Nuclear Watch New Mexico – Work Product

ALL RECENT WORK

Court Rules U.S. Nuclear Weapons Production Plan Violates Federal Law

FOR IMMEDIATE RELEASE, October 3, 2024

Media Contacts:
Ben Cunningham, Esquire, SCELP, 843-527-0078, [email protected]
Tom Clements, Savannah River Site Watch, 803-834-3084, [email protected]
Jay Coghlan, Nuclear Watch New Mexico, 505-989-7342, [email protected]
Scott Yundt, Tri-Valley CAREs, 925-443-7148, [email protected]
Queen Quet, Gullah/Geechee Sea Island Coalition, 843-838-1171, [email protected]

AIKEN, S.C. — On September 30, United States District Court Judge Mary Geiger Lewis ruled that the United States Department of Energy (“DOE”) and its semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (“NNSA”), violated the National Environmental Policy Act (“NEPA”) by failing to properly consider alternatives before proceeding with their plan to produce plutonium pits, a critical component of nuclear weapons, at the Los Alamos National Laboratory (“LANL”) in New Mexico and, for the first time ever, at the Savannah River Site (“SRS”) in South Carolina.

The Court found that the plan’s purpose had fundamentally changed from NNSA’s earlier analyses which had not considered simultaneous pit production at two sites.  These changes necessitated a reevaluation of alternatives, including site alternatives, which Defendants failed to undertake prior to moving forward while spending tens of billions of taxpayers’ dollars. Therefore, the Court entered judgment in favor of Plaintiffs, the nonprofit public interest groups Savannah River Site Watch, Nuclear Water New Mexico and Tri-Valley Communities Against a Radioactive Environment (CAREs); the Gullah/Geechee Sea Island Coalition; and Tom Clements as an individual plaintiff.

As a result of this ruling, the Defendants are required to newly assess pit production at a nation-wide programmatic level which will mean undertaking a thorough analysis of the impacts of pit production at DOE sites throughout the United States, including radioactive waste generation and disposal. Under the National Environmental Policy Act (NEPA), this will provide the opportunity for public scrutiny of and formal comment on their assessments.

Continue reading

High Detections of Plutonium in Los Alamos Neighborhood – As We Enter a New Nuclear Arms Race the Last One is Still Not Cleaned Up

FOR IMMEDIATE RELEASE, August 15, 2024
Dr. Michael Ketterer – 928.853.7188 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – In April Nuclear Watch New Mexico released a map of plutonium contamination based on Lab data. Today, Dr. Michael Ketterer, Professor Emeritus of Chemistry and Biochemistry, Northern Arizona University, is releasing alarmingly high results from samples taken from a popular walking trail in the Los Alamos Town Site, including detections of some of the earliest plutonium produced by humankind.

On July 2 and 17 Dr. Ketterer, with the assistance of Nuclear Watch New Mexico, collected water, soil and plant samples from Acid Canyon in the Los Alamos Town Site and soil and plant samples in Los Alamos Canyon at the Totavi gas station downstream from the Lab. The samples were prepared and analyzed by mass spectrometry at Northern Arizona University to measure concentrations of plutonium, and to ascertain its sources in the environment.

Continue reading

NEW Pit Production Fact Sheet – July 2024

Nuclear Weapons and Waste Issues in NM – July 14 Presentation

Groups Fire Back at Feds’ Move to Dismiss Plutonium Pit Lawsuit

NNSA Delays Urgent Research on Plutonium “Pit” Aging While Spending Tens of Billions on Nuclear Weapons Bomb Core Production

FOR IMMEDIATE RELEASE, April 17, 2024
Tom Clements, SRS Watch – 803.240.7268 | Email
Scott Yundt, TVC – 415.990.2070 | Email
Jay Coghlan – 505.989.7342 | Email

Nearly three years after filing a Freedom of Information Act request, the public interest group Savannah River Site Watch has finally received the National Nuclear Security Administration’s (NNSA’s) congressionally-required “Research Program Plan for Plutonium and Pit Aging.” However, the document is 40% blacked out, including references and acronyms. Plutonium “pits” are the radioactive cores of all U.S. nuclear weapons. The NNSA claims that potential aging effects are justification for a ~$60 billion program to expand production. However, the Plan fails to show that aging is a current problem. To the contrary, it demonstrates that NNSA is delaying urgently needed updated plutonium pit aging research.

In 2006 independent scientific experts known as the JASONs concluded that plutonium pits last at least 85 years without specifying an end date [i] (the average pit age is now around 40 years). A 2012 follow-on study by the Lawrence Livermore nuclear weapons lab concluded:

“This continuing work shows that no unexpected aging issues are appearing in plutonium that has been accelerated to an equivalent of ~ 150 years of age. The results of this work are consistent with, and further reinforce, the Department of Energy Record of Decision to pursue a limited pit manufacturing capability in existing and planned facilities at Los Alamos instead of constructing a new, very large pit manufacturing facility…” [ii]

Since then NNSA has reversed itself. In 2018 the agency decided to pursue the simultaneous production of at least 30 pits per year at the Los Alamos National Laboratory (LANL) in northern New Mexico and at least 50 pits per year at the Savannah River Site (SRS) in South Carolina. Upgrades to plutonium facilities at LANL are slated to cost $8 billion over the next 5 years. The redundant Savannah River Plutonium Processing Facility in South Carolina will cost up to $25 billion, making it the second most expensive building in human history.

Continue reading

NNSA’s Nuclear Weapons Budget Takes Huge Jump

Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut

FOR IMMEDIATE RELEASE, March 11, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.

The Biden Administration states that the $19.8 billion will be used to:

“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.

The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:

“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)

Continue reading

NNSA Suppresses How Taxpayers Money Is Spent

FOR IMMEDIATE RELEASE, January 19, 2024
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.

NNSA Suppresses How Taxpayers Money Is SpentA current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.

Continue reading

2023

Biden Releases Record NNSA Nuclear Weapons Budget

FOR IMMEDIATE RELEASE, March 14, 2023
Jay Coghlan – 505.989.7342 | Email | Scott Kovac – 505.989.7342 | Email

Santa Fe, NM – President Biden has released his proposed FY 2024 budget for the Department of Energy’s semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). The budget for NNSA’s “Total Weapons Activities” for nuclear weapons research and production programs is slated to increase by 10% to $18.8 billion.

Of that $18.8 billion requested for FY 2024, over $3 billion is devoted to “Life Extension Programs” or “Alterations” that extend the service lives of existing nuclear weapons by decades while giving them new military capabilities. It also includes two new-design nuclear weapons, the W87-1 ICBM warhead (increased 50% to $1 billion) and the sub-launched W93 warhead (increased 62% to $390 million). Meanwhile, funding for dismantlements that provide a good nonproliferation example and save taxpayers’ money by eliminating long-term security costs is decreased by 4% to $53.7 million. That is a small fraction of one percent of NNSA’s Total Weapons Activities.

Two bright spots, yet still small relative to the U.S.’ planned $2 trillion nuclear weapons “modernization” program, are the zeroing out of funding for the Sea-Launched Cruise Missile (SLCM) warhead and stronger language on the retirement of the 1.2 megaton B83 bomb. Trump proposed to bring back nuclear-armed sea-launched cruise missiles, which were retired by President George H. Bush after the end of the Cold War. Biden’s 2022 Nuclear Posture Review canceled the SLCM, but Congress insisted on funding it, which will only grow stronger with Republican control the House.

In Response to Lawsuit, NNSA Releases FY 2022 Performance Evaluation Reports as “Frequently Requested Documents” as Required by FOIA; Reveals Pit Production Schedule is Likely Increasingly Delayed

FOR IMMEDIATE RELEASE, March 9, 2023
Jay Coghlan – 505.989.7342 | Email | Scott Kovac – 505.989.7342 | Email

Santa Fe, NM – Today, the National Nuclear Security Administration[1] (NNSA) finally posted its FY 2022 Performance Evaluation Reports to its electronic “FOIA Reading Room.” These reports are “Frequently Requested Documents” as defined by the Freedom of Information Act (meaning three or more requests) and are therefore required to be posted under the law. The catalyst for this was a lawsuit filed by Nuclear Watch New Mexico in September 2022.

NNSA’s Performance Evaluation Reports for its eight nuclear weapons research and production sites[2] grade annual contractor performance and award performance fees accordingly. Approximately 57,000 people are employed by the NNSA nuclear weapons complex, 95% of them contractor personnel. The Department of Energy and NNSA (or its predecessor DOE Defense Programs) have been on the independent Government Accountability Office’s “High Risk List” for project mismanagement and waste of taxpayers’ dollars since 1992.

ALLIANCE FOR NUCLEAR ACCOUNTABILITY MEDIA ADVISORY: WHAT TO LOOK FOR IN THE U.S. DEPARTMENT OF ENERGY’S FY 2024 NUCLEAR WEAPONS AND CLEANUP BUDGET REQUEST

Alliance for Nuclear Accountability | March 8, 2023 ananuclear.org

The Biden Administration is releasing its Fiscal Year 2024 federal budget on Thursday, March 9. It is expected to be a “skinny budget” with just topline financial numbers. If the pattern of the last few years for the Department of Energy’s (DOE’s) budget is continued, there can be three more releases over the next six weeks that grow progressively more detailed (there is initially little if any site-specific budget information). Historically around 60% of DOE’s funding has been earmarked for nuclear weapons production and cleanup of Cold War wastes and contamination.

The release of the presidential budget begins the annual legislative process for funding DOE programs and sites. The two bicameral congressional subcommittees that have jurisdiction over the DOE budget are the Armed Services Committee Strategic Forces Subcommittee which “authorizes” funding, and the Energy and Water Development Appropriations Subcommittee which actually provides funding. Congress has managed to pass the Defense Authorization Act for more than 50 consecutive years, but is increasingly unable to pass appropriations bills, leading to short-term Continuing Resolutions (CRs). Given bipartisan friction and the beginning of election campaigning, Continuing Resolutions are likely for this coming federal fiscal year 2024, which begins October 1, 2023.

The Alliance for Nuclear Accountability strongly opposed the massive 25% FY 2021 increase that the Trump Administration gave to the nuclear weapons programs of DOE’s semi-autonomous National Nuclear Security Administration (NNSA). The Biden Administration not only kept Trump’s increases in subsequent budgets but substantially added to them, particularly for expanded production of plutonium “pit” bomb cores for nuclear weapons. Meanwhile, dismantlements of nuclear warheads have slowed to a crawl and funding for cleanup of Cold War radioactive and hazardous wastes has remained flat.

DOE’s nuclear weapons and environmental management programs have been on the Government Accountability Office’s “High Risk List” for project mismanagement and waste of taxpayers’ dollars for more than 30 consecutive years. Defense Department and DOE costs for so-called “modernization” of U.S. nuclear forces begun under Obama is expected to be around $2 trillion over the next 30 years.

State Environment Department Begins to Rein in Work On LANL’s Chromium Plume Given Major Differences With DOE

FOR IMMEDIATE RELEASE, February 21, 2023 | Scott Kovac – 505.989.7342 | Email

At a February 9, 2023 public community forum hosted by the Department of Energy’s Environmental Management Los Alamos Office, there were strong indications that the New Mexico Environment Department (NMED) is convinced that DOE’s plans to remediate the chromium groundwater contamination plume under Los Alamos National Laboratory (LANL) is not working. Kimberly Lebak, program manager for N3B, the LANL cleanup contractor, described how it is finalizing the 2023 milestones under the Consent Order that governs cleanup, despite the fact that the NMED Groundwater Bureau has requested that DOE stop injecting treated water by April 1, 2023. DOE and NMED are not seeing eye-to-eye concerning the “Interim Measure” that N3B is using to contain the chromium plume.

The two agencies disagree on the Interim Measure, originally designed to prevent chromium from migrating across the San Ildefonso Pueblo border while DOE tries to figure out a final remedy.

District Court Denies Department of Energy’s Motion to Dismiss Plutonium Pits Suit

FOR IMMEDIATE RELEASE, February 13, 2023 | South Carolina Environmental Law Project, Savannah River Site Watch, Nuclear Watch New Mexico, Tri-Valley CAREs, Gullah/Geechee Sea Island Coalition

AIKEN, S.C. — In a win for public participation and environmental protection, the United States District Court of South Carolina denied the Department of Energy’s motion to dismiss a 2021 legal action filed by multiple citizen groups. The suit was prompted by the agencies’ failure to take the “hard look” required by the National Environmental Policy Act at their plans to more than quadruple the production of plutonium pits for new nuclear weapons and split their production between the Los Alamos National Laboratory and the Savannah River Site.

In her ruling, Judge Mary Geiger Lewis thoroughly rejected the defendants’ arguments that the plaintiffs lacked standing, saying it was “not a close call”.

“We were able to defeat yet another attempt to use standing as a weapon to keep members of the public out of the government’s decision-making process,” said Leslie Lenhardt, Senior Managing Attorney at the South Carolina Environmental Law Project (SCELP).

To date, the Department of Energy (DOE) has refused to fully examine the environmental and safety impacts of their cross-country plan, which would create massive quantities of dangerous and radioactive material, put hundreds of billions of taxpayer dollars on the line, risk a new nuclear arms race, and violate the nation’s foundational environmental law.

Top Environment Official Takes Inside Info to Nuclear Weapons Agency, Gets Puny Slap-on-Wrist for Ethical Violation; Governor Should Enforce State Code of Conduct

FOR IMMEDIATE RELEASE, February 8, 2023 | Joni Arends, Concerned Citizens for Nuclear Safety – 505.986.1973 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The Department of Energy (DOE) will spend $9.4 billion dollars in New Mexico during this fiscal year 2023, 10% more than the State’s entire operating budget of $8.5 billion. To help enable its agenda of expanding nuclear weapons production that will cause more radioactive wastes and contamination, the DOE’s semi-autonomous National Nuclear Security Administration (NNSA) or its contractors often go head hunting for top State officials.

The New Mexico Environment Department (NMED) has sued DOE over the slow pace of cleanup at the Los Alamos National Laboratory (LANL). Stephanie Stringer, former Deputy Cabinet Director (the number two position at NMED), applied to work for NNSA in August 2022, and resigned to take that job in November. During that time, she was privy to NMED litigation strategy against DOE and chaired the New Mexico Water Quality Control Commission that denied a citizens’ motion against one of LANL’s most crucial facilities for expanding plutonium pit production, the Radioactive Liquid Waste Treatment Facility. As a result, the New Mexico Ethics commission fined Stringer a paltry $250. Assuming that Stringer is earning at least $100,000 base salary in her new position, that fine would have cost her approximately five hours of her time.

Comment on the Lawrence Livermore National Laboratory Draft Site-Wide Environmental Impact Statement

Nuclear Watch New Mexico January 21, 2023 Email

Via email to: [email protected]
Ms. Fana Gebeyehu-Houston,
LLNL SWEIS Document Manager,
1000 Independence Ave., SW, Washington, DC 20585

Dear Ms. Fana Gebeyehu-Houston:

Thank you for the opportunity to comment on the National Nuclear Security Administration’s (NNSA) Draft Site-Wide Environmental Impact Statement (SWEIS) for the continued operation of the Lawrence Livermore National Laboratory Main Site in Livermore, CA and Site 300 high explosives testing range near Tracy, CA.

Nuclear Watch New Mexico takes particular interest in the Livermore Lab as the sister lab of the Los Alamos National Laboratory (LANL). We have long been involved in the issue of plutonium pit production at LANL. We see the two labs as inextricably linked given that LANL will be producing plutonium pits for the new W87-1 warhead, for which LLNL is the lead design agency.

Our mission statement: Nuclear Watch New Mexico seeks to promote safety and environmental protection at nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

RECENT FACT SHEETS

It seems we can’t find what you’re looking for. Perhaps searching can help.

RECENT PRESS RELEASES

State Environment Department Begins to Rein in Work On LANL’s Chromium Plume Given Major Differences With DOE

FOR IMMEDIATE RELEASE, February 21, 2023 | Scott Kovac – 505.989.7342 | Email

At a February 9, 2023 public community forum hosted by the Department of Energy’s Environmental Management Los Alamos Office, there were strong indications that the New Mexico Environment Department (NMED) is convinced that DOE’s plans to remediate the chromium groundwater contamination plume under Los Alamos National Laboratory (LANL) is not working. Kimberly Lebak, program manager for N3B, the LANL cleanup contractor, described how it is finalizing the 2023 milestones under the Consent Order that governs cleanup, despite the fact that the NMED Groundwater Bureau has requested that DOE stop injecting treated water by April 1, 2023. DOE and NMED are not seeing eye-to-eye concerning the “Interim Measure” that N3B is using to contain the chromium plume.

The two agencies disagree on the Interim Measure, originally designed to prevent chromium from migrating across the San Ildefonso Pueblo border while DOE tries to figure out a final remedy.

District Court Denies Department of Energy’s Motion to Dismiss Plutonium Pits Suit

FOR IMMEDIATE RELEASE, February 13, 2023 | South Carolina Environmental Law Project, Savannah River Site Watch, Nuclear Watch New Mexico, Tri-Valley CAREs, Gullah/Geechee Sea Island Coalition

AIKEN, S.C. — In a win for public participation and environmental protection, the United States District Court of South Carolina denied the Department of Energy’s motion to dismiss a 2021 legal action filed by multiple citizen groups. The suit was prompted by the agencies’ failure to take the “hard look” required by the National Environmental Policy Act at their plans to more than quadruple the production of plutonium pits for new nuclear weapons and split their production between the Los Alamos National Laboratory and the Savannah River Site.

In her ruling, Judge Mary Geiger Lewis thoroughly rejected the defendants’ arguments that the plaintiffs lacked standing, saying it was “not a close call”.

“We were able to defeat yet another attempt to use standing as a weapon to keep members of the public out of the government’s decision-making process,” said Leslie Lenhardt, Senior Managing Attorney at the South Carolina Environmental Law Project (SCELP).

To date, the Department of Energy (DOE) has refused to fully examine the environmental and safety impacts of their cross-country plan, which would create massive quantities of dangerous and radioactive material, put hundreds of billions of taxpayer dollars on the line, risk a new nuclear arms race, and violate the nation’s foundational environmental law.

Top Environment Official Takes Inside Info to Nuclear Weapons Agency, Gets Puny Slap-on-Wrist for Ethical Violation; Governor Should Enforce State Code of Conduct

FOR IMMEDIATE RELEASE, February 8, 2023 | Joni Arends, Concerned Citizens for Nuclear Safety – 505.986.1973 | Email
Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – The Department of Energy (DOE) will spend $9.4 billion dollars in New Mexico during this fiscal year 2023, 10% more than the State’s entire operating budget of $8.5 billion. To help enable its agenda of expanding nuclear weapons production that will cause more radioactive wastes and contamination, the DOE’s semi-autonomous National Nuclear Security Administration (NNSA) or its contractors often go head hunting for top State officials.

The New Mexico Environment Department (NMED) has sued DOE over the slow pace of cleanup at the Los Alamos National Laboratory (LANL). Stephanie Stringer, former Deputy Cabinet Director (the number two position at NMED), applied to work for NNSA in August 2022, and resigned to take that job in November. During that time, she was privy to NMED litigation strategy against DOE and chaired the New Mexico Water Quality Control Commission that denied a citizens’ motion against one of LANL’s most crucial facilities for expanding plutonium pit production, the Radioactive Liquid Waste Treatment Facility. As a result, the New Mexico Ethics commission fined Stringer a paltry $250. Assuming that Stringer is earning at least $100,000 base salary in her new position, that fine would have cost her approximately five hours of her time.

Independent Government Accountability Office Releases Scathing Report on Expanding Plutonium Pit Production; Pressure Mounts on Los Alamos Lab to Increase Production

FOR IMMEDIATE RELEASE, January 12, 2023 | Jay Coghlan – 505.989.7342 | Email

Santa Fe, NM – Today, the independent Government Accountability Office (GAO) released a scathing report entitled NNSA Does Not Have a Comprehensive Schedule or Cost Estimate for Pit Production Capability. The National Nuclear Security Administration (NNSA) and its parent Department of Energy have been on the GAO’s High Risk List for project mismanagement since 1991.

Plutonium pits are the essential radioactive cores of nuclear weapons. There has been only limited production at the Los Alamos National Laboratory (LANL) since 1989 when a FBI raid investigating environmental crimes abruptly shut down production at the Rocky Flats Plant near Denver. NNSA now plans to spend $2.9 billion in FY 2023 alone to establish production of at least 30 pits per year at LANL and 50 pits per year at the Savannah River Site (SRS) in South Carolina.

The two main findings of GAO’s report are:

  • NNSA’s Plutonium Pit Production Scope of Work Includes Dozens of Programs, Projects, and Other Activities Managed by Multiple NNSA Offices at Multiple Sites (p 19)

New Mexico’s Revolving Nuclear Door: Top Environment Officials Sell Out to Nuclear Weapons Labs

Santa Fe, NM – As part of a long, ingrained history, senior officials at the New Mexico Environment Department (NMED) have repeatedly resigned to go to work for the nuclear weapons labs, the Department of Energy, or DOE contractors. In a number of cases that is where they came from to begin with.

The hierarchy of leadership at NMED starts with the Secretary, Deputy Secretaries and then Division Directors. The position of Resource Protection Division Director is particularly critical because it oversees the two NMED bureaus most directly involved with DOE facilities in New Mexico, the Hazardous Waste Bureau and the DOE Oversight Bureau. However, all four former or current Resource Protection Division Directors have gone or are going to work for the nuclear weapons labs, the DOE or its contractors. They are:

  • Chris Catechis, currently Acting Resource Protection Division Director, is reportedly assuming a job at the Los Alamos National Laboratory (LANL) within days. Prior to NMED he had worked at the Sandia National Laboratories for 22 years.[i] See https://www.linkedin.com/in/chris-catechis-ma-b76b1a8/
  • Catechis’ immediate supervisor Stephanie Stringer resigned October 31 to go to work for DOE’s semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). She was Resource Protection Division Director prior to being promoted to Deputy Cabinet Secretary for Operations (second only to NMED Secretary James Kenney).

Biden’s Nuclear Posture Review Fuels the New Nuclear Arms Race

Santa Fe, NM– Today, the Biden Administration has released its long awaited unclassified Nuclear Posture Review. It headlines a “Comprehensive, balanced approach to defending vital national security interests and reducing nuclear dangers.” It also declares that “deterrence alone will not reduce nuclear dangers.”

“Deterrence” against others has always been the publicly sold rationale for the United States’ nuclear weapons stockpile. First, there is the inconvenient fact that the U.S. was the first and only to use nuclear weapons in war. But secondly, the United States and the USSR (now Russia) never possessed their huge stockpiles for the sole purpose of deterrence anyway. Instead, their nuclear weapons policies have always been a hybrid of deterrence and nuclear war fighting, which threatens global annihilation to this very day.

As a pertinent example, after the Obama Administration released its 2010 Nuclear Posture Review, the Defense Department declared that, “…[t]he new guidance requires the United States to maintain significant counterforce capabilities against potential adversaries. The new guidance does not rely on a ‘counter-value’ or ‘minimum deterrence’ strategy.”[1] In simple language, that means nuclear war-fighting that could end civilization should deterrence fail, or even possible first strike. That is why we have thousands of nuclear weapons instead of just the few hundred needed for only deterrence. That is why we have the massive, $1.7 trillion “modernization” program that will keep nuclear weapons forever, for which Biden’s Nuclear Posture Review gives added policy foundation.

FULL PRESS RELEASE [PDF]

Watchdogs File Suit for NNSA’s Performance Evaluation Reports

Santa Fe, NM – Today, Nuclear Watch New Mexico has once again filed a lawsuit to pry loose the National Nuclear Security Administration’s (NNSA’s) full and complete Performance Evaluation Reports that evaluate contractor performance at its eight nuclear weapons sites. Approximately 57,000 people are employed by NNSA’s nuclear weapons production complex, 95% of them contractor personnel. NNSA and its parent Department of Energy have been on the independent Government Accountability Office’s “High Risk List” for project mismanagement and waste of taxpayers’ dollars since 1992.

NNSA’s Performance Evaluation Reports grade contractor performance, award performance fees and contain no classified information. Nevertheless, NNSA seeks to hide how taxpayers’ money is spent from the public, issuing only terse three page summaries instead of the full and complete Reports. Nuclear Watch sued in 2012 to obtain the full and complete Performance Evaluation Reports, after which NNSA started releasing them within three working days. But NNSA has again been releasing only summaries since 2019, despite a Freedom of Information Act request by Nuclear Watch that the agency never responded to.

To illustrate the importance of these Performance Evaluation Reports, in its FY 2021 Los Alamos Lab summary NNSA noted that the contractor “[s]ucessfully made advances in pit production processes…” Plutonium “pits” are the fissile cores of nuclear weapons whose expanded production the Pentagon has identified as the number one issue in the United States’ $2 trillion nuclear weapons “modernization” program. NNSA has directed the Los Alamos National Laboratory (LANL) to begin producing at least 30 pits per year by 2026 and the Savannah River Site (SRS) in South Carolina to begin producing at least 50 pits per year by 2030.

NNSA Finally Starts Overdue Los Alamos Lab Environmental Study for Nuclear Weapons Programs That Are Already Underway

Santa Fe, NM – Today, the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency with the Department of Energy, released a Notice of Intent to Prepare a Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory.

In its formal notice, NNSA avoids mentioning the elephant in the room, the already predetermined expanded production of plutonium “pits,” the radioactive cores of nuclear weapons. This is in direct contradiction to the National Environmental Policy Act’s requirement that federal agencies take a “hard look” at proposed actions before implementation.

Moreover, future pit production is not to maintain the safety and reliability of the existing stockpile, but instead is for speculative, untested new-design nuclear weapons for the accelerating nuclear arms race. The Los Alamos National Laboratory (LANL) is already spending billions of taxpayers’ dollars to upgrade plutonium facilities and hire more workers for more weapons of mass destruction. This site-wide EIS is a “check off the box” exercise for all the major changes since the last site-wide EIS in 2008. Since then the Lab has fundamentally changed into a nuclear weapons production site as its main mission.

The Department of Energy boosted Lab funding to $4.6 billion in FY 2023 (21% higher than FY 2022), which begins this coming October 1. Of that, $3.6 billion is slated for NNSA’s core nuclear weapons research and production programs, with expanded plutonium pit production taking the biggest slice of the pie at $1.63 billion. The percentage of nuclear weapons funding at LANL has steadily grown as the Lab increasingly banks its future on being a nuclear weapons production site. Today it is 73% of total institutional funding. country.

Billions of Taxpayer Dollars to be Spent on Plutonium Pit Production – NNSA Chooses Speed Over Safety, Condones Potential Lethal Radioactive Doses to Public

Santa Fe, NM – The National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency with the Department of Energy, is no longer pursuing a safety class active confinement system at PF-4, the Los Alamos National Laboratory’s plutonium pit manufacturing facility. This is a long-running battle between the independent Defense Nuclear Facilities Safety Board (DNFSB) and NNSA.

The Safety Board has strongly recommended active confinement systems since 2004, reporting that they “will continue to function during an accident, thereby ensuring that radioactive material is captured by filters before it can be released into the environment.” [i] However, a few years ago NNSA tried to kill the messenger by seriously restricting DNFSB access to NNSA nuclear facilities across the country.

New Mexico: Number One in Nuclear Weapons and Radioactive Wastes Near Last in Citizen and Child Well-Being

Santa Fe, NM – According to budget documents just released by the Department of Energy, DOE facilities in New Mexico will receive $9.4 billion in FY 2023, substantially larger than the state’s entire operating budget of $8.5 billion. Seventy-one percent ($6.7 billion) will be for core nuclear weapons research and production programs under the DOE’s semi-autonomous nuclear weapons agency, the National Nuclear Security Administration (NNSA). That is 40.5% of the NNSA’s total nation-wide nuclear weapons budget of $16.5 billion. It is also double that of the next closest state, since the Land of Enchantment has two of the nation’s three nuclear weapons laboratories (the Los Alamos and Sandia National Laboratories). Both of these Labs are within the Roman Catholic Archdiocese of Santa Fe, whose Archbishop John Wester has echoed Pope Francis’ call for the abolition of nuclear weapons.

In contrast, the goal of NNSA programs in New Mexico is to indefinitely extend the service lives of existing nuclear weapons while giving them new military capabilities. This will be followed by completely new nuclear weapons that cannot be tested given the global testing moratorium. Alternatively, it could prompt the U.S. back into nuclear weapons testing, which would have serious international proliferation implications. NNSA’s claimed rationale is “deterrence” which requires only a few hundred nuclear weapons. In reality the U.S. and Russia each have thousands of ready-to-launch weapons for nuclear war-fighting that would result in global catastrophe, no longer so hypothetical since Russia’s invasion of Ukraine.

RECENT NUCLEAR BUDGET GRAPHS

It seems we can’t find what you’re looking for. Perhaps searching can help.

Past Work Product (2020-2021)

South Carolina Environmental Law Project logo

Groups Notify Biden Admin of Impending Lawsuit Over Nuclear Bomb Core Plans

Multi-state coalition says DOE’s plans to massively expand plutonium pit production violate a major environmental law and constitutes an environmental injustice.

Jay Coghlan of Nuclear Watch New Mexico commented, “Instead of maintaining the safety and reliability of the existing nuclear weapons stockpile, NNSA may actually undermine it because all future pit production is for speculative new-design nuclear weapons. This is a colossal and unnecessary waste of taxpayers’ money on top of already wasted taxpayers’ money.”

CHARLESTON, S.C. — A coalition of public interest organizations notified (PDF below) the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) urging a comprehensive review of plans to vastly ramp up production of nuclear bomb cores at the Los Alamos National Lab in New Mexico and the Savannah River Site in South Carolina.

FULL PRESS RELEASE

In Tuesday’s letter to department officials, the groups say this lack of review violates the National Environmental Policy Act (NEPA) and would saddle already-burdened communities nearby the two DOE sites with significant quantities of toxic and radioactive waste, contravening President Biden’s executive order of making environmental justice a part of the mission of every agency.

Local Governments Should Leave the Regional Coalition of LANL Communities

Summary: Local governments get little in return for being members of the Regional Coalition of LANL Communities (RCLC). That is because the Coalition is ineffective, dysfunctional, wastes taxpayers’ money and stands in the way of genuine, comprehensive cleanup at the Los Alamos National Laboratory. The RCLC was created to serve the interests of the Department of Energy and Los Alamos County, both of whom strongly support expanded plutonium pit production for new nuclear weapons and supply 80% of the Coalition’s funding. The Regional Coalition brings no discernible economic benefit to local governments other than already rich Los Alamos County because the Lab’s presence is an economic net loss to them. Local governments should not put their time and money into the Coalition. Instead, their constituents would be better served if local governments left the coalition and advocated for comprehensive cleanup that would permanently protect the environment while providing hundreds of high paying jobs.

Background

In 2011 the Department of Energy pulled promised funding from the Community Involvement Fund administered by the New Mexico Community Foundation that supported independent, often critical citizen and tribal analyses of DOE cleanup programs. At the same time DOE began funding the Regional Coalition of LANL Communities modeled on earlier alliances with local governments around the Rocky Flats Plant near Denver, CO and the Mound Plant, near Mound, OH.

New Mexico Environment Department Takes Legal Action To Terminate Defective LANL Cleanup “Consent Order”

FOR IMMEDIATE RELEASE, February 25, 2021

The New Mexico Environment Department has announced that it is filing a lawsuit against the Department of Energy to terminate a “Consent Order” governing cleanup at the Los Alamos National Laboratory (LANL). Nuclear Watch New Mexico, which has fought against that Consent Order ever since it went into effect nearly five years ago, strongly supports and applauds NMED’s decision.

Much to its credit, in 2005 the State of New Mexico successfully compelled DOE to enter into a strong, enforceable Consent Order after years of tough negotiations and lawsuits brought against it by DOE and the University of California (then LANL’s manager). However, at the Lab’s request the anti-regulation Susanna Martinez Administration eviscerated that Consent Order with more than 150 milestone extensions.

Los Alamos Nuclear Weapons Lab Opens Office in the City of the Santa Fe (“Holy Faith”) of Peace and Environmental Protection

FEBRUARY 10, 2021

Santa Fe, NM – A Lab press release has announced that “[c]onnections between Los Alamos National Laboratory and the City of Santa Fe will be strengthened with the Laboratory’s opening of a new downtown office” after signing a 10-year lease on a 28,000-square-foot building. The Lab’s press release ignores LANL’s $2.9 billion nuclear weapons production budget (up 33% in one year), its proposed 46% cut to cleanup to $120 million, serious groundwater contamination and recent reports how it has neglected wildfire protection. Two catastrophic wildfires in the last 21 years on or near the Lab blanketed a large portion of northern New Mexico with possibly contaminated smoke.

The City of Santa Fe’s official name is the “La Villa Real de la Santa Fe de San Francisco de Asís” (“The Royal Town of the Holy Faith of Saint Francis of Assisi”), in honor of the beloved saint who preached peace and environmental protection and from whom the present Pope draws his name. Pope Francis has repeatedly called for the abolition of nuclear weapons and while in Japan paid homage to the victims of the Hiroshima and Nagasaki bombings. Those atomic bombs were designed and produced at the Los Alamos Lab.

FULL PRESS RELEASE

LANL Falls Behind on Wildfire Protection While Expanding Nuclear Weapons Production Watchdog Calls for New Site-Wide Environmental Impact Statement

FEBRUARY 9, 2021

Santa Fe, NM – The Department of Energy’s Inspector General is reporting that the Los Alamos National Laboratory (LANL) is falling seriously behind in wildfire protection. This is despite the fact that the 2000 Cerro Grande Fire forced the mandatory evacuation of both LANL and the Los Alamos townsite, burned 3,500 acres of Lab property and came within a half-mile of Area G, its largest waste dump. At the time Area G stored above ground some 40,000 barrels of plutonium-contaminated radioactive wastes. It could have been catastrophic had they burst and sent respirable airborne plutonium across northern New Mexico (inhaled plutonium is a very serious carcinogen).

In 2011 the Los Conchas Fire raced 13 miles in 24 hours to the Lab’s western boundary, where it was stopped along State Highway 4. Both it and the Cerro Grande Fire sent huge plumes of harmful smoke across northern New Mexico, possibly carrying Lab contaminants as well (operation of radioactive air emissions monitoring equipment was suspended during the Cerro Grande Fire).

FULL PRESS RELEASE

Nuclear Watch New Mexico’s Critique of Some NNSA Answers to Questions on LANL’s Planned Tritium Releases

November 4, 2020

The Los Alamos National Laboratory (LANL) proposes to vent up to 114,000 curies of radioactive tritium gas to the open atmosphere while claiming that it poses no public health and safety risks. Public outcry and congressional pressure prompted the National Nuclear Security Administration (NNSA) to host a public information virtual meeting on this issue on October 20. Due to the overwhelming turnout of some 150 interested citizens and ear-splitting technical difficulties NNSA is holding another public virtual meeting at 5:00 pm Thursday November 5.

Interested citizens can join the discussion at https://www.lanl.gov/environment/flanged-tritiumwaste-containers.shtml

If you wish to speak or ask questions you should pre-register at the same site.

DOE Issues Controversial Decision to Pursue a Plutonium Bomb Plant (PBP) at Savannah River Site (SRS); Inadequate Environmental Review and Lack of Justification for Production of 50 or More “Pits” per Year to Modernize Entire Nuclear Weapons Stockpile Open to Legal Challenge

November 5, 2020

The U.S. Department of Energy (DOE) today issued a formal decision that it will pursue a massive Plutonium Bomb Plant (PBP) at the DOE’s Savannah River Site (SRS) in South Carolina, in order to produce plutonium “pits,” or cores, for nuclear warheads. The provocative decision, which adds fuel to concerns about a new nuclear arms race with Russia and China, drew immediate opposition from public interest groups near DOE sites in South Carolina, New Mexico and California.

The issuance by DOE’s National Nuclear Security Administration (NNSA) of the “Record of Decision” (ROD) on the Environmental Impact Statement (EIS) on pit production at SRS, issued in late September, officially affirms the “preferred alternative” that DOE intends to produce a minimum of 50 plutonium “pits” per year by 2030 at SRS. Also on November 5, NNSA issued an “Amended Record of Decision” (AROD) to its 2008 nation-wide Complex Transformation Programmatic Environmental Impact Statement that incorporated its SRS pit-production decision.

Scoping Comments on the LLNL SWEIS

October 21, 2020
Ms. Fana Gebeyehu-Houston
NEPA Document Manager
National Nuclear Security Administration
Lawrence Livermore National Laboratory
P.O. Box 808, L-293, Livermore, CA 94551-0808

By Email to:[email protected]

Re: Scoping Comments on the LLNL SWEIS

Dear NEPA Document Manager:
I appreciate this opportunity to submit comments on the scope of the National Nuclear Security Administration’s (NNSA) Site-Wide Environmental Impact Statement (SWEIS) for the continued operation of the Lawrence Livermore National Laboratory (LLNL) Main Site in Livermore, CA and Site 300 high explosives testing range near Tracy, CA.

Nuclear Watch New Mexico is a nonprofit watchdog organization based in Santa Fe, New Mexico. We seek to promote safety and environmental protection at nuclear facilities; mission diversification away from nuclear weapons programs; greater accountability and cleanup in the nation-wide nuclear weapons complex; and consistent U.S. leadership toward a world free of nuclear weapons.

Pursuant to the National Environmental Policy Act the purpose of scoping is: “early identification of concerns, potential impacts, relevant effects of past actions and possible alternative actions.” Therefore, I ask that the analyses I am requesting be fully undertaken – and my questions fully answered – in the draft SWEIS.

First, I am skeptical of the timing of the initiation of this new SWEIS for LLNL during the COVID-19 pandemic and just before the November 3 election. As a prerequisite, the
National Nuclear Security Administration (NNSA) should have already begun a nationwide programmatic environmental impact statement (PEIS) on expanded plutonium pit
production which would then inform the LLNL SWEIS of the Livermore Lab’s role in that national effort, which is not insignificant. Following that pit production PEIS, both a
LLNL and Los Alamos National Laboratory SWEIS should proceed in parallel. It is particularly striking that NNSA is claiming NEPA compliance while relying on an
outdated Complex Transformation Supplemental PEIS and LANL SWEIS, both completed in 2008, and refusing to prepare new or supplemental ones.

75TH ANNIVERSARY HIROSHIMA DAY ONLINE COMMEMORATION CALLING FOR THE ABOLITION OF NUCLEAR WEAPONS
August 6, 2020

"Jay Coghlan of Nukewatch.org on the history of the Los Alamos labs, where the bomb was designed and fabricated, and how it continues to play the leading role in the creation of most U.S. nuclear weapons since then."

[embeddoc url="https://nukewatch.org/wp-content/uploads/2020/05/plutonium-pit-production-fact-sheet.pdf" download="all" viewer="browser"]

PLUTONIUM PIT PRODUCTION WORKSHOP – NOVEMBER 19, 2019

RADIO INTERVIEW – SCOTT KOVAC & JON LIPSKY

Scott Kovac of Nuclear Watch New Mexico and Jon Lipsky, the FBI agent who led the 1989 raid investigating environmental crimes that shut down the Rocky Flats Nuclear Bomb Plant join Xubi to talk about Nuclear weapons, Nuclear clean up and Pit production plans at LANL.

livingontheedge.libsyn.com

RADIO INTERVIEW – JAY COGHLAN & JON LIPSKY

PIT Production at LANL with Nuclear Watch New Mexico’s Jay Coghlan and Workshop Speaker, Jon Lipsky

The Richard Eeds Show 11/18

RADIO INTERVIEW – MARYLIA KELLEY, EXECUTIVE DIRECTOR, TRI-VALLEY CARES

Nuclear Watch NM’s Workshop on LANL & PIT Production with Marylia Kelley of Tri-Valley CARES

The Richard Eeds Show 11/19


Pit Production Workshop: View the Presentations

Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant

Introduction by Jay Coghlan

Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL

Marylia Kelly, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race

https://www.facebook.com/NukeWatch.NM/videos/825812604488302/

Scott Kovac Nuclear Watch New Mexico, on LANL cleanup issues

Blog Posts

NNSA’s Nuclear Weapons Budget Takes Huge Jump

Arms Race Accelerates with MIRVed Warheads
Los Alamos Lab Cleanup Cut

Ironically the day after the film Oppenheimer was awarded multiple Oscars, the Department of Energy’s semi-autonomous National Nuclear Security Administration (NNSA) asked Congress for its biggest nuclear weapons budget ever. NNSA’s FY 2025 request for “Total Weapons Activities” is $19.8 billion, $700 million above what Congress recently enacted for FY 2024. It is also a full billion dollars above what President Biden asked for last year, which Congress then added to and will likely do so again.

The Biden Administration states that the $19.8 billion will be used to:

“[P]rioritize implementation of the 2022 National Defense Strategy and Nuclear Posture Review by modernizing the Nation’s nuclear deterrent to keep the American people safe. The Budget supports a safe, secure, reliable, and effective nuclear stockpile and a resilient, responsive nuclear security enterprise necessary to protect the U.S. homeland and allies from growing international threats.” whitehouse.gov/wp-content/uploads/2024/03/budget_fy2025.pdf, page 75.

The 2022 National Defense Strategy and Nuclear Posture Review for the first time posited two nuclear “near peers”, i.e. Russia and China, that need to be simultaneously “deterred.” This hinted at a potentially large nuclear buildup which this budget may now be implementing. That claimed need to deter two nuclear near peers was explicitly taken a step beyond just deterrence in an October 2023 report from the Strategic Posture Commission. It declared:

“Decisions need to be made now in order for the nation to be prepared to address the threats from these two nuclear-armed adversaries arising during the 2027-2035 timeframe. Moreover, these threats are such that the United States and its Allies and partners must be ready to deter and defeat both adversaries simultaneously.” ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture, page vii (bolded emphasis added)

DOE/NNSA budget numbers from FY 2024 Energy and Water Agreement

Some DOE/NNSA budget numbers from FY 2024 Energy and Water Agreement

https://docs.house.gov/billsthisweek/20240304/FY24%20EW%20Conference%20JES%20scan.pdf

President must sign by Friday March 8 to avoid a partial government shutdown, including DOE and NNSA.

Lowlights:

•     Total funding for the National Nuclear Security Administration (NNSA) $24.135B (+8.9%)
•     $19.1 billion for NNSA’s Total Weapons Activities (+11.6% over FY 23)
•     $35M for the Sea-Launched Cruise Missile warhead (which Biden did not ask for).
•     $52M for B61-13 as a new program. Estimated ~340kt; limited earth-penetrating capability.
•     $389.6M for LANL-designed W93 sub-launched warhead (+62%)
•     $56M for dismantlements (a paltry 0.29% of Total Weapons Activities)
•     Los Alamos Plutonium Modernization $1.76B (+13.5%)
•     Savannah River Plutonium Modernization $1.06B (-15.8% because Congress added $500M in FY23 at NNSA’s request)
•     Total Plutonium Modernization $2.91B (+5.1%)
•     Uranium Processing Facility at the Y-12 Plant $810M (+124%; now way over budget despite NNSA promises)
•     Tritium Sustainment and Modernization $593M as a new program
•     Defense Nonproliferation near flat at $2.58B (+3.6%)
•     Defense Environmental Cleanup near flat at $7.29B (+3.7%)
•     LANL cleanup cut to $273.8M (-4.3%)

Of note: “The agreement directs NNSA to seek to enter into an agreement with the scientific advisory group known as JASON to conduct an assessment of the report entitled, “Research Program Plan for Plutonium and Pit Aging”.”

Rumor has it that NNSA’s nuclear weapons budget will be substantially increased in FY 2025, starting with the release of topline numbers on Monday March 11. In part those increases will implement recommendations made in the Strategic Posture Commission’s October 2023 report. See: https://www.ida.org/research-and-publications/publications/all/a/am/americas-strategic-posture

A Note on the Value of Site-Wide EISs in Midst of Texas Wildfires Updates

By Jay Coghlan

Texas wildfires live updates: Blaze grows to 500k acres, leading to power outages, evacuations across the map nbcnews.com/news/us-news/live-blog/texas-wildfires-live-updates-huge-blaze-covers-300000-acres-forcing-ev

The 2000 Cerro Grande Fire burned 3,500 acres of Los Alamos National Lab property and more than 250 homes in the Los Alamos townsite (I could see the bursts of propane tanks from my house 25 miles away).

It would have been worse except for a 1999 LANL Site-Wide Environmental Impact Statement (SWEIS) which postulated a hypothetical wildfire that eerily matched the real fire. That hypothetical fire was in the final SWEIS only because citizens (i.e. me) pointed out that DOE did not consider wildfire risk in the draft SWEIS.

DNFSB Recommendation February 8, 2024 – Excerpts Pertaining to LANL

Published 2/8/24 in the Federal Register at https://www.govinfo.gov/content/pkg/FR-2024-02-08/pdf/2024-02513.pdf

Pre-published at: https://public-inspection.federalregister.gov/2024-02513.pdf

Page numbers below are from that. All excerpts are verbatim.

DNFSB Recommendation 2003-01
Onsite Transportation Safety

[TSD = “Transportation Safety Document”

MAR = “Materials at Risk”, typically plutonium]

Page 2: however, more work is necessary to ensure the LANL TSD appropriately identifies all hazards, analyzes all pertinent accident scenarios, and evaluates the effectiveness of all credited safety controls.

3: the risk remains that LANL or other defense nuclear sites may regress to inadequate TSDs that fail to provide an effective set of safety controls

4: These safety issues are particularly concerning given the high material-at-risk (MAR) allowed by the TSD, the proximity of LANL’s onsite transportation routes to the public, and the nature of several credible accident scenarios. These factors result in high calculated unmitigated dose consequences to the public without an adequate safety control strategy.

Nuclear Weapons Issues & The Accelerating Arms Race: February 2024

FEDERAL BUDGET NEWS

Release of federal FY 2025 budget expected March 11 (it will initially be just topline numbers).

Meanwhile on the FY 2024 budget: House and Senate Armed Services Committee authorized funding exceeding Biden’s request, including money for the Sea-Launched Cruise Missile and nuclear warhead (reminder: that the President doesn’t want), plus adding $$ for plutonium pit production at the Savannah River Site. But appropriations bills are still not happening because of ever increasing congressional dysfunction. This is now best exemplified by Republicans rejecting an immigration bill they initially drafted but that Trump denounced because he wanted immigration to remain a hot issue during the presidential election campaign.

The current second “laddered” Continuing Resolution that is keeping the government running expires March 1 and 8.

NNSA Suppresses How Taxpayers Money Is Spent

The National Nuclear Security Administration (NNSA) has just released cursory two or three page summaries of contractors’ performance paid for by the American taxpayer. For the just ended fiscal year 2023, NNSA gave nothing less than grades of “Excellent” or “Very Good” in six broad mission goals for its major contractors. This is despite the constant cost overruns and schedule delays that are the rule, not the exception, in the nation-wide nuclear weapons complex. NNSA and its parent Department of Energy have been on the Government Accountability Office’s “High Risk List” for project mismanagement ever since GAO started that List in 1991.

A current example is the Uranium Processing Facility (UPF) at the Y-12 Plant near Oak Ridge, Tennessee, originally estimated in 2011 to cost $1.4 to $3.5 billion. After costs started going through the roof, NNSA and Senator Lamar Alexander (R.-TN), then-chair of Senate Energy and Water Appropriations, swore that UPF would never go over $6.5 billion. But even after eliminating non-nuclear weapons production missions and a formal decision to continue operations at two old, unsafe buildings slated for replacement, the Uranium Processing Facility is now estimated to cost $8.5 billion. However, even that is not the final price, as NNSA is still to “rebaseline” UPF costs at some unspecified date.

As New Mexicans Struggle, Sen. Heinrich is Proud of Nuclear Weapons Money

Sen. Heinrich is so proud of all of the nuclear weapons money in New Mexico. He is one of the chief congressional architects of expanded production of plutonium “pit” bomb cores and sits on the Senate Energy and Water Appropriations Subcommittee from where he can direct $$billions to the Sandia and Los Alamos Labs.

But during the Department of Energy’s long presence in the Land of Enchantment, according to Census Bureau data New Mexico has slid in per capita income from 32nd in 1959 to 47th in 2022. New Mexico has the most children living in poverty (30%) and is rated dead last in well-being of children and quality of public education. Finally, in a report that the Los Alamos Lab tried to suppress, six county governments surrounding Los Alamos County suffer a net economic loss from LANL.

In fiscal year 2024 DOE will spend $10 billion in New Mexico, 75% for core nuclear weapons research and production programs and 5% for dumping related radioactive wastes in our state. DOE’s budget is 6% greater than the entire operating budget of the State of New Mexico ($9.4 billion).

Senator Heinrich, please explain what good all that nuclear weapons money does for average New Mexicans, and not just for the privileged nuclear weapons enclaves.

For much more, please see nukewatch.org/new-mexico-americas-nuclear-colony

Nuclear Weapons Issues & The Accelerating Arms Race: January 2024

FEDERAL BUDGET NEWS

Half of the federal budget (including Energy and Water appropriations which funds DOE) shuts down January 19 and the other half February 2 if a Continuing Resolution (CR) is not reached. House Speaker Johnson agreed to a previous funding agreement with the Biden Administration but the so-called Freedom Caucus is now in revolt.

Update: On January 18, Congress passes third stopgap funding bill instead of full FY24 budget, keeping the government funded until March. 

Sen. Martin Heinrich aids and abets the new, more dangerous nuclear arms race. He is outspokenly proud of all of the nuclear weapons money in New Mexico, and he is one of the chief congressional architects of expanded production of plutonium “pit” bomb cores. In congress, Heinrich sits on the Senate Energy and Water Appropriations Subcommittee from where he can direct $$billions to the Sandia and Los Alamos Labs.

But during the Department of Energy’s long presence in the Land of Enchantment, according to Census Bureau data New Mexico has slid in per capita income from 32nd in 1959 to 47th in 2022. New Mexico has the most children living in poverty (30%) and is rated dead last in well-being of children and quality of public education. Finally, in a report that the Los Alamos Lab tried to suppress, six county governments surrounding Los Alamos County suffer a net economic loss from LANL.

In fiscal year 2024 DOE will spend $10 billion in New Mexico, 75% for core nuclear weapons research and production programs and 5% for dumping related radioactive wastes in our state. DOE’s budget is 6% greater than the entire operating budget of the State of New Mexico ($9.4 billion).

Senator Heinrich, please explain what good all that nuclear weapons money does for average New Mexicans, and not just for the privileged nuclear weapons enclaves.

For much more, please see https://nukewatch.org/wp-content/uploads/2023/06/New-Mexico-Americas-Nuclear-Colony.pdf

ACCELERATING NUCLEAR ARMS RACE

North Korea Issues Ominous Warning About Nuclear Strike This Year
North Korea has issued an ominous warning about “the highest risk of clashes this year” between the totalitarian state and its neighbor to the south, which could end in “a nuclear strike,” according to South Korean media. Yonhap News Agency, a major media outlet in Seoul, reported on Thursday that North Korea media condemned recent Army artillery exercises and naval firing drills and exercises. The Korean Central News Agency (KCNA), the state news agency of North Korea, said the exercises are “self destructive” and called South Koreans “warmongers,” according to Yonhap.

QUESTIONS FOR DOE FY 2015 BUDGET

ALLIANCE FOR NUCLEAR ACCOUNTABILITY

A national network of organizations working to address issues of 

nuclear weapons production and waste cleanup

Ashish Sinha: (301) 910-9405 [email protected]

Bob Schaeffer: (239) 395-6773 [email protected]

 

for use with March 4, 2014 Obama Administration Budget Request

 QUESTIONS FOR THE U.S. DEPARTMENT OF ENERGY (DOE)

 FY 2015 NUCLEAR WEAPONS, REACTOR AND CLEANUP BUDGET

 

The U.S. nuclear budget is out of control. Huge cost overruns for unnecessary production facilities are common.  At the same time, cleanup of radioactive and toxic pollution from weapons research, testing, production and waste disposal is falling behind. The Department of Energy (DOE) budget for FY 2015 will reveal the Obama Administration’s nuclear priorities.

The Alliance for Nuclear Accountability (ANA), a 25-year-old network of groups from communities downwind and downstream of U.S. nuclear sites, will be looking at the following issues. For details, contact the ANA leaders listed at the end of this Media Advisory.

— Does the budget reflect the Administration’s commitment to curtail unnecessary spending on the $19 billion Uranium Processing Facility at Oak Ridge by downsizing it to the capacity needed to support stockpile surveillance, maintenance and limited life extension?

— Does the budget address the looming deficit in nuclear weapons dismantlement capacity so the United States can meet its international arms reduction commitments?

 

— Will the Obama Administration articulate its alternative plutonium strategy to the $6 billion “CMRR Nuclear Facility,” which was effectively cancelled in 2012? Is any expanded production needed when expert studies have found that existing plutonium pits are durable?

— Will NNSA reduce funding or impose meaningful milestones at the National Ignition Facility (NIF), which performed less than half of its planned Stockpile Stewardship experiments in FY2013 and still has not achieved ignition.

— Is the budget a de facto cancellation of plans to pursue “interoperable warhead designs” by imposing a delay of five years or more on the program? How much money will taxpayers save?

 

— Does the FY 2015 budget seek more than the $537 million requested for the B61 Life Extension Program last year? Will the “First Production Unit” from this $10 billion program continue to slip to 2020 or later delaying needed routine replacement of critical components?

— How much of the additional $26 billion in Defense Sec. Chuck Hagel’s “Opportunity, Growth and Security Initiative” will go to DOE nuclear weapons programs? 

— Will the Administration support increased funding for the Defense Nuclear Facilities Safety Board (DNFSB) to provide independent oversight of DOE projects given the many cost over-runs, schedule delays, safety issues and technical problems?

 

— What is the projected life-cycle cost of the plutonium fuel (MOX) program at Savannah River? Is DOE’s internal cost assessment consistent with ANA’s estimate of $27 billion? When will it be released? Have any nuclear reactor operators committed to using MOX fuel?

 

— Does the Request include continued funding for design and licensing of Small Modular Reactors (SMRs), which private investors have been unwilling to finance fully because of concerns about viability and risks? Does DOE have plans to finance SMR construction?

 

How much additional Environmental Management (EM) funding would be necessary in FY 2015 to meet all legally mandated cleanup milestones? States say cleanup agreements at a dozen major sites are underfunded by hundreds of million dollars.

— In which states does DOE face fines and lawsuits for missing milestones due to budget shortfalls? Which states are enforcing their binding clean-up agreements by imposing fines and taking further legal action?

— What is the high range for total life-cycle clean-up costs (LCC) for EM sites Because of funding shortfalls, are LCC costs continuing to increase? In the FY 2013 Budget Request High Range LCC was $308.5 billion, and in the FY 2014 Request LCC was $330.9 billion.
— Does the FY 2015 Request include funds to cleanup contamination from the recent radiation release at the Waste Isolation Pilot Plant (WIPP)?  How much will this incident delay shipments from the Idaho National Lab, Los Alamos, Savannah River, and Oak Ridge?

— How much money is included for construction of new double-shell tanks to replace those leaking radioactive waste at the Hanford site? Are funds included for emergency pumping of tanks found to be leaking?

— Is DOE allocating sufficient funds to monitor and address ignitable hydrogen gas buildup in Hanford’s nuclear waste tanks as recommended by the Defense Nuclear Facilities Safety Board to protect workers, the public and the environment from possible explosions?

— Is an independent review of the Hanford Waste Treatment Plant included in the budget request to address concerns about the reliability of many of the parts and materials?

– How much money is DOE allocating for building and development of the Hanford Waste Treatment Plant based on the current, flawed design and how much on redesign?

— For information about specific DOE nuclear weapons sites and programs, contact:

Meredith Crafton – Hanford: (206) 292-2850 x26 [email protected]

Tom Clements – Savannah River and MOX Plant: (803) 240-7268 [email protected]

Jay Coghlan – Los Alamos Lab and Life Extension: (505) 989-7342 [email protected]

Don Hancock – Environmental Management Program: (505) 262-1862 [email protected]

Ralph Hutchison – Oak Ridge Site and Dismantlement: (865) 776-5050 [email protected]

Marylia Kelley – Livermore Lab and Life Extension: (925)-443-7148 [email protected]

 

WIPP Update Feb 27 2014 – 13 Employees Contaminated

WIPP Update Feb 27 2014 – 13 Employees Contaminated

I’ll remind us all that the Waste Isolation Pilot Plant (WIPP) site is NOT a National Security site. It is a fancy landfill. There are really no secret programs there to protect. Maybe there are some secret parts buried there, but they have long-since been crushed. There is no reason to withhold news. The waste streams are well known and exactly where they are emplaced in WIPP is also well known. When the public gets news from WIPP officials, we deserve to have our questions answered clearly with all the important facts included.

Our best wishes go out to the employees.

Here’s the February 26, 2014 letter from the U.S. Department of Energy – Carlsbad Field Office, which provides oversight of the private contractor, Nuclear Waste Partnership, LLC, that currently manages and operates WIPP. Unfortunately, this letter raises many questions. Below are each of the paragraphs of the letter, followed by my questions and comments.

First Paragraph –

This morning (February 26), the 13 Waste Isolation Pilot Plant (WIPP) employees that were on site the evening of February 14 were notified that they have tested positive for radiological contamination. Employees were notified within about 12 hours of the receipt of preliminary sample results.

Ok, “the 13 Waste Isolation Pilot Plant (WIPP) employees that were on site the evening of February 14,” sounds like there were only 13 employees at WIPP on Feb 14. But the February 15, 2014, 9:17 PM WIPP press release states, “All non-essential employees were off-site by 5:30 PM MST.” The February 15, 2014, 9:17 PM WIPP press release also states, “No contamination has been found on any equipment, personnel, or facilities.” I guess we are to read this as, “No contamination has been found ON any personnel.”

Questions raised –

How many employees were onsite when?

Were the 13 contaminated employees essential or non-essential?

Were the non-essential employees (how many?) that left by 5:30 bioassayed?

How does an employee inhale rads and not have any on them?

 

Second Paragraph –

At the time of the event, these employees were performing above ground operations, and federal oversight duties at the WIPP facility. Nuclear Waste Partnership, LLC, the site contractor, requested that all workers on site the night of the event submit follow-up bioassay samples as they were considered more likely to have indications of potential exposure. Additional samples will be collected from these employees in the weeks ahead in order to perform complete analyses.

Questions raised –

When did Nuclear Waste Partnership, LLC request the bioassay samples from the night workers?

What made them “more-likely” to be exposed? What exactly were they doing?

Were the non-essential employees (how many?) that left by 5:30 bioassayed? When was this request made?

 

Third Paragraph –

It is premature to speculate on the health effects of these preliminary results, or any treatment that may be needed. However, on-site sampling and surveys and environmental monitoring, to date, continue to support National Atmospheric Release Advisory Center (NARAC) modeling, which indicates that airborne contamination was likely at very low levels.

Questions raised –

Where is the National Atmospheric Release Advisory Center (NARAC) modeling? The public must be allowed to read any and all reference documents. And by the way, NARAC is located at the Lawrence Livermore National Laboratory, which is a Department of Energy site. 

 

Fourth Paragraph –

The material for this release event is transuranic radionuclides. The release material was predominantly americium-241, material which is consistent with the waste disposed of at the WIPP. This is a radionuclide used in consumer smoke detectors and a contaminant in nuclear weapons manufacturing.

Questions raised –

Really? Smoke detectors? Here’s from the EPA

As long as the radiation source stays in the detector, exposures would be negligible (less than about 1/100 of a millirem per year), since alpha particles cannot travel very far or penetrate even a single sheet of paper, and the gamma rays emitted by americium are relatively weak. If the source were removed, it would be very easy for a small child to swallow, but even then exposures would be very low because the source would pass through the body fairly rapidly (by contrast, the same amount of americium in a loose powdered form would give a significant dose if swallowed or inhaled). Still, its not a good idea to separate the source from the detector apparatus.

All the americium at WIPP is the byproduct of Cold War nuclear weapons production. The Center for Disease Control (CDC) explains the health effects of americium.

The radiation from americium is the primary cause of adverse health effects from absorbed americium. Upon entering the body by any route of exposure, americium moves relatively rapidly through the body and is deposited on the surfaces of the bones where it remains for a long time. As americium undergoes radioactive decay in the bone, alpha particles collide with nearby cell matter and give all of their energy to this cell matter. The gamma rays released by decaying americium can travel much farther before hitting cellular material, and many of these gamma rays leave the body without hitting or damaging any cell matter. The dose from this alpha and gamma radiation can cause changes in the genetic material of these cells that could result in health effects such as bone cancers.

 

Fifth Paragraph – Here it states that inhalation did employees did occur.

Determining employee dose typically involves multiple sample analyses to determine employee’s radionuclide excretion rate over time. This allows the lab to estimate the employee’s accumulated internal dose. The time this process takes depends largely on the solubility of the inhaled particulate, with less water-soluble radioactive materials requiring more samples and time to accurately estimate the dose. Follow-up urine samples may require about three or more weeks to accurately predict dose.

 

Sixth Paragraph –

We are now focusing our sampling program on employees with work assignments that may have placed them at greater risk, including those on shift February 15. We are still reviewing staff assignments to determine if additional employees will need to be tested. However, employees who feel they were assigned positions or functions that placed them at risk will be included in follow-up bioassay monitoring at their request.

Questions raised –

How many employees were working on the 15th? Were they wearing safety protection?

What is the criterion “to determine if additional employees will need to be tested”?

 

Seventh Paragraph –

There is no risk to family or friends of these employees. As we learn more information, we will continue to share. If you have any questions or concerns, please contact 1-800-336-9477. Thank you.

Questions raised –

What is the current status at the site?

Are employees working there now?

Are they wearing protective gear?

 

There apparently is a Press Conference today (Feb27 2014) at 3pm MST.

WIPP update Feb 26 2014

The New York Times ran a WIPP story today, NUCLEAR WASTE REPOSITORY SET TO REOPEN AFTER LEAK, New York Times — February 26, 2014, By Matthew L. Wald

This is a good example of what is known, what is being said, and what is not being said.

1. One shaft has a filter with a monitor and three don’t. The article, and many others, quotes a WIPP press release,

But late on Feb. 14, at an hour when no one was in the mine, an air monitor indicated the presence of radioactive contamination. An automated system cut off most of the ventilation and routed the exhaust through filters that are supposed to capture 99.97 percent of all contamination, turning off fans and changing the air flow, in less than one minute. 

At WIPP, there are 4 ways for air to get to the surface – the Exhaust Shaft, the Salt Shaft, the Air Intake Shaft, and the Waste Handling Shaft. When radioactive contamination is detected, airflow is directed to the Exhaust Shaft as its filter is put into place. This shaft has the only filter and monitors on any of the shafts. WIPP officials claim that it was a monitor in Panel 7 that detected radiation and set into action the sending of all the air to the Exhaust Shaft. The Panel 7 monitor is around 2000 feet from the shafts. This means that the WIPP officials were relying on any contamination to set off the monitor before any contamination went up a shaft. We need a layout of the monitors, and if they were working, in the underground.

 

2. “Safe levels” of radioactivity? The article quotes a WIPP monitor,

“For someone living in town, I would say the dose was probably zero,” Russell Hardy, director of the Carlsbad Environmental Monitoring and Research Center, an independent monitoring organization that is part of New Mexico State University, said in a telephone interview Tuesday. He said that the event would not add to background levels of radiation — including bomb fallout — any more than an eyedropper full of water would contribute to the rise in the level of the Pacific Ocean.

Seriously, an eyedropper in the Pacific? I had to look it up

There are over 70 cubic million miles in the Pacific Ocean. Meaning there are 188,000,000,000,000,000,000 gallons in the pacific ocean. That is 187 quintillion gallons.

No problem, unless you eat the fish that drank that drop. Anyway, I don’t believe anyone knows how much radiation was released. The preliminary results are based on a ridiculously small number of air samples. The official projections are based on the implication that the samples represent the maximum contamination, which is unlikely.

 

3. Then, it was explained how to get dosed –

Even in the desert, the danger to humans was small, the mine’s operators said. The highest reading from the monitors indicated that a person could have inhaled radioactive material that would emit a dose, over the person’s lifetime, of 3.4 millirem, an amount roughly equal to three days of natural background radiation. But to get the dose, the person would have had to stand for hours in the desert, on the downwind side of the plant.

Again, the official projections are based on the implication that the samples represent the maximum contamination, which is unlikely. We await the many soil samples that will shed light on the actual amounts.

 

 

WIPP Update Feb 25 2014

Let’s start with what we know.

The Waste Isolation Pilot Plant (WIPP) is the Nation’s only operating geologic repository for nuclear waste. WIPP can legally only accept a very specific type of waste – transuranic (TRU) waste generated at defense-related nuclear facilities.  “Transuranic” refers to atoms of man-made elements that are heavier (higher in atomic number) than uranium. The most prominent element in most TRU waste is plutonium. Some TRU waste consists of items such as soil, rags, tools, and laboratory equipment contaminated with radioactive materials. Other forms of TRU waste include organic and inorganic residues or even entire enclosed contaminated cases in which radioactive materials were handled.

The WIPP underground is 2150 feet below the surface. And will consist of 8 separate panels with 7 football field-sized rooms per panel. (Two additional panels, 9 & 10, are to be placed in the existing tunnels that lead to Panels 1 – 8.) WIPP has a legal maximum capacity of 175,564 m3 and is currently starting to fill Panel 7.

 

Timeline –

At 12:25 p.m.  February 5, 2014, – Shortly after 11 a.m., an underground vehicle used to transport salt is on fire in the underground.

At 11:30 PM Friday February 14, 2014, a continuous air monitor detected airborne radiation in the underground.

Sometime on Saturday February 15, 2014, a filter aboveground at the fence line of the WIPP facility (Location A) was sampled. The field preliminary analysis showed .87 Bq. (EPA’s action level for the isotopes of concern is 37 Bq.)

Sometime on February 17 & 18, 2014, more samples were taken from other monitors and also from Location A, which showed a much lower reading (.04 Bq) than it did three days earlier. http://www.wipp.energy.gov/Special/WIPP%20Environmental%20Sampling%20Results.pdf

 

Are the fire and the release related?

On the surface I would have to say yes. The first large fire in the underground was followed by first release 9 days later. But the 9 days is a problem. Apparently nothing happened for 9 days after the fire then something happened to cause the release of radionuclides aboveground. Did the fire somehow loosen the ceiling 2000’ away? Maybe, but right now, I have to think that it is a freak coincidence, because we don’t know the cause of the release.

 

Is the release serious?

Yes, WIPP is not supposed to leak for 10,000 years.

 

Is the release a threat?

Elevated levels of radionuclides can always pose a threat. The primary threat of alpha-emitters like plutonium is inhalation. Inhalation of very small amounts of plutonium can cause cancer.

The Location A monitor was some 6750 feet from the assumed source of the release, Panel 7. (2000’ from Panel 7 to the bottom of the exhaust shafts + 2150’ to the surface + ½ mile (2600’) to the monitor) Did Location A pick up a representative sample of the release? Unlikely. There are too many variables to know if the Feb 15 sample from Location A was higher or lower than the main part of the release. But the results do show that any higher risk is more than likely localized.

The map shows the seven monitoring locations. I have always thought that this was not enough monitoring locations.

 

What about the plume maps floating around the internet?

One in particular is getting some attention.

Please remember that these maps represent one possible outcome of a group of inputs entered into a NOAA computer program. We don’t know the input parameters that were used, therefore we do not know what this map is based on. This is not an actual map of where any actual plutonium actually went.

Also please notice the units.

The yellow is “1.0E-13 mass/m3”.

That would be .000,000,000,000,1 of something per cubic meter.

The blue is “1.0E-16 mass/m3”

That would be .000,000,000,000,000,1 of something per cubic meter.

It’s not nothing, but it’s not much. I would like to see what this map is based upon. This does show how well computers can crunch numbers.

 

What about claims of nuclear salt water rocket explosions in the WIPP underground?

There is a website in HungaryThat has an alert

A grim “Of Special Importance” (highest classification level) report prepared by the Russian State Atomic Energy Corporation (ROSATOM) circulating in the Kremlin warned that the “potentially catastrophic nuclear event” currently unfolding at the US atomic Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico has prompted the White House to begin pre-staging government forces and equipment in the event a large-scale evacuation is needed, Whatdoesitmean.com reported.

I’m sorry, but I don’t have time to respond to Whatdoesitmean.com. There was no Rosatom/WIPP report. There are no nuclear salt-water rockets in the underground at WIPP, exploded or otherwise.

 

What to do?

In the short term let’s keep a critical ear open to the DOE story and separate out the spin. I’m waiting for the next batch of samples to be released to the public. WIPP has several proposals modify its permit in the works. Clearly, at this time, those all need to be put on hold until details of the exact cause of this accident are released to the public. The health and environmental impacts must be fully known and cleanup must be completed to everyone’s satisfaction.

The official WIPP page.

 

Budget Deal Mixed Bag for Nuclear Weapons Programs

Budget Deal Mixed Bag for Nuclear Weapons Programs

Planned Long-Term Trend Not Sustainable

 

Following December’s budget deal Congressional appropriators have completed a one trillion dollar omnibus appropriations bill for this fiscal year, expected to pass given that neither political party wants another shutdown. The federal government has been running on a Continuing Resolution since October 1, and the omnibus bill now provides funding levels for the entire fiscal year 2014. Concerning the National Nuclear Security Administration’s nuclear weapons programs, the appropriators made a slight cut to Obama’s requested $7.87 billion, funding “Total Weapons Activities” at $7.78 billion.

All of this, of course, takes place within a larger context. The nonpartisan Congressional Budget Office (CBO) recently released a study entitled Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will cost $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars. This is simply not sustainable, given the nation’s continuing budget constraints.

The new omnibus appropriations bill has fully funded the most controversial program, the B61 nuclear bomb Life Extension Program (LEP), at the president’s request of $537 million. This overrode a proposed cut by Senate Energy and Water Development Appropriations, a key subcommittee that Senator Tom Udall sits on. Udall vigorously opposed that cut, saying that he wanted to save a few hundred jobs in New Mexico.

The B61 LEP has exploded in costs from an original $4 billion dollars to $12 billion, including a program synchronized with the Pentagon to give the bomb a new tail fin guidance kit that would transform it into the world’s first nuclear “smart” bomb. Its main mission is forward deployment in NATO countries, a relic of the Cold War, contradicting Obama’s rhetoric of lowering the presence of battlefield nuclear weapons in Europe.

But this is not a clear-cut victory for NNSA and the nuclear weapons labs. The appropriators cut funding for the B83 nuclear bomb that NNSA claims the B61 LEP will enable it to retire (leaving aside the fact that it was already planned for retirement). The appropriators made clear that they wanted to hold NNSA to its word.  Moreover, the appropriators demanded detailed reporting on major warhead refurbishments, which they applied retroactively to the B61 LEP, and cut the requested amount for the tail fin guidance kit in half. Finally, the fight over the B61 LEP will soon start all over again with the release of the proposed FY 2015 federal budget, expected in late February or early March.

So whereas the NNSA and the labs have won an ambiguous victory in the B61 LEP, the rest of the omnibus appropriations bill demonstrates how deeply troubled their nuclear weapons programs are. Foremost amongst these is a planned Life Extension Program for the W78 ICBM warhead, proposed to be “interoperable” with the W88 sub-launched warhead. This is the first of three proposed interoperable warheads, which the NNSA and labs want to use to transform both the nuclear weapons stockpile and the research and production complex that supports it, with requisite exorbitant appropriations to fund them. In a serious blow to this scheme, the appropriators funded only $38 million out of $72.69 million requested for paper studies. Although not yet officially reported, conventional wisdom in Washington, DC is that the Nuclear Weapons Council (composed of senior officials from both NNSA and the Pentagon) has already canceled the interoperable warhead.

The appropriators also require NNSA to submit a report by May 1 explaining the costs and benefits of stress testing plutonium pits at the Lawrence Livermore National Laboratory in California. These radioactive nuclear weapons cores would have to be transported back and forth from the Los Alamos Lab. This is significant because Livermore’s continuing future in nuclear weapons programs is becoming increasingly questionable, given the failure of its flagship National Ignition Facility to initiate fusion, its loss of security status to handle large amounts of plutonium, and now the doubtful future of interoperable warheads, which it was banking on.

Concerning the proposed Uranium Processing Facility (UPF) near Oak Ridge, TN, the appropriators provided $309 out of $325.8 million requested, but noted that it is an adjustment caused by the necessity to consider additional alternatives. The UPF has been under increasing fire after a half-billion dollar design mistake and a recent Pentagon estimate that it would cost $12 to $19 billion, up from $6 billion. Conspicuous in its absence is any mention of follow-on to the deferred plutonium facility at LANL (the “CMRR-Nuclear Facility”) whose mission is to expand plutonium pit production, or NNSA’s “alternative plutonium strategy.”

The appropriators also provided $343.5 million for the Mixed Oxide (MOX) Fuel Fabrication Facility, adding to the $320 million requested. However, they directed NNSA to identify the root causes of cost increases and prioritize recommended solutions and corrective measures, showing that this program too is in serious jeopardy.

The appropriators funded $224.79 million for “cleanup” at the Los Alamos National Laboratory, which primarily consists of removing radioactive transuranic wastes that were suppose to be shipped to the Waste Isolation Pilot Plant a decade ago. In contrast, LANL is planning to “cap and cover” around one million cubic meters of radioactive and toxic wastes and backfill, creating a de facto permanent, unlined nuclear waste dump above groundwater and the Rio Grande.

Jay Coghlan, Nuclear Watch New Mexico Director, commented, “The nuclear weaponeers have won for now the battle over funding for the gold-plated B61 bomb Life Extension Program, but we look forward to the coming fight over next year’s budget. The rest of their plans are falling apart because they are so often their own worst enemy with constant cost overruns and lack of clear need. We are confident that given the trillion dollar cost for future nuclear weapons, subs, bombers, and missiles, the public will increasingly demand cleanup and related jobs, not more nuclear bombs.”

 

# # #

 

The omnibus appropriations bill can be viewed at http://docs.house.gov/billsthisweek/20140113/113-HR3547-JSOM-D-F.pdf

The NNSA section begins at p. 34 or PDF p. 70.

 

 

Nukes Will Cost One Trillion over 30 Years; Cleanup, Job Creation Imperiled

Nuclear Weapons “Modernization” Will Cost One Trillion Dollars Over Thirty Years;

Locally, Los Alamos Lab Cleanup and Job Creation Are Imperiled

The nonpartisan Congressional Budget Office (CBO) has just released its study Projected Costs of Nuclear Forces 2014 -2023. Its stunning conclusion is that estimated costs for maintenance and “modernization” of the nuclear weapons stockpile, delivery systems, and research and production complex will total $355 billion over the next decade. This is 70% higher than the figure the Obama Administration reported to Congress in May 2012.

As if this were not bad enough, the CBO also reports that costs after 2023 will increase yet more rapidly since “modernization” is only now beginning. The report does not attempt to project costs for maintenance and modernization of nuclear forces over the planned period of the next thirty years, but given current trends it will easily exceed one trillion dollars.

Approximately two-thirds of the modernization costs will be for new submarines, bombers and missiles that could be operational for the rest of this century, contrary to the Obama Administration’s rhetoric of a future world free of nuclear weapons. The remaining third will be for the Department of Energy’s research and production complex, which includes the Los Alamos, Lawrence Livermore and Sandia nuclear weapons labs.

While the American public at large is experiencing growing income inequality and limited economic opportunity, nuclear weapons contractors are experiencing increasing profits and decreasing federal oversight. The for-profit corporations running the labs, comprised of Lockheed Martin (the world’s biggest defense contractor), Bechtel, and the University of California, plan a never-ending cycle of exorbitantly expensive “Life Extension Programs.” These programs will not only extend the service lives of existing nuclear weapons for decades, but also give them new military capabilities, contrary to declared U.S. international policy. Ironically, the contractors’ drive for profits may undermine national security, as confidence in our nuclear weapons could be eroded by planned massive changes to an extensively tested stockpile that has been proven to be reliable.

The Los Alamos National Laboratory (LANL) had planned to “modernize” with a new facility to support expanded production of plutonium pit cores (or “primaries”) for nuclear weapons. Because of budget constraints, the Obama Administration decided to defer it in favor of the Uranium Processing Facility near Oak Ridge, TN, for production of nuclear weapons “secondaries.” The LANL plutonium project, known as the Chemistry and Metallurgy Research Replacement (CMRR)-Nuclear Facility, had grown from an original estimate of $600 million to around $6 billion, for which it would not have created a single new permanent job (it would have merely relocating existing Lab jobs). But the Uranium Processing Facility has now grown from a similarly estimated $600 million to an astounding worse case $19 billion, in part due to a simple design error that cost a half-billion dollars just to correct on paper.

So-called nuclear weapons modernization at these costs is clearly not sustainable, especially when they create few if any new permanent jobs. Moreover, they exist for a product that must never be used (i.e. nuclear weapons). Therefore, they are of little economic benefit to society outside of the privileged enclaves that benefit from nuclear weapons research and production (for example, Los Alamos County is the second richest county out of 3,077 counties in the USA).

Funding for nuclear weapons modernization programs will rob taxpayers’ dollars for programs that local citizens really need. For example, the Los Alamos Lab plans to “cap and cover” its largest waste dump (called “Area G”), leaving up to one million cubic meters of poorly characterized radioactive and toxic wastes and backfill permanently buried in unlined pits and shafts. This will create a de facto permanent nuclear waste dump above the Rio Grande, and most importantly above a sole source groundwater aquifer that supplies 270,000 people in the arid Southwest.

The Cities of Santa Fe and Taos, New Mexico, oppose LANL’s plans to create a permanent nuclear waste dump, passing resolutions demanding full characterization of the wastes and offsite disposal. The resolutions note that, “full cleanup of Area G would be a win-win for New Mexicans, permanently protecting our precious groundwater and the Rio Grande while creating 100’s of high paying jobs for twenty years or more.” The costs for full cleanup of Area G would be about the same as four to five years’ worth of the Lab’s nuclear weapons programs that caused the mess to begin with.

Jay Coghlan, Nuclear Watch NM Director, commented, “We simply can’t afford to squander precious taxpayers’ money on programs that enrich contractors while introducing radical changes to fully tested nuclear weapons. This may harm national security by undermining confidence in stockpile reliability. Instead, New Mexicans should demand that their elected officials invest taxpayers’ money in programs that create real security for citizens, such as creating jobs that protect diminishing water resources, rather than their habitual support for unneeded, mismanaged and exorbitantly expensive nuclear weapons programs.”

# # #

 The Congressional Budget Office report Projected Costs of Nuclear Forces 2014 -2023 is available at http://www.cbo.gov/sites/default/files/cbofiles/attachments/12-19-2013-NuclearForces.pdf

The Santa Fe City press release announcing passage of its resolution opposing “cap and cover’ of Los Alamos Lab’s largest radioactive and toxic waste dump is available at https://web.archive.org/web/20220819151417/https://www.santafenm.gov/news/detail/santa_fe_city_council_unanimously_passed_resolution

For a comparative estimate of cleaning up LANL’s Area G radioactive and toxic waste dump see https://nukewatch.org/facts/nwd/Area_G_Comparison_Costs-11-14-12.pdf

For a history of successful citizen activism against expanded plutonium pit production see https://nukewatch.org/facts/nwd/Pit-Production-History.pdf

Op ed on Area G resolution had outdated info

The op-ed below ran in the New Mexican yesterday (Sunday 12/8/13) .  It had some outdated information.

The first iteration of the draft City resolution on Area G cleanup called for reburial of low-level wastes in a modern landfill, while specifically calling for any high level and transuranic wastes to be disposed offsite. Most low-level wastes are  mixed with hazardous wastes, which legally would have to be disposed offsite. Unfortunately DOE has sole regulatory authority over “purely” radioactive low-level wastes.

The resolution has now gone through several iterations, and the final draft that will presented to the Council does not have reburial. See
and scroll down.

Rather than being fast tracked this resolution has gone through 2 City committees and a 3rd today, before being presented to the full council on Wednesday.

FYI, two back-to-back events:

Wednesday, Dec. 11, 6:00-6:45 pm, Santa FePublic info session presented by Nuclear Watch NM and others (TBD) on Santa Fe City resolution calling for comprehensive cleanup of LANL’s largest radioactive waste dump (see below). First Presbyterian Church, 208 Grant Ave. From there we’ll walk two blocks to City Hall.

Wednesday, Dec. 11, 7:00 pm.

Santa Fe Santa Fe City Council hearing and public comment on a resolution introduced by Mayor Coss calling on LANL to examine alternatives to planned “cap and cover” of radioactive wastes at TA-54 Area G. This will be followed by the City Council’s yes or no vote to adopt. We are encouraging citizens to come and show their support for comprehensive cleanup of the Lab’s largest radioactive waste dump! Council Chambers, Santa Fe City Hall, 200 Lincoln Ave.

http://www.santafenewmexican.com/opinion/my_view/reader-view-city-resolution-on-waste-doesn-t-do-enough/article_559a0ec0-1e7d-5239-b6b9-2e480eec11f6.html

Reader View: City resolution on waste doesn’t do enough

ShannYn Sollitt

 Posted: Saturday, December 7, 2013 7:00 pm

By ShannYn Sollitt | 0 comments

On Dec. 2, the Finance Committee of the Santa Fe City Council considered a resolution requesting a consideration of the alternatives to Los Alamos National Laboratory’s current plan to deal with their highly radioactive legacy nuclear waste by leaving it buried in illegal landfills.

The laboratory’s only plan is to leave it in place and cover it. The highly toxic waste dumps in Los Alamos at the top of the watershed are leaking deadly contaminants into the Rio Grande, directly upstream from the city’s new water source — posing serious health threats to Santa Feans.

Thank you, Mayor David Coss, for your awareness, concern and willingness to bring this issue to the forefront, and for your foresight and compassion for the future generations of our community. However, if the intent is to assure a secure and potable water supply for the coming generations, the resolution falls short.

It relies on a cleanup proposal to rebury the low-level, yet still highly radioactive, waste in lined landfills. This approach postpones the problem for the coming generations while solutions to remediate it are available and being utilized now. American scientists are currently effectively remediating the nuclear devastation of land around the Fukushima nuclear plant in Japan.

For 55 years, Los Alamos National Laboratory has known of the serious health threats presented by the seepage of radionuclides into the groundwater and has done nothing more than “study” the problem — costing taxpayers billions. Clearly, the laboratory scientists have neither the environmental intelligence nor the will to cope with this problem. Sadly, the resolution is being fast-tracked through the council before the members of the community with considered solutions have been given the opportunity to present their ideas.

The resolution will come before the full City Council on Wednesday. Please help us broaden the discourse by contacting the mayor. Concerned citizens are asking for a seat at the table to share views of the viable alternatives to protect our bioregion from the scourge of the nuclear industry.

ShannYn Sollitt is founder and director of NetWorks Productions, a nonprofit communication arts production company dedicated to creating and disseminating media designed to inspire a peaceful and sustainable world.

Mayor’s Resolution Makes Sense

Mayor’s Resolution Makes Sense

The article in today’s Santa Fe New Mexican(11/13/13) criticizing the proposed City of Santa Fe resolution is long on rhetoric and short on solutions. I appreciate that it may be a slow news day, but this article belongs in the Opinion Section, in my humble opinion…

The resolution calls on Los Alamos Lab to complete a thorough clean up of its wastes left over from the Cold War. How can that be a bad thing? The resolution is just one of Mayor Coss’ efforts to address the economic and environmental issues facing Santa Fe. It works in conjunction with economic development because the waste must be dealt with and it will provide jobs into the future. The Mayor’s efforts for increasing spending at the Lab have been focused on obtaining much-needed cleanup dollars, not expanding the nuclear weapons production budgets.

The article claims that “other non-lethal waste that has been used since the mid 1940s has been buried and capped on LANL property.” It sounds like there is no problem. The term ‘non-lethal’ is misleading, and not really a term used to describe the millions of cubic meters of radiological and hazardous wastes in the ground around Los Alamos. Granted, much of the low-level radioactive wastes and solvents are in less dangerous concentrations, but there are buried radioactive wastes that will have to be remotely handled by robots when they are removed.

The resolution uses an example of the recent cleanup of Materials Disposal Area B that was accomplished using Stimulus Dollars. MDA B at LANL was excavated, characterized and the wastes were shipped to different sites. During cleanup at the Fernald site in Ohio, higher-level wastes were shipped off-site and the low-level waste was replaced on-site in modern landfills with monitoring wells. The resolution shares elements of these real-life completed cleanups. It is easy to criticize while not having one’s own plan. The criticism seems to imply that no action is needed.

Not every resolution can address every issue at LANL. But a resolution that proposes a better cleanup plan that will protect our drinking water and land, protect New Mexicans, and provide jobs is neither  “hypocritical” nor “propaganda.”

I invite alternative clean up proposals to be put on the table for discussion.

Santa Fe Mayor Calls to Not Allow the Creation of a Permanent Nuclear Waste Dump at Los Alamos

Santa Fe Mayor Calls to Not Allow the Creation of a Permanent Nuclear Waste Dump at Los Alamos

Santa Fe, NM – Nuclear Watch New Mexico applauds the demand by the Mayor of Santa Fe that the Los Alamos National Laboratory (LANL) not rule out alternatives to their so-called “cleanup” plan for Area G, the Lab’s largest radioactive waste dump. LANL plans to “cap and cover” and permanently leave one million cubic meters of radioactive and hazardous wastes buried forever.

Mayor David Coss will ask the Santa Fe City Council to approve his resolution to seek real cleanup alternatives at their December 11th meeting. Mayor Coss is also chairman of the Regional Coalition of LANL Communities that lobbies Congress for increased Lab funding. Yesterday he introduced his resolution to the Regional Coalition as well.

LANL is relying on their own outrageous estimate of $29 billion for removal of the waste at Area G as a rationale to leave the waste in place. Nuclear Watch has performed a cost comparison that compares the Lab’s estimate on a recent cleanup actually performed by the Lab and also to another Laboratory estimate. Our cost comparison shows that removal of the waste could actually cost less than $6 billion. The Lab’s preference is to cap and cover and leave the waste in place at Area G.

Scott Kovac, NukeWatch Program Director, commented, “LANL should quit playing games that cap and cover somehow represents genuine cleanup. For the same price as 5 years’ worth of nuclear weapons work that caused this mess to begin with, Area G could be fully cleaned up. I echo the Mayor’s words that this could be a real win-win for New Mexicans, permanently protecting groundwater and the Rio Grande while creating hundreds of long-term high-paying jobs. I call on other local governments and everyone to pick up the Santa Fe Mayor’s challenge.”

# # #

Read the Santa Fe Mayor’s press release
Read the Santa Fe City Resolution
Read Nuclear Watch’s cost comparison here and Area G fact sheet

Ex-Congresswoman Heather Wilson paid by nuclear weapons labs the day after she leaves office

Heather Wilson Finalized Contract with Sandia Labs While in Congress;

Payments Started the First Day She Left Congress;

Wilson Should Resign from Council Determining Labs’ Futures

 

Santa Fe, NM  – Today, The Albuquerque Journal reported that former Congresswoman Heather Wilson (R. – New Mexico) finalized her first contract with the Sandia National Laboratories on December 19, 2008, while she was still representing the district that includes that nuclear weapons facility. Moreover, her first invoice documents that she began to be paid $10,000 a month for “Consultant/Advisory Services” that had no written work requirements on January 4, 2009, her very first day out of office. A few months later she was also being paid $10,000 a month by the Los Alamos National Laboratory (LANL) for a similar contract.

The Albuquerque Journal article builds upon a Department of Energy (DOE) Inspector General investigation, which determined that the Sandia and Los Alamos Labs had made approximately $450,000 in improper payments to Wilson up until March 2011, when she began to campaign for the Senate. The DOE IG report said that the facts indicate that federal funds were used for prohibited lobbying activities, which that office is still investigating. The Labs were forced to return that money to the government, but not Wilson.

The Albuquerque Journal received the new information concerning the dates of Wilson’s contract with Sandia from Nuclear Watch New Mexico. The watchdog organization obtained the documents by appealing an initially rejected federal Freedom of Information Act (FOIA) request.

During her unsuccessful 2012 Senate campaign Wilson repeatedly attacked her opponent Martin Heinrich for not supporting the labs strongly enough. In particular, while invoking a jobs argument, she repeatedly criticized the Obama Administration for delaying a controversial facility at LANL for expanded production of plutonium pit cores for nuclear weapons. However, despite its estimated $6 billion cost to the taxpayer, the government’s own documents clearly disclosed that the facility would not create a single new permanent job because it would merely relocate existing Lab jobs. In contrast, during her entire Senate campaign, Wilson did not disclose the full extent of her financial ties to the nuclear weapons labs.

In February 2013, House Speaker John Boehner appointed Wilson to a congressional advisory council that will recommend how the nuclear weapons laboratories should be managed and operated in the future. Jay Coghlan, Director of Nuclear Watch New Mexico, commented, “Heather Wilson should resign from this advisory council immediately because of her clear conflict-of interest. If she does not step down voluntarily, congressional leaders must replace her.”

“Other Members of Congress should take heed of Heather Wilson’s highly questionable ethical behavior,” Coghlan continued. “They should remember that they were elected to represent their constituents, not the for-profit corporations running the labs. Our politicians should avoid even the appearance of favoring the interests of the nuclear weapons labs above the public’s best interests, which Wilson so clearly failed to do.”

# # #

Ex-Congresswoman Wilson’s contract with Sandia and invoices obtained through Nuclear Watch New Mexico’s Freedom of Information Act request are available at

https://nukewatch.org/facts/nwd/HeatherWilson-Sandia contract-invoices.pdf

The Nov. 3, 2013 Albuquerque Journal article From Congress to contract: Heather Wilson says 10K per month Sandia Labs deal met ethics rules is available at

http://www.abqjournal.com/293472/news/from-congress-to-contract.html

(a paid subscription is necessary for the full article).

The June 2013 DOE IG Report Concerns with Consulting Contract Administration at Various Department Sites (DOE/IG-0889) that focuses on Heather Wilson’s contracts with the Los Alamos and Sandia National Laboratories is available at http://energy.gov/ig/downloads/inspection-report-doeig-0889

 

903 W. Alameda #325, Santa Fe, NM 87501 • Voice and fax: 505.989.7342

[email protected] • www.nukewatch.org • https://nukewatch.org/watchblog/

http://www.facebook.com/NukeWatch.NM

 

Past NukeWatch Events

A Guide to “Scoping” the New LANL SWEIS

“Scoping” means determining the issues that should be included in public analyses required by the National Environmental Policy Act (NEPA) of proposed major actions by the federal government. According to the Department of Energy ‘s own NEPA implementation regulations, DOE must prepare a new or supplemental site-wide environmental impact statement (SWEIS) for its major sites when there are “significant new circumstances or information relevant to environmental concerns.” The last site-wide EIS for the Los Alamos National Laboratory (LANL) was completed in 2008 and is badly outdated. Moreover, since 2018 the National Nuclear Security Administration (NNSA), DOE’s semi-autonomous nuclear weapons agency, has been aggressively expanding the production of plutonium “pit” bomb cores for nuclear weapons at the Lab.

On August 19, 2022, NNSA finally announced its intent to prepare a new LANL SWEIS, but apparently the agency will not address expanded plutonium pit production.1 NNSA’s dubious argument is that it performed the legally required NEPA analysis for expanded plutonium pit production in a 2008 Complex Transformation Programmatic Environmental Impact Statement, the 2008 LANL SWEIS and a woefully inadequate “Supplement Analysis” in 2020 that concluded a new SWEIS was not needed. 2 3

Issues That Must Be Addressed in a New LANL SWEIS

This is meant to be a guide to (or list of) the issues that must be addressed in a new draft LANL SWEIS. It is not completely exhaustive, nor is it a comprehensive fact sheet on the substance of the issues. Nuclear Watch New Mexico will offer suggested scoping comments for interested citizens and submit its own comprehensive formal comments before the October 3 deadline or extended deadline (see “Timing” below).

HELP US SUPPORT NEW MEXICO’S GOVERNOR IN ACTING TO STOP WIPP EXPANSION!

STOP “FOREVER WIPP!”

The Department of Energy is seeking to modify the nuclear waste permit for southeastern New Mexico’s Waste Isolation Pilot Plant. Dragging out WIPP’s operations decades past the original 20-year agreement violates the social contract made with New Mexicans. WIPP is being equipped to take the waste that will be generated from production of plutonium pits for nuclear warheads, and it was never supposed to do that. An expansion of WIPP will impact the entire country, not just residents of southeastern New Mexico.

View the videos below for more information, and, if you live in an area that may be endangered by these nuclear waste transportation risks, please consider making your own “This is My Neighborhood” video!

Background Information – Problems with Nuclear Waste


Mixed Waste Landfill Facts

Support a Santa Fe County resolution calling for a new site-wide environmental impact statement (SWEIS) at the Los Alamos Lab before plutonium “pit” bomb core production is expanded.

The last SWEIS was in 2008 and much has changed.

Public comment period beginning not sooner than 3:30 pm (exact time indefinite), Tuesday January 26.

To participate by phone, call 1-408-418-9388, using meeting number 968 291 714 and password DcTWMVai436. To participate via internet, go to https://sfco.webex.com/sfco/j.php?MTID=maa656c921d094b90a0b6ce6ab2f26db9

The Santa Fe County agenda is available at https://www.santafecountynm.gov/documents/agendas/agendas/BCC_Agenda_1-26-2020.pdf
The draft resolution is available at https://wp.me/aar4I0-3cl and below:

Resolution Requesting NNSA Complete Full SWEIS for LANL Before Expanding Plutonium Pit Production

 

Public Comment Period Open until Feb. 1, 2021 – Environmental Impact Statement (EIS) for the Surplus Plutonium Disposition Program (SPDP):

NNSA issues Notice of Intent to prepare Environmental Impact Statement for Surplus Plutonium Disposition Program

“In light of the current COVID-19 pandemic, an online scoping meeting will be held in place of an in-person meeting.  The online public scoping meeting is tentatively scheduled for the end of January 2021.  The information and details on how to participate in the online public scoping meeting and submit comments will be provided in a future notice posted on the NNSA National Environmental Policy Act (NEPA) Reading Room website (https://www.energy.gov/nnsa/nnsa-nepa-reading-room) and will also be published in local newspapers.  Any necessary changes will be announced in the local media and on the NNSA NEPA Reading Room website.”

Past Work Product (2019-)

It seems we can’t find what you’re looking for. Perhaps searching can help.

2019


Proposed LANL Campus in Santa Fe

Read/Download the Full Press Release HERE


Pope Frances Calls for Nuclear Weapons Abolition

Read/Download the Full Press Release HERE


VIEW LIVE RECORDING & WORKSHOP RESOURCES

Presenters:

  • Jon Lipsky, FBI agent that led the 1989 raid investigating environmental crimes that shut down the Rocky Flats bomb plant
  • Jay Coghlan, Executive Director, Nuclear Watch New Mexico, on plutonium pit production at LANL
  • Marylia Kelley, Executive Director, Tri-Valley CAREs (Livermore, CA) on the new nuclear arms race
  • Scott Kovac, Nuclear Watch New Mexico, on LANL cleanup issues

NukeWatch’s 22-page formal comments on expanded plutonium pit production

Until NNSA fully complies with the National Environmental Policy Act through the preparation of a programmatic environmental impact statement on expanded plutonium pit production, Nuclear Watch believes that any irreversible or irretrievable commitment of resources to either the expansion of pit production at the Los Alamos Lab or to the repurposing of the MOX Facility at the Savannah River Site is unlawful.

Read/Download the Full Document HERE


Scoping comments on NNSA draft EIS for plutonium pit production at the Savannah River Site

THE NEED FOR A PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT: This is our first and primary concern, that NNSA must first complete a programmatic environmental impact statement (PEIS) on its nation-wide plans for plutonium pit production, in advance of the Savannah River Site-specific environmental impact statement. To get right to the point, we argue that the SRS EIS process should go no further than this scoping period and should resume only after a completed formal Record of Decision for a new or supplemental PEIS.

Read/Download the Full Document HERE


Expanding Nuclear Pit Production: The Facts and What You Can Do

The Facts
• The Trump administration wants the United States to produce 80 plutonium pits per year
by 2030 without offering any concrete justification for the additional nuclear bomb cores.
• Multiple studies by government agencies have found that pits last for at least 100 years.
The average pit in the US stockpile is around 36 years old.
• More than 15,000 existing pits are already stored at the Pantex Plant near Amarillo, TX.
• Independent experts find it nearly impossible that the Los Alamos National Laboratory
and the Savannah River Site will be able to meet the 80 pit per year by 2030 requirement,
and billions of taxpayer dollars will be thrown down the drain in the meantime.

Read/Download the Full Document HERE


Federal Government Meets Watchdogs’ Demand for Environmental Review of Expanded Plutonium Pit Production

In a victory for transparency and legal compliance by the government, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) today published a “Notice of Intent” in the Federal Register to complete environmental reviews on its controversial proposal to expand plutonium “pit” production for new and refurbished nuclear weapons.

[embeddoc url="https://nukewatch.org/wp-content/uploads/2019/06/SRS-plutonium-bomb-plant6-14-19.pptx" download="all" viewer="google"]

Read/Download the Full News Release HERE


Noted Environmental Lawyers Warn Government Not to Expand Production of Plutonium Bomb Cores in Violation of National Environmental Policy Act and Public Review

On behalf of three public interest organizations - Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch – attorneys for the law firm of Meyer Glitzenstein & Eubanks and the Natural Resources Defense Council recently sent a 16-page letter to Lisa Gordon-Hagerty, head of the National Nuclear Security Administration (NNSA). The detailed letter warns the nuclear agency to not proceed with aggressive plans to expand plutonium pit production without first meeting its legal requirements for timely public review and comment under the National Environmental Policy Act.

Read/Download the Full Press Release HERE


Faulty Radioactive Liquid Waste Valves Raise Crucial Plutonium Pit Production and Safety Board Issues

Last Wednesday, facility operations personnel entered a service room and noticed a leak emanating from a valve on the radioactive liquid waste (RLW) system. Upon subsequent visual inspection by a radiological control technician, RLUOB engineers believe that this valve, and 6 similar valves, may be constructed of carbon steel. The RLW system handles radioactive liquid waste streams from chemistry operations that include nitric and hydrochloric acids—carbon steel valves would be incompatible with these solutions. The suspect valves are also in contact with stainless steel piping, which would create another corrosion mechanism. RLUOB management plans to drain the affected piping sections and develop a work package to replace all of the suspect valves. They will also confirm the valve materials and if shown to be incorrect, investigate the cause of this failure in the design, procurement, and installation processes. The valves were installed in 2013 as part of a modification to add straining and sampling capabilities that were not in the included in the original design. [Please note that DNFSB reports are posted a few weeks later than dated.]

This immediately raises two crucial issues: 1) the National Nuclear Security Administration’s (NNSA’s) plans for expanded plutonium pit production; and 2) the current attempt by the Department of Energy to restrict Safety Board access to its nuclear weapons facilities.

Read/Download the Full Press Release HERE


A Tale of Two Consent Orders and What Is Needed

On March 1, 2005, after arduous negotiations and threats of litigation, the New Mexico Environment Department (NMED), Department of Energy (DOE), and Los Alamos National Laboratory (LANL) entered into a Consent Order specifying the schedule for investigation and cleanup of the Lab’s hundreds of contaminated sites. This Consent Order (CO) was LANL’s agreement to fence-to-fence cleanup of Cold War legacy wastes, which NMED began to enforce.

Read/Download the Full Comparison HERE


Global Nuclear Weapons Threats Are Rising

More than 25 years after the end of the Cold War, all eight established nuclear weapons powers are “modernizing” their stockpiles. Talks have broken down with North Korea, the new nuclear weapons power. Nuclear-armed India and Pakistan narrowly averted war last month. Russian President Vladmir Putin made new nuclear threats in response to Trump’s announced withdrawal from the Intermediate-Range Nuclear Forces Treaty. This could lead to hair-trigger missile emplacements in the heart of Europe and block extension of the New Strategic Arms Reduction Treaty with Russia. If so, the world will be without any nuclear arms control at all for the first time since 1972. Meanwhile, the U.S. criticizes non-weapons states for signing a nuclear weapons ban treaty, despite the fact there have long been treaties completely banning chemical and biological weapons of mass destruction that the U.S. seeks to enforce. The pending international NonProliferation Treaty (NPT) Preparatory Committee conference at the United Nations is widely expected to collapse in failure because of the nuclear weapons powers’ failure to enter into serious negotiations leading to nuclear disarmament. The NPT’s Article VI mandate for those negotiations has been in effect since 1970, when the Treaty was signed by 189 countries (more than any other treaty).

Read/Download the Full Press Release HERE



Nuclear Watch New Mexico — Department of Energy FY 2020 Nuclear Weapons Budget Request

Read/Download the Full Budget Compilation HERE


2018


Expanded Plutonium Pit Production for U.S. Nuclear Weapons

Plutonium pits are the radioactive cores or “triggers” of nuclear weapons. Their production has always been a chokepoint of resumed industrial-scale U.S. nuclear weapons production ever since a 1989 FBI raid investigating environmental crimes shut down the Rocky Flats Plant near Denver. In 1997 the mission of plutonium pit production was officially transferred to its birthplace, the Los Alamos National Laboratory (LANL) in northern New Mexico, but officially capped at not more than 20 pits per year. However, in 2015 Congress required expanded pit production by 2030 whether or not the existing nuclear weapons stockpile actually needs it. This will support new military capabilities for nuclear weapons and their potential use.

Read/Download the full fact sheet pdf HERE


Watchdog Groups Claim Nuclear Agency is Moving Forward to Manufacture New Plutonium Bomb Cores in Violation of National Environmental Law and Public Review

Nuclear Watch New Mexico, Savannah River Site Watch, and Tri-Valley CAREs sent a letter of demand to the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to inform the government that its plan to quadruple the production rate of plutonium bomb cores is out of compliance with the National Environmental Policy Act (NEPA).

NNSA’s premature plan to quadruple the production rate of plutonium bomb cores (“pits”), the heart of all US nuclear weapons, is out of compliance with requisite environmental law, the groups argue, as NNSA has failed to undertake a legally-mandated programmatic review and hold required public hearings.

View/Download the entire press release HERE


DNFSB Hearing - Formal Comments

Nuclear Watch New Mexico is submitted formal comments to express in the strongest possible terms our opposition to DOE Order 140.1 Interface with the Defense Nuclear Facilities Safety Board. We find that the Department of Energy’s (DOE’s) attempt to restrict and suppress DNFSB access is very misguided, arrogant, and likely illegal in that it acts contrary to the Board’s enabling legislation.

Read the comments here


New Contractors Selected For Expanded Nuclear Weapons Production at Los Alamos

Santa Fe, NM. Today the Department of Energy's National Nuclear Security Administration (NNSA) announced its choice for the new management and operating contract for the Los Alamos National Laboratory (LANL).The new contractor, Triad National Security, LLC, is a limited liability company consisting of the Battelle Memorial Institute, the University of California and Texas A&M University. All three are non-profits, and it is unclear how this will affect New Mexico gross receipts taxes.

Battelle claims to be the world's largest non-profit technology research and development organization, and manages a number of labs including the Lawrence Livermore and Idaho National Laboratories. Texas A&M was founded in 1876 as the state's first public institution of higher learning and has the largest nuclear engineering program in the country. DOE Secretary Rick Perry is an avid A&M alumnus.

View/download full press release


Groups Release Key DOE Documents on Expanded Plutonium Pit Production, DOE Nuclear Weapons Plan Not Supported by Recent Congressional Actions

Santa Fe, NM & Columbia, SC - "Two key U.S. Department of Energy documents on future production of plutonium "pits" for nuclear weapons, not previously released to the public, fail to justify new and upgraded production facilities at both the Los Alamos National Laboratory (LANL) in New Mexico and the Savannah River Site (SRS) in South Carolina."

View/download press release


Los Alamos Cleanup

View/download Fact sheet


What's Not in NNSA's Plutonium Pit Production Decision

 

- NNSA did not mention that up to 15,000 "excess" pits are already stored at the Pantex Plant near Amarillo, TX, with up to another 5,000 in "strategic reserve." The agency did not explain why new production is needed given that immense inventory of already existing plutonium pits. (In 2006 independent experts found that pits last a least a century. Plutonium pits in the existing stockpile now average around 40 years old.)
- NNSA did not explain how to dispose of all of that plutonium, given that the MOX program is an abysmal failure. Nor is it made clear where future plutonium wastes from expanded pit production will go since operations at the troubled Waste Isolation Pilot Plant are already constrained from a ruptured radioactive waste barrel, and its capacity is already overcommitted to existing radioactive wastes. View/download Press Release


NNSA Proposal to Raise Plutonium Limit Ten-Fold in Los Alamos' Rad Lab Is First Step in Expanded Plutonium Pit Production: Environmental Assessment Is Premature and Deceptive By Omission

"NNSA should begin nation-wide review of plutonium pit production, why it's needed, and what it will cost the American taxpayer in financial, safety and environmental risks. These are all things that the public should know." -Jay Coghlan, Director, Nuclear Watch New Mexico.

View/download Press Release


LANL Rad Lab: Formal Comments Under Nat'l Environmental Policy Act

Against raising plutonium limit at LANL Rad Lab

View/download Nuclear Watch comments as submitted

Excerpt:
"This Draft Rad Lab EA is deficient. There are major omissions, for example the lack of analyses of potential beryllium hazards and Intentional Destructive Acts. Moreover, safety, occupational and seismic risks are explained away in "preliminary analyses." All this should be corrected in a more complete environmental impact statement, including final and transparent analyses of safety and seismic risks...

"NNSA should proceed with a broader environmental impact statement after its May 11 decision on the future of expanded plutonium pit production."

- NNSA is planning a 10-fold increase in plutonium at the LANL Rad Lab with a view to ramping up the production of plutonium pits for new nuclear weapons.
- NNSA wants to re-categorize the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.
- (See details in our press release)
- National Environmental Policy Act


United States To Begin Construction Of New Nuclear Bomb Plant

The National Nuclear Security Administration (NNSA) announced on Friday, March 23, that it was authorizing the start of construction of the Uranium Processing Facility (UPF) and two sub-projects at the Y-12 National Security Complex in Oak Ridge, Tennessee. The UPF is a facility dedicated solely to the manufacture of thermonuclear cores for US nuclear bombs and warheads.
Citizen watchdog groups are responding by filing an expedited Freedom of Information Act request demanding a full fiscal accounting of the UPF bomb plant- something the NNSA has refused to provide for the last five years, including to Congress, despite repeated assurances that the project is "on budget."

"This project is already a classic boondoggle, and they are just getting started," said Ralph Hutchison, coordinator of the Oak Ridge Environmental Peace Alliance (OREPA) in Knoxville, Tennessee. "Worse, it undermines US efforts to discourage nuclear proliferation around the world. How can we oppose the nuclear ambitions of other countries when we are building a bomb plant here to manufacture 80 thermonuclear cores for warheads every year?"

Jay Coghlan of NukeWatch points out that "This project already has a long history, and it is instructive. In 2013, DOE announced it was 85% finished with the UPF design when it ran into the 'space/fit' issue- and more than a half-billion taxpayer dollars were just written off. In private business, that kind of thing gets you fired. In DOE's world of contractors running amok, they not only didn't get fired, not one Congressional hearing was held and the UPF budget went up the next year!"

- See full press release for all the details (PDF)
- View/download the OREPA/NukeWatch FOIA request (pdf)


The Regional Coalition of LANL Communities: Benefits for the Select Few

Santa Fe, NM- According to media reports, Andrea Romero, Executive Director of the Regional Coalition of LANL Communities, is accused of charging some $2,200 dollars of unallowable travel costs, such as alcohol and baseball tickets, while lobbying in Washington, DC for additional funding for the Los Alamos National Laboratory (LANL). She in turn accused the nonprofit group Northern New Mexico Protects of political motivations in revealing these questionable expenses. Romero is running in the Democrat Party primary against incumbent state Rep. Carl Trujillo for Santa Fe County's 46th district in the state House of Representatives.
Perhaps more serious is the fact that Romero was awarded an undisclosed amount of money by the Venture Acceleration Fund (VAF) for her private business Tall Foods, Tall Goods, a commercial ostrich farm in Ribera, NM. According to a May 8, 2017 Los Alamos Lab news release announcing the award to Tall Foods, Tall Goods, "The VAF was established in 2006 by Los Alamos National Security [LANS], LLC to stimulate the economy by supporting growth-oriented companies."[1] LANS, primarily composed of the Bechtel Corporation and the University of California, has held the annual ~$2.4 billion Los Alamos National Laboratory (LANL) management contract since June 2006.

For all the details, see full press release PDF


Major LANL Cleanup Subcontractor Implicated in Fraud - Entire Los Alamos Cleanup Should Be Re-evaluated

Santa Fe, NM. On December 17, 2017, the Department of Energy (DOE) awarded a separate $1.4 billion contract for cleanup at the Los Alamos National Laboratory (LANL) to Newport News Nuclear BWXT-Los Alamos, LLC (also known as "N3B"). This award followed a DOE decision to pull cleanup from LANL's prime contractor, Los Alamos National Security, LLC (LANS), after it sent an improperly prepared radioactive waste drum that ruptured underground at the Waste Isolation Pilot Plant (WIPP). That incident contaminated 21 workers and closed WIPP for nearly three years, costing taxpayers at least $1.5 billion to reopen.
Tetra Tech Inc is a major subcontractor for N3B in the LANL cleanup contract... Serious allegations of fraud by Tetra Tech were raised long before the LANL cleanup contract was awarded. The US Navy found that the company had committed wide spread radiological data falsification, doctored records and supporting documentation, and covered-up fraud at the Hunters Point Naval Shipyard cleanup project in San Francisco, CA. See media links and excerpts below..."

(See all the details in the full press release)


Detailed NNSA Budget Documents Accelerates Nuclear Weapons Arms Race

Santa Fe, NM. Late Friday February 23, the Trump Administration released the detailed FY 2019 budget for the National Nuclear Security Administration (NNSA), the semi-autonomous nuclear weapons agency within the federal Department of Energy. Overall, NNSA is receiving a $2.2 billion boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category [Nuclear] "Weapons Activities", 18% above the FY 2018 level. Of concern to the American taxpayer, DOE and NNSA nuclear weapons programs have been on the congressional Government Accountability Office's High Risk List for project mismanagement, fraud, waste and abuse since its inception in 1990...

(See all the details in the full press release)


NNSA Releases Draft Environmental Assessment for LANL Rad Lab; Raises Plutonium Limit 10 Times for Expanded Pit Production

Santa Fe, NM. Today the National Nuclear Security Administration announced an Environmental Assessment to increase the amount of plutonium used in the Radiological Laboratory Utility and Office Building (aka the "Rad Lab") at the Los Alamos National Laboratory from 38.6 grams of plutonium-239 equivalent to 400 grams. This 10-fold increase is significant because it will dramatically expand materials characterization and analytical chemistry capabilities in the Rad Lab in support of expanded plutonium pit production for future nuclear weapons designs. It also re-categorizes the Rad Lab from a "radiological facility" to a "Hazard Category-3" nuclear facility.

View/Download full press release


Trump's Budget Dramatically Increases Nuclear Weapons Work

Santa Fe, NM In keeping with the Trump Administration's recent controversial Nuclear Posture Review, today's just released FY 2019 federal budget dramatically ramps up nuclear weapons research and production.
The National Nuclear Security Administration (NNSA), the Department of Energy's semi-autonomous nuclear weapons agency, is receiving a $2.2 billion overall boost to $15.1 billion, a 17% increase above the FY 2018 enacted level. Of that, a full $11 billion is for the budget category (Nuclear) "Weapons Activities", 18% above the FY 2018 level.
Digging deeper under Weapons Activities, "Directed Stockpile Work" is increased from $3.3 billion to $4.7 billion, or 41%...

(read the full press release)


Draft Nuclear Posture Review Degrades National Security

Yesterday evening the Huffington Post posted a leaked draft of the Trump Administration's Nuclear Posture Review (NPR). This review is the federal government's highest unclassified nuclear weapons policy document, and the first since the Obama Administration's April 2010 NPR.
This Review begins with "Many hoped conditions had been set for deep reductions in global nuclear arsenals, and, perhaps, for their elimination. These aspirations have not been realized. America's strategic competitors have not followed our example. The world is more dangerous, not less." The NPR then points to Russia and China's ongoing nuclear weapons modernization programs and North Korea's "nuclear provocations." It concludes, "We must look reality in the eye and see the world as it is, not as we wish it be."
If the United States government were to really "look reality in the eye and see the world as it is", it would recognize that it is failing miserably to lead the world toward the abolition of the only class of weapons that is a true existential threat to our country. As an obvious historic matter, the U.S. is the first and only country to use nuclear weapons. Since WWII the U.S. has threatened to use nuclear weapons in the Korean and Viet Nam wars, and on many other occasions.
Further, it is hypocritical to point to Russia and China's "modernization" programs as if they are taking place in a vacuum. The U.S. has been upgrading its nuclear arsenal all along. In the last few years our country has embarked on a $1.7 trillion modernization program to completely rebuild its nuclear weapons production complex and all three legs of its nuclear triad.
Moreover, Russia and China's modernization programs are driven in large part by their perceived need to preserve strategic stability and deterrence..
(read the full press release)

2017


2017


New Mexico Environment Department Surrendered to DOE Extortion

Santa Fe, NM. The New Mexico State Auditor Office recently questioned whether two settlements between the New Mexico Environment Department and the Department of Energy were in the best interests of New Mexico. That Office noted:
"The New Mexico Environment Department unnecessarily forgave tens of millions of dollars in civil penalties related to various waste management issues and missed cleanup deadlines by the Department of Energy (DOE) and its contractors. Considering the seriousness of the violations, and the clarity regarding responsibility for the violations, it appears highly unusual that the Department would not collect any civil penalties under these circumstances."
NMED completed an assessment of $54 million in penalties that would have gone to New Mexico, but did not enforce them before making the settlements with DOE. This was at a time when the state was beginning to face a serious budget crisis. As State Senator John Arthur Smith (Chair of the Senate Finance Committee) put it, NMED's failure to levy penalties when New Mexico was facing a budget crisis is "taking it out of the pockets of our kids and young people when they do something like that."
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This is inexcusable that NMED preemptively surrendered to Department of Energy extortion. In effect DOE is saying if you, the regulator, fine us, we will cut the money the taxpayer has paid to clean up our mess that threatens the citizens you are suppose to protect."

(View/download full press release)


Los Alamos Hires New Contractor - Starts Cleanup On the Cheap

Santa Fe, NM- Today the Department of Energy (DOE) announced the award of the new Los Alamos National Laboratory legacy cleanup contract to Newport News Nuclear BWXT-Los Alamos, LLC. The $1.39 billion contract is for ten years, which works out to $139 million per year...
Jay Coghlan, Director of Nuclear Watch New Mexico, commented, "This dooms the Lab to cleanup on the cheap. This 140 million dollars per year to the cleanup contractor is based on a revised Consent Order by the New Mexico Environment Department that was a give away to the Los Alamos Lab. The original 2005 Consent Order held the Department of Energy's feet to the fire to complete real cleanup or pay stipulated penalties. In contrast, the Martinez administration gave the biggest polluter in northern New Mexico a free pass, forgiving a hundred million dollars in possible fines that should have gone to our kids' schools. New Mexicans deserve an Environment Department under a new governor that aggressively protects the environment and creates new high-paying jobs thorough enforcing comprehensive cleanup."

View/download the full press release


"Nuclear Weapons Development, Testing, Stockpile & UN Treaty" - Presentation by Nukewatch Director Jay Coghlan at the Albuquerque symposium "Dismantling the Nuclear Beast" Dec. 1-3, 2017.

View/download Power Point doc


Congressional Budget Office: Cost of Nuclear Weapons Upgrades and Improvements Increases to $1.2 Trillion

Today, in Washington, DC, the Congressional Budget Office released its new report, "Approaches for Managing the Costs of U.S. Nuclear Forces, 2017 to 2046". The Congressional Budget Office estimates that the most recent detailed plans for nuclear forces, which were incorporated in the Obama Administration's 2017 budget request, would cost $1.2 trillion in 2017 dollars over the 2017-2046 period: more than $800 billion to operate and sustain (that is, incrementally upgrade) nuclear forces and about $400 billion to modernize them.... Driving this astronomical expense is the fact that instead of maintaining just the few hundred warheads needed for the publicly claimed policy of "deterrence," thousands of warheads are being refurbished and improved to fight a potential nuclear war. This is the little known but explicit policy of the U.S. government!

(read full press release)


Santa Fe City Council: LANL Cleanup Order Must Be Strengthened & Expanded and Plutonium Pit Production Suspended Until Safety Issues Are Resolved

Santa Fe, NM. On the evening of Wednesday October 25, the Santa Fe City Council passed a resolution requesting that the New Mexico Environment Department strengthen the revised Los Alamos National Labs cleanup order to call for additional characterization of legacy nuclear wastes, increased cleanup funding, and significant additional safety training. The resolution also called for the suspension of any planned expanded plutonium pit production until safety issues are resolved.

(view/download full press release)


International Campaign to Abolish Nuclear Weapons Wins Nobel Peace Prize, NukeWatch Calls on New Mexico Politicians and Santa Fe Archbishop To Support Drive Toward Abolition

Santa Fe, NM. Nuclear Watch New Mexico strongly applauds the awarding of the Nobel Peace Prize to the International Campaign to Abolish Nuclear Weapons (disclosure: NukeWatch is one of ICAN's ~400 member groups around the world). This award is especially apt because the peoples of the world are now living at the highest risk for nuclear war since the middle 1980's, when during President Reagan's military buildup the Soviet Union became convinced that the United States might launch a pre-emptive nuclear first strike. Today, we not only have Trump's threats to "totally destroy" North Korea and Kim Jong-un's counter threats, but also renewed Russian fears of a US preemptive nuclear attack... Generally unknown to the American taxpayer, our government has quietly tripled the lethality of the US nuclear weapons stockpile..."

(view/download complete press release)


Expanded Plutonium Pit Production at LANL Will Not Result in Significant Positive Effect On Job Creation and the Regional Economy

The National Nuclear Security Administration's own documents have explicitly stated that expanded pit production would have no significant positive effect on job creation and the regional economy of northern New Mexico. Nuclear Watch argues that expanded plutonium pit production could actually have negative effect if it blocks other economic alternatives such as comprehensive cleanup, which could be the real job producer. Moreover, given LANL's poor safety and environmental record, expanded plutonium pit production could have a seriously negative economic impact on northern New Mexico in the event of any major accidents.

- view/download fact sheet


Chromium Groundwater Contamination at Los Alamos Lab Far Greater Than Previously Expected; LANL's Treatment Plan Must Be Drastically Changed

Santa Fe, NM. The Los Alamos National Laboratory (LANL) has detected far more hexavalent chromium (Cr) contamination than previously estimated in the "sole source" regional groundwater aquifer that serves Los Alamos, Santa Fe and the Espanola Basin. Sampling in July from a new well meant to inject treated groundwater back into the aquifer detected chromium contamination five times greater than the New Mexico groundwater standard of 50 micrograms per liter (ug/L).

View/download the full press release


Talking Points: The 2016 LANL Cleanup Consent Order Should Be Rescinded

The 2005 LANL Cleanup Consent Order was all about the enforceable schedules. It required DOE and LANL to investigate, characterize, and clean up hazardous and mixed radioactive contaminants from 70 years of nuclear weapons research and production. It stipulated a detailed compliance schedule that the Lab was required to meet. Under Gov. Martinez, NMED Secretary Ryan Flynn granted more than 150 compliance milestone extensions at the Lab's request, effectively eviscerating it.
In June 2016 the New Mexico Environment Department (NMED), the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) signed a revised Consent Order governing cleanup at the Los Alamos National Laboratory (LANL). The new Consent Order is a big step backward in achieving comprehensive, genuine cleanup at the Lab. The revised 2016 CO was a giveaway by NMED to DOE and the Lab, negotiated to allow DOE's budget to drive cleanup, not what is needed to permanently protect our water.
NMED should have kept the original, enforceable 2005 Consent Order that it fought so hard for under the Richardson Administration, modified as needed for the cleanup schedule and final compliance date.

View/download the complete talking points


Oak Ridge Environmental and Peace Alliance, Nuclear Watch New Mexico, and The Natural Resources Defense Council File Lawsuit Against New Nuclear Bomb Plant

Washington, DC Today, the Oak Ridge Environmental Peace Alliance (OREPA), Nuclear Watch New Mexico, and the Natural Resources Defense Council filed a federal lawsuit to stop construction of the problem-plagued Uranium Processing Facility (UPF) until legally required environmental review is completed. The UPF, located at the National Nuclear Security Administration's (NNSA's) Y-12 production plant near Oak Ridge, TN, is slated to produce new thermonuclear weapons components until the year 2080. The UPF is the tip of the spear for the U.S.'s planned one trillion dollar-plus make over of its nuclear weapons arsenal, delivery systems, and production plants.
"The story of this new bomb plant is a long tale of outrageous waste and mismanagement, false starts and re-dos, a federal agency that refuses to meet its legal obligation to engage the public, and a Senator that is bent on protecting this piece of prime nuclear pork for his home state," said Ralph Hutchison, coordinator of OREPA. "But the short version is this: when the NNSA made dramatic changes to the UPF, and admitted that it intends to continue to operate dangerous, already contaminated facilities for another twenty or thirty years, they ran afoul of the National Environmental Policy Act. Our complaint demands that the NNSA complete a supplemental environmental impact statement on the latest iteration of its flawed plans."

View/download the full press release


Some Background on Plutonium Pit Production at the Los Alamos Lab

Santa Fe, NM -The Washington Post has published the first in a series of articles on nuclear safety lapses in plutonium pit production at the Los Alamos Lab. Plutonium pits are the fissile cores of nuclear weapons that when imploded initiate the thermonuclear detonation of modern weapons. By the way, did you know? Plutonium facilities at LANL are- in principle- designed to withstand a serious earthquake of a degree expected to occur only once every 10,000 years. The last serious earthquake near the Lab is believed to have occurred 11,500 years ago.

View/download the full press release


This year's report examines the extraordinary spending at Department of Energy nuclear facilities and examines ways to reduce risks and save billions of dollars across the U.S. nuclear weapons complex.

(View/download PDF)


SA Preview of Trump's Budget: More Nuclear Bombs and Plutonium Pit Production

Santa Fe, NM. "The proposed level of funding for the National Nuclear Security Administration's (NNSA)'s Total Weapons Activities is $10.2 billion, a full billion above what was requested for FY 2017. In March, Trump's "skinny budget" stated NNSA's funding priorities as 'moving toward a responsive nuclear infrastructure', and 'advancing the existing warhead life extension programs'.
"Concerning Life Extension Programs, rather than merely maintaining and extending the lives of existing nuclear weapons as advertised, they are being given new military capabilities, despite denials at the highest levels of government. A current example is the B61-12 Life Extension Program, which is transforming a "dumb" nuclear bomb into the world's first highly accurate "smart" nuclear bomb.
"With respect to the Los Alamos National Laboratory (LANL), "responsive infrastructure" no doubt means accelerating upgrades to existing plutonium facilities and likely building two or three new underground "modules", all for the purpose of quadrupling plutonium pit production from 20 to 80 pits per year. (Plutonium pits are the fissile cores of nuclear weapons.)”

Read the full press release for all the details.


Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion

March 28, 2017, UN, NYC:
Ban Treaty Conference: Alliance for Nuclear Accountability Panel Discussion
See video clips of some of the speakers:


Plutonium Pit Production at LANL (Updated March 2017)

(view/download PDF)


Costs Jump in Nuclear Weapons vs. Cleanup; Nuclear Weapons Winning over Environmental Protection

Santa Fe, NM. America is at a crossroads, having to choose between an unnecessarily large, exorbitant, nuclear weapons stockpile, and cleanup that would protect the environment and water resources for future generations. Expanded nuclear weapons research and production, which will cause yet more contamination, is winning.
Two recently released government reports make clear the stark inequality between the so-called modernization program to upgrade and indefinitely preserve U.S. nuclear forces (in large part for a new Cold War with Russia), and the nation-wide program to clean up the radioactive and toxic contamination from the first Cold War. The Obama Administration launched a trillion dollar nuclear weapons "modernization" program, which President Trump may expand. In contrast, cleanup of the first Cold War mess has been cut from a high of $8.5 billion in 2003 to $5.25 billion in 2016, even though comprehensive cleanup would produce far more jobs than nuclear weapons programs.

Read the full press release for all the details.


NNSA Releases Los Alamos Lab Performance Evaluation Report,Nuclear Criticality Safety Issues Still Not Fully Resolved

The National Nuclear Security Administration (NNSA) has publicly released its fiscal year 2016 Performance Evaluation Report (PER) for Los Alamos National Security, LLC (LANS), the for-profit contractor that runs the Los Alamos Lab. The Performance Evaluation Report is NNSA's annual report card on contractor performance, and overall the agency awarded LANS $59 million in profit out of a possible $65 million. The grade was 85% for the incentive part of the award. In 2012 Nuclear Watch New Mexico successfully sued NNSA to ensure that the Performance Evaluation Reports detailing taxpayers funds paid to nuclear weapons contractors are publicly available. In 2016 the NNSA decided to put the LANL management contract out for competitive bid, but granted LANS a contract extension until the end of September 2018.
Despite the passing grade that NNSA gave LANS, there is still ample reason for public concern. First, it bears repeating that in February 2014 a radioactive waste drum improperly prepared by the Los Alamos National Laboratory (LANL) burst underground at the Waste Isolation Pilot Plant (WIPP), contaminating 21 workers and closing that multi-billion dollar facility (a limited restart of operations at WIPP may occur this month).
Less widely known is the fact that LANL's main plutonium facility that produces WIPP wastes has only recently restarted operations after being shut down since June 2013 because of nuclear criticality safety concerns... (more: read full press release)

Media appearances including radio interviews are listed on the internal Media page

See the NukeWatch Channel at YouTube for our extensive playlists of key videos.

See the Nukewatch Twitter feed

See the Nukewatch Tumblr site


WatchBlog Posts:

Over 200 posts published since 2009. See archives at the WatchBlog

Earlier Work Product items are archived here