programs is slated to increase by 10% to $18.8 billion.

Of that $18.8 billion requested for FY 2024, over $3 billion is devoted to “Life Extension Programs” or “Alterations” that extend the service lives of existing nuclear weapons by decades while giving them new military capabilities. It also includes two new-design nuclear weapons, the W87-1 ICBM warhead (increased 50% to $1 billion) and the sub-launched W93 warhead (increased 62% to $390 million). Meanwhile, funding for dismantlements that provide a good nonproliferation example and save taxpayers’ money by eliminating long-term security costs is decreased by 4% to $53.7 million. That is a small fraction of one percent of NNSA’s Total Weapons Activities.

Two bright spots, yet still small relative to the U.S.’ planned $2 trillion nuclear weapons “modernization” program, are the zeroing out of funding for the Sea-Launched Cruise Missile (SLCM) warhead and stronger language on the retirement of the 1.2 megaton B83 bomb. Trump proposed to bring back nuclear-armed sea-launched cruise missiles, which were retired by President George H. Bush after the end of the Cold War. Biden’s 2022 Nuclear Posture Review canceled the SLCM, but Congress insisted on funding it, which will only grow stronger with Republican control the House.

In Response to Lawsuit, NNSA Releases FY 2022 Performance Evaluation Reports as “Frequently Requested Documents” as Required by FOIA; Reveals Pit Production Schedule is Likely Increasingly Delayed

FOR IMMEDIATE RELEASE, March 9, 2023
Jay Coghlan – 505.989.7342 | Email | Scott Kovac – 505.989.7342 | Email

Santa Fe, NM – Today, the National Nuclear Security Administration[1] (NNSA) finally posted its FY 2022 Performance Evaluation Reports to its electronic “FOIA Reading Room.” These reports are “Frequently Requested Documents” as defined by the Freedom of Information Act (meaning three or more requests) and are therefore required to be posted under the law. The catalyst for this was a lawsuit filed by Nuclear Watch New Mexico in September 2022.

NNSA’s Performance Evaluation Reports for its eight nuclear weapons research and production sites[2] grade annual contractor performance and award performance fees accordingly. Approximately 57,000 people are employed by the NNSA nuclear weapons complex, 95% of them contractor personnel. The Department of Energy and NNSA (or its predecessor DOE Defense Programs) have been on the independent Government Accountability Office’s “High Risk List” for project mismanagement and waste of taxpayers’ dollars since 1992.

Past Work Product (2020-2021)

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

Federal agencies continue to reject a full review of the public safety and environmental risks of producing nuclear bomb cores at multiple DOE sites.

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “The government has yet to explain to American taxpayers why it will spend more than $50 billion to build new plutonium pit bomb cores for new-design nuclear weapons when we already have thousands of existing pits proven to be reliable for a century or more. This has nothing to do with maintaining the safety and reliability of the existing stockpile and everything to do with building up a new nuclear arms race that will threaten the entire world.”

SRS WATCH / EIN PRESSWIRE October 26, 2021

AIKEN, SOUTH CAROLINA  — Public interest groups shot back at the U.S. Department of Energy and the National Nuclear Security Administration’s attempt to suppress a lawsuit seeking a comprehensive environmental review of the agencies’ plans to produce large quantities of nuclear bomb cores, or plutonium pits, at DOE sites in New Mexico and South Carolina.

Expanded Plutonium “Pit” Bomb Production Rules Over Genuine Cleanup Los Alamos Lab Plans to Make Existing Nuclear Waste Dumps Permanent Without Eliminating Threat to Groundwater

The Department of Energy (DOE) has submitted a report to the New Mexico Environment Department (NMED) declaring its preferred plan to “cap and cover” radioactive and toxic wastes at one of the Los Alamos National Laboratory’s (LANL’s) oldest dumps. DOE’s $12 million cleanup-on-the-cheap plan for Material Disposal Area C will create a permanent nuclear waste dump above our regional groundwater. In contrast, DOE has asked Congress for one billion dollars for expanded plutonium “pit” bomb core production at LANL for fiscal year 2022 alone.

LANL used to falsely claim that groundwater contamination was impossible and even asked NMED for a waiver from even having to monitor for it. We now know that there is extensive groundwater contamination from hexavalent chromium (the carcinogen in the Erin Brockovich movie) and high explosives. Traces of plutonium have been detected 1,300 feet under Area C in regional groundwater monitoring wells. The dump also has a large toxic gaseous plume of industrial solvents known as volatile organic compounds (VOCs) which threatens nearby facilities.

Lawsuit Filed Against Biden Administration Over Nuclear Bomb Core Production Plans

Federal agencies’ refusal to review cross-country expansion of plutonium pit production violates the National Environmental Policy Act and the Administrative Procedures Act, groups say.

AIKEN, S.C. – Today, a coalition of community and public interest groups filed a lawsuit against the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA). This legal action is prompted by the agencies’ failure to take the “hard look” required by the National Environmental Policy Act at their plans to more than quadruple the production of plutonium pits and split their production between the Los Alamos National Laboratory in New Mexico and the Savannah River Site in South Carolina.

South Carolina Environmental Law Project logo

MEDIA ADVISORY – South Carolina Environmental Law Project and Nuclear Watchdogs Hold Virtual Press Conference

WHAT:

Public interest groups will hold a press conference for a major announcement of a forthcoming legal action as the U.S. Department of Energy and the National Nuclear Security Administration forge ahead with plans to drastically expand production of plutonium pits, the cores of nuclear weapons, at the Savannah River Site in South Carolina and the Los Alamos National Lab in New Mexico. The legal action follows previous unanswered requests from the groups to DOE and NNSA as seen in correspondence in February and April.

Following New Mexico Environment Department Lawsuit DOE Dramatically Increases Funding for Los Alamos Lab Cleanup

Santa Fe, NM – The Biden Administration has finally released budget details for Department of Energy (DOE) programs that clean up Cold War contamination and radioactive and toxic wastes. In January the New Mexico Environment Department sued DOE in order to terminate a 2016 “Consent Order” that subordinated cleanup at the Los Alamos National Laboratory (LANL) to the budget that DOE wants, which is increased nuclear weapons production. The Biden Administration has responded by increasing proposed cleanup funding at the Lab by 33% from $226 million in FY 2021 to $333.5 million proposed for FY 2022 (which begins October 1, 2021).

Biden Continues Trump’s Bloated Nuclear Weapons Budget

Will That Change in Future Years?

Santa Fe, NM – In a classic move that discouraged media coverage, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) released its long delayed FY 2022 Congressional Budget Request around 7:30 pm EST Friday, May 28, at the very beginning of the long Memorial Day weekend.

Nuclear Watch New Mexico strongly opposed the 25% FY 2021 increase that the Trump Administration bequeathed to NNSA’s nuclear weapons programs. That massive increase was originally sold in testimony to Congress as essential to maintaining the nuclear deterrence but later revealed as necessary to cover NNSA cost overruns and blown schedules.[i]

75TH ANNIVERSARY HIROSHIMA DAY ONLINE COMMEMORATION CALLING FOR THE ABOLITION OF NUCLEAR WEAPONS
August 6, 2020

"Jay Coghlan of Nukewatch.org on the history of the Los Alamos labs, where the bomb was designed and fabricated, and how it continues to play the leading role in the creation of most U.S. nuclear weapons since then."

[embeddoc url="https://nukewatch.org/wp-content/uploads/2020/05/plutonium-pit-production-fact-sheet.pdf" download="all" viewer="browser"]

PLUTONIUM PIT PRODUCTION WORKSHOP – NOVEMBER 19, 2019

RADIO INTERVIEW – SCOTT KOVAC & JON LIPSKY

Scott Kovac of Nuclear Watch New Mexico and Jon Lipsky, the FBI agent who led the 1989 raid investigating environmental crimes that shut down the Rocky Flats Nuclear Bomb Plant join Xubi to talk about Nuclear weapons, Nuclear clean up and Pit production plans at LANL.

livingontheedge.libsyn.com

RADIO INTERVIEW – JAY COGHLAN & JON LIPSKY

PIT Production at LANL with Nuclear Watch New Mexico’s Jay Coghlan and Workshop Speaker, Jon Lipsky

The Richard Eeds Show 11/18

RADIO INTERVIEW – MARYLIA KELLEY, EXECUTIVE DIRECTOR, TRI-VALLEY CARES

Nuclear Watch NM’s Workshop on LANL & PIT Production with Marylia Kelley of Tri-Valley CARES

The Richard Eeds Show 11/19


Pit Production Workshop: View the Presentations

Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant

Introduction by Jay Coghlan

Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL

Marylia Kelly, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race

https://www.facebook.com/NukeWatch.NM/videos/825812604488302/

Scott Kovac Nuclear Watch New Mexico, on LANL cleanup issues

Blog Posts

RECA Advocates on Capitol Hill Renew Push for Nuclear Radiation Victim Compensation This Week

This week saw important developments surrounding the Radiation Exposure Compensation Act (RECA), which provides compensation to individuals affected by U.S. nuclear testing and uranium mining and expired in June earlier this year, leaving many who were exposed to radiation without compensation. Advocates and lawmakers are intensifying efforts to push Speaker Mike Johnson to bring RECA back to the House floor for a vote.

Two Native American women, Linda Evers and Tina Cordova, have been at the forefront of this fight, advocating tirelessly to preserve and extend RECA’s provisions. Their work has resonated powerfully, especially in New Mexico, where uranium mining and nuclear tests have left entire communities facing severe health crises. These populations have been disproportionately impacted by radiation and suffered from generations of exposure to radioactive contamination, leading to chronic illnesses, cancers, and premature deaths. The situation is especially dire for Native American and rural communities, who have long borne the brunt of this toxic legacy, with little to no compensation or acknowledgment. The fight to extend RECA is not just about justice—it’s about survival for those still suffering the long-term effects of these catastrophic policies.

In a recent Washington, D.C. event, activists from New Mexico voiced their frustrations over the lack of progress, pushing lawmakers to extend the act and increase compensation limits. See more on this in the news report above from KOB 4.

Fate of interim storage at Supreme Court could be decided by October

Nuclear Waste ‘Interim’ Storage Updates

In June 2024, Holtec International, along with the U.S. Nuclear Regulatory Commission (NRC) and the Department of Justice, petitioned the U.S. Supreme Court to review a March ruling by the Fifth Circuit Court that vacated Holtec’s license to build a nuclear waste interim storage facility in New Mexico. The Fifth Circuit’s basis to vacate the license is that the NRC lacks the authority to license private interim storage sites like Holtec’s in New Mexico and a similar facility in Texas operated by Interim Storage Partners (ISP). Holtec’s petition to the Supreme Court aims to reverse the lower court’s ruling and allow the construction of the facility in southeastern New Mexico, which would store spent nuclear fuel “temporarily” while awaiting a permanent disposal solution.

Holtec contends that their operations are safe and necessary for managing the nation’s growing stockpile of nuclear waste. These sites and any transport to these sites are not only dangerous but environmentally unjust. New Mexico’s demographic is largely Latino. There are many communities of color, especially in the southern part of the state where the sites are being proposed. These sites present clear examples of environmental racism; people of color would be disproportionately affected if the Holtec/ISP CIS site were licensed and constructed.

For more background information, see:

Keeping a (Nuke)Watchful Eye on Consolidated Interim Storage: No High-Level Waste To New Mexico

Key dates include the petition being docketed on June 27, 2024, and scheduled for the Supreme Court’s conference on September 30, 2024. During this conference, the justices will decide whether the Supreme Court agrees to hear the case (grants certiorari). If it does, oral arguments may be scheduled in late 2024 or early 2025, with a decision expected afterward. The timeline for any Supreme Court ruling could vary, but such cases often take several months for a decision following the grant of certiorari.

For more information, see also: exchangemonitor.com/fate-of-interim-storage-at-supreme-court-could-be-decided-by-october

High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up

In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.

On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.

NNSA Town Hall July 22nd – Hruby: “We have to limit the growth of Los Alamos Laboratory…”

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) Los Alamos Field Office held a Town Hall event hosted by the DOE National Nuclear Security Administration (NNSA) and EM on Monday, July 22, in Santa Fe. The Town Hall was led by NNSA’s Jill Hruby and EM’s Senior Advisor Candice Robertson. The intent according the event flier was to “engage with the community, provide updates, and address concerns related to the DOE’s activities and initiatives.”

The public comment period began with Jay Coghlan, executive director of NukeWatch NM, reading aloud a statement from Archbishop John C. Wester to the DOE, NNSA and EM.

“Nuclear disarmament is a right to life issue. No other issue can cause the immediate collapse of civilization. In January 2022 I wrote a pastoral letter in which I traced the Vatican’s evolution from its uneasy conditional acceptance of so-called deterrence to Pope Francis’ declaration that the very possession of nuclear weapons is immoral.  https://archdiosf.org/living-in-the-light-of-christs-peace “Therefore, what does this say about expanded plutonium pit production at the Los Alamos Lab? And what does it say about the obscene amounts of money that are being thrown at pit production, often excused as job creation?

“What does this say about the fact that the [NNSA] is pursuing expanded pit production without providing the public the opportunity to review and comment as required by the National Environmental Policy Act? I specifically call upon NNSA to complete a new LANL Site-Wide Environmental Impact Statement.

“I have a simple message for NNSA and the nuclear weapons labs. You’re very good at creating them. Now show us how smart you are by demonstrating how to get rid of nuclear weapons. Stop this new arms race that threatens all of civilization. Let’s preserve humanity’s potential to manifest God’s divine love toward all beings.

READ FULL STATEMENT

NNSA adminstrator Jill Hruby began the event with a spiel about Russia continuing their nuclear saber rattling and China aquiring over 1500 nuclear weapons by 2025. She said NNSA is putting the pressure on to develop 7 weapons

Jill Hruby intro:

A lot has changed in the last 15 months. At the highest level Russia continues its full scale invasion of Ukraine including nuclear Saber rattling and the takeover of the Zaporizhia nuclear power plant. It has violated most nuclear norms and most recently seems to be exploring using nuclear weapons in space. China is projected to have 1500 nuclear warheads by the year 2035 and continue to express an intent to take over Taiwan, their technology advancement is significant, and the combination of China and Russia now means that parity in the number of nuclear weapons doesn’t make any sense. In addition, we have North Korea and Iran that are still players in this world and the cooperation between all of them is also advancing. But what I want to say is despite these advances, we do not want an arms race, this administration doesn’t want a new arms race, the NNSA doesn’t want an arms race. We’re trying to exercise leadership and transparency, but we also can’t sit on our hands, and so we’re trying to find the balance.

Keeping a (Nuke)Watchful Eye on Consolidated Interim Storage: No High-Level Waste To New Mexico

If you follow news on nuclear waste, you know that the federal government is required by law to have a permanent disposal plan for our nation’s nuclear waste before engaging in temporary storage, or “consolidated interim storage” for commercial spent nuclear fuel. There are currently about 86,000 metric tons of this fuel in the U.S., stored on-site at operating or shutdown nuclear power plants in 33 states, an amount that continues to grow by about 2,000 metric tons a year (GAO). This is waste generated by nuclear power plants called ‘high-level radioactive waste’ (HLW), also known as ‘spent’ or ‘irradiated’ fuel. This waste contains plutonium, uranium, strontium, and cesium; it is most toxic and dangerous type of radioactive waste created by the nuclear industry and will be radioactive for millions of years.

Two private companies “Holtec” and “Interim Storage Partners” are proposing to build and operate facilities for HLW called “Consolidated Interim Storage Facilities (CISF)” in New Mexico and Texas. While federal law requires the government to have a permanent disposal solution, it does not explicitly prevent private entities from offering interim storage solutions. Enter money-gobbling Holtec and ISP.

Your NukeWatch NM Team in DC!

Your Nuclear Watch New Mexico team has just returned from a weeklong trip to Washington D.C. (we went so you don’t have to!). We proudly joined the Alliance for Nuclear Accountability (ANA) in their annual “DC Days” conference and following Spring Meeting, where over 60 individuals from 30+ groups journeyed to DC to lobby congress on nuclear weapons, energy, and waste policy on behalf of the frontline nuclear communities we represent. From across the U.S. near nuclear complex sites in Georgia, New Mexico, Tennessee, California, Missouri, Colorado, Idaho, Michigan and beyond, members were present from the following groups: Beyond Nuclear, Georgia Women’s Action for New Directions, Nuclear Age Peace Foundation, Nuclear Watch New Mexico, Oak Ridge Environmental Peace Alliance, Parents Against Santa Susana Field Laboratory, Peaceworks Kansas City, Physicians for Social Responsibility – Los Angeles & Wisconsin, Rocky Mountain Peace & Justice Center, Snake River Alliance, Southwest Research and Information Center, Tri-Valley Communities Against a Radioactive Environment, and Women’s International League for Peace and Freedom. There were also a number of individual attendants participating from groups not currently affiliated with ANA as official members, notably more than previous years, which lends optimism for the potential growth of DC Days and ANA as a whole.

Recent Project: Plutonium Sampling at the Los Alamos National Lab

NukeWatch has recently published a project on plutonium sampling at Los Alamos National Laboratory showing plutonium migration and contamination into the groundwater at and around the lab. See more: 

In order to accomplish this, we gathered data from LANL's own Intellus database, and mapped and charted it using excel and eventually JavaScript here

Interactive Map: Plutonium Contamination and Migration Around LANL

Jay Coghlan/NukeWatch NM Letter to the Editor: Santa Fe Reporter March 20, 2024

By Jay Coghlan, The Santa Fe Reporter |

(EFF Designer Hannah Diaz)

Cover, March 13: “The Foilies”

THE GREATEST FOILIE OF ALL

The Reporter should stick around in its own back yard for the “The Foilies: Recognizing the worst in government transparency.” IMHO, it’s all small potatoes compared to the National Nuclear Security Administration (NNSA) and the Los Alamos National Laboratory (LANL) with their ~$60 billion program to expand production of plutonium pits, the critical (pun intended) cores of nuclear weapons. NNSA has no credible cost estimates for its most expensive and complex program ever. It has not conducted public reviews as legally required by the National Environmental Policy Act. Pit production will create more contamination and more radioactive wastes. New pits can’t be full-scale tested because of the international testing moratorium, which could erode confidence in stockpile reliability. Worse yet, it could prompt the US to return to full-scale testing, which would have serious global proliferation consequences.

Transparency? NNSA heavily redacts LANL’s “Performance Evaluation Report” on how taxpayers’ money is spent. Years go by before Freedom of Information Act requests are honored. And yet LANL and the NNSA are all too eager to lead us into a new nuclear arms race that could end civilization overnight.

Jay Coghlan
Nuclear Watch New Mexico, Santa Fe

What’s Not in NNSA’s Plutonium Pit Production Decision

 Today the National Nuclear Security Administration (NNSA) announced:

To achieve DoD’s [the Defense Department] 80 pits per year requirement by 2030, NNSA’s recommended alternative repurposes the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site in South Carolina to produce plutonium pits while also maximizing pit production activities at Los Alamos National Laboratory in New Mexico.  This two-prong approach – with at least 50 pits per year produced at Savannah River and at least 30 pits per year at Los Alamos – is the best way to manage the cost, schedule, and risk of such a vital undertaking.

First, in Nuclear Watch’s view, this decision is in large part a political decision, designed to keep the congressional delegations of both New Mexico and South Carolina happy. New Mexico Senators Tom Udall and Martin Heinrich are adamantly against relocating plutonium pit production to South Carolina. On the other hand, South Carolina Senator Lindsay Graham was keeping the boondoggle Mixed Oxide (MOX) program on life support, and this pit production decision may help to mollify him. This could also perhaps help assuage the State of South Carolina, which is suing the Department of Energy for failing to remove plutonium from the Savannah River Site as promised.

But as important is what is NOT in NNSA’s plutonium pit production decision:

  There is no explanation why the Department of Defense requires at least 80 pits per year, and no justification to the American taxpayer why the enormous expense of expanded production is necessary.

•  NNSA avoided pointing out that expanded plutonium pit production is NOT needed to maintain the safety and reliability of the existing nuclear weapons stockpile. In fact, no production of plutonium pits for the existing stockpile has been scheduled since 2011, and none is scheduled for the future.

•  NNSA did not mention that in 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old. The independent expert study did not find any end date for reliable pit lifetimes, indicating that plutonium pits could last far beyond just a century.

• NNSA did not mention that up to 15,000 “excess” pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in “strategic reserve.” The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits.

•  Related, NNSA did not explain how to dispose of all of that plutonium, given that the MOX program is an abysmal failure. Nor is it made clear where future plutonium wastes from expanded pit production will go since operations at the troubled Waste Isolation Pilot Plant are already constrained from a ruptured radioactive waste barrel, and its capacity is already overcommitted to existing radioactive wastes.

•  NNSA did not make clear that expanded plutonium pit production is for a series of speculative future “Interoperable Warheads.” The first IW is meant to replace nuclear warheads for both the Air Force’s land-based and the Navy’s sub-launched ballistic missiles. The Obama Administration delayed “IW-1” because the Navy does not support it. However, the Trump Administration is restarting it, with annual funding ballooning to $448 million by 2023, and “IW-2” starting in that same year. Altogether the three planned Interoperable Warheads will cost at least $40 billion, despite the fact that the Navy doesn’t support them.[1]

•  NNSA’s expanded plutonium pit production decision did not mention that exact replicas of existing pits will NOT be produced. The agency has selected the W87 pit for the Interoperable Warhead, but its FY 2019 budget request repeatedly states that the pits will actually be “W87-like.” This could have serious potential consequences because any major modifications to plutonium pits cannot be full-scale tested, or alternatively could prompt the U.S. to return to nuclear weapons testing, which would have severe international proliferation consequences.

•  The State of South Carolina is already suing the Department of Energy for its failure to begin removing the many tons of plutonium at the Savannah River Site (SRS). NNSA’s pit production decision will not solve that problem, even as it will likely bring more plutonium to SRS.

•  The independent Defense Nuclear Facilities Safety Board has expressed strong concerns about the safety of plutonium operations at both the Los Alamos National Laboratory (LANL) LANL and SRS, particularly regarding potential nuclear criticality incidents.[2] NNSA did not address those safety concerns in its plutonium pit production decision.

•  Politicians in both New Mexico and South Carolina trumpet how many jobs expanded plutonium pit production will create. Yet NNSA’s expanded plutonium pit production decision does not have any solid data on jobs produced. One indicator that job creation will be limited is that the environmental impact statement for a canceled $6 billion plutonium facility at LANL stated that it would not produce a single new Lab job because it would merely relocate existing jobs. Concerning SRS, it is doubtful that pit production could fully replace the jobs lost as the MOX program dies a slow death. In any event, there certainly won’t be any data on the greater job creation that cleanup and renewable energy programs would create. Funding for those programs is being cut or held flat, in part to help pay for nuclear weapons programs.

•  Finally, the National Environmental Policy Act (NEPA) requires that major federal proposals be subject to public review and comment before a formal decision is made. NNSA’s decision does not mention its NEPA obligations at all. In 1996 plutonium pit production was capped at 20 pits per year in a nation-wide Stockpile Stewardship and Management Programmatic Environmental Impact Statement (PEIS). NNSA failed to raise that production limit in any subsequent NEPA process, despite repeated attempts. Arguably a decision to produce 80 pits or more per year requires a new or supplemental nation-wide programmatic environmental impact statement to raise the production limit, which the new dual-site decision would strongly augment. This then should be followed by whatever site-specific NEPA documents might be necessary.

Jay Coghlan, Nuclear Watch Director, commented, “NNSA has already tried four times to expand plutonium pit production, only to be defeated by citizen opposition and its own cost overruns and incompetence. But we realize that this fifth attempt is the most serious. However, we remain confident it too will fall apart, because of its enormous financial and environmental costs and the fact that expanded plutonium pit production is simply not needed for the existing nuclear weapons stockpile. We think the American public will reject new-design nuclear weapons, which is what this expanded pit production decision is really all about.”

# # #

[1]     See 2012 Navy memo demonstrating its lack of support for the Interoperable Warhead at https://nukewatch.org/importantdocs/resources/Navy-Memo-W87W88.

[2]     For example, see Safety concerns plague key sites proposed for nuclear bomb production, Patrick Malone, Center for Public Integrity, May 2, 2108, https://www.usatoday.com/story/news/nation/2018/05/02/safety-concerns-nuclear-bomb-manufacture-sites/572697002/

 

NNSA Albuquerque Complex gets new $202 million facility, nuclear weapons money near doubles

See the National Nuclear Security Administration’s brief press release below on a new facility for its Albuquerque Complex.

Nuclear weapons spending for NNSA’s Albuquerque Complex nearly doubled from $312 million in FY 2018 to $604.4 million in FY 2019. Within that, Directed Stockpile Work nearly tripled from $133.4 million in FY 2018 to $338.9 million in FY 2019. Directed Stockpile Work is the hands-on nuclear weapons work, the biggest single element of which is “Life Extension Programs” that extend the service lives of existing nuclear weapons by up to 60 years, while also endowing them with new military capabilities.

The NNSA’s FY 2019 budget request justifies the new 333,000 square feet, $202 million Albuquerque Complex Project as follows:

Justification
The NNSA Albuquerque Complex provides vital services to the agency. The Albuquerque Complex houses multiple organizations that fulfill unique and essential roles within the nuclear weapons enterprise by providing programmatic, technical support, legal, security, procurement, human resources, business and administrative functions that directly support the NNSA national security mission. The proximity of the Albuquerque Complex to two NNSA national laboratories and the Air Force Nuclear Weapons Center on Kirtland Air Force Base makes it an ideal location for an NNSA field installation. The Albuquerque Complex has supported the DOE/NNSA from this location for over 50 years, and there are no plans to eliminate or reduce the size or function of this office in the near future. NNSA has a long-term commitment at this installation, and it will remain the primary field support office for NNSA.

In the old days the DOE Albuquerque Office pretty much ran the DOE nuclear weapons complex, until it screwed up the Rocky Flats Plant so bad that DOE HQ in Washington, DC pulled most of its power away. DOE Albuquerque Office officials were likely one of the targets of the Rocky Flats grand jury, but in 1992 those indictments were quashed and sealed by the federal judge in Colorado.

It looks like power is flowing back to NNSA’s Albuquerque Complex. As the FY 2019 budget justification states, it is ideally located near two of the nation’s three nuclear weapons labs (Los Alamos and Sandia) and next door to the Air Force’s Nuclear Weapons Center (which, for example, handles many billions of dollars in contracts for the Air Force’s new nuclear weapons-related acquisitions, such as the Long Range Standoff cruise missile and future ICBMs).

* * *

National Nuclear Security Administration
U.S Department of Energy
For Immediate Release
April 24, 2018
Contact:  NNSA Public Affairs, (202) 586-7371

Albuquerque Complex Project authorized to begin construction

WASHINGTON – The Department of Energy’s National Nuclear Security Administration (DOE/NNSA) authorized the start of construction of the Albuquerque Complex Project on April 20.

The project will provide a modern, safe, and reliable workspace for approximately 1,200 employees in Albuquerque, New Mexico, who support NNSA’s vital national security missions.

“Our dedicated employees at sites across the country deserve high-quality workspace,” said Lisa E. Gordon-Hagerty, DOE Under Secretary for Nuclear Security and NNSA Administrator.  “The Albuquerque Complex Project demonstrates NNSA’s commitment to achieving this goal and modernizing our infrastructure.”

Roughly 98 percent of NNSA’s combined federal and contractor workforce is located outside of the Washington, D.C. area.

The project will allow disposition of the current Albuquerque Complex, reducing NNSA’s total deferred maintenance by approximately $40 million.  It will also replace the existing complex of 25 buildings with a single, state-of-the-art facility.

###

Established by Congress in 2000, NNSA is a semi-autonomous agency within the U.S. Department of Energy responsible for enhancing national security through the military application of nuclear science. NNSA maintains and enhances the safety, security, and effectiveness of the U.S. nuclear weapons stockpile without nuclear explosive testing; works to reduce the global danger from weapons of mass destruction; provides the U.S. Navy with safe and effective nuclear propulsion; and responds to nuclear and radiological emergencies in the U.S. and abroad. Visit www.energy.gov/nnsa for more information.

Call to action! Comments Against WIPP Expansion Needed By April 3rd

Call to action!

Comments on WIPP Expansion Needed By April 3rd

Informational Meeting Is March 8th

 

New Mexico is under growing nuclear attack.

·      Plutonium pit production increases are planned for Los Alamos.

·      There are serious plans for all of the nation’s commercial spent nuclear fuel to head to NM.

·      WIPP has a major expansion in the works to allow even more radioactive waste into NM.

Today we ask you to join with others to stop a proposed major Waste Isolation Pilot Plant (WIPP) expansion. Officials at the WIPP are proceeding with a deluge of permit modifications to try to get as much weakening of the Hazardous Waste Permit as they can before 2019.

Because DOE is so far behind emplacing waste at WIPP, including because of the three-year shutdown from the 2014 radiation release, and they are running out of underground space, they want to change the way waste volume is measured. Since the 1970s, DOE has agreed that the amount of waste is the volume of the outer-most container. Now, DOE wants to estimate the amount of waste inside each container and use that lesser amount.

By April 3, we need You to submit written comments opposing DOE’s request. If possible, you can find out more at a public meeting (which isn’t for public comments):

“Clarification” of TRU Mixed Waste Disposal Volume Reporting

Thursday, March 8, 2018 3 – 5 p.m.
Courtyard by Marriott, 3347 Cerrillos Road, Santa Fe, New Mexico

DOE’s request is at: http://wipp.energy.gov/rcradox/rfc/Volume_of_Record.pdf

 

What to expect at this March 8 meeting:

·      Interested people, including NM Environment Department officials, gathered to discuss this issue in one of the smaller conference rooms

·      Optional sign-in sheet, and DOE handouts of their presentation

·      A presentation of the proposed plan by DOE

·      Question and answer period – Make sure you get all your questions answered

·      No opportunity for formal public comments

 

WIPP is now filling Panel 7 (of 10 originally proposed), which is about 70% of the space. But WIPP has only emplaced ~92,700 m3 of waste (about 53% of the 175,564 m3 allowed). DOE has “lost” more than 30,000 m3 of space by its inefficiency and contractor incompetence. Measuring the waste the proposed new way decreases the ‘amount of waste’ emplaced to date by ~26,000 m3.

The proposed modification is controversial and is part of a larger plan to expand WIPP, but is submitted as a Class 2 Permit Modification Request (PMR), which has lesser public input opportunities.  The public has opposed WIPP expansion for years and decades.  There is significant public concern and interest in the WIPP facility. This PMR should be a Class 3, which includes much more public input, a formal public hearing — a process that could take up to a year.

We will provide sample comments by April 3rd, but your comments are just as important.

The complete Permit Modification Request is here –

http://www.wipp.energy.gov/rcra-com-menu.asp

Class 2 Permit Modification Request Clarification of TRU Mixed Waste Disposal Volume Reporting Waste Isolation Pilot Plant Permit, Number NM4890139088-TSDF dated January 31, 2018

http://www.wipp.energy.gov/rcradox/rfc/18-0308_Redacted_enclosure.pdf

 

By April 3, please mail or fax or e-mail comments to:

Mr. Ricardo Maestas

New Mexico Environment Department

2905 Rodeo Park Drive East, Building 1

Santa Fe, NM 87505

Fax: 505-476-6030

E-mail: [email protected]

New Radiation Symbol

The Regional Coalition of LANL Communities: Benefits for the Select Few

 According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County’s 46th district in the state House of Representatives.

Perhaps more serious is the fact that Romero was awarded an undisclosed amount of money by the Venture Acceleration Fund (VAF) for her private business Tall Foods, Tall Goods, a commercial ostrich farm in Ribera, NM. According to a May 8, 2017 Los Alamos Lab news release announcing the award to Tall Foods, Tall Goods, “The VAF was established in 2006 by Los Alamos National Security [LANS], LLC to stimulate the economy by supporting growth-oriented companies.”[1] LANS, primarily composed of the Bechtel Corporation and the University of California, has held the annual ~$2.4 billion Los Alamos National Laboratory (LANL) management contract since June 2006.

The Regional Development Corporation administers the Venture Acceleration Fund.[2] It states that the median VAF award in 2017 was $41,000, and that preference is given to companies that “Have an association with LANL Technology or Expertise.” [3]

It is, at a minimum, unseemly for the Executive Director of the Regional Coalition, which lobbies for increased LANL funding, to receive funding for her private business from LANS, who runs LANL.[4] Ultimately that funding for her private business comes from the American taxpayer.

Romero’s employer, the Regional Coalition, is overwhelmingly funded by the Department of Energy (DOE) and the Los Alamos County government, which receives more than $30 million dollars annually from the Lab through state gross receipts taxes. The Regional Coalition has been lobbying the New Mexico legislature to pass a state law requiring that LANL continue to pay gross receipts tax in the event that its management contract is taken over by a nonprofit university.[5] If successful, that would help to ensure the Regional Coalition’s funding stream.

Concerning the “adequate funding for LANL” that the Regional Coalition lobbies for, LANL’s annual ~$2.4 billion budget is now 70% for core nuclear weapons research and production programs, while much of its remaining funding either directly or indirectly supports those programs. In partial contradiction, the Cities and Counties of Santa Fe and Taos, which belong to the RCLC, have at various times passed resolutions against expanded plutonium pit production for nuclear weapons and/or called for genuine comprehensive cleanup at the Lab.

Despite its rhetoric on producing jobs through cleanup, the Regional Coalition has yet to take a position advocating for genuine comprehensive cleanup at LANL. Instead, the Coalition seems to condone DOE and LANL plans to “cap and cover” and leave ~150,000 cubic meters of radioactive and toxic wastes permanently buried in unlined pits and trenches at the Lab’s largest waste dump, Area G.[6] This will create a permanent nuclear waste dump above the regional groundwater aquifer, three miles uphill from the Rio Grande. Radioactive and toxic wastes are buried directly in the ground without liners, and migration of plutonium has been detected 200 feet below Area G’s surface.[7]

In September 2016 the Department of Energy released a 2016 Lifecycle Cost Estimate Summary[8] of proposed future cleanup at LANL, which RCLC Executive Director Romero hailed as:

The Lifecycle Baseline documentation provides our communities the necessary foundation to properly advocate on behalf of the best possible scenarios for cleaning up legacy nuclear waste at the Laboratory in the most time and cost-efficient manner. After years of requests for this document, we now have the tool that can get us to additional cleanup dollars to get the job done.[9]

However, at the beginning of the 2016 Lifecycle Cost Estimate Summary DOE declares that “An estimated 5,000 cubic meters of legacy waste remains, of which approximately 2,400 cm [cubic meters] is retrievably stored below ground”, a claim which was widely reported in New Mexican media. From there DOE estimated that it would cost $2.9 to $3.8 billion to complete so-called cleanup around 2040, which is woefully low. The DOE report omits any mention of the ~150,000 cubic meters of poorly characterized radioactive and toxic wastes at Area G, an amount 30 times larger than DOE acknowledges. As a partial result, DOE funding for cleanup at LANL remains flat at around $190 million per year, when the New Mexico Environment Department is on record that $250 million per year is needed.

Jay Coghlan, Nuclear Watch Director, commented,

New Mexicans often hear from the Department of Energy and our congressional delegation how nuclear weapons programs economically benefit us. If that’s the case, why is it that New Mexico has fallen from 37th in per capita income in 1957 to 48th in 2017? [10] Why is it that while Los Alamos County is the second richest county in the USA, Main Street Española hasn’t significantly changed for the better in the last 40 years? It’s clear that the economic benefits of the nuclear weapons industry go only to the select few, while to its shame New Mexico as a whole continues to be ranked as the second worst state for children.

# # #

[Copying URLs into browsers is recommended.]

[1]     LANL’ s May 8, 2017 news release Six northern New Mexico businesses awarded funds to boost growth is available at http://www.lanl.gov/discover/news-release-archive/2017/May/0518-6-nnm-business-awarded-funds.php

[2]     “The RDC [Regional Development Corporation] was incorporated in 1996 to serve as the Department of Energy (DOE) Los Alamos Site “Community Reuse Organization” (CRO). As a CRO, the RDC’s mission is to diversify the economy within the north central New Mexico region. As a result, the RDC maintains a special working relationship with both the DOE and Los Alamos National Laboratory (LANL).” https://rdcnm.org/about/

[3]     See https://web.archive.org/web/20190120214344/https://rdcnm.org/vaf/

[4]     The mission statement of the Regional Coalition of LANL Communities is

… the Regional Coalition works in partnership to create one voice to ensure national decisions incorporate local needs and concerns. The organization’s focus is community and economic development, site employment, environmental remediation, and adequate funding for LANL. The Regional Coalition of LANL Communities is comprised of nine cities, counties and pueblos surrounding the Department of Energy’s Los Alamos National Laboratory (LANL). https://regionalcoalition.org/about

[5]     Four universities are currently vying for the LANL management contract: Purdue (with corporate partner Bechtel), the University of California, the University of Texas, and Texas A&M (DOE Secretary Rick Perry’s alma mater). Corporate partners for the last three have not been disclosed.

[6]     Estimated quantities of waste at Area G (in cubic yards) are from Table G3.41, MDA G Corrective Measures Evaluation, 2011, LANS, p. G-13. See excerpts at https://nukewatch.org/importantdocs/resources/Area_G_Pit_Totals_from_CME_rev3_Sept-2011.pdf

[7]     Documentation of the plutonium detection 200 feet below the surface of Area G is at https://nukewatch.org/importantdocs/resources/AGCME Plate_B-3_radionuclides_subsurface.pdf

[8]     The Department of Energy’s 2016 Lifecycle Cost Estimate Summary for LANL cleanup is available at https://nukewatch.org/importantdocs/resources/LBC-Summary-Aug-2016.pdf

[9]     https://web.archive.org/web/20170124153124/http://www.santafenm.gov/news/detail/department_of_energy_release_important_baseline_study

[10]   NM per capita income at https://web.archive.org/web/20161206084557/http://www.bea.gov:80/regional/bearfacts/pdf.cfm?

Major LANL Cleanup Subcontractor Implicated in Fraud; Entire Los Alamos Cleanup Should Be Re-evaluated

 On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as “N3B”).[1] This award followed a DOE decision to pull cleanup from LANL’s prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen.

Tetra Tech Inc is a major subcontractor for N3B in the LANL cleanup contract. Tetra Tech is part of Tech2 Solutions, and will be responsible for the groundwater and storm water programs at LANL that are of intense interest to the New Mexico Environment Department and citizen environmentalists.[2] To date, these programs have been supported by several New Mexico small businesses that will be displaced by Tetra Tech.

Serious allegations of fraud by Tetra Tech were raised long before the LANL cleanup contract was awarded. The US Navy found that the company had committed wide spread radiological data falsification, doctored records and supporting documentation, and covered-up fraud at the Hunters Point Naval Shipyard cleanup project in San Francisco, CA. See media links and excerpts below.

The award of the LANL cleanup contract that includes Tetra Tech raises serious questions about the DOE’s contract evaluation and award process, and the Department’s due diligence in reviewing the performance histories of companies bidding for DOE work. To put this in broad perspective, the DOE’s nuclear weapons and cleanup programs have the singular distinction of being on the congressional Government Accountability Office’s High Risk List for fraud, waste and abuse since 1990.

Potential groundwater contamination is of intense interest to New Mexicans. As late as 1996 the Los Alamos Lab was officially declaring that groundwater contamination was impossible because the overlying volcanic tuff was “impermeable.” LANL even went so far as to request a waiver from NMED to not have to monitor groundwater contamination at all (which fortunately NMED denied). What the Lab, which advertises its “scientific excellence,” omitted to say is that the Parajito Plateau’s geology is highly complex and deeply fractured, providing ready pathways for contaminants to reach groundwater. Indeed, in just the last few months Nuclear Watch forced LANL to admit that its chromium hexavalent-6 groundwater contamination plume is much bigger than previously thought.[3]

Scott Kovac, Nuclear Watch Research Director, commented, “It took years for the DOE Environmental Management Office in Los Alamos to put a cleanup contract in place. We are seriously disappointed that there are major problems before the contract even starts. This situation shines a light on the cozy DOE contractor system, where every cleanup site has different combinations of the same contractors. Call it different trees, but the same old monkeys, where the real priority is to profit off of taxpayers dollars before a shovel turns over any waste.”

Jay Coghlan, Nuclear Watch Director, added, “The entire LANL cleanup program needs to be rethought.” In September 2016 DOE released a 2016 Lifecycle Cost Estimate Summary[4] of proposed future cleanup at LANL. At the beginning of that document the Department declared, “An estimated 5,000 cubic meters of legacy waste remains, of which approximately 2,400 cm [cubic meters] is retrievably stored below ground”, which was widely reported in New Mexican media. From there DOE estimated that it will cost $2.9 to $3.8 billion to complete so-called cleanup around 2040, which is woefully low.

However, the DOE report was far from honest. It intentionally omitted any mention of approximately 150,000 cubic meters of poorly characterized radioactive and toxic wastes just at Area G (LANL’s largest waste dump) alone, an amount of wastes 30 times larger than DOE admits in the 2016 Lifecycle Cost Estimate.

In reality, DOE and LANL plan to not clean up Area G, instead installing an “engineered cover” and leaving the wastes permanently buried. This will create a permanent nuclear waste dump above the regional groundwater aquifer, three miles uphill from the Rio Grande. Radioactive and toxic wastes are buried directly in the ground without liners, and migration of plutonium has been detected 200 feet below Area G’s surface.[5]

“In sum,” Coghlan concluded, “DOE should take a cue from the president and tell TetraTech “you’re fired!” Beyond that, after the current governor gets out of the way, the New Mexico Environment Department should completely reevaluate cleanup at LANL and force the Lab to genuinely clean up, which it is failing to do now.”

# # #

Media excerpts (copying URLs into browser is recommended):

June 29, 2017, well before the LANL cleanup contract was awarded- https://www.sfgate.com/bayarea/article/Ex-SF-Navy-shipyard-workers-allege-fraud-in-11257774.php

Ex-SF Navy shipyard workers allege fraud in radiation cleanup By J.K. Dineen Published 9:06 pm, Thursday, June 29, 2017 “The cleanup of radioactive contamination at the Hunters Point Shipyard was marred by widespread fraud, faked soil samples, and a high-pressure culture where speed was valued over accuracy and safety, according to four former site workers…” “Questions over the accuracy of the soil tests emerged in October 2012, when the Navy discovered that some results were inconsistent with results from previous samples collected in the same areas.” “In a statement, Tetra Tech spokesman Charlie MacPherson said the company “emphatically denies the allegations made by individuals at today’s news conference that Tetra Tech engaged in a cover-up of fraud on the Hunters Point Naval Shipyard.”

Jan 31, 2018: https://sf.curbed.com/2018/1/31/16956458/hunters-point-toxic-cleanup-navy-responds-san-francisco

Navy: Do-over of $250 million cleanup at Hunters Point necessary Unknown delay for city’s biggest redevelopment project By Chris Roberts@cbloggy “…According to a review of Tetra Tech’s data, triggered by allegations of fraud first made in 2011 and 2012, as much as half of Tetra tech’s work contains problems. That’s enough for the Navy to lose trust in all of the company’s data, Derek Robinson, the Navy’s coordinator for cleanup at the shipyard, said in an interview on Tuesday. “We’ve lost confidence” in Tetra Tech’s work, said Robinson. “All areas” at the shipyard where Tetra Tech did work will be re-tested, beginning as early as this summer… Problems with Tetra Tech’s data first surfaced in 2011 and 2012, when contractors and workers at the shipyard stepped forward with allegations of fraud…”

Jan 26, 2018 https://sf.curbed.com/2018/1/26/16916742/hunters-point-shipyard-toxic-cleanup Almost half of toxic cleanup at Hunters Point Shipyard is questionable or faked, according to initial review City’s goals for housing, affordable housing in doubt after fraud at city’s biggest redevelopment project “much worse” than thought By Chris Roberts@cbloggy,

[1]     See https://energy.gov/em/articles/doe-awards-new-los-alamos-legacy-cleanup-contract

[2]     See http://tech2.solutions/projects/lanl/

[3]     The dangers of chromium-hexavalent 6 were made famous in the film Erin Brocovitch.

[4]     The Department of Energy’s 2016 Lifecycle Cost Estimate Summary for LANL cleanup is available at https://nukewatch.org/importantdocs/resources/LBC-Summary-Aug-2016.pdf

[5]     Documentation of the plutonium detection 200 feet below the surface of Area G is at https://nukewatch.org/importantdocs/resources/AGCME Plate_B-3_radionuclides_subsurface.pdf

Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race

Late Friday February 23 the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] “Weapons Activities”, 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office’s High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990.

Under Trump’s budget, funding for nuclear warhead dismantlements stay flat at $56 million, (point).5% of NNSA’s total nuclear weapons budget, despite the fact that dismantlements save taxpayers by eliminating constant security costs.[1] NNSA’s Nonproliferation Programs are budgeted at $1.86 billion, only 16% the size of the nuclear weapons budget. Funding for DOE cleanup of Cold War legacy wastes remains flat, in a number of cases insufficient to meet legal milestones. Meanwhile, the Department of Energy cuts sustainable transportation, renewable energy and energy efficiency by 33%.

Some selected NNSA FY 2019 nuclear weapons budget highlights are:

  • Funding is tripled from $218.76 million to $654.77 million for the W80-4 Life Extension Program for a Long Range Standoff nuclear warhead,[2] (slated for $804 million in FY 2022). This is for a new dual-use air launched cruise missile (ALCM), which is particularly destabilizing because ALCMs can evade radar by hugging topography. In addition, the targeted adversary has no way of knowing until it is hit whether the payload is conventional or nuclear. The LRSO nuclear weapon is arguably redundant to the new B61-12 nuclear bomb, to be delivered by the new super-stealthy new B21 Raider heavy bomber (whose astronomical costs are kept classified by the Air Force).
  • Funding for the world’s first nuclear smart bomb, the B61-12, is increased from $611.9 million to $794 million, with a First Production Unit scheduled for March 2020. As part of the escalating Cold War II arms race, its main mission is to be forward deployed in NATO countries against Russia.
  • The Obama Administration had delayed the Interoperable Warhead (IW) for five years. The IW-1 is very much back as a $53 million FY 2019 budget line item, up from $0 in FY 2018. The NNSA and the nuclear weapons labs are proposing three different types of interoperable warheads, which all together could cost more than $40 billion.

The IW-1 is supposed to be interoperable between the Air Force’s W78 intercontinental ballistic missile warhead and the Navy’s W88 sub-launched warhead. However, a 2012 memo leaked to Nuclear Watch and Tri-Valley CAREs shows that the Navy never supported it.[3] In addition, NNSA is beginning a $3 billion “alteration” to the W88 that will refresh its high explosives and give it a new fuze, making the Navy even less inclined to support the IW. The Interoperable Warhead is a huge make work project for the labs, particularly the Lawrence Livermore National Laboratory.

Nevertheless, the IW is the programmatic drive for expanded production of plutonium pits at the Los Alamos National Laboratory (LANL), which will incur many more billions in costs.

  • Trump’s recently released Nuclear Posture Review proposed quick development of a low-yield sub-launched Trident missile warhead. While not yet a separate budget line item, NNSA’s FY 2019 hints at dedicated funding next year:

The 2018 Nuclear Posture Review states that the United States will modify a small quantity of existing SLBM [submarine launched ballistic missiles] warheads to provide a low-yield option in the near-term. As the Nuclear Weapons Council translates policy into military requirements, the Administration will work with Congress for appropriate authorizations and appropriations to develop options that support the modification. (P. 80)

  • Plutonium Sustainment” is nearly doubled from $184 million to $361 million. NNSA’s FY 2019 budget says this will:

[S]upport fabrication of four to five development (DEV) W87 pits… and the selection of a single preferred alternative for plutonium pit production beyond 30 war reserve pits per year… (P. 57)

The increase represents the following:

Supports additional personnel, equipment, and certification activities needed to ramp pit production to meet mandated pit production requirements.

Supports additional infrastructure investments to meet requirements by the Nuclear Weapons Council to produce no fewer than 80 war reserve pits per year. (P. 117)

  This is significant for a number of reasons. First, as mentioned above, “plutonium pit production beyond 30 war reserve pits per year” is driven by the Interoperable Warhead, which the Navy doesn’t want and is a radically different design that could prompt a return to full-scale nuclear weapons testing. The existing stockpile does not need pit production. Future production is all about future new nuclear weapons designs.

The W87 pits mentioned above are for the Interoperable Warhead. Inside sources indicate that they will not be exact replicas, but instead may have additional built-in “surety” mechanisms to prevent unauthorized use. A serious concern is that any changes to the pit design could perturb the symmetrical implosion process of the plutonium pit, thereby potentially degrading confidence in weapons reliability.

Finally, there are serious doubts that the Los Alamos National Laboratory, the current site of plutonium pit production, is capable of more producing more than 30 pits per year.[4] This may lead to the relocation of the plutonium pit production mission to the Savannah River Site in South Carolina, or more likely in Nuclear Watch’s view production at both places.[5]

Despite the uncertainty of where future expanded plutonium pit production is going to be located, the Chemistry and Metallurgy Research Replacement Project at LANL is slated to be increased from $181 million in FY 2018 to $235 million in FY 2019. Increasing the plutonium limit 10-fold to 400 grams in the CMRR “Rad Lab” is the main priority, for which NNSA has just issued notice of an environmental assessment.[6] The purpose of the increase is to dramatically expand the Rad Lab’s capabilities for materials characterization[7] and analytical chemistry,[8] all in direct support of expanded plutonium pit production.[9]

  • The Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, TN, is increased to $703 million from $663 million, and is projected to go to $750 million in FY 2021, with construction to start soon. The UPF will produce future thermonuclear components that put the “H” in H-bomb. It was halted after a half-billion design mistake for which no one was held responsible, and a Defense Department estimate that it would cost $19 billion.

NNSA’s FY 2019 budget repeats the original claim that the UPF will cost only $6.5 billion. However, after downscoping the original UPF because of costs, NNSA now omits the costs of continued operations at two dangerous old facilities previously slated for decontamination and decommissioning.[10] Moreover, after a team of Lockheed Martin and Bechtel won the Y-12 management contract, it awarded UPF construction to Bechtel without competition. Bechtel is responsible for some of the biggest cost overruns in the DOE complex, for example the Waste Treatment Facility at Hanford (originally $3.5 billion, now $13.5 billion and may never work).

Jay Coghlan, Nuclear Watch Director, commented, “This rapid arms race build up is not going to make us safer. We don’t need thousands of nuclear weapons to deter North Korea. A new arms race with Russia is a giant step backwards. Further enriching the usual nuclear weapons contractors is the wrong priority when instead taxpayers’ money should be making our schools safe and rebuilding our country.”

# # #

NNSA’s FY 2019 detailed Congressional Budget Request is available at https://energy.gov/sites/prod/files/2018/02/f49/DOE-FY2019-Budget-Volume-1.pdf

[1]     Some 2,500 retired nuclear weapons are estimated to be in the dismantlement queue.

[2]     “Standoff” means that a B52 carrying the LRSO nuclear weapon can position itself some 1,500 miles from the intended target.

[3]     See 2012 Navy memo leaked to Nuclear Watch and Tri-Valley CAREs at  https://nukewatch.org/importantdocs/resources/Navy-Memo-W87W88.pdf

[4]     It should also be noted that major proposed federal actions are required to have public review and comment under the National Environmental Policy Act (NEPA), followed by an agency’s formal Record of Decision (ROD). After completing a 1996 a Stockpile Stewardship and Management Programmatic Environmental Impact Statement to relocate pit production to LANL from the Rocky Flats Plant, DOE issued a ROD limiting production to 20 pits per year. Nuclear Watch believes that NNSA plans to expand production beyond 20 pits per year require a new programmatic environmental impact statement.

[5]     An engineering study, reportedly based on an assumed production rate of 50 pits per year, is reportedly due this week, which may soon clarify this situation (however, it may be classified).

[6]     The 30-day public comment period ends March 26, 2018. Comments should be sent to emailed to [email protected] or mailed to NNSA Los Alamos Field Office, ATTN: CMRR Project Management Office, 3747 West Jemez Road, Los Alamos, NM 87544. Nuclear Watch will post sample comments at www.nukewatch.org by March 16.

[7]     Materials characterization ensures that the plutonium and/or highly enriched uranium are of sufficient “weapons-grade” to begin pit production to begin with.

[8]     Analytical chemistry performs up to a hundred quality control samples per pit as it is being produced.

[9]     For more, please see https://nukewatch.org/pressreleases/PR-2-22-18-CMRR_Rad_Lab_draft_EA.pdf

[10]     In addition, the independent Defense Nuclear Facilities Safety Board says these two old facilities can never be brought up to modern seismic standards, while a few years ago the US Geologic Survey dramatically raised projected potential seismic risks in eastern Tennessee.

Trump’s Budget Dramatically Increases Nuclear Weapons Work

In keeping with the Trump Administration’s recent controversial Nuclear Posture Review, today’s just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production.

The National Nuclear Security Administration (NNSA), the Department of Energy’s semi-autonomous nuclear weapons agency, is receiving a $2.2 billion overall boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category (Nuclear) “Weapons Activities”, 18% above the FY 2018 level.

Digging deeper under Weapons Activities, “Directed Stockpile Work” is increased from $3.3 billion to $4.7 billion, or 41%. Directed Stockpile Work is the hands on, nut and bolts operations that include extending the service lives of existing nuclear weapons for up to 60 years, while also endowing them with new military capabilities.

In addition, NNSA budget documents show “Weapons Activities (Reimbursable)” (parentheses in the original), adding another $1.76 billion to NNSA’s Nuclear Weapons Activities, for a total of $12.78 billion. It is not made clear where that additional money comes from, but most likely is from the Defense Department, as it has been in the past.

Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the Government Accountability Office’s High Risk List for project mismanagement and fraud, waste and abuse since its inception in 1990.

Meanwhile, NNSA Nonproliferation Programs are budgeted at $1.86 billion, only 16% the size of the nuclear weapons budget. Further, the State Department is being cut by $10.4 billion to $28.3 billion (a 29% cut), while many senior diplomatic positions are left unfilled (such as the U.S. ambassador to South Korea), even as the possibility of peace on the Korean peninsula is breaking out.

The NNSA budget also reiterates the executive branch’s intent to terminate the Mixed Oxide (MOX) program, designed to “burn” military plutonium in commercial reactors. That program would introduce plutonium to the global market, contrary to its stated intent as a nonproliferation program. It has also been a debacle in terms of cost overruns, blown schedules and lack of contractor accountability, kept alive only by South Carolina congressional political pork interests.

However, the MOX program’s slow demise puts yet more pressure on New Mexico to become the nation’s radioactive waste dumping ground, with up to 35 tons of military plutonium potentially headed for the Waste Isolation Pilot Plant (which already lacks capacity for currently scheduled wastes). In addition, the Trump budget increases funding for so-called interim storage of spent nuclear fuel rods, the nation’s deadliest high-level radioactive wastes. There are two separate proposals for “interim” storage of 100 tons of spent nuclear fuel in either southern New Mexico or just on the other side of the border with Texas.

The Waste Isolation Pilot Plant (WIPP) received an increase to $397 million, $106 million above the FY 2018 level. This starts the expansion of WIPP with a new ventilation shaft that has silently morphed from replacing the old contaminated exhaust shaft into being an additional intake shaft. Plans are underway for a new filter building, which will replace the capabilities lost due to the 2014 radiological release caused by an improperly prepared radioactive waste drum from the Los Alamos Lab. That closed WIPP for nearly three years, costing the American taxpayer at least $1.5 billion to reopen. The planned new intake shaft will greatly increase WIPP”s capabilities, allowing for expansion to take more of the nation’s radioactive wastes.

The cleanup request for Los Alamos National Laboratory (LANL) stays flat at $192 million. The basis for this is DOE’s woefully low lifecycle cost estimate for LANL cleanup, which in turned is predicated upon the New Mexico Environment Department’s revised cleanup Consent Order. Under Governor Susana Martinez, the revised Consent Order allows DOE and LANL to fund so-called cleanup at levels they choose, rather than needed cleanup driving the funding.

The Los Alamos Lab explicitly plans to leave permanently buried 200,000 cubic yards of radioactive and hazardous wastes in unlined pits and trenches, above our groundwater and three miles uphill from the Rio Grande. Once those wastes are “capped and covered”, LANL plans to claim that “cleanup” is completed.

Finally, under Trump’s budget, the Department of Energy cuts sustainable transportation, renewable energy and energy efficiency by 33% and zeroes out weatherization programs.

Jay Coghlan of Nuclear Watch commented,

The Trump budget prepares for nuclear war, in which even Ronald Reagan said there can’t be any winners. It finances a new Cold War arms race with Russia and indirectly increases the chances of a nuclear war with North Korea. It sets back nonproliferation and cleanup programs, and further hollows out our country by diverting yet more huge sums of money to the usual fat cat nuclear weapons contractors. Come November, voters should vote their conscience over how the federal government under Trump prioritizes their tax dollars for good or ill.

# # #

Nuclear Watch New Mexico will provide more budget information on our web site www.nukewatch.org and blog www.nukewatch.org/watchblog as it becomes available. The available budget documents are still not detailed enough for new issues and programs that we are keenly interested in, such as new, more usable mininukes and expanded plutonium pit production at LANL.

 

Testimony Calls Out Continued DOE Cost Estimating Mismanagement

Testimony Calls Out Continued DOE Cost Estimating Mismanagement

Given that DOE has challenges estimating almost all large projects, taxpayers must push to spend on cleanup first. Both nuclear weapons and environmental management estimates keep increasing. We can keep spending on dangerous nuclear weapons that we don’t need, or we can finally focus on cleaning up the Cold War mess.

Government Accountability Office (GAO) officials presented some of their recent work to Congress concerning management problems facing the Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) and Office of Environmental Management (EM). NNSA is responsible for managing the nation’s nuclear weapons and supporting the nation’s nuclear nonproliferation efforts. In support of these missions, NNSA’s February 2016 budget justification for the Weapons Activities appropriations account included about $49.4 billion for fiscal years 2017 through 2021 to implement its nuclear weapons complex modernization plans. More recently, in November 2017, NNSA issued its Stockpile Stewardship and Management Plan, which included about $10.2 billion for nuclear weapons activities for fiscal year 2018.

Since the end of the Cold War, it is claimed that much of the nuclear weapons production infrastructure has become outdated, prompting congressional and executive branch decision makers to call on DOE to develop plans to modernize. The Department of Defense’s (DOD) 2010 Nuclear Posture Review identified long-term modernization wishes and alleged requirements. In January 2017, the President directed the Secretary of Defense to initiate a new Nuclear Posture Review to meet the Administration’s vision. This review was released in February 2018.

GAO has found that NNSA’s estimates of funding needed for its modernization plans exceeded the budgetary projections included in the President’s own modernization budgets. And the costs of some major modernization programs—such as for nuclear weapon Life Extension Programs (LEPs) — may also increase and further bust future modernization budgets.

The LEPs facing potential cost increases include:

B61-12 LEP. An independent cost estimate for the program completed in October 2016 exceeded the program’s self-conducted cost estimate from June 2016 by $2.6 billion.

W80-4 LEP. Officials from NNSA’s Office of Cost Policy and Analysis told us that this program may be underfunded by at least $1 billion to meet the program’s existing schedule

W88 Alteration 370. According to officials from NNSA’s Office of Cost Policy and Analysis, this program’s expanded scope of work may result in about $1 billion in additional costs.

EM is responsible for decontaminating and decommissioning nuclear facilities and sites that are contaminated from decades of nuclear weapons production and nuclear energy research. In February 2017, GAO reported that, since its inception in 1989, EM has spent over $164 billion on cleanup efforts, which include retrieving, treating, and disposing of nuclear waste.

GAO found that the federal government’s environmental liability has been growing for the past 20 years—and is likely to continue to increase—and that DOE is responsible for over 80 percent ($372 billion) of the nearly $450 billion reported environmental liability. Notably, this estimate does not reflect all of the future cleanup responsibilities that DOE may face.

EM Growing Liability
Department of Energy’s Office of Environmental Management’s Annual Spending and Growing Environmental Liability

 

 

 

 

 

 

 

 

 

 

 

 

As NNSA works to modernize the nuclear weapons complex, EM is addressing the legacy of 70 years of nuclear weapons production. These activities generated large amounts of radioactive waste, spent nuclear fuel, excess plutonium and uranium, and contaminated soil and groundwater. They also contaminated thousands of sites and facilities, including land, buildings, and other structures and their systems and equipment. Various federal laws, agreements with states (including New Mexico), and court decisions require the federal government to clean up environmental hazards at federal sites and facilities, such as nuclear weapons production facilities. For years, GAO and others have reported on shortcomings in DOE’s approach to addressing its environmental liabilities, including incomplete data on the extent of cleanup needed.

EM has some budget issues, too.

Examples of costs that DOE cannot yet estimate include the following:

DOE has not yet developed a cleanup plan or cost estimate for the Nevada National Security Site and, as a result, the cost of future cleanup of this site was not included in DOE’s fiscal year 2015 reported environmental liability. The nearly 1,400-square-mile site has been used for hundreds of nuclear weapons tests since 1951. These activities have resulted in more than 45 million cubic feet of radioactive waste at the site. According to DOE’s financial statement, since DOE is not yet required to establish a plan to clean up the site, the costs for this work are excluded from DOE’s annually reported environmental liability.

DOE’s reported environmental liability includes an estimate for the cost of a permanent nuclear waste repository, but these estimates are highly uncertain and likely to increase. In March 2015, in response to the termination of the Yucca Mountain repository program, DOE proposed separate repositories for defense high-level and commercial waste. In January 2017, we reported that the cost estimate for DOE’s new approach excluded the costs and time frames for site selection and site characterization.

Govt pulls full Nuclear Posture Review – Get it here!

The old link for the full Nuclear Posture Review

https://media.defense.gov/2018/Feb/02/2001872886/-1/-1/1/2018-NUCLEAR-POSTURE-REVIEW-FINAL-REPORT.PDF

live on Friday February 2, 2018, now yields nothing.

The Defense Department’s new link

https://www.defense.gov/News/Special-Reports/0218_npr/

has an executive summary and some fact sheets, but not the full  Review.

Interestingly, the executive summary looks like it’s translated into Russian, Chinese, Japanese, Korean and French. No doubt people around the world are looking at it.

But you now can find the full Nuclear Posture Review at

https://nukewatch.org/importantdocs/resources/2018-NUCLEAR-POSTURE-REVIEW-FINAL-REPORT.PDF

That won’t go away!

“Gateway Drug to Nuclear War” Feeds More Nuke Addiction

“Gateway Drug to Nuclear War” Feeds More Nuke Addiction

The Trump Administration’s high policy document, the Nuclear Posture Review (NPR), released February 2, includes recommendations for the deployment of lower yield, “more usable” nuclear warheads. This will only feed the US addiction to nukes.

An article on the same day in The American Conservative, “Trump’s Nuke Plan Raising Alarms Among Military Brass”, quotes one retired senior Army officer who tracked the NPR as saying that nuclear neocons were providing Donald Trump with “gateway drug for nuclear war.”

From that article –

So while the [NPR’s] recommendations won’t necessarily be a surprise, what is less public is the bitter battle during its drafting that pitted senior Army and Navy warriors against nuclear wonks inside the Defense Department. That fight—over the exorbitant costs associated with the NPR, and charges that it could make nuclear war more likely—are bound to continue through implementation.

“It’s one thing to write a policy,” a senior Pentagon civilian privy to the NPR fight told The American Conservative, “and it’s another thing to have it implemented. What the NPR is recommending will break the bank, and a lot of people around here are worried that making nuclear weapons more usable isn’t what we should be doing. The conventional military guys have dug in their heels, they’re dead-set against it. This battle isn’t over.”

In effect, the congressionally mandated review calls for the U.S. to deploy two new types of lower yield nuclear warheads, generally defined as nuclear bombs below a five kiloton range (the one dropped on Hiroshima was 20 kilotons), that could be fitted onto a submarine-launched ballistic missile, and one, yet to be developed, that would be fitted onto a submarine-launched cruise missile. Additionally, the NPR calls for “recapitalizing” the complex of nuclear laboratories and plants, which, taken together with the proposed modernization program of the U.S. nuclear arsenal (the “triad”), will almost certainly cost in excess of the estimated price tag of $1.2 trillion over the next 30 years.

The article continues that Army and Navy officers worry that senior administration officials would promote massive new funding initiatives at the expense of badly needed funding for conventional military readiness. They also worry, more urgently, that the administration would put the nation on the slippery slope to nuclear escalation.

NukeWatch’s bottom line: Addiction to nukes is a potentially world-ending problem.

Trump’s Nuclear Posture Review goes in the opposite direction of meeting our long-term need to eliminate the one class of weapons of mass destruction that can truly destroy our country. It will instead set back nonproliferation and arms control efforts across the globe, and further hollow out our country by diverting yet more huge sums of money to the usual fat defense contractors at the expense of public education, environmental protection, natural disaster recovery, etc. Under the Trump Administration, expect Medicare and Social Security to be attacked to help pay for a false sense of military security. Trump’s Nuclear Posture Review is part and parcel of that.

Nuclear Watch New Mexico seeks to promote safety and environmental protection at nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons. Please help support NukeWatch.

Trump’s Nuke Plan Raising Alarms Among Military Brass

Past NukeWatch Events

Briefing on Plutonium Migration at the Los Alamos National Laboratory

Who:        Nuclear Watch New Mexico and chemist Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry at Northern Arizona University

What:       Nuclear Watch has mapped plutonium migration based on sampling data from Intellus, the Lab’s environmental sampling database. Our map graphically demonstrates widespread contamination down the Rio Grande to Cochiti Lake and vertically to deep groundwater. We believe it shows the need for comprehensive cleanup at LANL instead of proposed “cap and cover” that will leave toxic and radioactive wastes permanently buried in unlined pits and trenches.

When:      11:00 am MT Thursday April 25, 2024

Where:     https://us06web.zoom.us/j/95570087953?pwd=R1hNUEIyb1BLaktDQzZQaWNEdlpoQT09

                  Meeting ID: 922 1214 9822 Passcode: 975887

This virtual briefing is for media and the public. Nuclear Watch and Dr. Ketterer will briefly present followed by Q&A. Media and reporters will be given preference for questions. Please feel free to forward this notice to others.

Our plutonium contamination map and background materials will be available at www.nukewatch.org by 10:00 am MT Thursday April 25.

Nuclear Communities of the Southwest: New Exhibit at the Albuquerque Museum

NukeWatch’s Nuclear New Mexico Map will be on display as part of Nuclear Communities of the Southwest at the Albuquerque Museum. This exhibition features videos, photographs, and memorabilia from Sandia and Los Alamos National Laboratories as well as the Kirtland Air Force Base. This exhibition will put these historical objects in conversation with downwinder voices and artists’ responses to New Mexico’s involvement in the development of nuclear technologies.
It will open in the museum’s Keleher Gallery on March 23, 2024, and will run through September 15, 2024.
Please see the flyer above for the opening event information.

First Annual Plutonium Trail Caravan

On Saturday, April 6, you will be able to join the First Annual Plutonium Trail Caravan!  It will start at Pojoaque and end at Lamy.  It will also stop in Eldorado and you are welcome to join the caravan on its way to the final stop in Lamy.  There will be several stops along the way, with more details coming soon.  Please save the date for 30 minutes on the afternoon of April 6.  There will be fun satiric songs, banners, and plenty of people to ask questions about risks to neighborhoods on the route.

Submit Public Comment on the Environmental Assessment for LANL Chromium Plume by March 13

The Department of Energy (DOE) releases Draft Chromium Interim Measure and Final Remedy Environmental Assessment to address a chromium plume under Los Alamos National Laboratory. But there is no ‘final remedy.’ The proposed action is to keep trying “what can be done now with the information that is known,” while drilling more wells.

DOE is accepting public comments on the draft EA through Feb. 12 March 13, 2024

WIPP Information Exchange Dec. 13 – In Person and Virtual

The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Salado Isolation Mining Contractors (SIMCO) (Permittees) will conduct a virtual WIPP Information Exchange pursuant to Permit Part 4, Section 4.2.1.5, Legacy TRU Waste Disposal Plan. This exchange will discuss information regarding the Legacy TRU Waste Disposal Plan.

Questions and comments outside the scope of the Legacy TRU Waste Disposal Plan should be directed to the WIPP Community Forum.

Wednesday, December 13, 2023, 2 p.m. – 4 p.m.

Skeen-Whitlock Building
4021 National Parks Hwy
Carlsbad, NM 88220

REGISTRATION:
In-Person Registration:
WIPP Information Exchange In-Person Registration: https://form.jotform.com/222836798629172

Virtual Registration:
WIPP Information Exchange Virtual Registration:

QUESTIONS:
For questions regarding this information exchange please contact the WIPP Information Center at [email protected] or by calling 1-800-336-9477.

Upholding the CTBT Regime in a Time of Adversity

Thursday, Nov. 16, 10:00-11:30 am, U.S. Eastern Time

RSVP via Zoom by November 14

As with other critical nuclear risk reduction and arms control agreements, the 1996 Comprehensive Nuclear Test Ban Treaty (CTBT) is under threat due to inattention, diplomatic inaction, and worsening relations between nuclear-armed adversaries.

Disturbingly, but not surprisingly, Russian President Vladimir Putin has signed a bill from the Russian parliament to “un-ratify” the CTBT, ostensibly to “mirror” the United States’ posture toward the treaty and somehow pressure the United States to ratify the pact.

Putin says Russia will not resume nuclear explosive testing unless the United States does, but Russian officials have accused the United States of making preparations to resume nuclear testing. U.S. officials deny any such plans. Russia, China, and the United States, however, all continue to engage in military nuclear activities at their former test sites.

Support COMPREHENSIVE CLEANUP at Area C – Your Comments Needed!

Extended 2-Page Sample Comments available now! Download here:

We need your help to support the State’s mandate to excavate wastes instead of leaving them in place.

The New Mexico Environment Department (NMED) has rejected the Los Alamos National Laboratory’s (LANL’s) plans for so-called cleanup through “cap and cover.” LANL’s plan would leave existing radioactive and hazardous wastes uncharacterized and forever buried in unlined pits and trenches as a permanent threat to groundwater. At issue is remediation of the Lab’s “Material Disposal Area C” waste dump that has 7 pits and 108 shafts of radioactive and hazardous wastes.

This mandate will help maximize protection of human health and the environment and ensure that our critical drinking water resources are permanently protected.

Any person who wishes to comment on the proposed Statement of Basis should submit written comments, along with their name and address, to the NMED Hazardous Waste Bureau, 2905 Rodeo Park Drive, Building 1, Santa Fe, New Mexico, 87505-6303

or by email to [email protected].

Only written comments received by 5:00 p.m. MDT, November 6, 2023, will be considered by NMED in making a final decision.

Read the Area C NWNM Press Release

Read our 1-PAGE Sample Comments

Read our 2-PAGE Sample Comments

Download our 1-PAGE Sample Comments to use on your own:

Download our 2-PAGE Sample Comments to use on your own:

Important document links from the NMED page – (scroll down to Material Disposal Area (MDA) C, SWMU 50-009, Remediation, September 7, 2023)
env.nm.gov/hazardous-waste/lanl
Includes – Public Notice,
September 7, 2023-NMED Statement of Basis MDA C
June 30, 2021-DOE Corrective Measures Evaluation Rev. 1 for MDA C

Read the Santa Fe New Mexican article –
santafenewmexican.com/news/local_news/state-tells-feds-to-excavate-lanl-waste-pit-at-805m-cost
State tells feds to excavate LANL waste pit at $805M cost
By Scott Wyland, Sep 18, 2023

THIS Friday! Public Meeting: WIPP Renewal, September 22, 5 – 7PM

WIPP Renewal Public Meeting – In Person or Online

WebEx link: nmed-oit.webex.com…

Meeting number: 2634 380 5952
Password: ESphqvid567
Join by phone
+1-415-655-0001 US Toll
Access code: 2634 380 5952

Location: IN-PERSON or ONLINE

ONLINE: WebEx: nmed-oit.webex.com…
IN-PERSON:
Larrazolo Auditorium
Harold Runnels Bldg
1190 So. St. Francis Drive
Santa Fe, NM 87505
or
Skeen-Whitlock Bldg
4021 National Parks Hwy
Carlsbad, NM 88220

Contact [email protected]

Defense Nuclear Facilities Safety Board (DNFSB) Public Hearing November 16 on “Legacy cleanup activities, nuclear safety, and increased production activities” at Los Alamos National Laboratory (LANL)

November 16, 2022 12:00pm to 9:45pm MT
Two Sessions will be Held:
1. Nuclear Safety at Area G – 12:00–2:30 pm MT
2. National Security Missions and Nuclear Safety Posture – 4:00–9:45 pm MT
Santa Fe Community Convention Center
201 West Marcy Street

Santa FeNM 87501


On November 16, the Defense Nuclear Facilities Safety Board (DNFSB) will hold a public hearing at the Santa Fe Community Convention Center in Santa Fe, New Mexico.

Join In-Person if You Can!

The hearing will also be streamed and a link will be available on the hearing website on the day of the event: https://www.dnfsb.gov/public-hearings-meetings/november-16-2022-public-hearing

Past Work Product (2019-)

Plutonium Pit Production Forum – Full Video

Workshop on expanded production of the radioactive cores of nuclear weapons at the Los Alamos National Laboratory

Presenters:

  • Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
  • Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
  • Marylia Kelley, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
  • Scott Kovac, Nuclear Watch New Mexico, on LANL cleanup issues

Is Los Alamos Lab Half Empty or Over Full of Radioactive Wastes?

August 22, 2019

The Department of Energy’s (DOE’s) Environmental Management Los Alamos (EMLA) field office has repeatedly claimed that “> [i.e., more than] ½ of legacy cleanup has been completed.”1 This claim doesn’t explain how this is measured. Does it mean ½ of the time, ½ of the cost, ½ of the sites, or ½ of the wastes? However it is measured, New Mexicans need to know that DOE and the Los Alamos National Laboratory (LANL) are NOT talking about real comprehensive cleanup.

When EMLA and its cleanup contractor (N3B) talk about cleanup, they mean specific narrow measures for specific sites, including much paperwork and studies instead of actual cleanup. Contrary to EMLA’s self-proclaimed openness and transparency, the claim of greater that half-completed cleanup is based on decisions made without public input to leave the vast majority of radioactive and toxic wastes permanently buried above our precious groundwater.

While some Lab cleanup started in the late 1980s, tracking of the cleanup budget didn’t start until 1997, which is the date used as the beginning of “prior costs” in recent DOE Congressional Budget Requests. 2 EMLA’s current estimated date for completion of planned cleanup is 2037. That would be 22 years down and 18 to go, if we look at 1997 to 2037, which would be ½ of the time if EMLA completes its planned cleanup by 2037. If decisions are made to remove more wastes, which would be the right thing to do, cleanup could last for decades more while generating 100’s of high-paying jobs. Real, comprehensive cleanup would be well worth the wait!

2019


Proposed LANL Campus in Santa Fe

Read/Download the Full Press Release HERE


Pope Frances Calls for Nuclear Weapons Abolition

Read/Download the Full Press Release HERE


VIEW LIVE RECORDING & WORKSHOP RESOURCES

Presenters:

  • Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
  • Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
  • Marylia Kelley, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
  • Scott Kovac, Nuclear Watch New Mexico, on LANL cleanup issues

NukeWatch’s 22-page formal comments on expanded plutonium pit production

Until NNSA fully complies with the National Environmental Policy Act through the preparation of a programmatic environmental impact statement on expanded plutonium pit production, Nuclear Watch believes that any irreversible or irretrievable commitment of resources to either the expansion of pit production at the Los Alamos Lab or to the repurposing of the MOX Facility at the Savannah River Site is unlawful.

Read/Download the Full Document HERE


Scoping comments on NNSA draft EIS for plutonium pit production at the Savannah River Site

THE NEED FOR A PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT: This is our first and primary concern, that NNSA must first complete a programmatic environmental impact statement (PEIS) on its nation-wide plans for plutonium pit production, in advance of the Savannah River Site-specific environmental impact statement. To get right to the point, we argue that the SRS EIS process should go no further than this scoping period and should resume only after a completed formal Record of Decision for a new or supplemental PEIS.

Read/Download the Full Document HERE


Expanding Nuclear Pit Production: The Facts and What You Can Do

The Facts
• The Trump administration wants the United States to produce 80 plutonium pits per year
by 2030 without offering any concrete justification for the additional nuclear bomb cores.
• Multiple studies by government agencies have found that pits last for at least 100 years.
The average pit in the US stockpile is around 36 years old.
• More than 15,000 existing pits are already stored at the Pantex Plant near Amarillo, TX.
• Independent experts find it nearly impossible that the Los Alamos National Laboratory
and the Savannah River Site will be able to meet the 80 pit per year by 2030 requirement,
and billions of taxpayer dollars will be thrown down the drain in the meantime.

Read/Download the Full Document HERE


Federal Government Meets Watchdogs’ Demand for Environmental Review of Expanded Plutonium Pit Production

In a victory for transparency and legal compliance by the government, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) today published a “Notice of Intent” in the Federal Register to complete environmental reviews on its controversial proposal to expand plutonium “pit” production for new and refurbished nuclear weapons.

[embeddoc url="https://nukewatch.org/wp-content/uploads/2019/06/SRS-plutonium-bomb-plant6-14-19.pptx" download="all" viewer="google"]

Read/Download the Full News Release HERE


Noted Environmental Lawyers Warn Government Not to Expand Production of Plutonium Bomb Cores in Violation of National Environmental Policy Act and Public Review

On behalf of three public interest organizations - Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch – attorneys for the law firm of Meyer Glitzenstein & Eubanks and the Natural Resources Defense Council recently sent a 16-page letter to Lisa Gordon-Hagerty, head of the National Nuclear Security Administration (NNSA). The detailed letter warns the nuclear agency to not proceed with aggressive plans to expand plutonium pit production without first meeting its legal requirements for timely public review and comment under the National Environmental Policy Act.

Read/Download the Full Press Release HERE


Faulty Radioactive Liquid Waste Valves Raise Crucial Plutonium Pit Production and Safety Board Issues

Last Wednesday, facility operations personnel entered a service room and noticed a leak emanating from a valve on the radioactive liquid waste (RLW) system. Upon subsequent visual inspection by a radiological control technician, RLUOB engineers believe that this valve, and 6 similar valves, may be constructed of carbon steel. The RLW system handles radioactive liquid waste streams from chemistry operations that include nitric and hydrochloric acids—carbon steel valves would be incompatible with these solutions. The suspect valves are also in contact with stainless steel piping, which would create another corrosion mechanism. RLUOB management plans to drain the affected piping sections and develop a work package to replace all of the suspect valves. They will also confirm the valve materials and if shown to be incorrect, investigate the cause of this failure in the design, procurement, and installation processes. The valves were installed in 2013 as part of a modification to add straining and sampling capabilities that were not in the included in the original design. [Please note that DNFSB reports are posted a few weeks later than dated.]

This immediately raises two crucial issues: 1) the National Nuclear Security Administration’s (NNSA’s) plans for expanded plutonium pit production; and 2) the current attempt by the Department of Energy to restrict Safety Board access to its nuclear weapons facilities.

Read/Download the Full Press Release HERE


A Tale of Two Consent Orders and What Is Needed

On March 1, 2005, after arduous negotiations and threats of litigation, the New Mexico Environment Department (NMED), Department of Energy (DOE), and Los Alamos National Laboratory (LANL) entered into a Consent Order specifying the schedule for investigation and cleanup of the Lab’s hundreds of contaminated sites. This Consent Order (CO) was LANL’s agreement to fence-to-fence cleanup of Cold War legacy wastes, which NMED began to enforce.

Read/Download the Full Comparison HERE


Global Nuclear Weapons Threats Are Rising

More than 25 years after the end of the Cold War, all eight established nuclear weapons powers are “modernizing” their stockpiles. Talks have broken down with North Korea, the new nuclear weapons power. Nuclear-armed India and Pakistan narrowly averted war last month. Russian President Vladmir Putin made new nuclear threats in response to Trump’s announced withdrawal from the Intermediate-Range Nuclear Forces Treaty. This could lead to hair-trigger missile emplacements in the heart of Europe and block extension of the New Strategic Arms Reduction Treaty with Russia. If so, the world will be without any nuclear arms control at all for the first time since 1972. Meanwhile, the U.S. criticizes non-weapons states for signing a nuclear weapons ban treaty, despite the fact there have long been treaties completely banning chemical and biological weapons of mass destruction that the U.S. seeks to enforce. The pending international NonProliferation Treaty (NPT) Preparatory Committee conference at the United Nations is widely expected to collapse in failure because of the nuclear weapons powers’ failure to enter into serious negotiations leading to nuclear disarmament. The NPT’s Article VI mandate for those negotiations has been in effect since 1970, when the Treaty was signed by 189 countries (more than any other treaty).

Read/Download the Full Press Release HERE



Nuclear Watch New Mexico — Department of Energy FY 2020 Nuclear Weapons Budget Request

Read/Download the Full Budget Compilation HERE


2018


Expanded Plutonium Pit Production for U.S. Nuclear Weapons

Plutonium pits are the radioactive cores or “triggers” of nuclear weapons. Their production has always been a chokepoint of resumed industrial-scale U.S. nuclear weapons production ever since a 1989 FBI raid investigating environmental crimes shut down the Rocky Flats Plant near Denver. In 1997 the mission of plutonium pit production was officially transferred to its birthplace, the Los Alamos National Laboratory (LANL) in northern New Mexico, but officially capped at not more than 20 pits per year. However, in 2015 Congress required expanded pit production by 2030 whether or not the existing nuclear weapons stockpile actually needs it. This will support new military capabilities for nuclear weapons and their potential use.

Read/Download the full fact sheet pdf HERE


Watchdog Groups Claim Nuclear Agency is Moving Forward to Manufacture New Plutonium Bomb Cores in Violation of National Environmental Law and Public Review

Nuclear Watch New Mexico, Savannah River Site Watch, and Tri-Valley CAREs sent a letter of demand to the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to inform the government that its plan to quadruple the production rate of plutonium bomb cores is out of compliance with the National Environmental Policy Act (NEPA).

NNSA’s premature plan to quadruple the production rate of plutonium bomb cores (“pits”), the heart of all US nuclear weapons, is out of compliance with requisite environmental law, the groups argue, as NNSA has failed to undertake a legally-mandated programmatic review and hold required public hearings.

View/Download the entire press release HERE


DNFSB Hearing - Formal Comments

Nuclear Watch New Mexico is submitted formal comments to express in the strongest possible terms our opposition to DOE Order 140.1 Interface with the Defense Nuclear Facilities Safety Board. We find that the Department of Energy’s (DOE’s) attempt to restrict and suppress DNFSB access is very misguided, arrogant, and likely illegal in that it acts contrary to the Board’s enabling legislation.

Read the comments here


New Contractors Selected For Expanded Nuclear Weapons Production at Los Alamos

Santa Fe, NM. Today the Department of Energy's National Nuclear Security Administration (NNSA) announced its choice for the new management and operating contract for the Los Alamos National Laboratory (LANL).The new contractor, Triad National Security, LLC, is a limited liability company consisting of the Battelle Memorial Institute, the University of California and Texas A&M University. All three are non-profits, and it is unclear how this will affect New Mexico gross receipts taxes.

Battelle claims to be the world's largest non-profit technology research and development organization, and manages a number of labs including the Lawrence Livermore and Idaho National Laboratories. Texas A&M was founded in 1876 as the state's first public institution of higher learning and has the largest nuclear engineering program in the country. DOE Secretary Rick Perry is an avid A&M alumnus.

View/download full press release


Groups Release Key DOE Documents on Expanded Plutonium Pit Production, DOE Nuclear Weapons Plan Not Supported by Recent Congressional Actions

Santa Fe, NM & Columbia, SC - "Two key U.S. Department of Energy documents on future production of plutonium "pits" for nuclear weapons, not previously released to the public, fail to justify new and upgraded production facilities at both the Los Alamos National Laboratory (LANL) in New Mexico and the Savannah River Site (SRS) in South Carolina."

View/download press release


Los Alamos Cleanup

View/download Fact sheet


What's Not in NNSA's Plutonium Pit Production Decision

 

- NNSA did not mention that up to 15,000 "excess" pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in "strategic reserve." The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits. (In 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old.)
- NNSA did not explain how to dispose of all of that plutonium, given that the MOX program is an abysmal failure. Nor is it made clear where future plutonium wastes from expanded pit production will go since operations at the troubled Waste Isolation Pilot Plant are already constrained from a ruptured radioactive waste barrel, and its capacity is already overcommitted to existing radioactive wastes. View/download Press Release


NNSA Proposal to Raise Plutonium Limit Ten-Fold in Los Alamos' Rad Lab Is First Step in Expanded Plutonium Pit Production: Environmental Assessment Is Premature and Deceptive By Omission

"NNSA should begin nation-wide review of plutonium pit production, why it's needed, and what it will cost the American taxpayer in financial, safety and environmental risks. These are all things that the public should know." -Jay Coghlan, Director, Nuclear Watch New Mexico.

View/download Press Release


LANL Rad Lab: Formal Comments Under Nat'l Environmental Policy Act

Against raising plutonium limit at LANL Rad Lab

View/download Nuclear Watch comments as submitted

Excerpt:
"This Draft Rad Lab EA is deficient. There are major omissions, for example the lack of analyses of potential beryllium hazards and Intentional Destructive Acts. Moreover, safety, occupational and seismic risks are explained away in "preliminary analyses." All this should be corrected in a more complete environmental impact statement, including final and transparent analyses of safety and seismic risks...

"NNSA should proceed with a broader environmental impact statement after its May 11 decision on the future of expanded plutonium pit production."

- NNSA is planning a 10-fold increase in plutonium at the LANL Rad Lab with a view to ramping up the production of plutonium pits for new nuclear weapons.
- NNSA wants to re-categorize the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.
- (See details in our press release)
- National Environmental Policy Act


United States To Begin Construction Of New Nuclear Bomb Plant

The National Nuclear Security Administration (NNSA) announced on Friday, March 23, that it was authorizing the start of construction of the Uranium Processing Facility (UPF) and two sub-projects at the Y-12 National Security Complex in Oak Ridge, Tennessee. The UPF is a facility dedicated solely to the manufacture of thermonuclear cores for US nuclear bombs and warheads.
Citizen watchdog groups are responding by filing an expedited Freedom of Information Act request demanding a full fiscal accounting of the UPF bomb plant- something the NNSA has refused to provide for the last five years, including to Congress, despite repeated assurances that the project is "on budget."

"This project is already a classic boondoggle, and they are just getting started," said Ralph Hutchison, coordinator of the Oak Ridge Environmental Peace Alliance (OREPA) in Knoxville, Tennessee. "Worse, it undermines US efforts to discourage nuclear proliferation around the world. How can we oppose the nuclear ambitions of other countries when we are building a bomb plant here to manufacture 80 thermonuclear cores for warheads every year?"

Jay Coghlan of NukeWatch points out that "This project already has a long history, and it is instructive. In 2013, DOE announced it was 85% finished with the UPF design when it ran into the 'space/fit' issue- and more than a half-billion taxpayer dollars were just written off. In private business, that kind of thing gets you fired. In DOE's world of contractors running amok, they not only didn't get fired, not one Congressional hearing was held and the UPF budget went up the next year!"

- See full press release for all the details (PDF)
- View/download the OREPA/NukeWatch FOIA request (pdf)


The Regional Coalition of LANL Communities: Benefits for the Select Few

Santa Fe, NM- According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County's 46th district in the state House of Representatives.
Perhaps more serious is the fact that Romero was awarded an undisclosed amount of money by the Venture Acceleration Fund (VAF) for her private business Tall Foods, Tall Goods, a commercial ostrich farm in Ribera, NM. According to a May 8, 2017 Los Alamos Lab news release announcing the award to Tall Foods, Tall Goods, "The VAF was established in 2006 by Los Alamos National Security [LANS], LLC to stimulate the economy by supporting growth-oriented companies."[1] LANS, primarily composed of the Bechtel Corporation and the University of California, has held the annual ~$2.4 billion Los Alamos National Laboratory (LANL) management contract since June 2006.

For all the details, see full press release PDF


Major LANL Cleanup Subcontractor Implicated in Fraud - Entire Los Alamos Cleanup Should Be Re-evaluated

Santa Fe, NM. On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as "N3B"). This award followed a DOE decision to pull cleanup from LANL's prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen.
Tetra Tech Inc is a major subcontractor for N3B in the LANL cleanup contract... Serious allegations of fraud by Tetra Tech were raised long before the LANL cleanup contract was awarded. The US Navy found that the company had committed wide spread radiological data falsification, doctored records and supporting documentation, and covered-up fraud at the Hunters Point Naval Shipyard cleanup project in San Francisco, CA. See media links and excerpts below..."

(See all the details in the full press release)


Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race

Santa Fe, NM. Late Friday February 23, the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] "Weapons Activities", 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office's High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990...

(See all the details in the full press release)


NNSA Releases Draft Environmental Assessment for LANL Rad Lab; Raises Plutonium Limit 10 Times for Expanded Pit Production

Santa Fe, NM. Today the National Nuclear Security Administration announced an Environmental Assessment to increase the amount of plutonium used in the Radiological Laboratory Utility and Office Building (aka the "Rad Lab") at the Los Alamos National Laboratory from 38.6 grams of plutonium-239 equivalent to 400 grams. This 10-fold increase is significant because it will dramatically expand materials characterization and analytical chemistry capabilities in the Rad Lab in support of expanded plutonium pit production for future nuclear weapons designs. It also re-categorizes the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.

View/Download full press release


Trump's Budget Dramatically Increases Nuclear Weapons Work

Santa Fe, NM In keeping with the Trump Administration's recent controversial Nuclear Posture Review, today's just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production.
The National Nuclear Security Administration (NNSA), the Department of Energy's semi-autonomous nuclear weapons agency, is receiving a $2.2 billion overall boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category (Nuclear) "Weapons Activities", 18% above the FY 2018 level.
Digging deeper under Weapons Activities, "Directed Stockpile Work" is increased from $3.3 billion to $4.7 billion, or 41%...

(read the full press release)


Draft Nuclear Posture Review Degrades National Security

Yesterday evening the Huffington Post posted a leaked draft of the Trump Administration's Nuclear Posture Review (NPR). This review is the federal government's highest unclassified nuclear weapons policy document, and the first since the Obama Administration's April 2010 NPR.
This Review begins with "Many hoped conditions had been set for deep reductions in global nuclear arsenals, and, perhaps, for their elimination. These aspirations have not been realized. America's strategic competitors have not followed our example. The world is more dangerous, not less." The NPR then points to Russia and China's ongoing nuclear weapons modernization programs and North Korea's "nuclear provocations." It concludes, "We must look reality in the eye and see the world as it is, not as we wish it be."
If the United States government were to really "look reality in the eye and see the world as it is", it would recognize that it is failing miserably to lead the world toward the abolition of the only class of weapons that is a true existential threat to our country. As an obvious historic matter, the U.S. is the first and only country to use nuclear weapons. Since WWII the U.S. has threatened to use nuclear weapons in the Korean and Viet Nam wars, and on many other occasions.
Further, it is hypocritical to point to Russia and China's "modernization" programs as if they are taking place in a vacuum. The U.S. has been upgrading its nuclear arsenal all along. In the last few years our country has embarked on a $1.7 trillion modernization program to completely rebuild its nuclear weapons production complex and all three legs of its nuclear triad.
Moreover, Russia and China's modernization programs are driven in large part by their perceived need to preserve strategic stability and deterrence..
(read the full press release)

2017


2017


New Mexico Environment Department Surrendered to DOE Extortion

Santa Fe, NM. The New Mexico State Auditor Office recently questioned whether two settlements between the New Mexico Environment Department and the Department of Energy were in the best interests of New Mexico. That Office noted:
"The New Mexico Environment Department unnecessarily forgave tens of millions of dollars in civil penalties related to various waste management issues and missed cleanup deadlines by the Department of Energy (DOE) and its contractors. Considering the seriousness of the violations, and the clarity regarding responsibility for the violations, it appears highly unusual that the Department would not collect any civil penalties under these circumstances."
NMED completed an assessment of $54 million in penalties that would have gone to New Mexico, but did not enforce them before making the settlements with DOE. This was at a time when the state was beginning to face a serious budget crisis. As State Senator John Arthur Smith (Chair of the Senate Finance Committee) put it, NMED's failure to levy penalties when New Mexico was facing a budget crisis is "taking it out of the pockets of our kids and young people when they do something like that."
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This is inexcusable that NMED preemptively surrendered to Department of Energy extortion. In effect DOE is saying if you, the regulator, fine us, we will cut the money the taxpayer has paid to clean up our mess that threatens the citizens you are suppose to protect."

(View/download full press release)


Los Alamos Hires New Contractor - Starts Cleanup On the Cheap

Santa Fe, NM- Today the Department of Energy (DOE) announced the award of the new Los Alamos National Laboratory legacy cleanup contract to Newport News Nuclear BWXT-Los Alamos, LLC. The $1.39 billion contract is for ten years, which works out to $139 million per year...
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This dooms the Lab to cleanup on the cheap. This 140 million dollars per year to the cleanup contractor is based on a revised Consent Order by the New Mexico Environment Department that was a give away to the Los Alamos Lab. The original 2005 Consent Order held the Department of Energy's feet to the fire to complete real cleanup or pay stipulated penalties. In contrast, the Martinez administration gave the biggest polluter in northern New Mexico a free pass, forgiving a hundred million dollars in possible fines that should have gone to our kids' schools. New Mexicans deserve an Environment Department under a new governor that aggressively protects the environment and creates new high-paying jobs thorough enforcing comprehensive cleanup."

View/download the full press release


"Nuclear Weapons Development, Testing, Stockpile & UN Treaty" - Presentation by Nukewatch Director Jay Coghlan at the Albuquerque symposium "Dismantling the Nuclear Beast" Dec. 1-3, 2017.

View/download Power Point doc


Congressional Budget Office: Cost of Nuclear Weapons Upgrades and Improvements Increases to $1.2 Trillion

Today, in Washington, DC, the Congressional Budget Office released its new report, "Approaches for Managing the Costs of U.S. Nuclear Forces, 2017 to 2046". The Congressional Budget Office estimates that the most recent detailed plans for nuclear forces, which were incorporated in the Obama Administration's 2017 budget request, would cost $1.2 trillion in 2017 dollars over the 2017-2046 period: more than $800 billion to operate and sustain (that is, incrementally upgrade) nuclear forces and about $400 billion to modernize them.... Driving this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of "deterrence," thousands of warheads are being refurbished and improved to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government!

(read full press release)


Santa Fe City Council: LANL Cleanup Order Must Be Strengthened & Expanded and Plutonium Pit Production Suspended Until Safety Issues Are Resolved

Santa Fe, NM. On the evening of Wednesday October 25, the Santa Fe City Council passed a resolution requesting that the New Mexico Environment Department strengthen the revised Los Alamos National Labs cleanup order to call for additional characterization of legacy nuclear wastes, increased cleanup funding, and significant additional safety training. The resolution also called for the suspension of any planned expanded plutonium pit production until safety issues are resolved.

(view/download full press release)


International Campaign to Abolish Nuclear Weapons Wins Nobel Peace Prize, NukeWatch Calls on New Mexico Politicians and Santa Fe Archbishop To Support Drive Toward Abolition

Santa Fe, NM. Nuclear Watch New Mexico strongly applauds the awarding of the Nobel Peace Prize to the International Campaign to Abolish Nuclear Weapons (disclosure: NukeWatch is one of ICAN's ~400 member groups around the world). This award is especially apt because the peoples of the world are now living at the highest risk for nuclear war since the middle 1980's, when during President Reagan's military buildup the Soviet Union became convinced that the United States might launch a pre-emptive nuclear first strike. Today, we not only have Trump's threats to "totally destroy" North Korea and Kim Jong-un's counter threats, but also renewed Russian fears of a US preemptive nuclear attack... Generally unknown to the American taxpayer, our government has quietly tripled the lethality of the US nuclear weapons stockpile..."

(view/download complete press release)


Expanded Plutonium Pit Production at LANL Will Not Result in Significant Positive Effect On Job Creation and the Regional Economy

The National Nuclear Security Administration's own documents have explicitly stated that expanded pit production would have no significant positive effect on job creation and the regional economy of northern New Mexico. Nuclear Watch argues that expanded plutonium pit production could actually have negative effect if it blocks other economic alternatives such as comprehensive cleanup, which could be the real job producer. Moreover, given LANL's poor safety and environmental record, expanded plutonium pit production could have a seriously negative economic impact on northern New Mexico in the event of any major accidents.

- view/download fact sheet


Chromium Groundwater Contamination at Los Alamos Lab Far Greater Than Previously Expected; LANL's Treatment Plan Must Be Drastically Changed

Santa Fe, NM. The Los Alamos National Laboratory (LANL) has detected far more hexavalent chromium (Cr) contamination than previously estimated in the "sole source" regional groundwater aquifer that serves Los Alamos, Santa Fe and the Espanola Basin. Sampling in July from a new well meant to inject treated groundwater back into the aquifer detected chromium contamination five times greater than the New Mexico groundwater standard of 50 micrograms per liter (ug/L).

View/download the full press release


Talking Points: The 2016 LANL Cleanup Consent Order Should Be Rescinded

The 2005 LANL Cleanup Consent Order was all about the enforceable schedules. It required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It stipulated a detailed compliance schedule that the Lab was required to meet. Under Gov. Martinez, NMED Secretary Ryan Flynn granted more than 150 compliance milestone extensions at the Lab's request, effectively eviscerating it.
In June 2016 the New Mexico Environment Department (NMED), the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) signed a revised Consent Order governing cleanup at the Los Alamos National Laboratory (LANL). The new Consent Order is a big step backward in achieving comprehensive, genuine cleanup at the Lab. The revised 2016 CO was a giveaway by NMED to DOE and the Lab, negotiated to allow DOE's budget to drive cleanup, not what is needed to permanently protect our water.
NMED should have kept the original, enforceable 2005 Consent Order that it fought so hard for under the Richardson Administration, modified as needed for the cleanup schedule and final compliance date.

View/download the complete talking points


Oak Ridge Environmental and Peace Alliance, Nuclear Watch New Mexico, and The Natural Resources Defense Council File Lawsuit Against New Nuclear Bomb Plant

Washington, DC Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration's (NNSA's) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.'s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants.
"The story of this new bomb plant is a long tale of outrageous waste and mismanagement, false starts and re-dos, a federal agency that refuses to meet its legal obligation to engage the public, and a Senator that is bent on protecting this piece of prime nuclear pork for his home state," said Ralph Hutchison, coordinator of OREPA. "But the short version is this: when the NNSA made dramatic changes to the UPF, and admitted that it intends to continue to operate dangerous, already contaminated facilities for another twenty or thirty years, they ran afoul of the National Environmental Policy Act. Our complaint demands that the NNSA complete a supplemental environmental impact statement on the latest iteration of its flawed plans."

View/download the full press release


Some Background on Plutonium Pit Production at the Los Alamos Lab

Santa Fe, NM -The Washington Post has published the first in a series of articles on nuclear safety lapses in plutonium pit production at the Los Alamos Lab. Plutonium pits are the fissile cores of nuclear weapons that when imploded initiate the thermonuclear detonation of modern weapons. By the way, did you know? Plutonium facilities at LANL are- in principle- designed to withstand a serious earthquake of a degree expected to occur only once every 10,000 years. The last serious earthquake near the Lab is believed to have occurred 11,500 years ago.

View/download the full press release


This year's report examines the extraordinary spending at Department of Energy nuclear facilities and examines ways to reduce risks and save billions of dollars across the U.S. nuclear weapons complex.

(View/download PDF)


SA Preview of Trump's Budget: More Nuclear Bombs and Plutonium Pit Production

Santa Fe, NM. "The proposed level of funding for the National Nuclear Security Administration's (NNSA)'s Total Weapons Activities is $10.2 billion, a full billion above what was requested for FY 2017. In March, Trump's "skinny budget" stated NNSA's funding priorities as 'moving toward a responsive nuclear infrastructure', and 'advancing the existing warhead life extension programs'.
"Concerning Life Extension Programs, rather than merely maintaining and extending the lives of existing nuclear weapons as advertised, they are being given new military capabilities, despite denials at the highest levels of government. A current example is the B61-12 Life Extension Program, which is transforming a "dumb" nuclear bomb into the world's first highly accurate "smart" nuclear bomb.
"With respect to the Los Alamos National Laboratory (LANL), "responsive infrastructure" no doubt means accelerating upgrades to existing plutonium facilities and likely building two or three new underground "modules", all for the purpose of quadrupling plutonium pit production from 20 to 80 pits per year. (Plutonium pits are the fissile cores of nuclear weapons.)”

Read the full press release for all the details.


Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion

March 28, 2017, UN, NYC:
Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion
See video clips of some of the speakers:


Plutonium Pit Production at LANL (Updated March 2017)

(view/download PDF)


Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection

Santa Fe, NM. America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning.
Two recently released government reports make clear the stark inequality between the so-called modernization program to upgrade and indefinitely preserve U.S. nuclear forces (in large part for a new Cold War with Russia), and the nation-wide program to clean up the radioactive and toxic contamination from the first Cold War. The Obama Administration launched a trillion dollar nuclear weapons "modernization" program, which President Trump may expand. In contrast, cleanup of the first Cold War mess has been cut from a high of $8.5 billion in 2003 to $5.25 billion in 2016, even though comprehensive cleanup would produce far more jobs than nuclear weapons programs.

Read the full press release for all the details.


NNSA Releases Los Alamos Lab Performance Evaluation Report,Nuclear Criticality Safety Issues Still Not Fully Resolved

The National Nuclear Security Administration (NNSA) has publicly released its fiscal year 2016 Performance Evaluation Report (PER) for Los Alamos National Security, LLC (LANS), the for-profit contractor that runs the Los Alamos Lab. The Performance Evaluation Report is NNSA's annual report card on contractor performance, and overall the agency awarded LANS $59 million in profit out of a possible $65 million. The grade was 85% for the incentive part of the award. In 2012 Nuclear Watch New Mexico successfully sued NNSA to ensure that the Performance Evaluation Reports detailing taxpayers funds paid to nuclear weapons contractors are publicly available. In 2016 the NNSA decided to put the LANL management contract out for competitive bid, but granted LANS a contract extension until the end of September 2018.
Despite the passing grade that NNSA gave LANS, there is still ample reason for public concern. First, it bears repeating that in February 2014 a radioactive waste drum improperly prepared by the Los Alamos National Laboratory (LANL) burst underground at the Waste Isolation Pilot Plant (WIPP), contaminating 21 workers and closing that multi-billion dollar facility (a limited restart of operations at WIPP may occur this month).
Less widely known is the fact that LANL's main plutonium facility that produces WIPP wastes has only recently restarted operations after being shut down since June 2013 because of nuclear criticality safety concerns... (more: read full press release)

Media appearances including radio interviews are listed on the internal Media page

See the NukeWatch Channel at YouTube for our extensive playlists of key videos.

See the Nukewatch Twitter feed

See the Nukewatch Tumblr site


WatchBlog Posts:

Over 200 posts published since 2009. See archives at the WatchBlog

Earlier Work Product items are archived here

Scroll to top