Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law

FOR IMMEDIATE RELEASE, October 3, 2024

Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]

AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.

The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites.  These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.

As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.

Continue reading

High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up

FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.

On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.

Continue reading

NEW Pit Production Fact Sheet – July 2024

Nuclear Weapons and Waste Issues in NM – July 14 Presentation

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production

FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email

Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.

In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:

“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]

Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.

Continue reading

NNSA’s Nuclear Weapons Budget Takes Huge Jump

Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut

FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.

The Biden Administration states that the $19.8 billion will be used to:

“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.

The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:

“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)

Continue reading

NNSA Suppresses How Taxpayers Money Is Spent

FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.

NNSA Suppresses How Taxpayers Money Is SpentA current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.

Continue reading

2023

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT FACT SHEETS

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT PRESS RELEASES

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT NUCLEAR BUDGET GRAPHS

It seems we can’t find what you’re looking for. Perhaps searching can help.

Past Work Product (2020-2021)

It seems we can’t find what you’re looking for. Perhaps searching can help.

75TH ANNIVERSARY HIROSHIMA DAY ONLINE COMMEMORATION CALLING FOR THE ABOLITION OF NUCLEAR WEAPONS
August 6, 2020

"Jay Coghlan of Nukewatch.org on the history of the Los Alamos labs, where the bomb was designed and fabricated, and how it continues to play the leading role in the creation of most U.S. nuclear weapons since then."

[embeddoc url="https://nukewatch.org/wp-content/uploads/2020/05/plutonium-pit-production-fact-sheet.pdf" download="all" viewer="browser"]

PLUTONIUM PIT PRODUCTION WORKSHOP – NOVEMBER 19, 2019

RADIO INTERVIEW – SCOTT KOVAC & JON LIPSKY

Scott Kovac of Nuclear Watch New Mexico and Jon Lipsky, the FBI agent who led the 1989 raid investigating environmental crimes that shut down the Rocky Flats Nuclear Bomb Plant join Xubi to talk about Nuclear weapons, Nuclear clean up and Pit production plans at LANL.

livingontheedge.libsyn.com

RADIO INTERVIEW – JAY COGHLAN & JON LIPSKY

PIT Production at LANL with Nuclear Watch New Mexico’s Jay Coghlan and Workshop Speaker, Jon Lipsky

The Richard Eeds Show 11/18

RADIO INTERVIEW – MARYLIA KELLEY, EXECUTIVE DIRECTOR, TRI-VALLEY CARES

Nuclear Watch NM’s Workshop on LANL & PIT Production with Marylia Kelley of Tri-Valley CARES

The Richard Eeds Show 11/19


Pit Production Workshop: View the Presentations

Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant

Introduction by Jay Coghlan

Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL

Marylia Kelly, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race

https://www.facebook.com/NukeWatch.NM/videos/825812604488302/

Scott Kovac Nuclear Watch New Mexico, on LANL cleanup issues

Blog Posts

NNSA life extension program and Pentagon tail fin kit create new military capabilities

The NNSA press release below reports on a limited drop test of a mocked up B61-12 nuclear bomb from a helicopter, not its slated delivery systems (B-2 bombers and various sophisticated NATO aircraft). But this press release is of course misleading, focusing on replacing radar vacuum tubes in order “to increase the safety and security of the bomb.”

The real action will begin soon. Note the press release’s phrase “With the incorporation of a new Air Force tail kit assembly…” In its last budget request NNSA marks the following milestone “In FY 2014, NNSA will integrate the nuclear bomb assembly components and the Air Force Tail Kit Assembly into functional Compatibility Test Units (CTUs) for integration testing with Air Force nuclear certified aircraft.” NNSA FY 2014 Congressional Budget Request, page WA-32.

This is a good example of how the NNSA’s ~$10 billion B61 Life Extension Program and the Air Force’s ~$3.2 billion Tail Kit Assembly program are co-joined. Together they will create the world’s first nuclear “smart” bomb for delivery by future super stealthy F-35s (with each bomb costing more than twice their weight in gold). This clearly creates new military capabilities for an existing nuclear weapon, contrary to official U.S. policy declared at the 2010 NonProliferation Treaty Review Conference and elsewhere.

National Nuclear Security Administration
U.S. Department of Energy

For Immediate Release
August 29, 2013
Contact: NNSA Public Affairs, (202) 586-7371

B61-12 Life Extension Program Radar Drop Tests Completed Successfully

WASHINGTON, D.C. – As part of the ongoing effort to refurbish the aging B61 nuclear bomb without resorting to underground nuclear testing, two successful B61-12 radar drop tests were successfully completed at the Tonopah Test Range in Nevada on Aug. 14 and 15, 2013, by engineers from Sandia National Laboratories.

Current B61s use decades-old vacuum tubes as part of their radar system. The new radar system, which had not been tested outside of a laboratory environment, was assembled in a gravity bomb configuration and successfully functioned as it was dropped from a helicopter.

“The B61 contains the oldest components in the U.S. arsenal,” said Don Cook, National Nuclear Security Administration Deputy Administrator for Defense Programs. “As long as the United States continues to have nuclear weapons, we must ensure that they remain safe, secure and effective without the use of underground testing. The B61 has been in service a decade longer than planned, and our refurbishment program is a scientific and engineering challenge. These successful tests have given us confidence in our ability to integrate the new radar design and move forward with our efforts to increase the safety and security of the bomb.”

The Nuclear Weapons Council, a joint Department of Defense and Department of Energy/NNSA organization established by Congress, moved the B61 Life Extension Program (LEP) from the planning stages to development engineering in February 2012. The scope of this LEP includes refurbishment of both nuclear and non-nuclear components to address aging, ensure extended service life, and improve safety, reliability and security of the bomb. With the incorporation of a new Air Force tail kit assembly, the design will also enable consolidation and replacement of the existing B61-3, -4, -7, and -10 bombs by the B61-12 bomb. The LEP will reuse or remanufacture existing components to the extent possible.

This radar drop test is one of several critical milestones for the B61-12 LEP this year. Radar testing will continue with integration of other B61-12 components, including the weapon and firing control units to demonstrate the arming, fuzing and firing subsystem. The B61-12 LEP is an essential element of the U.S. strategic nuclear deterrent and of the nation’s commitments to extended deterrence and it ensures the continued vitality of the air-delivered leg of the U.S. nuclear triad.

Established by Congress in 2000, NNSA is a semi-autonomous agency within the U.S. Department of Energy responsible for enhancing national security through the military application of nuclear science. NNSA maintains and enhances the safety, security, reliability and performance of the U.S. nuclear weapons stockpile without nuclear testing; works to reduce global danger from weapons of mass destruction; provides the U.S. Navy with safe and effective nuclear propulsion; and responds to nuclear and radiological emergencies in the U.S. and abroad. Visit www.nnsa.energy.gov for more information.

 

Excellence Unfulfilled at the LANL’s Plutonium Facility

A Los Alamos National Laboratory fact sheet touts the Lab as a plutonium “center of excellence”. However, the Laboratory Director paused operations in the Plutonium Facility on June 27, 2013. (The Plutonium Facility, called PF-4, is located at Technical Area 55 at Los Alamos National Laboratory (LANL). PF-4 is home for the Lab’s plutonium work, including nuclear weapons component production.) The pause was based on issues identified during safety reviews and findings from recent assessments. For one, the Defense Nuclear Facilities Safety Board (Board) performed a review of the Criticality Safety Program at Los Alamos National Laboratory (LANL) in May 2013. (The Board is an independent organization within the executive branch chartered with the responsibility of providing recommendations and advice to the President and the Secretary of Energy regarding public health and safety issues at Department of Energy (DOE) defense nuclear facilities.) This review identified significant non-compliances with DOE requirements and industry standards in the Lab’s Criticality Safety Program (CSP). In addition, this review identified criticality safety concerns around operations at the Plutonium Facility. The Board noted that some of these deficiencies are long standing and indicated flaws in federal oversight and contractor assurance. Much plutonium work, especially work with a high potential for criticality, will be stopped through the rest of 2013.

Nuclear criticality safety is defined as “protection against the consequences of an inadvertent nuclear chain reaction, preferably by prevention of the reaction.” The most potentially dangerous aspect of a criticality accident is the release of nuclear radiation if it maintains a self-sustaining nuclear chain reaction.

To date, the only thing self-sustaining is the Lab’s inability to address its criticality issues and yet still convince Congress to keep funding plutonium work there. To prevent bad things from happening, DOE’s regulations and directives require contractors to evaluate potential accident conditions and put in place appropriate controls and safety measures. History shows that the Los Alamos Laboratory just cannot do this, even though much of the work is performed on plutonium pits, the primaries of nuclear weapons. Even though actual need for this work has not been proven, the Lab has entrenched itself as the only place in the country where plutonium pits can be made, developed, and tested.

For fiscal year 2014, the budget request for nuclear ‘weapons activities’ at LANL was $1.4 billion. The exact amount that is spent on plutonium operations in PF-4 is unknown to us, but the budget request for 2014 for Directed Stockpile Work, which is where major parts of the plutonium operations are located, was $460 million. This is a 23% increase over last year’s budget. The funding pours into the Lab regardless of whether the Lab is actually doing any work, which is frequently stopped.

Here’s history of criticality problems and work stoppages at Los Alamos Laboratory:
In 2005, an assessment determined that LANL’s expert-based Criticality Safety Program (CSP) was not compliant with applicable DOE requirements and industry standards.

In 2006, LANS developed a Nuclear Criticality Safety Program Improvement Plan.

In 2007, in response to concerns raised by the Board’s staff, LANL determined that the authorized loading of vault storage rooms in PF-4 could lead to a critical configuration.

In 2008, the Government Accountability Office reported concerns about nuclear safety at LANL are long-standing. Problems included 19 occasions since 2003 where criticality safety requirements were violated, such as storing materials in quantities higher than safety limits allow, 17 of 19 of the site’s nuclear facilities operating without proper safety documentation, reported inadequacies in safety systems, radiological releases, and four enforcement actions for significant violations of nuclear safety rules.

Los Alamos Report for Week Ending April 3, 2009
LANL management placed the facility in stand-by mode until roughly 125 safety evaluations could be re-evaluated.

Los Alamos Report for Week Ending October 2, 2009
The Plutonium Facility was placed in standby mode because management declared the fire suppression system inoperable based on recent hydraulic calculations that concluded the system was not able to achieve the water coverage required. LANL had performed a system adequacy analysis in 2008. The hydraulic calculation completed for the system identified that 13 of approximately 100 hydraulic areas did not meet the requirement.

Los Alamos Report for Week Ending October 16, 2009
A general evacuation alarm was caused by a Criticality Alarm System signal because of a loss of all facility ventilation and failure of the Facility Control System at the Plutonium Facility. The facility was in standby mode during this event due to previously identified issues with the fire suppression system and, therefore, limited personnel were in the facility.

Los Alamos Report for Week Ending September 10, 2010
Operations in Plutonium Facility were suspended because potentially explosive ammonium nitrate was discovered in two filter ducts.

Los Alamos Report for Week Ending December 3, 2010
It was revealed that greater than 1000 items, or about 20%, of the total vault holdings are items packaged in potentially vulnerable containers with taped slip-top lids rather than in robust safety-significant containers that include a HEPA-filtered vent. The presence of these slip-top containers requires respirator use whenever operators access the vault. In FY10, LANL made meaningful progress in addressing these legacy materials.

In 2011, an event occurred at PF-4 in which fissile material handlers violated procedural requirements and criticality safety controls while moving and photographing plutonium rods.

Beginning in 2012, LANS experienced an 18-month exodus of criticality safety professionals from its criticality safety group. LANS currently employs 2 full-time and 2 part-time qualified criticality safety analysts, in addition to 3 part-time subcontractors—far fewer than the 17 criticality safety analysts it has determined to be necessary to support operations, meet mission goals, and maintain the CSP.

Los Alamos Report for Week Ending April 20, 2012
Plutonium Facility personnel use a software program called MAR Tracker to track plutonium that is used in the facility. A system engineer discovered an error in
MAR Tracker that caused only a small subset of applicable facility containers (roughly 1700 out of 13000 containers) to be checked during the required annual MAR surveillance. The Plutonium Facility was placed in Standby Mode.

Los Alamos Report for Week Ending June 15, 2012
LANL identified a number of fuel rods in TA-35 Building 27 that were not consistent with the criticality safety evaluation for the facility. Operations at this building had previously been suspended in late-May due to the discovery of three fuel rods that were not in the facility or institutional tracking systems.

Los Alamos Report for Week Ending December 14, 2012
LANL identified that the Criticality Safety Evaluations (CSEs) for two rooms did not adequately address the potential for interaction effects between storage locations. Plutonium Facility management suspended operations in these two vault rooms.

Los Alamos Report for Week Ending February 15, 2013
LANL began a focused training program (“boot camp”) to provide an intensive learning environment for new criticality safety staff. The program consisted of nine modules including: nuclear theory; criticality safety calculation methods; ANSI/ANS, DOE and LANL criticality safety standards and requirements; criticality safety evaluations; and criticality alarm and detection systems. This program along with on-the-job training and performance demonstrations was to provide a mechanism for achieving full qualification as a LANL criticality safety analyst. Conduct of the boot camp was part of the LANL corrective action plan for improving the nuclear criticality safety program.

Los Alamos Report for Week Ending May 3, 2013
The laboratory completed criticality safety assessments at LANL nuclear facilities. The review teams identified 3, 4, and 6 findings for TA-55, CMR, and Area G, respectively. In all cases, the assessments concluded adequate implementation of the Criticality Safety Program with the exception of identified findings. Notably, one of the findings at Area G identified that supervisors and operations center personnel did not have an adequate understanding of criticality safety requirements. Area G management paused operations based on this finding and conducted appropriate training to resolve this issue.

In May 2013, the staff of the Defense Nuclear Facilities Safety Board (Board) performed a review of the Criticality Safety Program at Los Alamos National Laboratory. This review identified significant non-compliances with applicable Department of Energy requirements and industry standards in the implementation of the Criticality Safety Program. The Board’s staff identified the following non-compliances during its review:
• Most criticality safety controls are not incorporated into operating procedures.
• Operators typically do not utilize written procedures when performing work.
• Fissile material labels do not list parameters relevant to criticality safety (e.g., mass).
• Some fissile material operations lack Criticality Safety Evaluations (CSEs).
• Some CSEs do not analyze all credible abnormal conditions.

Los Alamos Report for Week Ending June 28, 2013
The Laboratory Director paused programmatic activities at the Plutonium Facility. The pause was directed based on issues identified during procedural and criticality safety reviews and findings from recent assessments. Reviews at PF-4 have identified a number of procedural issues and the need for clarification and improvement of criticality safety controls.

Los Alamos Report for Week Ending July 26, 2013
Plutonium Facility personnel identified several criticality safety issues associated with recent construction activity. Even though plutonium work was paused, the Laboratory Director and the Facility Operations Director (FOD) approved construction activities that had the potential to affect nuclear materials.

For more information, please read the LAMonitor article By John Severance
Safety board visits LANL

Nuclear weapons are “the world’s most heinous weapons”

Secretary of State John Kerry correctly condemned the Syrian regime’s apparent use of chemical weapons, but he’s wrong calling them “the world’s most heinous weapons.” Instead that awful distinction belongs to nuclear weapons, a class of weapons far above any other. If ever used again nuclear weapons would indiscriminately kill far more people, including women, children and non-combatants, than chemical weapons ever could, and poison the planet with radioactive fallout. Nevertheless our country is planning repeating cycles of “Life Extension Programs” costing $100 billion or more, giving existing nuclear weapons new military capabilities. This is directly contrary to what Kerry’s predecessor ex-Secretary Hillary Clinton declared as official U.S. policy at the 2010 NonProliferation Treaty Review Conference.

The cost of the mismanaged Los Alamos and Sandia Labs’ Life Extension Program for the B61 nuclear bomb has more than doubled from $4 billion to $10 billion. A related $3.2 billion Pentagon program will produce a new tail fin guidance kit. Together these programs will create the world’s first nuclear “smart” bomb for delivery by future super stealthy aircraft, while each bomb will cost more than twice their weight in gold.

The U.S. should review its own moral authority while preparing for military action in Syria. In particular our New Mexican congressional delegation must stop automatically supporting expanded nuclear weapons programs without deeply questioning their own consciences. Our politicians’  justifications to date have been to protect a few hundred jobs at the Labs, which don’t really trickle down to average New Mexicans anyway.

As evidence of the lack of broad benefit to New Mexicans, according to the U.S. Census Bureau our state was 37th in per capita income in 1959. In 2010 we were 44th, despite the vaunted economic presence of the nuclear weapons industry in New Mexico, and in 2013 we were rated dead last for the well being of our children by the KIDS COUNT Data Center. Our politicians should be striving mightily that New Mexicans increasingly benefit from our vast renewable solar, wind, biomass and geothermal resources that would employ far more citizens, instead of pandering to nuclear weapons programs that produce a commodity that we can only hope will never be used.

 

 

 

On my soap box about Sandia Labs

John Fleck of the Albuquerque Journal had an article today entitled “Sandia Labs manager gets 6 more months,”  describing Lockheed Martin’s half year contract extension. John knows all three nuclear weapons labs well, and I won’t be telling him things that he doesn’t already know. But I’ll use his article as an excuse to stand on my soap box about Sandia Labs.

To my taste, John’s article makes Sandia sound a little too benign with phrases like “the nuclear weapons research center” and “Sandia is one of the nation’s three nuclear weapons design and maintenance laboratories.” What is left unreported is that Sandia is a major production site that, for example, manufactured 850 neutron generators for nuclear weapons in 2010, and loads them with radioactive tritium. In addition to design responsibility for non-nuclear components, Sandia’s secondary mission has long been “weapons effects” research for making sure nuclear weapons continue to work in lethal radiation environments. This enables multi-strike nuclear warfighting rather than the simple deterrence sold as doctrine to the American public.

Further, instead of mere “maintenance,” all three nuclear weapons labs (Sandia, Los Alamos and Lawrence Livermore) are lobbying for a never-ending cycle of so-called Life Extension Programs that will intentionally introduce profound changes to existing nuclear weapons. Major changes are the last thing we should do to a stockpile that has been extensively tested and proven to be even more reliable than previously thought, when we can no longer full-scale test. All of this will be of enormous expense to the American taxpayer, where for example the currently proposed Life Extension Program for the B61 bomb has exploded in costs from $4 billion to more than $10 billion, resulting in each bomb costing twice its weight in gold. Added to this is a related $3.2 billion Pentagon program giving the B61 a new tail fin guidance kit, transforming it into the world’s first nuclear “smart” bomb for delivery by planned super stealthy aircraft.

In addition to prolonging their service lives for 30 years or more, these Life Extension Programs have and will create new military capabilities for existing nuclear weapons, despite denials at the highest levels of the U.S. government to the world at large (for example, at the United Nations’ 2010 NonProliferation Treaty Review Conference). The lab directors wear two hats, the first as directors who are required to annually certify to the president and Congress that the nuclear weapons stockpile is safe, secure and reliable. The second hat is that as presidents of the executive board of the for-profit corporations running the labs, which will directly benefit from never-ending Life Extension Programs that may actually undermine stockpile reliability. So far from mere “research” and “maintenance” we have a deep seated conflict-of-interest driven by profit that will stymie our global leadership toward getting rid of nuclear weapons while continuing to fleece the American taxpayer.

Foremost in this is the Sandia National Laboratories, which amongst the three labs now has the largest nuclear weapons budget. In the past, Sandia has been singled out as a model of lab mission diversification, with its total annual institutional budget falling below 50% nuclear weapons. That is no longer true given recent large increases to its nuclear weapons research and production programs, which now comprise ~55% of Sandia’s total budget.

 

 

Nuclear weapon research at the universities

A July 5th article in the Deseret News reported on an NNSA program that gives millions of dollars to universities for “predictive science”, which is defined as:

Predictive science is the application of verified and validated computational simulations to predict the behavior of complex systems where routine experiments are not feasible. The selected PSAAP II centers will focus on unclassified applications of interest to NNSA and its national laboratories — Lawrence Livermore National Laboratory, Los Alamos National Laboratory and Sandia National Laboratories.

Funny, nuclear weapons are not mentioned.
The good news, and few know this better than Utah, is that testing nuclear weapons no longer requires full-scale explosions. The bad news is that predictive science, to the NNSA, is the “science” of predicting whether nuclear warheads will work after they have been refurbished, modernized, and given new military characteristics. We know that the old versions work. Do the students know that they helping to prolong the nuclear menace by testing newly designed versions of the old weapons on their computers?
It should be called nuclear weapons perpetuating science 101.

New Mexico Members of Congress Vote for Exorbitant Nuclear Bomb While State Is Ranked as the Worst for Children

Yesterday all three House members of the New Mexican congressional delegation voted against an amendment that would cut money added to a wasteful nuclear weapons program. In April the Obama Administration asked for $537 million in fiscal year 2014 for a “Life Extension Program” for the B61 Cold War nuclear bomb, 45% above the 2013 level. The House Appropriations Committee added $23.7 million to that bloated request, which the amendment would have cut. Overall, the B61 Life Extension Program has exploded in estimated costs to where each warhead will cost twice their weight in gold just to “refurbish” (which does not include original production and ongoing maintenance costs).

 The sponsor of the amendment, Rep. Mike Quigley, D-Ill., testified during floor debate:

At a time when we are slashing funds for disease research at the NIH [National Institute of Health], failing to fund our crumbling infrastructure, and underinvesting in our children¹s education, we are increasing funding to keep hundreds of nuclear bombs in operation that we will never use. The Cold War is over.

The Albuquerque Journal reported that Rep. Ben Ray Luján, D-N.M.,

…supported the full $551 million for the B61 Life Extension Program because it is a national security priority. “This funding is important for Los Alamos and Sandia labs’ effort to ensure the safety of the nuclear weapons stockpile, and cuts to that funding impact the ability to keep it secure,” Luján said.

Rather just ensuring safety and security the program will radically improve the bomb, giving it new military capabilities by turning it into a precisely targeted smart bomb and mating it to future bombers for supersonic stealthy delivery. Currently the main mission of B61 bombs is as tactical nuclear weapons in NATO countries, a relic of the Cold War. Improved B61’s fly in the face of Obama’s newly declared goal of reducing the presence of battlefield nuclear weapons in Europe, even as he proposes to negotiate with the Russians for further arms reductions. Moreover, if security is really the issue, the sure solution that saves taxpayers money and encourages nonproliferation is to withdraw the nuclear bombs from forward deployment in Europe, where a few years ago protesting peace activists were able to infiltrate within a few hundred yards of them.

Ironically, the B61 Life Extension Program may actually undermine our own national security by introducing major changes to existing bombs. Our stockpile has been extensively full-scale tested, and repeated studies have found our nuclear weapons to be even more reliable than previously believed. The Los Alamos and Sandia Labs propose to create a “frankenbomb” by mixing and matching four variants of the B61 bomb into a single new modification. Common sense dictates that the last thing we should do while seeking to maintain confidence in our reliable nuclear weapons stockpile is to introduce major changes that can’t be tested.

Our New Mexican congressional delegation represents a state that was just ranked as the worst of all fifty for the well-being of its children, where more than 25% live in poverty. In stark contrast, Los Alamos County, dominated by the lab, is the second richest county in the entire USA. Nuclear weapons programs are a poor producer of jobs, where for example according to the government’s own documents a new $6 billion plutonium facility was not going to produce a single new permanent job at Los Alamos Lab.

Contrary to the claimed economic benefits of the Los Alamos and Sandia Labs, New Mexico as a whole continues to fall from 37th in per capita personal income in 1959 to 44th in 2011. Nevertheless, the Labs have always had inordinate influence over New Mexican politicians. One extreme example is the recent starling revelation that in between unsuccessful Senate campaigns former Rep. Heather Wilson was paid more than $450,000 by the Los Alamos and Sandia Labs for “consulting” contracts that had no written work requirements.

The nuclear weapons labs have voracious appetites for federal funding, with their directors simultaneously acting as the presidents of the executive board of the for-profit limited liability corporations that run the labs (those private LLCs pay 2/3’s of the directors’ annual compensation of around one million dollars). Business will boom with never-ending Life Extension Programs, and Sandia and Los Alamos are not satisfied with just one Life Extension Program for the B61. They already plan yet another one 20 years from now that initial figures indicate would be even more expensive. In fact, the labs plan a never-ending cycle of Life Extension Programs that intentionally seek to implement major design changes for all existing types of nuclear weapons in our stockpile, costing at least $60 billion (while the doubling of costs has so far been the rule).

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “Congressman Ben Ray Luján should ask himself the question what good does a Cold War nuclear bomb that the for-profit labs want to endlessly tinker with do for New Mexican children? Pork for the labs should not drive nuclear weapons policies, especially when it’s of little if any tangible benefit to average New Mexicans. Luján should, instead, dedicate himself to boosting funding for programs that would really help our children but are facing painful sequester cuts, such as education, medical care and food assistance. Those investments would really brighten their future, and help raise New Mexico from its shameful position as the worst state for kids.”

# # # 

See House rejects effort to trim $23.7M in funding for B61, Michael Coleman, Albuquerque Journal, July 11, 2013.

For New Mexico’s ranking as the worst state for kids see Kids Count Data Center http://datacenter.kidscount.org/updates/show/20-2013-data-book-rankings
For the scope and schedule of perpetual Life Extension Programs for existing nuclear weapons see NNSA’s FY 2014 Stockpile Stewardship and Management Plan
https://nukewatch.org/importantdocs/resources/SSMP-FY2014.pdf

NM Environment Department Reclassifies WIPP Request!

Thanks to everyone’s work, the NM Environment Department has decided to get more information before allowing any leaky Hanford high-level tank waste to come to New Mexico!

NMED issued its determination to reclassify the DOE request as a class 3 – which requires a public hearing – “because there is significant public interest.”

Public comments made the difference!

There will be much more to do.

See https://nukewatch.org/watchblog/?p=1503 for background.

From the NMED release –
July 2, 2013
RE: ELEVATION OF CLASS 2 MODIFICATION TO REMOVE EXCLUDED WASTE PROHIBITION WASTE ISOLATION PILOT PLANT

The New Mexico Environment Department (Department) received a permit modification
request dated April 8,2013 from the U.S. Department of Energy Carlsbad Field Office and
Nuclear Waste Partnership, LLC (the Permittees) on April 9,2013. The Permittees seek to
modify the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (Permit) and
request that the Department process the request as a Class 2 modification under the
regulations at 20.4.1.900 NMAC, incorporating 40 CFR § 270.42(b).
The request modifies the prohibition of excluded waste from the WIPP Permit.

Page 2
Under 40 CFR § 270.42(b)(6)(i)(C), the Secretary may determine that the modification
request must follow the procedures in § 270.42(c) for Class 3 modifications for the following
reasons: (1) There is significant public concern about the proposed modification; or (2) The
complex nature of the change requires the more extensive procedures of Class 3.
In this matter, I have determined that it is appropriate for the Department to process the
modification request as a Class 3 modification under 40 CFR § 270.42( c) because there is
significant public interest.
If you have questions regarding this matter please address them to Trais Kliphuis, of the
Hazardous Waste Bureau, at 476-6051 or [email protected].
Sincerely,
Ryan Flynn
Cabinet Secretary-Designate

Help Stop Increased Nuclear Weapons Funding

Immediate Action Required

The House of Representatives Energy & Water Appropriations bill is coming up for a vote this week of July 8, 2013. It will come up tomorrow, with votes on amendments as soon as Tuesday or Wednesday. Rep. Quigley (D-IL) will be offering a floor amendment cutting the increase that the Energy & Water subcommittee added to the B61 Life Extension Program.

Please call urging your Representative to vote yes on the Quigley amendment to cut funding on the B61 nuclear warhead program. Please call rather than email at this point, to DC offices, as the timeline is very short.

Over the last few years, spending on nuclear weapons and nuclear bomb plants has continued to grow despite massive cost overruns. Especially wasteful is the plan to overhaul the B61 nuclear bomb, with an eventual total cost of $10 billion by 2019. This is way too much money for a bomb that is dangerous and outdated, and it is urgent that we slow down the spending before it is too late.

Cutting nukes spending in the Republican-controlled House can be an uphill battle. But we have been working with allies in Congress to stop this program that would overhaul 400 B61 nuclear bombs at a total price tag of $25 million each (almost double their weight in gold). We can see some wins, if our representatives feel the pressure.

Call your representative now at (202) 224-3121 to vote for the Quigley amendment to cut funds for the B61 nuclear bomb. [Direct phone numbers for the New Mexican delegation below.]

Subject Line: Budget Cut for Nuclear Bombs

Dear [Name],

Call your representative at (202) 224-3121 right now. To look up your representative click here: http://www.house.gov/representatives/find/
Use this sample message and add your own words:

“My name is [your name] and I live in [your city]. I am calling to tell Rep. [your rep’s name] to vote for the Quigley amendment to the Appropriations bill to cut excess funds for the B61 nuclear bomb.”
This is an important chance to cut wasteful spending on dangerous and outdated nuclear weapons. You can convince Congress to make this a priority.

Thank you,

Your name

New Mexico Representatives
Rep. Ben Ray Luján
http://lujan.house.gov/
Washington D.C. Office • Ph: (202) 225-6190

Rep. Michelle Lujan Grisham
http://lujangrisham.house.gov/
Washington, DC Office?•?Phone: 202-225-6316?

Rep. Steve Pearce
http://pearce.house.gov/
Washington, DC Office • Phone: 855-4-PEARCE (732723) or (202) 225-2365

Senate Appropriations Cuts Nuclear Bomb Life Extension Program; NM’s Tom Udall Tries to Restore Funding to Bloated Program

Santa Fe, NM – Today the Senate Energy and Water Development Appropriations Subcommittee reported that it cut funding for the National Nuclear Security Administration’s B61 nuclear bomb Life Extension Program (LEP). This is a significant victory for good governance, and it could positively influence future nuclear arms control.  The Obama Administration’s request for the B61 LEP was $537 million for FY 2014, a 45% increase above FY 2013. Senate Energy and Water cut it by $168 million to $369 million, and directed NNSA to look at alternatives since the full-blown program is experiencing massive cost overruns.

Senator Tom Udall opposed this cut since most of the B61 work will take place at the Los Alamos and Sandia nuclear weapons labs in New Mexico. Udall now sits on Senate Energy and Water, and successfully engineered a provision that would restore B61 LEP funding if certain cost and schedule requirements are met. Meanwhile House appropriators have added $23 million to the already bloated program, which sets up a sharp difference that must be reconciled in conference. This is where “deals” tend to be cut, and Tom Udall’s position on the B61 LEP could be critical.

In the past few years Senator Tom Udall actively supported a Walmart-sized “CMRR-Nuclear Facility” at Los Alamos that exploded in costs from $600 million to ~$6 billion, which for fiscal reasons the Obama Administration prudently decided to delay.  The CMRR’s main mission is to quadruple LANL’s production of plutonium cores (or “pits”) for nuclear weapons. Expanded pit production is necessary only for new-design nuclear weapons or heavily modified existing weapons.

If the full Life Extension Program that Tom Udall currently supports goes forward the estimated 400 B61 nuclear bombs will literally cost more than their weight in gold to refurbish (and that does not include original production costs). Moreover, the program will radically improve the bomb, giving it new military capabilities by turning it into a precisely targeted smart bomb and mating it to future bombers for supersonic stealthy delivery. Currently the main mission of B61’s is as tactical nuclear weapons in NATO countries, a relic of the Cold War. Improved B61’s fly in the face of Obama’s just declared goal of reducing the presence of battlefield nuclear weapons in Europe, even as he proposes to negotiate with the Russians for further arms reductions.

The nuclear weapons labs’ have voracious appetites for federal funding, with their directors simultaneously acting as the presidents of the executive board of the for-profit limited liability corporations that run the labs (those private LLCs pay 2/3’s of the directors’ annual compensation of around one million dollars). Business will boom with never-ending Life Extension Programs, and Sandia and Los Alamos are not satisfied with just one Life Extension Program for the B61. They already plan yet another one 20 years from now that initial figures indicate would be even more expensive.

In fact, the labs plan a never-ending cycle of Life Extension Programs that intentionally seek to implement major design changes for all existing types of nuclear weapons in our stockpile, costing at least $60 billion (while the doubling of costs has so far been the rule). Further, these major changes may undermine our own national security by eroding confidence in performance reliability when major modifications cannot be full-scale tested. We should instead stick to proven existing nuclear weapons designs, and avoid serious changes which arguably profit only nuclear weapons contractors.  Genuine maintenance of our nuclear weapons stockpile, such as the well-understood replacement of limited life components, would be prudent, technically sound and relatively inexpensive.

New Mexico, the state that Tom Udall represents, was just ranked as the worst state of all fifty for the well-being of its children, where more than 25% live in poverty. In sharp contrast, Los Alamos County, dominated by the lab, is the second richest county in the entire USA.

Jay Coghlan, director of Nuclear Watch New Mexico, commented, “Tom Udall could better serve all New Mexicans if he focused more on improving the lives of our children instead of the nuclear weapons labs and the service life of an archaic Cold War nuclear bomb. Specifically, he should drop his opposition to the cut in funding for the exorbitant and unneeded B61 nuclear bomb Life Extension Program, and make that clear in House-Senate conference. He should, instead, seek to boost funding for programs that really benefit New Mexican children but are facing painful sequester cuts, such as education, medical care and food assistance. And given our state’s increasingly crippling drought, Tom Udall could better serve all New Mexicans while sitting on the Senate Energy and Water Subcommittee by expanding water conservation and wildfire prevention programs, instead of favoring the labs through so-called Energy appropriations with increased funding for worse than useless nuclear weapons programs.”

# # #

Obama Calls For Further Nuclear Weapons Reductions While Increased Production and New Facilities at Los Alamos Are Still On the Table

Obama Calls For Further Nuclear Weapons Reductions
While Increased Production and New Facilities at Los Alamos Are Still On the Table

On June 19, in Berlin, President Barack Obama declared that, in concert with Russia, he plans to seek to cut the deployed strategic nuclear arsenal by up to one-third. He also said he will pursue significant bilateral cuts in tactical or battlefield nuclear weapons in Europe. In contrast, Obama’s National Nuclear Security Administration (NNSA) recently released plans for unneeded upgrades and dangerous improvements to existing nuclear weapons, which could force expanded nuclear component production and construction of new facilities at Los Alamos.

In the just released “FY 2014 Stockpile Stewardship and Management Plan” (SSMP), NNSA proposes perpetual Life Extension Programs for nuclear warheads that will result in three types of ballistic missile warheads and two types of nuclear air bombs. Although it’s still vague, the three so-called interoperable warheads would replace four types of existing warheads, which make little sense given the staggering estimated costs. These radical upgrades, if implemented, could not be full-scale tested, which would undermine confidence in their reliability. Our existing nuclear weapons designs have been extensively tested and subsequent studies have found them to be even more reliable and long-lived than originally thought.

The President’s speech is also incongruous with the SSMP in the area of plutonium pit production, and states “Preliminary plans call for pit production of potentially up to 80 pits per year starting as early as FY 2030.” (SSMP Pg. 62) With Obama’s further proposed arsenal reductions, any planned increase in weapons production is only a concession the nuclear weapons contractors profits. The alleged need for more plutonium pits cascades into a misplaced call for more production facilities. NNSA is “…evaluating the feasibility of constructing small laboratory modules connected to existing nuclear facilities…” (SSMP Pg. 8) to meet future claimed plutonium-manufacturing requirements. The SSMP states that Los Alamos can produce up to 30 pits per year without new facilities.

The need for increased pit production has never been explained adequately to the public, but the claim likely is centered on one of the interoperable warhead plans – the W78/88. In a May 7, 2013 testimony to the Senate Subcommittee on Strategic Forces, Dr. Penrose C. Albright, Director, Lawrence Livermore National Laboratory claimed that the W78/88 would require increased pit production at Los Alamos. He goes on to try to scare the Committee by saying that without construction funding for new pit facilities now, the W78/88 warhead upgrade could cost even more. He stated, “without going into the detail, the most likely option for the primary on the 78/88 does require the stand-up and operation of plutonium pit production capabilities at Los Alamos. And so any delay by the Government—any delay in funding to get that stood up—and that really has to start now—is going to add significant schedule risks to the program.” (Hearing Pg. 17)

The President should adopt the more fiscally prudent and technically sound alternative of replacing limited life components while he actually works to eliminate nukes altogether. This unending cycle of proposed Life Extension Program will waste huge sums of taxpayers money and is in direct conflict with the President’s own long-term goal of a future world free of nuclear weapons.

The full text of President’s Obama’s speech is available at http://www.whitehouse.gov/the-press-office/2013/06/19/remarks-president-obam

NNSA’s FY 2014 Stockpile Stewardship and Management Plan (SSMP) is available at https://nukewatch.org/importantdocs/resources/SSMP-FY2014.pdf

Hearing To Receive Testimony On National Nuclear Security Administration Management Of Its National Security Laboratories In Review Of The Defense Authorization Request For Fiscal Year 2014 And The Future Years Defense Program, Tuesday, May 7, 2013, U.S. Senate Subcommittee On Strategic Forces, Committee On Armed Services, Washington, DC.
http://www.armed-services.senate.gov/Transcripts/2013/05%20May/13-36%20-%205-7-13.pdf

Past NukeWatch Events

It seems we can’t find what you’re looking for. Perhaps searching can help.

Past Work Product (2019-)

It seems we can’t find what you’re looking for. Perhaps searching can help.

2019


Proposed LANL Campus in Santa Fe

Read/Download the Full Press Release HERE


Pope Frances Calls for Nuclear Weapons Abolition

Read/Download the Full Press Release HERE


VIEW LIVE RECORDING & WORKSHOP RESOURCES

Presenters:

  • Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
  • Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
  • Marylia Kelley, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
  • Scott Kovac, Nuclear Watch New Mexico, on LANL cleanup issues

NukeWatch’s 22-page formal comments on expanded plutonium pit production

Until NNSA fully complies with the National Environmental Policy Act through the preparation of a programmatic environmental impact statement on expanded plutonium pit production, Nuclear Watch believes that any irreversible or irretrievable commitment of resources to either the expansion of pit production at the Los Alamos Lab or to the repurposing of the MOX Facility at the Savannah River Site is unlawful.

Read/Download the Full Document HERE


Scoping comments on NNSA draft EIS for plutonium pit production at the Savannah River Site

THE NEED FOR A PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT: This is our first and primary concern, that NNSA must first complete a programmatic environmental impact statement (PEIS) on its nation-wide plans for plutonium pit production, in advance of the Savannah River Site-specific environmental impact statement. To get right to the point, we argue that the SRS EIS process should go no further than this scoping period and should resume only after a completed formal Record of Decision for a new or supplemental PEIS.

Read/Download the Full Document HERE


Expanding Nuclear Pit Production: The Facts and What You Can Do

The Facts
• The Trump administration wants the United States to produce 80 plutonium pits per year
by 2030 without offering any concrete justification for the additional nuclear bomb cores.
• Multiple studies by government agencies have found that pits last for at least 100 years.
The average pit in the US stockpile is around 36 years old.
• More than 15,000 existing pits are already stored at the Pantex Plant near Amarillo, TX.
• Independent experts find it nearly impossible that the Los Alamos National Laboratory
and the Savannah River Site will be able to meet the 80 pit per year by 2030 requirement,
and billions of taxpayer dollars will be thrown down the drain in the meantime.

Read/Download the Full Document HERE


Federal Government Meets Watchdogs’ Demand for Environmental Review of Expanded Plutonium Pit Production

In a victory for transparency and legal compliance by the government, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) today published a “Notice of Intent” in the Federal Register to complete environmental reviews on its controversial proposal to expand plutonium “pit” production for new and refurbished nuclear weapons.

[embeddoc url="https://nukewatch.org/wp-content/uploads/2019/06/SRS-plutonium-bomb-plant6-14-19.pptx" download="all" viewer="google"]

Read/Download the Full News Release HERE


Noted Environmental Lawyers Warn Government Not to Expand Production of Plutonium Bomb Cores in Violation of National Environmental Policy Act and Public Review

On behalf of three public interest organizations - Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch – attorneys for the law firm of Meyer Glitzenstein & Eubanks and the Natural Resources Defense Council recently sent a 16-page letter to Lisa Gordon-Hagerty, head of the National Nuclear Security Administration (NNSA). The detailed letter warns the nuclear agency to not proceed with aggressive plans to expand plutonium pit production without first meeting its legal requirements for timely public review and comment under the National Environmental Policy Act.

Read/Download the Full Press Release HERE


Faulty Radioactive Liquid Waste Valves Raise Crucial Plutonium Pit Production and Safety Board Issues

Last Wednesday, facility operations personnel entered a service room and noticed a leak emanating from a valve on the radioactive liquid waste (RLW) system. Upon subsequent visual inspection by a radiological control technician, RLUOB engineers believe that this valve, and 6 similar valves, may be constructed of carbon steel. The RLW system handles radioactive liquid waste streams from chemistry operations that include nitric and hydrochloric acids—carbon steel valves would be incompatible with these solutions. The suspect valves are also in contact with stainless steel piping, which would create another corrosion mechanism. RLUOB management plans to drain the affected piping sections and develop a work package to replace all of the suspect valves. They will also confirm the valve materials and if shown to be incorrect, investigate the cause of this failure in the design, procurement, and installation processes. The valves were installed in 2013 as part of a modification to add straining and sampling capabilities that were not in the included in the original design. [Please note that DNFSB reports are posted a few weeks later than dated.]

This immediately raises two crucial issues: 1) the National Nuclear Security Administration’s (NNSA’s) plans for expanded plutonium pit production; and 2) the current attempt by the Department of Energy to restrict Safety Board access to its nuclear weapons facilities.

Read/Download the Full Press Release HERE


A Tale of Two Consent Orders and What Is Needed

On March 1, 2005, after arduous negotiations and threats of litigation, the New Mexico Environment Department (NMED), Department of Energy (DOE), and Los Alamos National Laboratory (LANL) entered into a Consent Order specifying the schedule for investigation and cleanup of the Lab’s hundreds of contaminated sites. This Consent Order (CO) was LANL’s agreement to fence-to-fence cleanup of Cold War legacy wastes, which NMED began to enforce.

Read/Download the Full Comparison HERE


Global Nuclear Weapons Threats Are Rising

More than 25 years after the end of the Cold War, all eight established nuclear weapons powers are “modernizing” their stockpiles. Talks have broken down with North Korea, the new nuclear weapons power. Nuclear-armed India and Pakistan narrowly averted war last month. Russian President Vladmir Putin made new nuclear threats in response to Trump’s announced withdrawal from the Intermediate-Range Nuclear Forces Treaty. This could lead to hair-trigger missile emplacements in the heart of Europe and block extension of the New Strategic Arms Reduction Treaty with Russia. If so, the world will be without any nuclear arms control at all for the first time since 1972. Meanwhile, the U.S. criticizes non-weapons states for signing a nuclear weapons ban treaty, despite the fact there have long been treaties completely banning chemical and biological weapons of mass destruction that the U.S. seeks to enforce. The pending international NonProliferation Treaty (NPT) Preparatory Committee conference at the United Nations is widely expected to collapse in failure because of the nuclear weapons powers’ failure to enter into serious negotiations leading to nuclear disarmament. The NPT’s Article VI mandate for those negotiations has been in effect since 1970, when the Treaty was signed by 189 countries (more than any other treaty).

Read/Download the Full Press Release HERE



Nuclear Watch New Mexico — Department of Energy FY 2020 Nuclear Weapons Budget Request

Read/Download the Full Budget Compilation HERE


2018


Expanded Plutonium Pit Production for U.S. Nuclear Weapons

Plutonium pits are the radioactive cores or “triggers” of nuclear weapons. Their production has always been a chokepoint of resumed industrial-scale U.S. nuclear weapons production ever since a 1989 FBI raid investigating environmental crimes shut down the Rocky Flats Plant near Denver. In 1997 the mission of plutonium pit production was officially transferred to its birthplace, the Los Alamos National Laboratory (LANL) in northern New Mexico, but officially capped at not more than 20 pits per year. However, in 2015 Congress required expanded pit production by 2030 whether or not the existing nuclear weapons stockpile actually needs it. This will support new military capabilities for nuclear weapons and their potential use.

Read/Download the full fact sheet pdf HERE


Watchdog Groups Claim Nuclear Agency is Moving Forward to Manufacture New Plutonium Bomb Cores in Violation of National Environmental Law and Public Review

Nuclear Watch New Mexico, Savannah River Site Watch, and Tri-Valley CAREs sent a letter of demand to the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to inform the government that its plan to quadruple the production rate of plutonium bomb cores is out of compliance with the National Environmental Policy Act (NEPA).

NNSA’s premature plan to quadruple the production rate of plutonium bomb cores (“pits”), the heart of all US nuclear weapons, is out of compliance with requisite environmental law, the groups argue, as NNSA has failed to undertake a legally-mandated programmatic review and hold required public hearings.

View/Download the entire press release HERE


DNFSB Hearing - Formal Comments

Nuclear Watch New Mexico is submitted formal comments to express in the strongest possible terms our opposition to DOE Order 140.1 Interface with the Defense Nuclear Facilities Safety Board. We find that the Department of Energy’s (DOE’s) attempt to restrict and suppress DNFSB access is very misguided, arrogant, and likely illegal in that it acts contrary to the Board’s enabling legislation.

Read the comments here


New Contractors Selected For Expanded Nuclear Weapons Production at Los Alamos

Santa Fe, NM. Today the Department of Energy's National Nuclear Security Administration (NNSA) announced its choice for the new management and operating contract for the Los Alamos National Laboratory (LANL).The new contractor, Triad National Security, LLC, is a limited liability company consisting of the Battelle Memorial Institute, the University of California and Texas A&M University. All three are non-profits, and it is unclear how this will affect New Mexico gross receipts taxes.

Battelle claims to be the world's largest non-profit technology research and development organization, and manages a number of labs including the Lawrence Livermore and Idaho National Laboratories. Texas A&M was founded in 1876 as the state's first public institution of higher learning and has the largest nuclear engineering program in the country. DOE Secretary Rick Perry is an avid A&M alumnus.

View/download full press release


Groups Release Key DOE Documents on Expanded Plutonium Pit Production, DOE Nuclear Weapons Plan Not Supported by Recent Congressional Actions

Santa Fe, NM & Columbia, SC - "Two key U.S. Department of Energy documents on future production of plutonium "pits" for nuclear weapons, not previously released to the public, fail to justify new and upgraded production facilities at both the Los Alamos National Laboratory (LANL) in New Mexico and the Savannah River Site (SRS) in South Carolina."

View/download press release


Los Alamos Cleanup

View/download Fact sheet


What's Not in NNSA's Plutonium Pit Production Decision

 

- NNSA did not mention that up to 15,000 "excess" pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in "strategic reserve." The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits. (In 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old.)
- NNSA did not explain how to dispose of all of that plutonium, given that the MOX program is an abysmal failure. Nor is it made clear where future plutonium wastes from expanded pit production will go since operations at the troubled Waste Isolation Pilot Plant are already constrained from a ruptured radioactive waste barrel, and its capacity is already overcommitted to existing radioactive wastes. View/download Press Release


NNSA Proposal to Raise Plutonium Limit Ten-Fold in Los Alamos' Rad Lab Is First Step in Expanded Plutonium Pit Production: Environmental Assessment Is Premature and Deceptive By Omission

"NNSA should begin nation-wide review of plutonium pit production, why it's needed, and what it will cost the American taxpayer in financial, safety and environmental risks. These are all things that the public should know." -Jay Coghlan, Director, Nuclear Watch New Mexico.

View/download Press Release


LANL Rad Lab: Formal Comments Under Nat'l Environmental Policy Act

Against raising plutonium limit at LANL Rad Lab

View/download Nuclear Watch comments as submitted

Excerpt:
"This Draft Rad Lab EA is deficient. There are major omissions, for example the lack of analyses of potential beryllium hazards and Intentional Destructive Acts. Moreover, safety, occupational and seismic risks are explained away in "preliminary analyses." All this should be corrected in a more complete environmental impact statement, including final and transparent analyses of safety and seismic risks...

"NNSA should proceed with a broader environmental impact statement after its May 11 decision on the future of expanded plutonium pit production."

- NNSA is planning a 10-fold increase in plutonium at the LANL Rad Lab with a view to ramping up the production of plutonium pits for new nuclear weapons.
- NNSA wants to re-categorize the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.
- (See details in our press release)
- National Environmental Policy Act


United States To Begin Construction Of New Nuclear Bomb Plant

The National Nuclear Security Administration (NNSA) announced on Friday, March 23, that it was authorizing the start of construction of the Uranium Processing Facility (UPF) and two sub-projects at the Y-12 National Security Complex in Oak Ridge, Tennessee. The UPF is a facility dedicated solely to the manufacture of thermonuclear cores for US nuclear bombs and warheads.
Citizen watchdog groups are responding by filing an expedited Freedom of Information Act request demanding a full fiscal accounting of the UPF bomb plant- something the NNSA has refused to provide for the last five years, including to Congress, despite repeated assurances that the project is "on budget."

"This project is already a classic boondoggle, and they are just getting started," said Ralph Hutchison, coordinator of the Oak Ridge Environmental Peace Alliance (OREPA) in Knoxville, Tennessee. "Worse, it undermines US efforts to discourage nuclear proliferation around the world. How can we oppose the nuclear ambitions of other countries when we are building a bomb plant here to manufacture 80 thermonuclear cores for warheads every year?"

Jay Coghlan of NukeWatch points out that "This project already has a long history, and it is instructive. In 2013, DOE announced it was 85% finished with the UPF design when it ran into the 'space/fit' issue- and more than a half-billion taxpayer dollars were just written off. In private business, that kind of thing gets you fired. In DOE's world of contractors running amok, they not only didn't get fired, not one Congressional hearing was held and the UPF budget went up the next year!"

- See full press release for all the details (PDF)
- View/download the OREPA/NukeWatch FOIA request (pdf)


The Regional Coalition of LANL Communities: Benefits for the Select Few

Santa Fe, NM- According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County's 46th district in the state House of Representatives.
Perhaps more serious is the fact that Romero was awarded an undisclosed amount of money by the Venture Acceleration Fund (VAF) for her private business Tall Foods, Tall Goods, a commercial ostrich farm in Ribera, NM. According to a May 8, 2017 Los Alamos Lab news release announcing the award to Tall Foods, Tall Goods, "The VAF was established in 2006 by Los Alamos National Security [LANS], LLC to stimulate the economy by supporting growth-oriented companies."[1] LANS, primarily composed of the Bechtel Corporation and the University of California, has held the annual ~$2.4 billion Los Alamos National Laboratory (LANL) management contract since June 2006.

For all the details, see full press release PDF


Major LANL Cleanup Subcontractor Implicated in Fraud - Entire Los Alamos Cleanup Should Be Re-evaluated

Santa Fe, NM. On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as "N3B"). This award followed a DOE decision to pull cleanup from LANL's prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen.
Tetra Tech Inc is a major subcontractor for N3B in the LANL cleanup contract... Serious allegations of fraud by Tetra Tech were raised long before the LANL cleanup contract was awarded. The US Navy found that the company had committed wide spread radiological data falsification, doctored records and supporting documentation, and covered-up fraud at the Hunters Point Naval Shipyard cleanup project in San Francisco, CA. See media links and excerpts below..."

(See all the details in the full press release)


Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race

Santa Fe, NM. Late Friday February 23, the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] "Weapons Activities", 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office's High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990...

(See all the details in the full press release)


NNSA Releases Draft Environmental Assessment for LANL Rad Lab; Raises Plutonium Limit 10 Times for Expanded Pit Production

Santa Fe, NM. Today the National Nuclear Security Administration announced an Environmental Assessment to increase the amount of plutonium used in the Radiological Laboratory Utility and Office Building (aka the "Rad Lab") at the Los Alamos National Laboratory from 38.6 grams of plutonium-239 equivalent to 400 grams. This 10-fold increase is significant because it will dramatically expand materials characterization and analytical chemistry capabilities in the Rad Lab in support of expanded plutonium pit production for future nuclear weapons designs. It also re-categorizes the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.

View/Download full press release


Trump's Budget Dramatically Increases Nuclear Weapons Work

Santa Fe, NM In keeping with the Trump Administration's recent controversial Nuclear Posture Review, today's just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production.
The National Nuclear Security Administration (NNSA), the Department of Energy's semi-autonomous nuclear weapons agency, is receiving a $2.2 billion overall boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category (Nuclear) "Weapons Activities", 18% above the FY 2018 level.
Digging deeper under Weapons Activities, "Directed Stockpile Work" is increased from $3.3 billion to $4.7 billion, or 41%...

(read the full press release)


Draft Nuclear Posture Review Degrades National Security

Yesterday evening the Huffington Post posted a leaked draft of the Trump Administration's Nuclear Posture Review (NPR). This review is the federal government's highest unclassified nuclear weapons policy document, and the first since the Obama Administration's April 2010 NPR.
This Review begins with "Many hoped conditions had been set for deep reductions in global nuclear arsenals, and, perhaps, for their elimination. These aspirations have not been realized. America's strategic competitors have not followed our example. The world is more dangerous, not less." The NPR then points to Russia and China's ongoing nuclear weapons modernization programs and North Korea's "nuclear provocations." It concludes, "We must look reality in the eye and see the world as it is, not as we wish it be."
If the United States government were to really "look reality in the eye and see the world as it is", it would recognize that it is failing miserably to lead the world toward the abolition of the only class of weapons that is a true existential threat to our country. As an obvious historic matter, the U.S. is the first and only country to use nuclear weapons. Since WWII the U.S. has threatened to use nuclear weapons in the Korean and Viet Nam wars, and on many other occasions.
Further, it is hypocritical to point to Russia and China's "modernization" programs as if they are taking place in a vacuum. The U.S. has been upgrading its nuclear arsenal all along. In the last few years our country has embarked on a $1.7 trillion modernization program to completely rebuild its nuclear weapons production complex and all three legs of its nuclear triad.
Moreover, Russia and China's modernization programs are driven in large part by their perceived need to preserve strategic stability and deterrence..
(read the full press release)

2017


2017


New Mexico Environment Department Surrendered to DOE Extortion

Santa Fe, NM. The New Mexico State Auditor Office recently questioned whether two settlements between the New Mexico Environment Department and the Department of Energy were in the best interests of New Mexico. That Office noted:
"The New Mexico Environment Department unnecessarily forgave tens of millions of dollars in civil penalties related to various waste management issues and missed cleanup deadlines by the Department of Energy (DOE) and its contractors. Considering the seriousness of the violations, and the clarity regarding responsibility for the violations, it appears highly unusual that the Department would not collect any civil penalties under these circumstances."
NMED completed an assessment of $54 million in penalties that would have gone to New Mexico, but did not enforce them before making the settlements with DOE. This was at a time when the state was beginning to face a serious budget crisis. As State Senator John Arthur Smith (Chair of the Senate Finance Committee) put it, NMED's failure to levy penalties when New Mexico was facing a budget crisis is "taking it out of the pockets of our kids and young people when they do something like that."
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This is inexcusable that NMED preemptively surrendered to Department of Energy extortion. In effect DOE is saying if you, the regulator, fine us, we will cut the money the taxpayer has paid to clean up our mess that threatens the citizens you are suppose to protect."

(View/download full press release)


Los Alamos Hires New Contractor - Starts Cleanup On the Cheap

Santa Fe, NM- Today the Department of Energy (DOE) announced the award of the new Los Alamos National Laboratory legacy cleanup contract to Newport News Nuclear BWXT-Los Alamos, LLC. The $1.39 billion contract is for ten years, which works out to $139 million per year...
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This dooms the Lab to cleanup on the cheap. This 140 million dollars per year to the cleanup contractor is based on a revised Consent Order by the New Mexico Environment Department that was a give away to the Los Alamos Lab. The original 2005 Consent Order held the Department of Energy's feet to the fire to complete real cleanup or pay stipulated penalties. In contrast, the Martinez administration gave the biggest polluter in northern New Mexico a free pass, forgiving a hundred million dollars in possible fines that should have gone to our kids' schools. New Mexicans deserve an Environment Department under a new governor that aggressively protects the environment and creates new high-paying jobs thorough enforcing comprehensive cleanup."

View/download the full press release


"Nuclear Weapons Development, Testing, Stockpile & UN Treaty" - Presentation by Nukewatch Director Jay Coghlan at the Albuquerque symposium "Dismantling the Nuclear Beast" Dec. 1-3, 2017.

View/download Power Point doc


Congressional Budget Office: Cost of Nuclear Weapons Upgrades and Improvements Increases to $1.2 Trillion

Today, in Washington, DC, the Congressional Budget Office released its new report, "Approaches for Managing the Costs of U.S. Nuclear Forces, 2017 to 2046". The Congressional Budget Office estimates that the most recent detailed plans for nuclear forces, which were incorporated in the Obama Administration's 2017 budget request, would cost $1.2 trillion in 2017 dollars over the 2017-2046 period: more than $800 billion to operate and sustain (that is, incrementally upgrade) nuclear forces and about $400 billion to modernize them.... Driving this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of "deterrence," thousands of warheads are being refurbished and improved to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government!

(read full press release)


Santa Fe City Council: LANL Cleanup Order Must Be Strengthened & Expanded and Plutonium Pit Production Suspended Until Safety Issues Are Resolved

Santa Fe, NM. On the evening of Wednesday October 25, the Santa Fe City Council passed a resolution requesting that the New Mexico Environment Department strengthen the revised Los Alamos National Labs cleanup order to call for additional characterization of legacy nuclear wastes, increased cleanup funding, and significant additional safety training. The resolution also called for the suspension of any planned expanded plutonium pit production until safety issues are resolved.

(view/download full press release)


International Campaign to Abolish Nuclear Weapons Wins Nobel Peace Prize, NukeWatch Calls on New Mexico Politicians and Santa Fe Archbishop To Support Drive Toward Abolition

Santa Fe, NM. Nuclear Watch New Mexico strongly applauds the awarding of the Nobel Peace Prize to the International Campaign to Abolish Nuclear Weapons (disclosure: NukeWatch is one of ICAN's ~400 member groups around the world). This award is especially apt because the peoples of the world are now living at the highest risk for nuclear war since the middle 1980's, when during President Reagan's military buildup the Soviet Union became convinced that the United States might launch a pre-emptive nuclear first strike. Today, we not only have Trump's threats to "totally destroy" North Korea and Kim Jong-un's counter threats, but also renewed Russian fears of a US preemptive nuclear attack... Generally unknown to the American taxpayer, our government has quietly tripled the lethality of the US nuclear weapons stockpile..."

(view/download complete press release)


Expanded Plutonium Pit Production at LANL Will Not Result in Significant Positive Effect On Job Creation and the Regional Economy

The National Nuclear Security Administration's own documents have explicitly stated that expanded pit production would have no significant positive effect on job creation and the regional economy of northern New Mexico. Nuclear Watch argues that expanded plutonium pit production could actually have negative effect if it blocks other economic alternatives such as comprehensive cleanup, which could be the real job producer. Moreover, given LANL's poor safety and environmental record, expanded plutonium pit production could have a seriously negative economic impact on northern New Mexico in the event of any major accidents.

- view/download fact sheet


Chromium Groundwater Contamination at Los Alamos Lab Far Greater Than Previously Expected; LANL's Treatment Plan Must Be Drastically Changed

Santa Fe, NM. The Los Alamos National Laboratory (LANL) has detected far more hexavalent chromium (Cr) contamination than previously estimated in the "sole source" regional groundwater aquifer that serves Los Alamos, Santa Fe and the Espanola Basin. Sampling in July from a new well meant to inject treated groundwater back into the aquifer detected chromium contamination five times greater than the New Mexico groundwater standard of 50 micrograms per liter (ug/L).

View/download the full press release


Talking Points: The 2016 LANL Cleanup Consent Order Should Be Rescinded

The 2005 LANL Cleanup Consent Order was all about the enforceable schedules. It required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It stipulated a detailed compliance schedule that the Lab was required to meet. Under Gov. Martinez, NMED Secretary Ryan Flynn granted more than 150 compliance milestone extensions at the Lab's request, effectively eviscerating it.
In June 2016 the New Mexico Environment Department (NMED), the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) signed a revised Consent Order governing cleanup at the Los Alamos National Laboratory (LANL). The new Consent Order is a big step backward in achieving comprehensive, genuine cleanup at the Lab. The revised 2016 CO was a giveaway by NMED to DOE and the Lab, negotiated to allow DOE's budget to drive cleanup, not what is needed to permanently protect our water.
NMED should have kept the original, enforceable 2005 Consent Order that it fought so hard for under the Richardson Administration, modified as needed for the cleanup schedule and final compliance date.

View/download the complete talking points


Oak Ridge Environmental and Peace Alliance, Nuclear Watch New Mexico, and The Natural Resources Defense Council File Lawsuit Against New Nuclear Bomb Plant

Washington, DC Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration's (NNSA's) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.'s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants.
"The story of this new bomb plant is a long tale of outrageous waste and mismanagement, false starts and re-dos, a federal agency that refuses to meet its legal obligation to engage the public, and a Senator that is bent on protecting this piece of prime nuclear pork for his home state," said Ralph Hutchison, coordinator of OREPA. "But the short version is this: when the NNSA made dramatic changes to the UPF, and admitted that it intends to continue to operate dangerous, already contaminated facilities for another twenty or thirty years, they ran afoul of the National Environmental Policy Act. Our complaint demands that the NNSA complete a supplemental environmental impact statement on the latest iteration of its flawed plans."

View/download the full press release


Some Background on Plutonium Pit Production at the Los Alamos Lab

Santa Fe, NM -The Washington Post has published the first in a series of articles on nuclear safety lapses in plutonium pit production at the Los Alamos Lab. Plutonium pits are the fissile cores of nuclear weapons that when imploded initiate the thermonuclear detonation of modern weapons. By the way, did you know? Plutonium facilities at LANL are- in principle- designed to withstand a serious earthquake of a degree expected to occur only once every 10,000 years. The last serious earthquake near the Lab is believed to have occurred 11,500 years ago.

View/download the full press release


This year's report examines the extraordinary spending at Department of Energy nuclear facilities and examines ways to reduce risks and save billions of dollars across the U.S. nuclear weapons complex.

(View/download PDF)


SA Preview of Trump's Budget: More Nuclear Bombs and Plutonium Pit Production

Santa Fe, NM. "The proposed level of funding for the National Nuclear Security Administration's (NNSA)'s Total Weapons Activities is $10.2 billion, a full billion above what was requested for FY 2017. In March, Trump's "skinny budget" stated NNSA's funding priorities as 'moving toward a responsive nuclear infrastructure', and 'advancing the existing warhead life extension programs'.
"Concerning Life Extension Programs, rather than merely maintaining and extending the lives of existing nuclear weapons as advertised, they are being given new military capabilities, despite denials at the highest levels of government. A current example is the B61-12 Life Extension Program, which is transforming a "dumb" nuclear bomb into the world's first highly accurate "smart" nuclear bomb.
"With respect to the Los Alamos National Laboratory (LANL), "responsive infrastructure" no doubt means accelerating upgrades to existing plutonium facilities and likely building two or three new underground "modules", all for the purpose of quadrupling plutonium pit production from 20 to 80 pits per year. (Plutonium pits are the fissile cores of nuclear weapons.)”

Read the full press release for all the details.


Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion

March 28, 2017, UN, NYC:
Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion
See video clips of some of the speakers:


Plutonium Pit Production at LANL (Updated March 2017)

(view/download PDF)


Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection

Santa Fe, NM. America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning.
Two recently released government reports make clear the stark inequality between the so-called modernization program to upgrade and indefinitely preserve U.S. nuclear forces (in large part for a new Cold War with Russia), and the nation-wide program to clean up the radioactive and toxic contamination from the first Cold War. The Obama Administration launched a trillion dollar nuclear weapons "modernization" program, which President Trump may expand. In contrast, cleanup of the first Cold War mess has been cut from a high of $8.5 billion in 2003 to $5.25 billion in 2016, even though comprehensive cleanup would produce far more jobs than nuclear weapons programs.

Read the full press release for all the details.


NNSA Releases Los Alamos Lab Performance Evaluation Report,Nuclear Criticality Safety Issues Still Not Fully Resolved

The National Nuclear Security Administration (NNSA) has publicly released its fiscal year 2016 Performance Evaluation Report (PER) for Los Alamos National Security, LLC (LANS), the for-profit contractor that runs the Los Alamos Lab. The Performance Evaluation Report is NNSA's annual report card on contractor performance, and overall the agency awarded LANS $59 million in profit out of a possible $65 million. The grade was 85% for the incentive part of the award. In 2012 Nuclear Watch New Mexico successfully sued NNSA to ensure that the Performance Evaluation Reports detailing taxpayers funds paid to nuclear weapons contractors are publicly available. In 2016 the NNSA decided to put the LANL management contract out for competitive bid, but granted LANS a contract extension until the end of September 2018.
Despite the passing grade that NNSA gave LANS, there is still ample reason for public concern. First, it bears repeating that in February 2014 a radioactive waste drum improperly prepared by the Los Alamos National Laboratory (LANL) burst underground at the Waste Isolation Pilot Plant (WIPP), contaminating 21 workers and closing that multi-billion dollar facility (a limited restart of operations at WIPP may occur this month).
Less widely known is the fact that LANL's main plutonium facility that produces WIPP wastes has only recently restarted operations after being shut down since June 2013 because of nuclear criticality safety concerns... (more: read full press release)

Media appearances including radio interviews are listed on the internal Media page

See the NukeWatch Channel at YouTube for our extensive playlists of key videos.

See the Nukewatch Twitter feed

See the Nukewatch Tumblr site


WatchBlog Posts:

Over 200 posts published since 2009. See archives at the WatchBlog

Earlier Work Product items are archived here